{"document":{"slug":"rec-20260821-5274","title":"Protest of the Indicated PJM Transmission Owners re PJM Interconnection, L.L.C.’s proposed tariff amendment","issued":"2026-08-21","accession":"20260821-5274","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Transmission Systems, Inc.Mid-Atlantic Interstate Transmission LLCTrans-Allegheny Interstate Line Company ,Keystone Appalachian Transmission Company ,Jersey Central Power & Light Company ,Monongahela Power Company ,The Potomac Edison Company ,Duquesne Light Company ,","kind":"protest","file":"sources/filings/text/20260821-5274_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5274","tier":"record","sha256":"fe1f142927f76c2814066e1b138126fdf28433c85e4ea6056f37a2f90c98ae64","pages":11,"tokens":3047,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":240,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C. \n  \n \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \nDocket No. ER26-3380-000 \nPROTEST OF THE INDICATED PJM TRANSMISSION OWNERS \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“FERC” or the “Commission”),1 the Indicated PJM Transmission \nOwners2 respectfully submit this Protest to PJM Interconnection, L.L.C.’s (“PJM”) proposed \ntariff amendment (“Proposed Tariff”) concerning its Federal Power Act (“FPA”) section 205 \nfiling seeking to amend its tariff to adopt a Reliability Backstop Procurement (“RBP”).  \nSpecifically, this Protest addresses section 18.7 of PJM’s Proposed Tariff (the “Exit \nAmendment”), which would establish new prerequisites to a Transmission Owner (“TO”) \nexiting PJM and new exit fees.  This Protest is not brought on by any desire to exit PJM; rather, \nthe Protest aims to confront PJM’s deviation from the Consolidated Transmission Owners \n \n1 18 C.F.R. § 385.211 (2026). \n2 The Indicated PJM Transmission Owners are American Transmission Systems, Inc., Mid-Atlantic \nInterstate Transmission, LLC, Trans-Allegheny Interstate Line Company, Keystone Appalachian \nTransmission Company, Jersey Central Power & Light Company, Monongahela Power Company, and \nThe Potomac Edison Company (collectively, “The FirstEnergy Transmission Companies”), and \nDuquesne Light Company.  Each of the Indicated PJM Transmission Owners is also submitting a \nseparate protest in the instant proceeding focusing on other aspects of the Proposed Tariff.  Indicated \nPJM Transmission Owners join in this narrowly-focused Protest concerning section 18.7 of the \nProposed Tariff."},{"page":2,"startToken":240,"endToken":523,"text":"2 \nAgreement’s (“CTOA”) processes and the Exit Amendment proposal that conflicts with \nrelevant Commission precedent. \nAs set forth herein, the Exit Amendment is procedurally and substantively defective \nand should be rejected by the Commission.   \nFirst, PJM did not follow the required procedure under the CTOA to file the \namendment.  Contrary to PJM’s position, the Exit Amendment is not a mere change to the \n“terms and conditions of the PJM Tariff” that PJM may unilaterally file under Section 9.2(a) \nof the PJM Open Access Transmission Tariff (“OATT”).  Rather, the Exit Amendment \neffectively amends the CTOA, and therefore could be filed only after a vote of the TOs with \nsufficient support—a requirement that was indisputably not met here.  Under CTOA section \n8.5.1, amending the CTOA requires a two-thirds majority of both representatives holding two-\nthirds of the Individual Votes cast and representatives holding two-thirds of the Weighted \nVotes cast.  There is a narrow fallback—a simple majority of both Individual Votes and \nWeighted Votes suffices only if opposition stays below five percent of Weighted Votes (for \nthe Individual-Vote count) and below three Parties (for the Weighted-Vote count).  PJM’s Exit \nAmendment met neither of these requirements. \nSecond, the Exit Amendment is inconsistent with Commission precedent and violates \ncost-causation principles by assigning generation- and capacity-related costs to TOs rather than \nto Load Serving Entities (“LSEs”).  The Commission has never allocated generation- and \ncapacity-related costs to TOs and, more specifically, the Exit Amendment conflicts with highly \nrelevant precedent in the Duquesne Light Co. proceeding where the Commission notably did \nnot apply generation-related costs to an exiting TO in its capacity as a TO.3   \n \n3 Duquesne Light Co., 122 FERC ¶ 61,039 (2008)."