{"document":{"slug":"rec-20260821-5294","title":"Motion to Intervene and Comments of Talen Energy Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5294","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Talen Energy Corporation","kind":"comments","file":"sources/filings/text/20260821-5294_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5294","tier":"record","sha256":"1e8f0f874b67b50c6d2df6daa782b5e55aa745207c4f4d18c199b0ae49150af3","pages":14,"tokens":3818,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":373,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Governance and Stakeholder  \nReforms \n) \n) \n) \n) \n \nDocket No. AD26-7-000 \n \nMOTION TO INTERVENE AND COMMENTS OF \nTALEN ENERGY CORPORATION \nThe Federal Energy Regulatory Commission (“FERC” or “Commission”) established \nindependent system operators (“ISOs”) based on a set of principles, including that the \n“management and administration of the ISO should be carried out in an efficient manner.”1  PJM \nInterconnection, L.L.C.’s (“PJM”) current stakeholder process falls short of this principle.  \nChairman Laura Swett summarized the PJM stakeholder process recently as “slow where it must \nbe fast, opaque where it must be transparent, and vulnerable to vetoes and agenda control exactly \nwhen the region needs immediate action.”2  Chairman Swett’s observation aptly sets forth three \npriorities the Commission should seek to bolster through PJM governance reforms: efficiency, \ntransparency, and independence. \n \n1  \nPromoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public \nUtilities and Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, 61 Fed. \nReg. 21,540 (May 10, 1996) FERC Stats. & Regs. ¶ 31,036 (1996) (providing 11 principles that FERC would use \nin evaluating the creation of voluntary ISOs, including: (1) the ISO’s governance should be fair and non-\ndiscriminatory; (2) the ISO and its employees must have no financial interest in the performance of any power \nmarket participant; (3) the ISO should provide open access; (4) the ISO is primarily responsible for short-term \nreliability; (5) the ISO must have control over the interconnection of transmission; (6) the ISO should be able to \nidentify and relieve constraints on its system; (7) the ISO should have appropriate incentives for efficient \nmanagement and administration and management and administration of the ISO should be carried out in an \nefficient manner; (8) the ISO’s pricing policies should promote efficient use and investment in generation, \ntransmission, and consumption; (9) transmission system information should be publicly available on a timely \nbasis; (10) the ISO should develop mechanism to coordinate with neighboring areas; and (11) alternative dispute \nresolution procedures should be established as a first resort to dispute resolution within the ISO). \n2  \nChairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, MD (May 12, 2026), at \nhttps://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-meeting-baltimore-md-\n0."},{"page":2,"startToken":373,"endToken":633,"text":"2 \n \nTalen Energy Corporation (“Talen”) welcomes the opportunity presented by the \nCommission to comment on PJM’s governance and stakeholder process.  Talen also encourages \nthe Commission to use every tool it possesses to further reforms that will result in PJM’s increased \nefficiency and transparency, while protecting the independence of the PJM Board. \nI. \nMOTION TO INTERVENE \nPursuant to Rule 214 of the Commission’s Rules of Practice and Procedure,3 Talen \nrespectfully submits this motion to intervene in the above-captioned proceeding.  The formal legal \nname of Talen is Talen Energy Corporation.  Talen is a corporation organized and existing under \nthe laws of Delaware.  Talen maintains its principal place of business at 2929 Allen Parkway, 22nd \nFloor, Houston, Texas 77019. Talen is a leading independent power producer and energy \ninfrastructure company which owns and operates approximately 15.7 gigawatts of power \ninfrastructure in the United States.  Talen produces and sells electricity, capacity, and ancillary \nservices into wholesale U.S. power markets, including and primarily in PJM.  Accordingly, the \nactions taken by the Commission in this matter will directly affect the interests of Talen.  