{"document":{"slug":"rec-20260821-5259","title":"Post-Conference Comments of National Grid plc o/b/o National Grid Ventures re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5259","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"National Grid Plc","kind":"comments","file":"sources/filings/text/20260821-5259_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5259","tier":"record","sha256":"dc49498934bcdd7b8c86a348386baeca822f8cf27be81a09b24f2b55ce89ce67","pages":6,"tokens":1553,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":239,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Governance and Stakeholder Reforms  \n) \n \nDocket No. AD26-7-000 \n \n \nPOST-CONFERENCE COMMENTS OF NATIONAL GRID \n \nNational Grid plc, on behalf of its competitive energy development corporation, National \nGrid Ventures (“NGV”), respectfully submits these comments in response to the Notice \nRequesting Post-Conference Comments (“Notice”), issued by the Federal Energy Regulatory \nCommission (“FERC” or “Commission”) on July 30, 2026, in the above-referenced docket, \nfollowing the Commission’s July 23, 2026 Commissioner-led technical conference to discuss \nPJM Interconnection, L.L.C.’s (“PJM”) governance and stakeholder processes.  NGV is a voting \nmember of PJM in the “Other Supplier” sector and is an active participant in PJM’s competitive \ntransmission processes.  NGV appreciates the Commission’s focus on identifying and evaluating \nconcrete, actionable reforms to improve PJM’s ability to address operational and market needs in \na timely and efficient manner.  To that end, below please find NGV’s responses to the questions \npresented in the Appendix to the Notice regarding PJM’s Board of Directors independence, \nFederal Power Act section 205 filing rights, stakeholder process, and state participation.   \nPJM Board Independence \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments: NGV supports an extension of Board member terms to 4 to 6 years.  Longer \nterms will support continuity during a period of extraordinary industry transformation, \nstrengthen institutional memory, and reinforce Board independence.  The terms of the \nBoard members should remain staggered."},{"page":2,"startToken":239,"endToken":601,"text":"2 \n \n \nQuestions/Comments \nYes No \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nX \n \n \nComments: If terms are extended to 4 to 6 years, NGV supports capping a Board \nmember to the number of terms that equate to 12 years of service.  This brings the \ncurrent 15-year maximum service limit in PJM closer to the limits of service for other \nISOs (e.g., 9 years in CAISO and MISO). \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \n \nComments: NGV supports PJM expressing a preference for Board members that reside \nin the PJM region; however, NGV does not support making PJM residence a \nrequirement.  The Board’s purpose is not geographic representation; it is independent, \nexpert governance of one of the world’s largest and most complicated organized \nelectricity markets.  While residence in PJM has its benefits, the search for Board \nmembers should prioritize qualities such as deep electricity sector expertise and \nexperience solving the challenges PJM will face over the next several years.   \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \nX \n \n \nComments: NGV believes a cooling off period of one year for Board members is \nsufficient.  One year still creates meaningful separation, while two years unnecessarily \nexcludes some of the candidates with the most relevant expertise.  Actual conflicts \nmatter more than elapsed time.  \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \n \n \n \nComments: No comments at this time. \n6) \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning?  \nX \n \n \nComments: The Board should be required to explain the rationale behind significant \nBoard decisions.  This will increase transparency, increase confidence in Board \nindependence, and provide important feedback to stakeholders.  NGV has no comments \nat this time regarding whether individual Board member votes should be made public.   \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nX"},{"page":3,"startToken":601,"endToken":883,"text":"3 \n \n \nQuestions/Comments \nYes No \n \nComments: The Board’s deliberations on matters affecting PJM’s markets, transmission \nsystem, reliability, and consumers should generally be observable when confidentiality \nis not necessary, with non-public executive sessions reserved for times when \nconfidentiality serves a legitimate governance purpose. \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \n \n \n \nComments: No comments at this time.  \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX \n \n \nComments: Yes, states represent an interest that is not adequately captured on the \nNominating Committee.  The Nominating Committee should include one voting \nmember representing the collective PJM states.  This could help strengthen the \nlegitimacy of PJM’s independent governance model and build trust between the states \nand PJM.  \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \n \n \nComments: NGV needs more information on the potential metrics, how those metrics \nwould be developed, and who they would apply to before forming an opinion on this \nissue.    \n \nSection 205 Filing Rights \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \nX \n \n \nComments: PJM’s stakeholder process should provide meaningful input, technical \nexpertise, and a clear measure of stakeholder support, but stakeholder votes should \nremain advisory.  \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \nX \n \n \nComments: NGV supports expanding PJM’s FPA section 205 filing rights.  Giving PJM \nincreased authority would expedite actions and support PJM’s ability to react to the \ndynamic changes in the market."},{"page":4,"startToken":883,"endToken":1198,"text":"4 \n \n \nQuestions/Comments \nYes No \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n \nComments: NGV supports expanding PJM’s FPA section 205 filing rights.  Giving PJM \nincreased authority would expedite actions and support PJM’s ability to react to the \ndynamic changes in the market. \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \n \nX \n \nComments: At this time, NGV does not support OPSI having jump ball rights.    \nInstead, NGV supports providing adequate funding and empowerment of states to \norganize themselves through a new organization that can more meaningfully advocate \nfor their interests at PJM.   \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \nX \n \n \nComments: A supermajority jump ball right for the Members Committee would \nappropriately balance independent PJM governance with meaningful stakeholder \nparticipation.  PJM’s Board should have primary responsibility for exercising PJM’s \nFPA section 205 filing rights, and ordinary stakeholder votes should remain advisory.  \nHowever, where an alternative proposal achieves an exceptionally high level of cross-\nsector stakeholder support, that consensus should have a meaningful procedural \nconsequence.  Allowing both the Board proposal and the supermajority-supported \nalternative proposal to be presented to FERC preserves Board independence while \nensuring that extraordinary stakeholder consensus cannot simply be disregarded.  FERC \nwould remain the ultimate arbiter of the competing approaches. \n \nStakeholder Process \n \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \n \n \nComments: No comments at this time. \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees?"},{"page":5,"startToken":1198,"endToken":1517,"text":"5 \n \n \nQuestions/Comments \nYes No \n \nComments: No comments at this time. \n \nState Participation \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \nX \n \n \nComments: Yes.  This group could complement, not replace, OPSI by providing a state \npolicy perspective that is distinct from OPSI’s remit.  The Northeast provides a useful \nmodel.  In ISO-NE, the New England States Committee on Electricity (“NESCOE”) \nprovides a regional vehicle through which the New England governors advance their \ncollective interests on regional electricity matters.  NESCOE is distinct from the New \nEngland Conference of Public Utility Commissioners (“NECPUC”), allowing \ngovernors’ energy policy perspectives and utility regulators’ perspectives to be \nrepresented separately.  A second state organization in PJM could also improve regional \ncoordination.  PJM spans 13 states and the District of Columbia, whose policies and \nresource preferences differ substantially.  Many of PJM’s most difficult challenges \ncannot be solved effectively one state at a time.  A governors’ representative \norganization could provide a forum for states to identify areas of common interest, \ndevelop regional positions, and engage PJM collectively.  \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?   \n \n \n \nComments: No comments at this time. \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \n \nX \n \nComments: PJM should not be required to consult with OPSI as a procedural \nprerequisite to exercising its FPA section 205 filing rights, including with respect to \nresource adequacy or transmission cost allocation.  However, PJM should substantially \nstrengthen its engagement with OPSI and other state representatives.  Improving \ntransparency and demonstrating that state concerns have been meaningfully considered \nwould help rebuild trust between PJM and the states without compromising PJM’s \nindependence."},{"page":6,"startToken":1517,"endToken":1553,"text":"6 \n \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n/s/ Amber Thornhill \n \n \n \n \n \n \n \n \n \nAmber Thornhill \nDirector, FERC and ISO Relations  \n   & Market Policy \nNational Grid \n801 Pennsylvania Ave., NW \nSuite 801 \nWashington, DC 20004 \n(215) 696-6689 \nAmber.Thornhill@nationalgrid.com \n \nDated: August 24, 2026"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1198},{"p":5,"at":0,"title":"Pages 5 to 6","method":"page range","endPage":6,"endAt":318,"startToken":1198,"endToken":1553}]}