},{"page":3,"startToken":523,"endToken":836,"text":"3 \nAs explained herein and for the reasons set forth below, the Commission should reject \nthe Exit Amendment. \nI. \nBACKGROUND \nOn December 15, 2005, the TOs and PJM entered into the CTOA, whose purpose is to \nestablish the “rights and commitments” of PJM and the TOs.4  \nPJM’s RBP proposal had its origins in a January 2026 statement of principles signed \nby the governors of the states within PJM’s territory.5  PJM advanced the proposal through its \nCritical Issue Fast Path (“CIFP”) process, presenting an initial proposal at an April 16–17, \n2026 set of meetings and revising it at further CIFP meetings on May 4–5, May 27, and June \n10–11, 2026.6  In these latter meetings, PJM began to highlight the purported risk posed by a \nTO exiting PJM during the RBP’s 15-year term.   \nPJM addressed this “Transmission Owner Separation Risk” at its May 27, 2026 CIFP \nmeeting and again in its June 11, 2026 proposal paper.7  As of the June 11 paper, PJM had still \nnot settled on the fees a departing TO would owe, presenting instead alternative “Options”, \nincluding one that would add a twenty-percent “deficiency penalty” on top of an accelerated \npayment of the remaining notional contract value.8 \n \n4  CTOA at p. 1, available at https://www.pjm.com/pjmfiles/directory/merged-tariffs/toa42.pdf.  \n5 See Nat’l Energy Dominance Council, Statement of Principles Regarding PJM (Jan. 16, 2026), \nhttps://www.energy.gov/documents/statement-principles-regarding-pjm. \n6 PJM, CIFP Reliability Backstop Procurement — PJM Proposal, at 1 (June 11, 2026) (“June 11 CIFP \nPaper”) (initial proposal presented at the April 16–17, 2026 CIFP meetings; further CIFP meetings held \nMay \n4–5, \nMay \n27, \nand \nJune \n10–11, \n2026), \navailable \nat \nhttps://www.pjm.com/-\n/media/DotCom/committees-groups/cifp-rbp/2026/20260610/20260610-item-04a---pjm-reliability-\nbackstop-procurement-paper.pdf. \n7 June 11 CIFP Paper at 18 & n.12. \n8 Id. at 18."},{"page":4,"startToken":836,"endToken":1178,"text":"4 \nOn July 31, 2026, PJM filed its RBP proposal with the Commission with a proposed \neffective date of September 29, 2026.9  The RBP would commit PJM’s members to significant \nexpenditures via the procurement of new capacity resources for a fixed fifteen-year term, from \nthe 2028/2029 through 2042/2043 Delivery Years.10  Unlike the current Base Residual Auction \nthat procures capacity to supply one year’s worth of electricity at a time (in recent years, at a \ncost of approximately $16 billion per year11), the RBP is a one-time procurement of capacity \nover fifteen years, which could cost more than $20 billion.12   \nThe Exit Amendment component of the filed proposal would impose penalties on TOs \nthat withdraw from PJM and that take with them either “Committed RBP Resources” or “Load \nAllocated RBP Charges” within their Zones, as discussed further infra at 8.13   \nII. \nARGUMENT \nA. \nPJM Lacked Authority To File The Exit Amendment \nPJM exceeded the bounds of its filing authority in proposing the Exit Amendment.  \nFirst, because the Exit Amendment effectively amends the CTOA, PJM needed to—but did \nnot—obtain a supporting vote of the TOs in the PJM Transmission Owners Agreement-\nAdministrative Committee (“TOAAC”) before filing the RBP Proposal.  Second, even if the \nExit Amendment does not amend the CTOA, PJM can only justify its proposal under cost-\n \n9 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy and \nLarge Loads, Docket No. ER26-3380-000 (filed July 31, 2026) (“RBP Proposal”).  \n 10 RBP Proposal, Attachment DD § 18.4 (“fixed period of fifteen (15) Delivery Years, starting with \nthe 2028/2029 Delivery Year . . . through the end of the 2042/2043 Delivery Year”). \n11 Ethan Howland, PJM Capacity Prices Hit Record High as Grid Operator Falls Short of Reliability \nTarget, Utility Dive (Dec. 18, 2025), https://www.utilitydive.com/news/pjm-interconnection-capacity-\nauction-data-center/808264/. \n12 PJM’s initial procurement target of 6,831.3 MW—at PJM’s proposed price cap of $555-per-\nmegawatt-day—would cost $20.8 billion over the next 15 years.  \n13 Proposed Tariff § 18.7."},{"page":5,"startToken":1178,"endToken":1484,"text":"5 \ncausation principles by casting it as a “provision[] governing the recovery of transmission-\nrelated costs incurred by the Transmission Owners”—but such a filing is within the TOs’, not \nPJM’s, exclusive filing authority.  