{"document":{"slug":"rec-20260821-5258","title":"Post-Technical Conference Comments of Capital Power Corporation supplementing the previously filed comments re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5258","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Capital Power Corporation","kind":"comments","file":"sources/filings/text/20260821-5258_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5258","tier":"record","sha256":"e5b7393f46c5bc79fe8488c3edf1bf65a1f53b58813e102c3df4890dfa3d77a7","pages":15,"tokens":3779,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":223,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n) \nPJM Governance and  \n \n \n) \n \n \n Docket No. AD26-7-000 \nStakeholder Reforms   \n \n \n)  \n) \n \n \nPOST-TECHNICAL CONFERENCE COMMENTS  \nOF CAPITAL POWER CORPORATION \n \nPursuant to the Commission’s July 30, 2026 Notice Requesting Post-Conference \nComment, Capital Power Corporation (“Capital Power” or the “Company”) supplements its \npreviously submitted comments and submits these post-technical comments, along with the \nNotice’s prescribed list, to the Federal Energy Regulatory Commission (“Commission” or \n“FERC”) in the above-referenced docket.  Capital Power appreciates the opportunity to provide \nfurther commentary and commends the Commission for focusing this proceeding on actionable \nreforms to improve transparency, efficiency, and accountability in PJM Interconnection LLC’s \n(“PJM”) governance. \nI. \nEXECUTIVE SUMMARY \nCapital Power is an independent power producer that entered the PJM market last year with \nits acquisition of Hummel Station and Rolling Hills, owning and operating approximately 2.2 GW \nof generation in PJM. At this point in the proceedings, the challenges and frustrations are well-\ndocumented, and the Commission was clear: reforms are necessary, and they are happening one \nway or another.1 The record reflects broad concern that PJM must be able to respond more \n \n1 Chairman Laura Swett (opening remarks): “[I]f we can’t all agree, then FERC will be in a position where we may \nhave to do it for you.”). FERC, Commission-Led Technical Conference on PJM Governance and Stakeholder"},{"page":2,"startToken":223,"endToken":473,"text":"2 \n \neffectively to resource adequacy challenges, accelerated load growth, transmission needs, \ninterconnection constraints, and rapidly evolving market-design questions. At the same time, the \nrecord does not support abandoning the stakeholder-driven framework that has long provided a \nforum for market participants, states, customers, and PJM to develop durable market solutions. In \nthat vein, Capital Power supports targeted, actionable reforms to PJM’s governance and \nstakeholder processes.  \nCapital Power therefore urges the Commission to focus on reforms that: (1) strengthen \nBoard independence and accountability; (2) formalize transparent and early state engagement; (3) \npreserve meaningful stakeholder participation in market design and Federal Power Act (“FPA”) \nsection 205-related processes; and (4) improve transparency around priorities, timelines, and \ncommittee ownership. \nII. \nCOMMENTS \nA. The Commission Should Pursue Targeted Reforms, Not Wholesale Redesign of \nPJM’s Governance Framework. \n \nCapital Power agrees that PJM’s governance processes must be capable of producing \ntimely, durable decisions. The July 23 technical conference reflected significant concern about \nwhether PJM’s current processes can respond quickly enough to resource adequacy needs, load \ngrowth, transmission development, and market-design challenges. But speed alone should not be \nthe measure of success. For investors in generation and related infrastructure, the critical question \nis whether PJM’s processes produce decisions that are transparent, durable, legally sustainable, \nand grounded in a full record. The Commission should therefore distinguish between reforms that \nimprove process discipline and reforms that would reallocate substantive rights in ways that could \n \nReforms, at 11:00 (FERC.gov, July 23, 2026), https://www.ferc.gov/news-events/events/PJM-Governance-\nStakeholder-Reforms."},{"page":3,"startToken":473,"endToken":751,"text":"3 \n \ndestabilize market expectations. Capital Power supports the former and urges caution with respect \nto the latter. \nIn his remarks, Peter Lake, Senior Director of Power at the National Energy Dominance \nCouncil, urged industry stakeholders to learn from the successes of other ISOs as it grapples with \nthis governance issue. In its first set of comments, Capital Power describes the stakeholder \nmaterials and governance structure in Alberta’s Independent Electricity System Operator \n(“AESO”), where the Company has been a long-standing participant. Just as the AESO informed \nthe Company’s position in those comments, in these comments, Capital Power looks to the existing \nframeworks for ISO New England (“ISO-NE”), the