Talen \nhas a direct and material interest in the instant proceeding that no other party can adequately \nrepresent.  Talen therefore requests that the Commission grant this motion to intervene and permit \nTalen to participate in this proceeding with full rights as a party thereto. \nII. \nCOMMENTS    \nThe Federal Power Act (“FPA”) provides the Commission with authority to regulate ISOs \nand regional transmission organizations (“RTOs”), such as PJM, as “public utilities” because the \n \n3  \n18 C.F.R. § 385.214 (2026)."},{"page":3,"startToken":633,"endToken":1049,"text":"3 \n \nRTOs operate the interstate transmission system.4  As a result, FERC has jurisdiction under FPA \nSections 205 and 206 over PJM’s stakeholder process because the stakeholder process “provides \ninput that directly affects the content of jurisdictional practices” and “is one that directly affects \njurisdictional rates.”5  The Commission should not hesitate to exercise its jurisdiction to improve \nthe governance and stakeholder process of the largest energy market in the country and ensure that \nthe RTO, including its Board, remains compliant with the Commission’s RTO principles set forth \nin Order No. 888 and Order No. 2000.6    \nA. \nTalen supports reforms that would result in increased efficiency in the PJM \nstakeholder and decision-making process.  \nElectric sector innovation will not wait for PJM.  Rather, PJM must meet the moment.  \nThere may be instances where imminent and significant decisions must be made quickly to keep \npace with the industry or reliability considerations.  PJM’s existing stakeholder process has proven \ninadequate in this regard.  For example, recent and significant Critical Issue Fast Path (“CIFP”) \nproceedings proved unproductive.  PJM’s 2026 CIFP combining Reliability Backstop \nProcurement (RBP) and the Connect & Manage (C&M) put forth about a dozen proposals for each \n \n4  \nPJM Interconnection, L.L.C., 101 FERC ¶ 61,318 at P 25 (2002) (explaining that PJM “as the operator of the \ntransmission facilities that make up the PJM grid and the provider of transmission services within the PJM control \narea, is just as much a public utility as the owners of those facilities”). \n5  \nPJM Interconnection, L.L.C., 157 FERC ¶ 61,229 at P 11 (2016); FERC v. Elec. Power Supply Ass’n, 577 U.S. \n260, 278 (2016) (providing that FERC’s jurisdiction under FPA Sections 205 and 206 are limited to practices that \n“directly affect the [wholesale rate]”); see also New England Power Pool Participants Committee, 166 FERC ¶ \n61,062 at P 48 (2019) (holding that the New England Power Pool Participants Committee “rules with respect to \nmembership fall within the Commission’s jurisdiction because they directly affect Commission-jurisdictional \nrates”). \n6  \nSupra at n.1; Order No. 2000, Regional Transmission Organizations, 89 FERC ¶ 61,285 at p. 38 (1999) (providing \nthat RTO independence is based on three main criteria: (1) RTO employes and directors have no financial stake \nin any market participant; (2) the RTO must have a decision-making process that is independent of control by any \nmarket participant or class of participants; and (3) the RTO must have exclusive and independent authority to file \nchanges to its transmission tariff)."},{"page":4,"startToken":1049,"endToken":1341,"text":"4 \n \nissue, with only one RBP proposal receiving stakeholder support.7  The CFIP process for Large \nLoad Additions in 2025 required months of member-driven deliberations and led to twelve \nseparate proposals, none of which were approved by the required threshold of votes.8  In addition, \nthe 2023 CIFP on resource adequacy resulted in 20 rejected packages.9  PJM should avoid such \nquagmires for certain issues that the PJM Board deems a priority.  PJM could publish such priority \nissues annually, with quarterly updates or on an individual, one-off basis as determined by the PJM \nBoard in its discretion.  For an issue that has previously been subject to the stakeholder deliberation \nprocess but has lagged therein for any reason, then, to the extent that the PJM Board believes it \nmust act unilaterally, the Board should also be able to label such issues as a priority to avoid further \nundue delay. \nFor imminent, priority concerns, the stakeholder process should become advisory.  