Third, even if the Exit Amendment is not such a filing and \ninstead merely “relates to or affects” provisions governing the recovery of transmission-related \ncosts, PJM still was required to, but did not, provide detailed advance notice to the TOs before \nmaking the filing. \n1. \nThe Exit Amendment Effectively Amends The CTOA Without A \nMajority Vote In Support By The Transmission Owners \n \nUnder CTOA section 8.5.1, any amendment to the CTOA may be filed only after an \napproval vote of the TOs with either a two-thirds majority voting in favor, or a simple majority \nvoting in favor but with votes in opposition remaining below a certain threshold.14  PJM’s Exit \nAmendment effectively proposes such an amendment, and yet was filed without the required \napproval by the TOs in the TOAAC.   \nUnder the current CTOA, an exiting TO’s obligations are governed by sections 3.2 and \n3.4.  Pursuant to section 3.2, “[a]ny Party may withdraw from” the CTOA if it meets three \npreconditions: (1) securing alternative arrangements for comparable transmission service; (2) \nobtaining FERC approval to withdraw; and (3) “if its Transmission Facilities do not comprise \nan entire Control Area,” satisfying all applicable NERC and Applicable Regional Reliability \nCouncil standards for operating a Control Area or being included within an existing one.15  \nPursuant to section 3.4, a withdrawing TO remains liable for obligations it incurred, that were \nincurred on its behalf, or that arose under the CTOA before the withdrawal’s effective date.16 \n \n14 CTOA § 8.5.1. \n15 Id. § 3.2 (“Withdrawal From This Agreement”). \n16 Id. § 3.4 (“Obligations After Withdrawal, Transfer, or Assignment”)."},{"page":6,"startToken":1484,"endToken":1832,"text":"6 \nThe Exit Amendment changes both sections.  It modifies section 3.2 by adding new \nRBP-related preconditions to withdrawal—making it no longer true that a TO “may withdraw \nfrom” the CTOA if it meets section 3.2’s preconditions alone.  The Exit Amendment likewise \namends section 3.4 by making a withdrawing TO liable for new RBP-related obligations found \nnowhere in the current CTOA.  Because the Exit Amendment amends these terms of the \nCTOA, under section 8.5.1, the Exit Amendment could be properly filed only after a vote of \nTOs in the TOAAC in support, with either a two-thirds majority voting in favor, or a simple \nmajority voting in favor but with votes in opposition remaining below a certain threshold—\nwhich PJM did not obtain. \nPJM cannot escape section 8.5.1’s limitations by characterizing the Exit Amendment \nas a change to the “terms and conditions of the PJM Tariff” under CTOA section 7.5.1(i).  If \nPJM could alter the CTOA’s substance simply by casting the change as an OATT amendment, \nCTOA section 8.5.1 would be a nullity, as it would effectively provide PJM unilateral \ndiscretion to amend the CTOA in clear contravention of that section. The only way to give \neffect to both provisions is to treat CTOA section 8.5.1 as controlling wherever an amendment \nwould change the CTOA’s substantive terms, as this one does.17 \n2. \nIf The Exit Amendment Concerns Transmission-Related Rather \nThan Generation- and Capacity-Related Costs, It Is Within The \nTransmission Owners’, Not PJM’s, Exclusive Authority To File \nAs discussed infra, the Exit Amendment violates cost-causation principles because it \nimposes generation- and capacity-related costs on TOs.  But if the proposal could somehow be \n \n17  See, e.g., Transmission Agency of N. Cal. v. FERC, 628 F.3d 538, 547 (D.C. Cir. 2010) (“[i]n \nconstruing tariffs, courts and agencies must look to the four corners of the tariff and consider the entire \ninstrument as a whole”) (quoting Consol. Gas Transmission Co. v. FERC, 771 F.2d 1536, 1545 (D.C. \nCir. 1985) (brackets in original))."},{"page":7,"startToken":1832,"endToken":2120,"text":"7 \nviewed as imposing transmission-related costs, it would run headlong into CTOA section \n7.5.1(iv).  