Southwest Power Pool (“SPP”), and the \nMidcontinent Independent System Operator (“MISO”). \n1. \nStakeholder Process: Transparency, Accountability, and Certainty  \nCapital Power does not believe the Commission should begin from the premise that PJM’s \nsector-weighted voting structure is the principal cause of delay. Further, the Company does not \nsupport converting the stakeholder process into a purely advisory process. Indeed, it is paramount \nto preserve the benefits of stakeholder engagement and regional collaboration that have long \ncharacterized PJM governance. Destabilizing the stakeholder framework at this stage will only \ncause further delay and create more confusion in the already confusing process described later in \nthis section. While independent power producers do not require guaranteed outcomes, they do need \nvisible timelines, decision pathways, initiative ownership, and escalation rights, because the \nabsence of procedural certainty increases regulatory risk, delays investment decisions, and \nundermines confidence in PJM’s stakeholder process. \nThe more practical concern for newer and growing market participants like the Company \nis that PJM’s stakeholder process can be difficult to navigate. Significant effort may be required to"},{"page":4,"startToken":751,"endToken":1051,"text":"4 \n \nidentify the responsible committee, determine how an issue moves from one body to another, \nunderstand the decision pathway, and assess whether an initiative remains on schedule. Capital \nPower therefore recommends that PJM develop and maintain a public strategic work plan \nidentifying priority initiatives, the responsible committee or PJM office, expected milestones, \ntarget decision dates, dependencies on other initiatives, and the expected filing pathway. PJM \nshould also consider simplifying its committee structure or assigning broader mandates to fewer \nforums where issues are cross-cutting. These reforms would improve speed and accountability \nwithout destabilizing the stakeholder framework. \n2. \nFPA 205 Filing Rights: Utilize a Well-Defined “Jump Ball” Mechanism \nCapital Power does not support materially expanding PJM’s unilateral section 205 filing \nauthority in a manner that would bypass existing stakeholder approval rights over major market-\ndesign provisions. Materially altering the allocation of existing section 205 filing rights, including \nby relocating substantive market-design or transmission-planning provisions into documents more \ndirectly controlled by PJM, could disturb the balance of authority that underpins stakeholder \nparticipation and reduce confidence that major market-design changes will be developed through \na transparent, multi-sector process. With that being said, Capital Power recognizes the \nCommission’s concern that gridlock and supermajority thresholds may sometimes leave the \nCommission without a clear set of alternatives when urgent reforms are needed. A carefully \ndesigned “jump ball” mechanism could strike the right balance without rendering stakeholder \nparticipation advisory.  \nAs an example, the Company looks to section 11.1.5 of ISO-NE’s Participants Agreement (the \n“jump ball” provision),2 which has helped optimize the Commission’s decision-making authority \n \n2 Section 11.1.5 of the ISO-NE Participants Agreement provides that if a Market Rule proposal that differs from that \nproposed by ISO-NE is approved by a Participants Committee vote of 60 percent or more, ISO-NE “shall, as part of"},{"page":5,"startToken":1051,"endToken":1442,"text":"5 \n \nby allowing the Commission to consider fully developed alternatives and, where appropriate, adopt \nthe proposal or combination of proposals it finds just and reasonable. In January 2014, ISO-NE \nand the New England Power Pool Participants Committee (“NEPOOL”) jointly submitted, \npursuant to FPA section 205 and section 11.1.5 of the ISO-NE Participants Agreement, alternative \nproposals intended to address fleet-wide resource performance problems in New England.3 While \nISO-NE’s proposal suggested significant changes to the Forward Capacity Market design and \nNEPOOL’s proposal involved incremental changes to the Forward Capacity Market and the energy \nand ancillary services market, the Commission ultimately held that neither proposal, standing \nalone, was just and reasonable. However, after having the opportunity to review the details of both \nproposals, the Commission was able to invoke its FPA section 206 rights and direct ISO-NE to file \na hybrid of both proposals, finding that “aspects of the two proposals, in combination and as \nmodified by the Commission, constituted a just and reasonable solution to the region’s resource \nperformance problems.”4 Similarly, more recently in 2021, ISO-NE and NEPOOL jointly \nsubmitted two alternative proposals, based on two competing methodologies, to calculate Offer \nReview Trigger Prices in the Forward Capacity