That \ndoes not mean the stakeholder process would be circumvented altogether.  The PJM Board can \nbenefit from the insights, expertise, and opinions of stakeholders; however, the Board should be \nable to move quickly to address imminent issues without the need for a prolonged stakeholder \nprocess. Similar advisory processes have already been adopted by the California Independent \n \n7  \nLeith-Yessian, Devin, PJM Stakeholders Endorse 1 Backstop Procurement Proposal, Reject ‘Connect and \nManage’, RTO INSIDER (June 30, 2026), available at https://www.rtoinsider.com/135656-pjm-stakeholders-\nendorse-backstop-procurement-proposal-reject-connect-and-manage/. \n8  \nLeith-Yessian, Devin, PJM Stakeholders Reject all CIFP Proposals on Large Loads, RTO INSIDER (Nov. 20, \n2025), available at https://www.rtoinsider.com/120206-pjm-stakeholders-reject-all-cifp-proposals-large-loads/. \n9  \nLeith-Yessian, Devin, PJM Pushing Forward on Efforts to Meet Rising Data Center Load, RTO INSIDER (Jan. 5, \n2026), available at https://www.rtoinsider.com/122643-pjm-pushing-forward-on-efforts-to-meet-rising-data-\ncenter-load/."},{"page":5,"startToken":1341,"endToken":1659,"text":"5 \n \nSystem Operator (“CAISO”),10 the Midcontinent Independent System Operator (“MISO”)11 and \nthe Southwest Power Pool (“SPP”).12  Consequently, PJM should have FPA Section 205 filing \nrights unencumbered by the requirement to obtain approval of two-thirds of the Members \nCommittee for issues the Board has deemed a priority.  This can extend to issues involving the \nenergy market, ancillary services, regional transmission expansion planning, etc.  There is no need \nto lower the Members Committee approval threshold from two-thirds sector-weighted voting for \nissues not deemed a priority. \nIf member votes become advisory for deemed priority issues, then it is reasonable for the \nMembers Committee to have recourse in the form of “jump ball” filing rights over portions of the \nPJM Tariff when a supermajority of stakeholders approves an alternative proposal.  Such a right \nwould be consistent with the ISO New England’s process, whereby the New England Power Pool \n(“NEPOOL”) may file an alternative proposal under FPA Section 205 if 60% or more stakeholders \nare in support.13  However, FERC and PJM should cooperate to determine the best way to enable \nstakeholders to independently reach consensus similar to the dedicated stakeholder process \nadministered by NEPOOL.  Subject to the limitations and context above, Talen votes “yes” on \nNos. 11, 12, 13, and 15, and votes “no” on No. 16. \n \n10  Corporate Governance Principles, Version #4.2, CALIFORNIA INDEPENDENT SYSTEM OPERATOR (Oct. 15, 2025) \n(establishing that the CAISO board shall consider stakeholder input, but will ultimately hold decision-making \nauthority).  \n11  Agreement of Transmission Facilities Owners to Organize the Midcontinent Independent System Operator, Inc., \nMIDCONTINENT INDEPENDENT SYSTEM OPERATOR, INC. (affirming that the MISO Advisory Committee will not \nexcersie control over the MISO board or MISO). \n12  Governing Documents Tariff, SOUTHWEST POWER POOL (March 31, 2026) (establishing SPP stakeholder \ncommittees as “advisory” committees). \n13  Participants Agreement among ISO New England Inc. and the New England Power Pool and the Individual \nParticipants § 11.1.5."},{"page":6,"startToken":1659,"endToken":1993,"text":"6 \n \nPJM States should also have a role in the stakeholder process. Talen generally supports \nState involvement because States have a unique perspective to be able to opine on local issues and \npriorities.  For this reason, Talen is supportive of providing a second state representative group \nconsisting of governors’ representatives and/or state legislators’ representatives, in addition to the \nOrganization of PJM States Inc. (“OPSI”). \nTalen also supports OPSI consultation early in the stakeholder process.  It would arguably \nbe too late and inefficient to consult with OPSI “prior to making a section 205 filing” because any \nconstructive feedback from OPSI would need to be circulated through the stakeholders again.   \nTalen further supports allowing states to vote for informational purposes on motions before \nthe Members Committee.  