Under CTOA section 7.5.1(iv), the TOs hold “unilateral and exclusive” rights to \nmake an FPA section 205 filing concerning “any provisions governing the recovery of \ntransmission-related costs incurred by the Transmission Owners.”18  If the Exit Amendment is \nnot deemed to impose generation- and capacity-related costs (which it does) and instead \ndeemed to impose transmission-related costs, it would certainly “govern[] the recovery of \ntransmission-related costs incurred by the Transmission Owners” and so lies outside PJM’s \nunilateral filing authority and within the exclusive filing authority of the TOs. \n3. \nAt A Minimum, The Exit Amendment “Relates To Or Affects” The \nRecovery Of Transmission-Related Costs, And PJM Failed To \nProvide The Transmission Owners The Requisite Advance Notice \nBefore Proceeding With The Filing  \nIf the Exit Amendment does not concern capacity costs, and if contrary to the argument \nin Point I.B the Exit Amendment does not concern “the recovery of transmission-related costs \nincurred by the Transmission Owners,” it at least “relates to or affects . . . [the] provisions \ngoverning the recovery of transmission-related costs.”19  A filing in this “relates to or affects” \ncategory may proceed only after PJM (a) gives the TOs at least 45 days’ notice of the intended \nfiling, “in sufficient detail to provide them a reasonable opportunity to include appropriate \nprovisions in the PJM Tariff governing these subjects,”20 and (b) “consult[s] with the \nTransmission Owners and the PJM Members Committee beginning not less than seven (7) \ndays in advance of any such Section 205 filing[.]”21 \n \n18 CTOA § 7.5.1(iv). \n19 CTOA § 7.5.1(iv). \n20 Id. \n21 Id. § 7.5.1(ii)."},{"page":8,"startToken":2120,"endToken":2418,"text":"8 \nPJM gave no such notice or consultation.  Its high-level policy descriptions were far \ntoo general to convey the content of its eventual filing, and the few details it shared changed \nrepeatedly.  As of June 11, 2026 (50 days before PJM submitted its filing), PJM’s proposal \nstill contemplated multiple “options” for the exit fee,22 leaving the TOs unable to discern the \ncontours of PJM’s proposed filing.  The June 2026 iteration of PJM’s proposal offered two \noptions for the exit fee demanded of TOs that “leave with generation that was part of RBP” \nand cannot be pseudo-tied to PJM:  (1) that the TO “must pay PJM the notional value of \nremainder of contract value (mws x rate x remaining years) on an accelerated basis[;]” and (2) \n“Same as Option 1 but prior to exiting, TO must also pay PJM an extra 20% deficiency \npenalty.”23  PJM’s as-filed proposal discarded both options and would implement a different \nand more uncertain fee for such TOs, obligating them to pay “costs associated with the \nremaining term of the RBP Resource, the amount which shall be determined through a filing \nsubmitted under the Federal Power Act.”24   \nBy providing only a moving target, PJM denied the TOs any meaningful notice or \nopportunity for consultation—precisely what the 45-day detailed-notice requirement and 7-\nday consultation requirement guarantee. \nB. \nThe Exit Amendment Improperly Assigns Generation- And Capacity-\nRelated Costs To Transmission Owners \nThe Exit Amendment is not only defective because it violates the terms of the CTOA, \nbut impermissible also because it violates well-established cost-causation principles by \n \n22 PJM Interconnection, L.L.C., Reliability Backstop Procurement Design (June 11, 2026) at \n37, https://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260611/20260611-\nitem-04a---pjm-reliability-backstop-procurement-design-presentation.pdf.   \n23 Id. \n24 Proposed Tariff § 18.7(a)."},{"page":9,"startToken":2418,"endToken":2727,"text":"9 \nallocating generation- and capacity-related costs to TOs, which neither caused nor will benefit \nfrom these costs. \nPursuant to the Exit Amendment, an exiting TO with “Committed RBP Resources” \n(i.e., resources that were cleared to provide capacity in the RBP) “located within the physical \nboundaries of the Transmission Owner’s Zone” must, before exiting, either preserve the RBP \ncommitments with the owners of RBP Resources within its Zone, pay all costs for those \nResources to pseudo-tie into PJM, or “pay costs associated with the remaining term of the RBP \nResource” in an amount to “be determined through a filing submitted under the Federal Power \nAct.”25  For a TO “seeking to exit PJM[] with net load that has been allocated RBP Charges \nfor RBP Resources not located within the physical boundaries of the [TO’s] Zone,” the Exit \nAmendment requires that TO either to enter into agreements that preserve those RBP \ncommitments or “pay all forward obligations on an accelerated basis” before exiting.26 \nThese charges make an exiting TO responsible for the RBP commitments of generation \nresources and/or load within its zone.  