Market.5  Again, FERC’s approved approach ended \nup being one that encompassed different aspects of both proposals. It should be noted, however, \nthat the jump rights in ISO-NE are properly limited by subject matter – to Market Rule proposals \n– and cannot be used for any and every ISO-NE governance, planning, transmission, \nadministrative, or manual issue. Further, the proposal alternative to ISO-NE’s must receive at least \n \nany required Section 205 filing, describe the alternate Market Rule proposal in sufficient detail to permit reasonable \nreview by the Commission [and also explain its] reasons for not adopting the [alternate] proposal, and [why it] \nbelieves its own proposal is superior….” Section 11.1.5 provides that the Commission may “adopt any or all of \nISO[-NE]'s Market Rule proposal or the alternate Market Rule proposal as it finds ... to be just and reasonable and \npreferable.” ISO-NE Participants Agreement, § 11.1.5. \n3 ISO New England Inc., et al., 147 FERC ¶ 61,172 (2014), reh’g denied, 153 FERC ¶ 61,223 (2015) (“Rehearing \nOrder”).  \n4 Rehearing Order, P 1. \n5 See generally ISO New England Inc., 175 FERC ¶ 61,195 (2021), clarified, 176 FERC ¶ 61,125 (2021)."},{"page":6,"startToken":1442,"endToken":1778,"text":"6 \n \na 60% supermajority threshold and is triggered only when ISO-NE is making a required section \n205 filing. Meaning, it is not a free-floating independent filing right for NEPOOL.  \nCapital Power encourages the Commission to consider a PJM-specific alternative-proposal \nmechanism informed by the guardrails used in ISO-NE, while preserving the existing allocation \nof section 205 filing rights in PJM. The Company envisions a mechanism whereby if a defined \nsupermajority of Organization of PJM States, Inc. (“OPSI”) or the Members Committee supports \nan alternative proposal on specified subjects, that alternative could be presented to the Commission \nalongside PJM’s proposal. The supermajority threshold would be important to ensure that only \nstrongly supported alternatives would be filed before the Commission, thereby avoiding \nprocedural clutter. Ultimately, a jump ball mechanism that is appropriately designed would \npreserve the Commission’s decisional authority while allowing the record to reflect meaningful \nalternatives developed through transparent processes. \n3. \nBoard Reform to Promote Accountability and Transparency \nCapital Power supports reforms that strengthen the transparency and accountability of the \nPJM Board and specifically suggests two vehicles for doing so: public observation of non-\nconfidential meetings and annual governance reporting. The Commission has long recognized \nindependence as a core characteristic of RTO governance, and transparency is necessary to ensure \nthat independence exists not only in form, but also in practice.6 The Commission has also \nemphasized the importance of RTO and ISO responsiveness to customers, stakeholders, and \nultimately the consumers who benefit from and pay for electricity service.7  \n \n6 See, e.g., Regional Transmission Organizations, Order No. 2000, 89 FERC ¶ 61,285 (1999) at 152, order on reh’g, \nOrder No. 2000-A, 90 FERC ¶ 61,201 (2000), aff’d sub nom., Pub. Util. Dist. No. 1 of Snohomish County v. FERC, \n272 F.3d 607 (D.C. Cir. 2001).  \n7 See generally Wholesale Competition in Regions with Organized Elec. Mkts., Order No. 719, 125 FERC ¶ 61,071 \n(2008), order on reh’g, Order No. 719-A, 128 FERC ¶ 61,059, order on reh’g, Order No. 719-B, 129 FERC ¶ \n61,252 (2009)."},{"page":7,"startToken":1778,"endToken":2041,"text":"7 \n \nTo be clear, enhanced Board accountability should not be confused with unilateral Board \ncontrol over detailed market design. The Company asserts that the Board’s proper role is to set \nstrategic direction, ensure that PJM management is prioritizing the region’s most significant risks, \nand hold management accountable for execution, while the detailed development of market rules \nshould continue to occur through a transparent stakeholder process, subject to Commission review. \nLonger Board terms, reasonable maximum service limits, and qualification criteria that ensure \nfamiliarity with the PJM region would help stabilize Board oversight while preserving \nindependence. \nCapital Power supports greater transparency into Board decision-making via public \nobservation of non-confidential strategic sessions where appropriate. Capital Power recognizes \nthat not all Board matters can or should be conducted publicly. Board sessions should remain \nclosed where necessary to address personnel matters, cybersecurity, physical security, \nenforcement, litigation, privileged legal advice, commercially sensitive information, Critical \nEnergy/Electric Infrastructure Information, or other confidential information protected by \napplicable law or Commission policy. In addition, to further enhance visibility of the Board’s \ndecision-making