However, providing formal voting rights to States puts PJM on the \nprecipice of a slippery slope.  The Federal Power Act provides the Commission with exclusive \njurisdiction over wholesale sales of electricity in the interstate market and “leaves to the States \nalone, the regulation of [retail electricity sales.]14  States cannot set an interstate wholesale rate \nbecause it would “contraven[e] the FPA’s division of authority between state and federal \nregulators.”15  Accordingly, providing States formal voting rights—or providing OPSI “jump ball” \nfiling rights—is ill-conceived and arguably inconsistent with the FPA.  States and state \ncommissions may continue to initiate their own proceedings with FERC should they desire to do \nso.16  Subject to the limitations and context above, Talen votes “yes” on Nos. 9, 18, and 20 \nand votes “no” on Nos. 14 and 19. \n \n14  FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 264 (2016).  \n15  Hughes v. Talen Energy Marketing, LLC, 578 U.S. 150, 163 (2016).  \n16  See, e.g., 18 C.F.R. § 385.206 (providing that any organization or person can file a complaint against another \nparty alleging violation of a statute, rule, order, or other law administered by FERC or any other alleged wrong \nover which FERC may have jurisdiction)."},{"page":7,"startToken":1993,"endToken":2312,"text":"7 \n \nB. \nTalen supports reforms that would result in increased transparency in the \nPJM stakeholder and decision-making process. \nReasoned decision-making ensures that there is a logical corollary between the facts \npresented and the decision made.  Further, reasoned decision-making protects the legitimacy of \nthe decision-maker.17  The PJM Board should provide the vote count and a reasoned explanation \n(similar to Decisional Letters) based on the facts and issues considered that resulted in the decision \nrendered.  For this reason, Talen votes “yes” on No. 6. \nLegitimacy is also fostered when voting rules bar the furtherance of affiliate interests.  As \nsuch, Talen also supports applying voting rules barring affiliate votes to lower-level committees.  \nFor this reason, Talen votes “yes” on No. 17. \nNotwithstanding the need for increased transparency, some existing and proposed \nmeasures may be counterproductive towards the goal of increased efficiency.  For example, \nrestrictions on Board and stakeholder communications may undermine efforts to coalesce around \nbest paths forward for imminent or priority issues.  More frequent and recurring meetings between \nthe Board and stakeholders would be beneficial for all parties. The Board should also be permitted \nto entertain individual meeting requests for imminent or “priority” issues.  Subject to this \nlimitation and context, Talen votes “yes” on No. 5. \nIn addition, opening Board meetings to the public may unnecessarily politicize the Board’s \ndecisions and delay progress.  PJM would not be alone in holding closed Board meetings.18  For \n \n17  Cf., supra at n.2 (Chairman Swett explaining that complaints regarding PJM’s stakeholder process “are warning \nsigns of a serious legitimacy crisis and a signal that confidence in PJM’s decision making has completely \neroded”). \n18  See ISO-NE, By-Laws, Art. IV (Board meetings are only open to the directors and ISO-NE management); By-\nLaws of the New York Independent System Operating, Inc., Art. III, sec. 1(c) (Board meetings are closed to \nStakeholders, though representatives from FERC and the NYPSC may attend as non-voting participants)."},{"page":8,"startToken":2312,"endToken":2652,"text":"8 \n \nthis reason, Talen votes “no” on No. 7.  If public guests are allowed in Board meetings, they \nshould be pre-registered, at the invitation of a member, and appear in-person.   \nC. \nTalen supports reforms that would protect the independence of the PJM \nBoard. \nThe Commission explained in Order No. 2000, that RTO independence is based on three \nmain criteria: (1) RTO employes and directors have no financial stake in any market participant; \n(2) the RTO must have a decision-making process that is independent of control by any market \nparticipant or class of participants; and (3) the RTO must have exclusive and independent authority \nto file changes to its transmission tariff.19  The Commission should ensure PJM’s compliance with \nthis criteria, but additional restrictions that becomes superfluous or restrict PJM’s ability to attract \nthe best talent to serve on its Board are unnecessary.  