{"document":{"slug":"rec-20260821-5293","title":"Motion to Intervene and Initial Comments of Amazon Energy LLC re PJM Interconnection, L.L.C.'s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5293","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Amazon Energy LLC","kind":"comments","file":"sources/filings/text/20260821-5293_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5293","tier":"record","sha256":"cfc536598ac06c7cf4fd9ff995c17f869ed1858081a981688a9f9408dfd9a342","pages":9,"tokens":2110,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":229,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C.  \n) \nDocket No. ER26-3380  \n \nMOTION TO INTERVENE AND INITIAL COMMENTS OF AMAZON ENERGY LLC  \n  \nAmazon Energy LLC (“Amazon”) respectfully submits these initial comments to the \nFederal Energy Regulatory Commission (the “Commission”) and moves to intervene in the above-\ncaptioned proceeding.   \nI. \nINTRODUCTION \n  \nPJM Interconnection, L.L.C. (“PJM”) submitted to the Commission on July 31, 2026, \nrevisions to the PJM Open Access Transmission Tariff and the Reliability Assurance Agreement \nAmong Load Serving Entities to establish the Reliability Backstop Procurement (“RBP”) (the \n“RBP Proposal”).1  In submitting the RBP Proposal, PJM seeks the Commission’s authorization \nto (i) “procure new capacity resources through a backstop auction”; (ii) commence the backstop \nauction no later than September 2026; (iii) provide price certainty for new capacity resources for \nfifteen years; and (iv) allocate the costs associated with such new capacity resources to Load \nServing Entities (“LSEs”) with new data center load that have not self-procured new capacity or \nagreed to be curtailable.2 \n  \nThe RBP Proposal purports to “address the influx of large loads while maintaining resource \nadequacy, reliability, and affordability in a manner that respects the divide between state and \n \n1 PJM Interconnection, L.L.C., Reliability Backstop Procurement, Docket No. ER26-3380-000 (filed July 31, 2026) \n(“PJM RBP Filing”).  \n2 PJM RBP Filing at 2 (emphasis in original)."},{"page":2,"startToken":229,"endToken":493,"text":"2 \nfederal authorities and avoids disrupting existing commercial arrangements.”3  While Amazon \nsupports the objective of the RBP Proposal to ensure sufficient capacity is available to meet load \ngrowth, Amazon is concerned with several provisions in PJM’s filing.  \nFirst, the RBP Proposal as drafted would disrupt existing agreements and fails to recognize \nbona fide bilateral capacity agreements executed before PJM filed the RBP Proposal, including \nagreements supported by existing capacity.  This could result in large-load customers with \nexecuted bilateral contracts or electric service agreements (“ESAs”) that have already procured \ncapacity double paying for capacity.  \nSecond, by establishing RBP cost responsibility based on a single snapshot of forecasted \nload growth, rather than updating the capacity allocation as load actually materializes over the life \nof the RBP, the RBP Proposal risks assigning capacity costs to PJM customers that did not cause, \nand may not benefit from, the procured capacity – an outcome that contravenes fundamental cost-\ncausation and beneficiary-pays principles.  \nThird, the RBP Proposal does not provide RBP resources or new resources contractually \ncommitted to serve large-load customers with a reasonable path to bring new capacity online.  The \nCommission should therefore require PJM to amend the RBP Proposal to address these \nshortcomings so that the RBP (i) equitably allocates just and reasonable costs of capacity to new \nlarge-load customers that benefit from it, and (ii) facilitates the expeditious interconnection of new \ncapacity resources needed to address PJM’s reliability shortfall.   \nII. \nCOMMUNICATIONS \n  \nCommunications should be addressed to the following person, who should also be \ndesignated for service on the Commission’s official service list for this proceeding: \n \n3 Id."