Those cannot be fairly allocated to a TO as transmission-\nrelated costs.  Commission precedent is directly on point: “cost-causation and benefits/burdens \nprinciples” require that costs be allocated to those who cause and/or benefit from them.27  In \nother words, “costs are allocated to the parties who cause the incurrence of such costs.”28  In \nparticular, where “real-time load is the primary beneficiary, and the primary cost-driver” of a \nprogram, and where that program “address[es] generation-related reliability concerns, not \ntransmission-related concerns,” the “costs of the Program should be allocated to Real-Time \n \n25 Id. \n26 Id. § 18.7(b). \n27 ISO New England Inc., 144 FERC ¶ 61,204, at P 70 (2013). \n28 ISO New England, Inc., 115 FERC ¶ 61,145, at P 13 (2006)."},{"page":10,"startToken":2727,"endToken":2974,"text":"10 \nLoad Obligation,” not TOs.29  Notably, Duquesne Light Co., the leading Commission \nprecedent, involved Duquesne Light Company’s (“Duquesne”) planned exit from PJM in both \nits capacity as a TO and an LSE.  It was only in the context of its role as an LSE, pursuant to \nthe PJM Reliability Assurance Agreement, that the Commission ruled that Duquesne was \nproperly held responsible “for paying for all the capacity PJM acquired on its behalf up through \nand including the upcoming January auction.”30   \nCost-causation principles condemn PJM’s Exit Amendment.  TOs neither cause the \ncosts of procuring generation capacity over the RBP’s 15-year term (nor the costs of procuring \ngeneration capacity under PJM’s one-year-at-a-time Base Residual Auction), nor do they \ndirectly benefit from those costs.  LSEs and their customers do.  Allocating the costs to TOs, \ntherefore, violates cost-causation principles. \nIII. \nCONCLUSION \nFor the foregoing reasons, the Indicated PJM Transmission Owners respectfully \nrequest that the Commission reject PJM’s proposed Exit Amendment.  \nDated:  August 21, 2026 \nRespectfully submitted, \n/s/ Evan K. Dean \n \n \n \nEvan K. Dean \nManaging Counsel, Transmission Rates & \nServices \nFirstEnergy Service Company \n341 White Pond Drive \nAkron, Ohio 44320 \nTelephone: 330-620-9585 \nedean@firstenergycorp.com \n/s/ Sanford I. Weisburst \n \n \nSanford I. Weisburst \nMatthew Meyer \nMadeleine Fleming \nQUINN EMANUEL URQUHART \n& SULLIVAN, LLP \n295 Fifth Avenue, Ninth Floor \nNew York, New York 10016 \nTelephone: 212-849-7000 \nFacsimile: 212-849-7100 \nsandyweisburst@quinnemanuel.com \nmatthewmeyer@quinnemanuel.com \n \n29 144 FERC ¶ 61,204, at P 70. \n30 Duquesne Light Co., 122 FERC ¶ 61,039, at P 83 (2008)."},{"page":11,"startToken":2974,"endToken":3047,"text":"11 \nmadeleinefleming@quinnemanuel.com \n \n/s/ Anthony Alden \n \n \n \nAnthony Alden \nQUINN EMANUEL URQUHART  \n & SULLIVAN, LLP  \n865 S Figueroa St, 10th Floor \nLos Angeles, CA 90017 \nTelephone: 213-443-3000 \nanthonyalden@quinnemanuel.com \nCounsel for the FirstEnergy Transmission Companies \n \n \n/s/ Michael Brechlin  \n \n \nMichael Brechlin  \nManager Asst GC - Regulatory Law State \nRegulatory \nDuquesne Light Company  \nNova Place \n100 South Commons, Suite 118 \nMail Drop OGC-L1 \nPittsburgh, PA 15212 \nTelephone: 412-393-6431 \nmbrechlin@duqlight.com \n \n \nCounsel for Duquesne Light Company"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":111,"startToken":0,"endToken":541},{"p":3,"at":111,"title":"I. BACKGROUND","method":"printed heading","endPage":4,"endAt":876,"startToken":541,"endToken":981},{"p":4,"at":876,"title":"II. ARGUMENT","method":"printed heading","endPage":4,"endAt":891,"startToken":981,"endToken":983},{"p":4,"at":891,"title":"A. PJM Lacked Authority To File The Exit Amendment","method":"printed heading","endPage":8,"endAt":1357,"startToken":983,"endToken":2342},{"p":8,"at":1357,"title":"B. The Exit Amendment Improperly Assigns Generation- And Capacity-","method":"printed heading","endPage":10,"endAt":915,"startToken":2342,"endToken":2864},{"p":10,"at":915,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":583,"startToken":2864,"endToken":3047}]}