{"document":{"slug":"rec-20260821-5280","title":"Comments of Buckeye Power, Inc. in response to FERC's 07/30/2026 Notice re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5280","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Buckeye Power, Inc.","kind":"comments","file":"sources/filings/text/20260821-5280_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5280","tier":"record","sha256":"ad145111d0de4788231162fa089014fdf88a9f499638a27127ea097a2da21328","pages":7,"tokens":1172,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":268,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n       \nPJM Governance and Stakeholder \nReforms \n) \n) \n \nDocket No. AD26-7-000 \n \n \nCOMMENTS OF BUCKEYE POWER, INC. \n \nBuckeye Power, Inc. (“Buckeye”) submits these comments pursuant to the \nCommission’s Notice Requesting Post-Conference Comment of July 30, 2026.1  \nBuckeye is an Ohio non-profit generation and transmission cooperative that \nproduces, procures, and provides at wholesale all the electric capacity, energy, and \ntransmission required by its member electric distribution cooperatives. Buckeye operates \nas a cooperative and is owned by its 25 member distribution cooperatives, which are in \nturn each owned by their member-consumers.2  Those member cooperatives serve more \nthan 400,000 residential, commercial, and industrial customers in service territories \nencompassing 77 of Ohio’s 88 counties. Buckeye operates not for the benefit of \nshareholders, but for the benefit of its member-consumers.  \n \n1 Notice Requesting Post-Conference Comment (July 30, 2026), eLibrary No. 20260730-3067 (the \n“Notice”). \n2 The 25 distribution cooperative members of Buckeye are: Adams Rural Electric Cooperative, Inc.; \nBuckeye Rural Electric Cooperative, Inc.; Butler Rural Electric Cooperative, Inc.; Carroll Electric \nCooperative, Inc.; Consolidated Cooperative, Inc.; Darke Rural Electric Cooperative, Inc.; Firelands \nElectric Cooperative, Inc.; The Frontier Power Company; Guernsey-Muskingum Electric Cooperative, Inc.; \nHancock-Wood Electric Cooperative, Inc.; Holmes-Wayne Electric Cooperative, Inc.; Licking Rural \nElectrification, Inc.; Logan County Cooperative Power and Light Association, Inc.; Lorain-Medina Rural \nElectric Cooperative, Inc.; Mid-Ohio Energy Cooperative, Inc.; Midwest Electric, Inc.; Midwest Energy & \nCommunications; North Central Electric Cooperative, Inc.; North Western Electric Cooperative, Inc.; \nPaulding-Putnam Electric Cooperative, Inc.; Pioneer Rural Electric Cooperative, Inc.; South Central Power \nCompany; Tricounty Rural Electric Cooperative, Inc.; Union Rural Electric Cooperative, Inc.; and \nWashington Electric Cooperative, Inc."},{"page":2,"startToken":268,"endToken":480,"text":"- 2 - \n \nBuckeye’s mission is to provide “to all member systems, stably and competitively \npriced, economical and highly reliable wholesale power, for the benefit of their members \nand their communities.”3 Buckeye provides this supply through wholesale power \nagreements under which it obtains generation resources and transmission service to meet \nthe demand of its members, and its members pay a cost-based rate for these resources. \nBuckeye or its affiliates own or have the right to the output of approximately 2,445 \nmegawatts of generating capacity located in or delivered into PJM Interconnection, \nL.L.C. (“PJM”). Buckeye is both a taker of transmission service under the PJM Open \nAccess Transmission Tariff (“Tariff”) and a participant in the PJM market. Buckeye \nparticipates in the PJM market both as a market seller (as a generation owner) and as a \nbuyer (as a Load-Serving Entity). \nBuckeye has appended to these comments its responses to the questions posed in \nthe appendix to the Notice.  \nRespectfully submitted, \n \n/s/ Lija Kaleps-Clark___ \nKurt P. Helfrich \nGeneral Counsel \nLija Kaleps-Clark \nDeputy General Counsel \nBuckeye Power, Inc. \n6677 Busch Boulevard \nColumbus, Ohio 43229 \nTelephone: (614) 681-5151 \nkhelfrich@ohioec.org  \nlkaleps@ohioec.org  \n \nCounsel for Buckeye Power, Inc. \n \n3 Buckeye’s mission statement can be found on its website at https://ohioec.org/buckeye-power."},{"page":3,"startToken":480,"endToken":624,"text":"Questions/Comments \nYes \nNo \n1) \nShould Board members’ terms be extended to five or more years? \nY \n  \n  \nComments:  \n2) \nShould there be a maximum number of years that a Board member may serve (e.g., 10 years)? \nY \n \n  \nComments:  \n3) \nShould the Board member qualification rules be revised to provide a preference for some Board \nmembers that reside in the PJM region? \nY \n  \n  \nComments: Buckeye is supportive of giving “preference” for Board members that reside in the PJM \nregion.  