},{"page":3,"startToken":493,"endToken":769,"text":"3 \nWilliam Friedman \nAmazon Energy LLC \nwfried@amazon.com \n \n  \nAmazon requests, to the extent necessary, that the Commission waive the requirements of \nRule 203(b)(3)4 to permit the person named above to be placed on the official service list in this \nproceeding to avoid delays in responding to official documents and communications. \nIII. \nCOMMENTS \nA. \nLarge-load customers that procured capacity before PJM submitted the RBP \nProposal should not be required to pay for duplicative capacity through the \nbackstop procurement.  \n \n  \nUnder the RBP Proposal, large-load customers that do not procure their own capacity via \nbilateral contracts must pay capacity costs in the RBP backstop auction.  This framework ignores \nthe fact that some large-load customers like Amazon procured their own capacity under PJM’s \nrules as they existed at the time of contracting.  As a result, large-load customers that entered \nbinding bilateral capacity agreements before the date of PJM’s Statement of Principles filing in \nthis docket (January 16, 2026) but have not finalized their load ramp under those contracts would \nbe assigned the costs of the RBP auction in addition to the costs of the capacity they already \nprocured, thereby requiring an unreasonable double charge for capacity.  To remedy this inequity, \nthe Commission should protect existing arrangements to ensure that customers with ESAs and \ncapacity contracts signed before January 16, 2026, are not charged twice for capacity under the \nRBP Proposal.  Customers that relied on PJM’s pre-existing framework and entered binding \ncapacity arrangements before PJM filed the RBP Proposal with the Commission should not have \nthe value of those agreements nullified by eligibility criteria adopted after the fact. \n \n4 18 C.F.R. 285.203(b)(3)."},{"page":4,"startToken":769,"endToken":1086,"text":"4 \nB. \nPJM’s cost-allocation proposal risks contravening longstanding cost-causation \nand beneficiary-pays principles, potentially penalizing existing load in LSE \nzones and elevating the risks associated with forecasting accuracy.  \n \nPJM proposes to allocate RBP capacity costs to LSEs based on forecasted load growth \nfrom the 2026/2027 Delivery Year to the 2028/2029 Delivery Year (as forecasted by the LSEs) and \nthen delegate responsibility to state regulators and Relevant Electric Retail Regulatory Authorities \n(“RERRAs”) to allocate capacity costs via retail rates to large-load customers that do not secure \ncapacity through bilateral arrangements.  Once the LSE load growth and capacity allocation \ncalculation is performed, each zone’s/area’s resulting share of the Final RBP Target “shall remain \nconstant throughout the fixed, fifteen-year term.” 5   PJM asserts that, under its proposed \nmethodology, zones with new load not matched with new capacity can be said to have caused the \nresource adequacy shortfall underlying the RBP.  This is problematic because PJM identifies those \npurported “cost causers” using a single forecast load snapshot and then freezes the result for the \nup to fifteen-year duration of RBP capacity contracts.  \nA static, fifteen-year load growth assumption and resulting capacity allocation cannot be \nreconciled with fundamental cost-causation and beneficiary-pays principles in the dynamic load-\ngrowth environment PJM itself describes.  Under the RBP Proposal, a zone assigned a large share \nof the RBP Target based on forecasted load growth would retain that capacity responsibility \nthroughout the fifteen-year RBP term even if the forecasted large load never materializes, \nmaterializes at a lower level, ceases operations, or locates elsewhere.  Because large load is \nmaterializing rapidly and in locations that may differ materially from the 2026/2027 through \n2028/2029 Delivery Year forecasts, a capacity allocation frozen at the outset will begin to diverge \nfrom actual cost causation.  Although PJM’s proposed RBP mechanism allows states and RERRAs \n \n5 PJM RBP Filing, Attachment A, Proposed Tariff Attachment DD § 18.3 (Marked/Redline Format)."},{"page":5,"startToken":1086,"endToken":1369,"text":"5 \nto determine how a zone’s RBP cost responsibility is allocated among LSEs and large-load \ncustomers, state regulators can allocate only the costs that PJM has first assigned to the relevant \nzone.  