For example, Board member qualification \nrules should not include a preference for PJM residents.  Prior experience with and an aptitude for \nPJM issues is more important than PJM residence.  In addition, “cooling off” periods with respect \nto conflict-of-interest rules are unnecessary, provided that all financial conflict of interest rules \nremain intact and consistent with Order No. 2000. This approach would be consistent with how \nother ISO/RTOs, such as CAISO,20 the Electric Reliability Council of Texas,21 the Independent \nSystem Operator of New England,22 the New York Independent System Operator (“NYISO”)23 \n \n19  Supra at n.7. \n20  See CA Public Utilities Code § 337(b); and Board Selection Policy, Version #5.5, CALIFORNIA INDEPENDENT \nSYSTEM OPERATOR (Oct. 19, 2025).    \n21  See Amended and Restated Bylaws of Electric Reliability Council of Texas, Inc., ELECTRIC RELIABILITY COUNCIL \nOF TEXAS, INC. (approved on Dec. 20, 2022); and ERCOT Code of Conduct – The Way We Work, ELECTRIC \nRELIABILITY COUNCIL OF TEXAS, INC.   \n22  See Participants Agreement among ISO New England Inc. and the New England Power Pool and the Individual \nParticipants; and ISO New England Inc. Code of Conduct. \n23  See By-Laws of the New York Independent System Operator, Inc."},{"page":9,"startToken":2652,"endToken":3002,"text":"9 \n \nand SPP,24 rely on financial conflict of interest rules instead of using a “cooling off” period.25  \nAccordingly, Talen votes “no” on No. 3 and votes “yes” on No. 4. \nIt is also not advisable to revise PJM’s governing documents in a manner that could subvert \nthe Board’s independence.  Tying management compensation to the achievement of public \nperformance metrics is one such example.  The Board is often called on to make difficult decisions \nthat are in the best interests of stakeholders and the public in the long term.  A perverse incentive \ncould be created if a Board member’s compensation was tied to short-term metrics.  For this \nreason, Talen votes “no” on No. 10.   \nIt is also unnecessary to include a “public interest” responsibility in PJM’s governing \ndocuments.  Section 7.7(i) of PJM’s Operating Agreement already provides that the Board’s \nPrimary responsibility” is to  \nensure that the President, the other officers of the LLC, and Office \nof the Interconnection perform the duties and responsibilities set \nforth in the Agreement, including . . . the safe and reliable operation \nof the PJM Region . . . operation of a robust, competitive, and non-\ndiscriminatory electric power market in the PJM Region, and . . . \nshall not have undue influence over the operation of the PJM \nRegion.26  \nAs a result, including a “public interest” responsibility would be redundant at best.27    For this \nreason, Talen votes “no” on No. 8. \n \n24  Governing Documents Tariff, SOUTHWEST POWER POOL (March 31, 2026).  \n25  MISO similarly reduced its cooling off period from two years to one year in 2017. See Midcontinent Independent \nSystem Operator, Inc., Docket No. ER17-686-000 (delegated letter order) (issued on Feb. 23, 2017).  \n26  PJM Operating Agreement at Section 7.7(i) (Duties and Responsibilities of the PJM Board) (emphasis added). \n27  The only RTO/ISO with a specific “public interest” principle is CAISO and the principle is established by the \nPublic Utility Code.  See Ca. Pub. Utility Code § 345.5(a) (providing that CAISO “shall conduct its operations \nconsistent with applicable state and federal laws and consistent with the interests of the people of the state”)."},{"page":10,"startToken":3002,"endToken":3110,"text":"10 \n \nIndependence can also be reinforced by longer terms, subject to overall caps.  Further, \nBoard members should have staggered terms, with 3 seats expiring each cycle allowing for a full \nBoard turnover every 6-years.  Talen supports a 6-year term, with a 2-term limit (for a total of 12 \nyears).  The twelve-year total term limit is consistent with NYISO’s practice.28  Board members’ \nterms should expire every 2 years on a staggered basis, to preserve continuity and stability on the \nBoard.  