However, residence within PJM should not be a requirement for Board member qualification as this \nwould likely limit the number of qualified candidates. \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off period for Board \nmembers from two years to one year? \nY \n  \n  \nComments:  \n5) \nShould restrictions on Board communications be relaxed to enable more communication between \nthe Board and stakeholders? \n  \nN"},{"page":4,"startToken":624,"endToken":797,"text":"- 4 - \n \n  \nComments:  Existing processes allow multiple opportunities for the Board and the stakeholders to \ncommunicate.  Relaxing restrictions is not necessary and may lead to unrestricted ex parte communications and \nundermine independent decision-making. \n6) \nIn order to increase transparency, should Board votes be made public or the Board be required to \nexplain its reasoning? \nY \n  \n  \nComments:  \n7) \nIn order to increase transparency, should some Board meetings be open or available to the \npublic? \nY  \n \n  \nComments: Buckeye supports allowing certain Board meetings to be open to the public, recognizing the value of \ntransparency and stakeholder engagement. However, Buckeye does not support requiring all Board meetings to \nbe open to the public, as non-public meetings can provide an important forum for candid, open discussion, \ndeliberation, and the exchange of ideas that supports effective decision-making. \n8) \nShould PJM’s governing documents be revised to explicitly state that the responsibility of PJM \nand its Board is to serve the public interest? \nY \n \n  \nComments: \n9) \nShould state representatives have at least one voting member on the Nominating Committee? \nY \n \n  \nComments:"},{"page":5,"startToken":797,"endToken":994,"text":"- 5 - \n \n10) \nShould PJM adopt public performance metrics and tie management compensation to their \nachievement? \n  \nN \n  \nComments:  \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only inform the Board? \n  \nN \n  \nComments: While Buckeye agrees with the ability for PJM to have Section 205 filing rights as indicated in \nresponse to questions 12 and 13 below, Buckeye believes the stakeholder process is important and valuable to \nidentify the most effective solutions.  Buckeye thus supports PJM stakeholders having “jump ball” rights where \nPJM has Section 205 filing rights when a supermajority of stakeholders approve an alternative proposal as \nindicated in response to question 15.      \n12) \nShould PJM have section 205 filing rights over the energy market and ancillary services \nunencumbered by the requirement to obtain approval of two-thirds of the Members Committee? \nY \n  \n  \nComments: \n13) \nShould PJM have section 205 filing rights over Regional Transmission Expansion Planning \n(RTEP) unencumbered by the requirement to obtain approval of two-thirds of the Members \nCommittee? \nY \n  \n  \nComments:  \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource \nadequacy and transmission cost allocation filings when a supermajority of OPSI agrees on an \nalternative proposal? \n \nN \n  \nComments:"},{"page":6,"startToken":994,"endToken":1145,"text":"- 6 - \n \n15) \nShould the Members Committee have “jump ball” filing rights over the portions of the tariff \nwhere PJM has 205 filing rights when a supermajority of stakeholders approves an alternative \nproposal? \nY \n \n \nComments: \n16) \nShould the approval threshold in the Members Committee be lowered from two-thirds sector-\nweighted voting? \n  \nN \n  \nComments: \n17) \nShould the voting rules barring affiliate votes, which apply to senior standing committees, also \napply to lower-level committees? \nY \n  \n  \nComments: \n \n18) \nIn addition to OPSI, should there be a second state representative group consisting of governors’ \nrepresentatives and/or state legislators’ representatives? \nY \n \n  \nComments: Buckeye supports the creation of an additional state representative group if states determine that such \na group is needed. \n19) \nShould state representatives have a formal voting role in the stakeholder process (limited to \ncertain topics, such as resource adequacy and regional transmission cost allocation) in addition to \nthe consumer advocate votes?  \nY \n \n  \nComments:"},{"page":7,"startToken":1145,"endToken":1172,"text":"- 7 - \n \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 filing related to \nresource adequacy and transmission cost allocation? \nY \n  \n  \nComments:"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":797},{"p":5,"at":0,"title":"Pages 5 to 7","method":"page range","endPage":7,"endAt":178,"startToken":797,"endToken":1172}]}