They do not have the authority to correct a regional or zonal allocation that assigns too much \nof the fifteen-year RBP obligation to one zone and too little to another because actual load \ndevelopment diverged from PJM’s initial forecast. \nThe Commission should therefore require PJM to periodically update the allocation of RBP \ncosts to reflect actual incremental load growth over the RBP commitment period.  Rather than \nfixing each zone’s share to a single forecast snapshot, PJM should recalculate responsibility for \nthe remaining costs based on incremental load that comes online, continuing until it identifies \nincremental load, net of qualifying offsets, corresponding to the Final RBP Target.  This method \nwill enable PJM states to establish cost-allocation principles that protect customers that have or \nwill bring additional capacity for new load.  \nA dynamic allocation would better match the demand side of the RBP to the duration of \nthe supply obligation PJM proposes to undertake.  The RBP framework is intended to secure a \ncapacity product to support new load entering the system, regardless of whether that load \nmaterializes during the 2028/2029 Delivery Year as forecasted. The new load coming online that \ndoes not otherwise enable new capacity—regardless of forecasted time or LSE zone—should be \nallocated RBP costs.  Aligning costs with benefits in this way would also reduce the risk of \nallocating stranded costs to existing customers and eliminate the perverse incentive for new large-\nload customers to strategically site in zones assigned comparatively small obligations under a \nforecast made years earlier."},{"page":6,"startToken":1369,"endToken":1642,"text":"6 \nC. \nThe Commission should direct PJM to provide an accelerated interconnection \nprocess for RBP resources and resources committed to serve new large-load \ncustomers, so that new capacity comes online when the reliability needs arise. \n \nThe Commission should require PJM to implement an accelerated generator \ninterconnection process for (i) RBP resources and (ii) resources supported by executed bilateral \ncapacity arrangements with new large-load customers. \nThere is precedent within PJM’s recent initiatives for such an approach, including the \ncreation of the Expedited Interconnection Track intended to interconnect advanced projects of \nsignificant size more quickly, outside the ordinary Cycle Process, in response to PJM’s urgent need \nfor additional Capacity Resources.  Further, accelerated treatment need not guarantee \ninterconnection or shift network-upgrade costs to other customers.  Accelerated processing would \nsimply address timing; protracted interconnection study processes should not prevent projects that \nhave demonstrated commercial viability and have undertaken binding obligations to mitigate the \ncapacity shortfall within PJM from coming online in a timely manner.  \nTo close the anticipated 6.8 GW capacity gap in PJM, the Commission should therefore \ndirect PJM to establish or expand its existing expedited interconnection processes to provide for \nan accelerated interconnection pathway for RBP resources and resources with qualifying bilateral \ncapacity contracts.  \nIV. \nMOTION FOR LEAVE TO INTERVENE OUT-OF-TIME \n  \nPursuant to Rules 212 and 214 of the Commission’s Rules of Practice and Procedure, 18 \nC.F.R. §§ 385.212, 385.214, Amazon respectfully requests leave to intervene out-of-time in the \ncaptioned proceeding.  \n  \nIn determining whether to grant a motion to intervene out-of-time, the Commission may \nconsider whether (i) the movant had “good cause” for failing to file the motion within the time"},{"page":7,"startToken":1642,"endToken":1931,"text":"7 \nprescribed; (ii) permitting intervention would disrupt the proceeding; (iii) the movant’s interest is \nnot adequately represented by other parties in the proceeding; and (iv) allowing the intervention \nwould prejudice or burden existing parties.6  Amazon’s motion for leave to intervene out-of-time \nshould be granted.  \n  \nFirst, good cause exists for granting Amazon’s motion.  