Subject to this limitation and context, Talen votes “yes” on Nos. 1 and 2. \n \n28  NYISO Bylaws at Art. II, Sec. 4 and Art. III, Sec. 3(b)."},{"page":11,"startToken":3110,"endToken":3261,"text":"III. \nCONCLUSION  \nTalen appreciates the opportunity to opine on the PJM governance and stakeholder process.  \nThe issues facing the RTO are too important and pressing to be bogged down by the existing \nstakeholder process.  The Commission has identified certain measures that would increase the \nefficiency and transparency of PJM, while protecting the independence of the PJM Board.  Talen \nrespectfully requests that the Commission consider its comments provided herein.  For ease of \nreference, Talen has attached hereto an Appendix with its standalone answers to the Commission’s \nquestions.  \n \n \n \n \n \n \n       Respectfully Submitted, \n \n /s/ Jennifer Mansh \n \n \nJennifer Mansh \nSenior Vice President, Regulatory \nCounsel \nTalen Energy Corp. \n600 Hamilton Street, Suite 600 \nAllentown, PA 18101 \nJennifer.Mansh@talenenergy.com \n \n /s/ Andrew DeVore \n \nAndrew DeVore \nLilla Grisham \nKirkland & Ellis LLP \n1301 Pennsylvania Avenue, N.W. \nWashington, D.C. 20004 \n(202) 389-3117 \nandrew.devore@kirkland.com  \nlilla.grisham@kirkland.com \n \n \n \n \n \nCounsel for Talen Energy Corporation \n \n \nDated: August 21, 2026"},{"page":12,"startToken":3261,"endToken":3495,"text":"APPENDIX A \nTALEN’S RESPONSES TO THE COMMISSION’S POST-TECHNICAL CONFERENCE QUESTIONS \nPJM Board Independence \n \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nX \n \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \n \nX \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \nX \n \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \nX \n \n6) \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning?  \nX \n \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \n \nX \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \n \nX \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX \n \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \nX \n \nSection 205 Filing Rights \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \nX"},{"page":13,"startToken":3495,"endToken":3751,"text":"13 \n \n \nQuestions/Comments \nYes No \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \nX \n \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \n \nX \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \nX \n \n \nStakeholder Process \n \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \nX \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \nX \n \n \nState Participation \n \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \nX \n \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?   \n \nX \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \nX"},{"page":14,"startToken":3751,"endToken":3818,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day caused to be served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in this docket. \nDated at Washington, D.C. this 21st day of August, 2026. \n \n \n \n \n \n \n  \n   /s/ Andrew DeVore  \n \n \n \n \n \n \n \nAndrew DeVore \nKirkland & Ellis LLP \n1301 Pennsylvania Avenue, N.W. \nWashington, D.C. 20004 \n \nCounsel for Talen Energy Corporation"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":358,"startToken":0,"endToken":424},{"p":2,"at":358,"title":"I. MOTION TO INTERVENE","method":"printed heading","endPage":2,"endAt":1506,"startToken":424,"endToken":597},{"p":2,"at":1506,"title":"II. COMMENTS","method":"printed heading","endPage":3,"endAt":640,"startToken":597,"endToken":730},{"p":3,"at":640,"title":"A. Talen supports reforms that would result in increased efficiency in the PJM","method":"printed heading","endPage":7,"endAt":5,"startToken":730,"endToken":1994},{"p":7,"at":5,"title":"B. Talen supports reforms that would result in increased transparency in the","method":"printed heading","endPage":8,"endAt":182,"startToken":1994,"endToken":2342},{"p":8,"at":182,"title":"C. Talen supports reforms that would protect the independence of the PJM","method":"printed heading","endPage":11,"endAt":0,"startToken":2342,"endToken":3110},{"p":11,"at":0,"title":"III. CONCLUSION","method":"printed heading","endPage":14,"endAt":0,"startToken":3110,"endToken":3751},{"p":14,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":14,"endAt":451,"startToken":3751,"endToken":3818}]}