processes, Capital Power also supports requiring PJM to provide public \nexplanations when the Board acts on significant market-design, resource adequacy, transmission \nplanning, interconnection, or governance matters. PJM should provide a public report explaining \nthe Board’s disposition, the legal and policy basis for the decision, the principal alternatives \nconsidered, the reasons any material alternatives were rejected, and the extent to which the Board’s \naction reflects or departs from stakeholder positions. Such reforms would not require the Board to \nbecome a market design committee or intrude into confidential matters. Rather, they would"},{"page":8,"startToken":2041,"endToken":2319,"text":"8 \n \nenhance confidence that the Board is exercising its oversight role in a transparent, accountable, \nand independent manner. \nCapital Power also recommends that PJM prepare an annual governance report. The \nCommission has repeatedly asked for evidence and data to understand where the issues with \ngovernance lie. An annual governance report would help create that evidence going forward by \ndocumenting where governance bottlenecks actually arise and whether reforms are improving the \ntimeliness and quality of PJM decision-making. At a minimum, such a report should identify major \ninitiatives considered during the year; the origin and subject matter of each initiative; committee \nreferrals; elapsed time by stage; number and reasons for deferrals; stakeholder voting outcomes by \nsector and in the aggregate; Board dispositions; whether alternatives were considered; whether the \nBoard accepted, rejected, or modified committee or stakeholder recommendations; filing dates; \nimplementation dates; whether expedited procedures were used; and whether the initiative later \nreturned for redesign. \nFor independent power producers and other investors, such information is directly relevant \nto market confidence. Investors do not require certainty that their preferred policy outcome will \nprevail. They do require reasonable visibility into how PJM prioritizes issues, where decisions are \nmade, when decisions are expected, and why significant proposals advance, stall, or are rejected. \nA public governance report would provide PJM, stakeholders, states, and the Commission with a \ncommon factual basis for assessing whether governance reforms are improving accountability and \nprocess discipline without undermining PJM’s stakeholder-driven framework. \nB. State Participation in PJM Governance Needs to be Early, Formal, and Structured, \nBut Jurisdictionally Disciplined. \nCapital Power supports earlier and more structured state engagement in PJM governance. \nMany of the region’s most significant challenges, including resource adequacy, transmission"},{"page":9,"startToken":2319,"endToken":2608,"text":"9 \n \ndevelopment, interconnection delays, generation retirements, siting, permitting, and large-load \ngrowth, cannot be addressed effectively through wholesale market rules alone. States have direct \nresponsibilities over retail service, resource policy, siting, permitting, and other matters that \nmaterially affect whether PJM can maintain reliability and accommodate load growth. State \nperspectives should therefore be incorporated before positions become entrenched and before \nmajor proposals reach the end of the stakeholder process. \nFormal state involvement in RTO governance is not novel, and an examination of each \nmodel demonstrates the spectrum on which formal participation can exist. Although none should \nbe imported wholesale into PJM, a tailored approach that uses aspects of each may strike the \nappropriate balance. SPP and its Regional State Committee (“RSC”), comprised of one designated \ncommissioner from each state regulatory commission having jurisdiction, provides perhaps the \nstrongest example of formal state authority. The SPP RSC has “primary” responsibility for \ndetermining regional proposals in areas such as transmission cost allocation, financial transmission \nrights, remote resources, and regional resource adequacy.8 SPP demonstrates that defined state \nauthority over resource adequacy and cost allocation can be formalized without eliminating the \nRTO Board or stakeholder process. \nISO-NE’s model provides states a formal platform, through its New England State \nCommittee on Electricity (“NESCOE”), while appropriately limiting its authority to unilaterally \nmake tariff changes.  NESCOE represents the policy perspectives of the New England governors \non resource adequacy and system planning and expansion, is funded through the ISO’s budget, \nand is recognized as the FERC-approved Regional State Committee for New England.9 But \nNESCOE does not have unilateral authority to implement tariff or market-rule changes and instead \n \n8 SPP, Bylaws, First Revised Volume No. 4, § 7.2.  \n9 ISO-NE, Oversight and Decision-Making, https://www.iso-ne.com/about/corporate-governance."