While Amazon did not intervene \nbecause the impact of this proceeding on Amazon’s operations was not immediately clear, Amazon \nhas been, and remains, actively engaged in power markets in PJM as a large-load customer.  The \noutcome of this proceeding could directly impact Amazon’s operations and indirectly affect the \nmany businesses and customers who rely on Amazon for critical cloud computing, data storage, \nand transactional services.  Given that PJM submitted the proposal to the Commission on July 31, \n2026, and the proposed effective date for the RBP is September 29, 2026, Amazon’s intervention \nat this point in time is critical.  \n  \nSecond, granting Amazon’s motion will not disrupt, delay, defer, or otherwise impact the \nschedule associated with the Commission’s consideration of PJM’s RBP Proposal.  Amazon does \nnot seek to alter the Commission’s timeline; it simply requests to be a party to this proceeding. \n  \nThird, as a large-load customer operating within PJM, Amazon has direct and substantial \ninterests in this proceeding.  As previously noted, this proceeding involves a proposed one-time \nRBP for the procurement of new capacity outside the standard PJM RPM process. Amazon may \nbe directly and substantially affected by the outcome of this proceeding, and Amazon’s interests \ncannot be adequately represented by any other party.  \nFourth, permitting Amazon’s motion will not prejudice or place additional burdens upon \nexisting parties.  Amazon will accept the record as it currently stands.   \n \n6 18 C.F.R. § 385.214(d)(1)."},{"page":8,"startToken":1931,"endToken":2034,"text":"8 \nTherefore, Amazon respectfully requests that the Commission grant this motion for leave \nto intervene out-of-time, for good cause shown, and permit Amazon’s participation in this \nproceeding with full rights as a party thereto.  \nV. \nCONCLUSION \n  \nWHEREFORE, for the foregoing reasons, Amazon respectfully requests that the \nCommission grant its motion to intervene out-of-time, permit Amazon to participate in this \nproceeding with full rights as a party to this proceeding, and consider the comments above and \nfactor them into the Commission’s decision-making.  \n \nRespectfully submitted, \n/s/ William Friedman  \n  \nWilliam Friedman \nAmazon Energy LLC \nwfried@amazon.com \nCounsel for Amazon Energy LLC \n \nDated: August 21, 2026"},{"page":9,"startToken":2034,"endToken":2110,"text":"9 \nCERTIFICATE OF SERVICE \nI hereby certify that I caused copies of the foregoing document to be served this day upon \neach person designated on the official service list compiled by the Secretary in this proceeding in \naccordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and \nProcedure.  \nDated at Washington, DC, this 21st day of August 2026. \n \n/s/ William Friedman  \n  \nWilliam Friedman \nSenior Corporate Counsel \nAmazon Energy LLC \nwfried@amazon.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":405,"startToken":0,"endToken":55},{"p":1,"at":405,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":1657,"startToken":55,"endToken":465},{"p":2,"at":1657,"title":"II. COMMUNICATIONS","method":"printed heading","endPage":3,"endAt":337,"startToken":465,"endToken":547},{"p":3,"at":337,"title":"III. COMMENTS","method":"printed heading","endPage":3,"endAt":353,"startToken":547,"endToken":549},{"p":3,"at":353,"title":"A. Large-load customers that procured capacity before PJM submitted the RBP","method":"printed heading","endPage":4,"endAt":3,"startToken":549,"endToken":770},{"p":4,"at":3,"title":"B. PJM’s cost-allocation proposal risks contravening longstanding cost-causation","method":"printed heading","endPage":6,"endAt":3,"startToken":770,"endToken":1370},{"p":6,"at":3,"title":"C. The Commission should direct PJM to provide an accelerated interconnection","method":"printed heading","endPage":6,"endAt":1506,"startToken":1370,"endToken":1572},{"p":6,"at":1506,"title":"IV. MOTION FOR LEAVE TO INTERVENE OUT-OF-TIME","method":"printed heading","endPage":8,"endAt":233,"startToken":1572,"endToken":1965},{"p":8,"at":233,"title":"V. CONCLUSION","method":"printed heading","endPage":9,"endAt":3,"startToken":1965,"endToken":2035},{"p":9,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":486,"startToken":2035,"endToken":2110}]}