},{"page":10,"startToken":2608,"endToken":2890,"text":"10 \n \nworks within the FERC-approved ISO-NE/NEPOOL stakeholder process.10 This model is \ninstructive because it shows that a formal and sophisticated state role need not become a substitute \nfor stakeholder process or Commission review. \nLastly, MISO provides another useful example. The Organization of MISO States \nparticipates in the MISO stakeholder process, provides recommendations to the MISO Board on \npolicies affecting state interests, intervenes in FERC proceedings, and has a special role in \ntransmission planning and transmission cost allocation under MISO’s governing rules.11  \nTaken together, these examples demonstrate that formal state participation can be \nstructured along a spectrum, ranging from advisory participation to defined responsibilities over \nparticular state-sensitive subjects. \nPJM already has a foundation for such engagement through OPSI, which was created to \npromote and protect the public interest in reliable and reasonably priced electric service within the \nPJM Control Area, and provides a vehicle for coordinated state participation. Rather than creating \nduplicative or conflicting state processes, the Commission should encourage reforms that clarify \nand strengthen OPSI’s role, coordinate that role with any Governors’ Collaborative function, and \nprovide transparent channels through which state-identified issues can be considered in PJM \ngovernance. \nCapital Power therefore supports requiring PJM to consult with OPSI before making \nsection 205 filings related to resource adequacy, regional transmission cost allocation, and other \nmatters that materially affect state responsibilities. Capital Power also supports a narrowly tailored \nstate alternative-proposal mechanism, structured like the jump ball mechanism example above, \n \n10 NESCOE, Our Work, https://nescoe.com/our-work/.  \n11 FERC, Participation in Midcontinent Independent System Operator (MISO) Processes, \nhttps://www.ferc.gov/participation-midcontinent-independent-system-operator-miso-processes. See also MISO, \nFERC Electric Tariff, Fifth Revised Vol. No. 1, Attachment FF (Transmission Expansion Planning Protocol), § I.B."},{"page":11,"startToken":2890,"endToken":3160,"text":"11 \n \nunder which a defined level of state support could require PJM to present an OPSI-supported \nalternative to the Commission alongside PJM’s own proposal on specified subjects. Such a \nmechanism should be limited, transparent, and procedural. It should not displace existing \nstakeholder rights, convert PJM’s stakeholder process into a purely advisory process, or give states \ngeneral voting authority over wholesale market design. \nTo further bolster the states’ voice, Capital Power also supports including state \nrepresentation in the Board nominating process. A state role in the Nominating Committee would \nimprove regional legitimacy and help ensure that Board candidates understand the state-federal \ninterface that is increasingly central to PJM’s reliability, resource adequacy, and transmission \nchallenges. At the same time, Board selection reforms should preserve Board independence and \nshould not make Board members representatives of particular states or constituencies. \nFinally, any enhanced state participation should be coordinated and transparent. To the \nextent OPSI, the Governors’ Collaborative, consumer advocates, or other state representatives are \ngiven formal roles, those roles should be clearly defined to avoid duplicative processes, \ninconsistent late-stage interventions, or uncertainty over which state body speaks for which \npurpose. The objective should be early engagement, durable outcomes, and better information for \nPJM, stakeholders, states, and the Commission, not another layer of procedural complexity. \nIII. \nCONCLUSION \nFor the foregoing reasons, Capital Power respectfully urges the Commission to pursue \ntargeted PJM governance reforms that improve transparency, accountability, state engagement, \nand decisional efficiency while preserving meaningful stakeholder participation and the existing \nbalance of section 205-related rights. Capital Power appreciates the Commission’s leadership in \nthis proceeding and looks forward to continued engagement on reforms that support reliable"},{"page":12,"startToken":3160,"endToken":3235,"text":"12 \n \nservice, competitive markets, and the investment certainty needed to meet PJM’s evolving \nresource adequacy and transmission challenges. \n \nRespectfully submitted,  \n____________________________ \nDarsh Singh \nSenior Legal Counsel \nCapital Power Corporation  \n2300 N Street, NW \nSuite 520 \nWashington, DC 20037 \nTel: (989) 633-7963 \nEmail: dasingh@capitalpower.com   \n \n \n \n \nCounsel for Capital Power Corporation  \nLeah Adelman \nSenior Advisor, Energy Market & Policy \nCapital Power Corporation  \n2300 N Street, NW \nSuite 520 \nWashington, DC 20037 \nEmail: ladelman@capitalpower.com  \n \nAugust 21, 2026"},{"page":13,"startToken":3235,"endToken":3443,"text":"13 \n \nAppendix \n \nPJM Board Independence \n \nQuestions/Comments \nYes \nNo \n1) \nShould Board members’ terms be extended to five or more years? \nYes \n \n \nComments: \n2) \nShould there be a maximum number of years that a Board member may serve (e.g., 10 \nyears)? \nYes \n \n \nComments: \n3) \nShould the Board member qualification rules be revised to provide a preference for some \nBoard members that reside in the PJM region? \nYes \n \n \nComments: \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off period for Board \nmembers from two years to one year? \n \n \n \nComments: \n5) \nShould restrictions on Board communications be relaxed to enable more communication \nbetween the Board and stakeholders? \nYes \n \n \nComments:  \n6) \nIn order to increase transparency, should Board votes be made public or the Board be \nrequired to explain its reasoning?  \nYes \n \n \nComments:  \n7) \nIn order to increase transparency, should some Board meetings be open or available to the \npublic? \nYes \n \n \nComments:   \n8) \nShould PJM’s governing documents be revised to explicitly state that the responsibility of \nPJM and its Board is to serve the public interest? \nYes \n \n \nComments:  \n9) \nShould state representatives have at least one voting member on the Nominating \nCommittee? \nYes \n \n \nComments:  \n10) \nShould PJM adopt public performance metrics and tie management compensation to their"},{"page":14,"startToken":3443,"endToken":3664,"text":"14 \n \n \nQuestions/Comments \nYes \nNo \nachievement? \n \nComments: \n \nSection 205 Filing Rights \n \nQuestions/Comments \nYes \nNo \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only inform the Board? \n \nNo \n \nComments:  \n12) \nShould PJM have section 205 filing rights over the energy market and ancillary services \nunencumbered by the requirement to obtain approval of two-thirds of the Members \nCommittee? \n \nNo \n \nComments:  \n13) \nShould PJM have section 205 filing rights over Regional Transmission Expansion Planning \n(RTEP) unencumbered by the requirement to obtain approval of two-thirds of the Members \nCommittee? \n \n \n \nComments:   \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource \nadequacy and transmission cost allocation filings when a supermajority of OPSI agrees on \nan alternative proposal? \nYes \n \n \nComments: Yes, provided that, as described in this filing, PJM remains the Section 205 filer and OPSI’s \nalternative is included for Commission consideration as part of a required PJM filing, rather than filed by \nOPSI pursuant to an independent or shared Section 205 right \n15) \nShould the Members Committee have “jump ball” filing rights over the portions of the \ntariff where PJM has 205 filing rights when a supermajority of stakeholders approves an \nalternative proposal? \nYes \n \n \nComments:  \n \nStakeholder Process \n \nQuestions/Comments \nYes \nNo \n16) \nShould the approval threshold in the Members Committee be lowered from two-thirds \nsector-weighted voting? \n \n \n \nComments:"},{"page":15,"startToken":3664,"endToken":3779,"text":"15 \n \n \nQuestions/Comments \nYes \nNo \n17) \nShould the voting rules barring affiliate votes, which apply to senior standing committees, \nalso apply to lower-level committees? \n \nNo \n \nComments:  \n \nState Participation \n \nQuestions/Comments \nYes \nNo \n18) \nIn addition to OPSI, should there be a second state representative group consisting of \ngovernors’ representatives and/or state legislators’ representatives? \n \n \n \nComments:  \n19) \nShould state representatives have a formal voting role in the stakeholder process (limited to \ncertain topics, such as resource adequacy and regional transmission cost allocation) in \naddition to the consumer advocate votes?   \n \n \n \nComments:  \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 filing related to \nresource adequacy and transmission cost allocation? \nYes \n \n \nComments:"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":906,"startToken":0,"endToken":106},{"p":1,"at":906,"title":"I. EXECUTIVE SUMMARY","method":"printed heading","endPage":2,"endAt":896,"startToken":106,"endToken":337},{"p":2,"at":896,"title":"II. COMMENTS","method":"printed heading","endPage":2,"endAt":911,"startToken":337,"endToken":339},{"p":2,"at":911,"title":"A. The Commission Should Pursue Targeted Reforms, Not Wholesale Redesign of","method":"printed heading","endPage":8,"endAt":1762,"startToken":339,"endToken":2280},{"p":8,"at":1762,"title":"B. State Participation in PJM Governance Needs to be Early, Formal, and Structured,","method":"printed heading","endPage":11,"endAt":1554,"startToken":2280,"endToken":3100},{"p":11,"at":1554,"title":"III. CONCLUSION","method":"printed heading","endPage":15,"endAt":850,"startToken":3100,"endToken":3779}]}