{"document":{"slug":"rec-20260821-5296","title":"Comments of Ohio Energy Leadership Council on the Reliability Backstop Procurement proposed by PJM Interconnection, L.L.C","issued":"2026-08-21","accession":"20260821-5296","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Ohio Energy Leadership Council","kind":"comments","file":"sources/filings/text/20260821-5296_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5296","tier":"record","sha256":"bbe2c2df1823e8a68da0b1bc7b50786ab9436749d83cb7294617531f4e9cf882","pages":13,"tokens":3447,"emptyPages":[],"textThemes":["adequacy","retail"]},"pages":[{"page":1,"startToken":0,"endToken":249,"text":"UNITED STATES OF AMERICA \nBEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  \n \n \nPJM Interconnection, L.L.C. \n  \n \n) \n) \n) \n \n \nDocket No. ER26-3380-000 \n \n \n \nCOMMENTS OF OHIO ENERGY LEADERSHIP COUNCIL \n \n \nPursuant to the Federal Energy Regulatory Commission (the “Commission”) Rules of \nPractice and Procedure, Ohio Energy Leadership Council (“OELC”) respectfully submits these \ncomments on the Reliability Backstop Procurement (“RBP”) proposed in this proceeding by PJM \nInterconnection, L.L.C. (“PJM”). \nI. \nSUMMARY AND REQUESTED COMMISSION ACTION \nOELC supports the objective of maintaining resource adequacy and recognizes the need \nfor timely, durable action where new load growth is genuinely causing incremental capacity needs. \nBut the Commission should not permit the RBP or any associated definition of “Large Load” to \nturn existing, energy-intensive Ohio manufacturers into the financial backstop for load growth they \ndid not cause. Accordingly, OELC respectfully requests that the Commission condition any \nacceptance of PJM’s RBP proposal on the following: \n1. \nEstablish a separate, protective threshold for non-data-center customers. A non-data-\ncenter customer—including traditional manufacturing, steelmaking, chemical, industrial, \neducational, institutional, information-technology, and retail customers—should be treated \nas a Large Load only if its Peak Load Contribution (“PLC”) is at least 150 MW. The lower \n50 MW threshold should not apply to non-data-center customers. \n2. \nUse a transparent, system-relevant measurement. For both threshold eligibility and any \nallocation that rests on load magnitude, PJM must measure PLC using the customer’s load \nduring the established PJM system-peak hours used to develop capacity obligations—not \nthe customer’s highest demand at any time during the measurement year."},{"page":2,"startToken":249,"endToken":540,"text":"2 \n \n3. \nSpecify the implementation details in tariff language. PJM should identify the \napplicable peak-hour set, the data source and metering boundary, treatment of behind-the-\nmeter generation and demand response, the measurement period, notice and verification \nprocedures, and a customer-level dispute process before any charge is imposed. \n4. Ensure New Generation is Incentivized. The Commission should modify PJM’s \nproposed resource-selection methodology to materially value new dispatchable \ngeneration’s reliability attributes. \nThese protections are necessary for the proposal to satisfy the Federal Power Act’s just-\nand-reasonable standard. Section 205 requires that all Commission-jurisdictional rates, charges, \npractices, and classifications be just and reasonable. PJM bears the burden to demonstrate that each \nproposed RBP practice—including its resource-eligibility, accreditation, offer-quantity, selection, \ncommitment, and cost-allocation rules—meets that standard. \nII. \nOELC’S INTEREST AND EXPERIENCE \n \nOELC is a not-for-profit trade association that represents its members’ interests in utility \nand ratemaking matters in Ohio. Managing the cost and availability of energy is a crucial \ncomponent of success for many businesses, and OELC advocates for competitive, reasonable, and \ntransparent laws, policies, and utility rates through effective lobbying and legal advocacy. OELC’s \nwork is directed to ensuring that Ohio remains an attractive place for businesses and enterprises to \nremain, grow, invest, and create jobs. \nFor more than 30 years, OELC has helped its members understand and manage their \nelectric and natural gas supply costs. OELC and its members have direct, long-standing experience \nwith the practical effects of utility tariffs, rate design, energy legislation, and regulatory policy on \nOhio businesses that must manage significant energy consumption and exposure to volatile energy \ncosts. OELC’s members include energy-intensive manufacturing, industrial, educational, \ninstitutional, information-technology, and retail business customers in Ohio. Collectively, OELC’s \nmembers annually consume many billions of kilowatt-hours of electricity and are major"},{"page":3,"startToken":540,"endToken":808,"text":"3 \n \ncontributors to Ohio’s economy and employment sector. For OELC’s members, electricity is not \na discretionary purchase; it is a material production input, a prerequisite to continuous operations, \nand a major component of the delivered cost of goods and services. \nOELC’s advocacy has included helping shape Ohio energy legislation concerning \nrenewable-energy, energy-efficiency, and peak-demand-reduction requirements, including \nlegislation intended to prevent the unreasonable imposition of utility-initiated cost burdens on \nlarge energy consumers. OELC has also advocated for tariff mechanisms that recognize and \nprovide value for customers that can manage peak consumption or curtail electric demand—\nactions that provide system-wide benefits to the electric grid. \nThrough its dedicated lobbying and regulatory advisors, OELC actively participates in \nlegislative matters affecting Ohio energy and utility policy and participates in matters before the \nPublic Utilities Commission of Ohio (“PUCO”). That work includes electric distribution-rate \nproceedings for Ohio electric utilities and other PUCO proceedings affecting member utility rates \nand issues. OELC is therefore well positioned to explain how wholesale capacity-market and large-\nload-cost-allocation decisions affect Ohio end-use customers and the competitiveness of Ohio’s \nindustrial economy.  \nA capacity-cost allocation that fails to distinguish new, unusually large, data-center-driven \nload from the established industrial base would have immediate practical consequences. It would \nraise the cost of making steel, chemicals, and other essential materials in Ohio; put further pressure \non facilities competing against foreign producers; impair the ability of domestic firms to invest \nand retain jobs; and contribute to price pressure throughout downstream supply chains. The \nCommission should not adopt a rate design that creates those consequences without a clear and \ndemonstrated causal connection to the RBP need."},{"page":4,"startToken":808,"endToken":1093,"text":"4 \n \nIII. \nA 50 MW THRESHOLD FOR NON-DATA-CENTER CUSTOMERS WOULD BE \nARBITRARY, OVERINCLUSIVE, UNJUST AND UNREASONABLE. \nA 50 MW threshold may be an administratively convenient number, but it is not a \ndemonstrated measure of responsibility for the extraordinary new-load conditions at issue. It would \ndraw into the Large Load category an extensive range of established industrial facilities whose \noperational demand reflects manufacturing processes, long-standing production footprints, and \nemployment-intensive operations—not a new, concentrated demand shock. A threshold must do \nmore than identify customers that use a meaningful amount of electricity. It must identify \ncustomers whose incremental system-peak demand creates the need for the specific capacity \nprocurement and associated charges.  \nA 50 MW non-data-center threshold fails that test for a number of reasons. Energy-\nintensive manufacturers use substantial electricity because they produce essential goods. Their \ndemand is often steady, process-driven, and embedded in the long-established load profile on \nwhich PJM’s system planning, capacity obligations, and tariffs have been built. The fact that a \nsteel mill, chemical facility, or other manufacturer exceeds 50 MW at times says nothing about \nwhether it is a new load addition, whether it contributed to the relevant load adjustment, or whether \nit caused an incremental reliability need.  \nBy contrast, the RBP’s stated purpose is to address a shortfall associated with rapid \nadditions of load. The Commission should not permit a proxy that converts the mere size of an \nestablished customer into proof of causation. That would make the charge overinclusive, sever the \nlink between cost and responsibility, and expose existing manufacturers to a substantial new cost \nobligation based on a trait—electricity intensity—that is central to their productive activity and \nunrelated to the new-load phenomenon the RBP is meant to address."},{"page":5,"startToken":1093,"endToken":1365,"text":"5 \n \nTraditional industrial facilities—particularly steel and chemical producers—are \nfoundational to domestic supply chains. They supply inputs used in infrastructure, transportation, \nconstruction, energy systems, agriculture, health care, and national-defense-related production. A \ndurable national-security and national economic strategy requires that these industries have access \nto reliable and reasonably priced power. Reliability and affordability are complementary \nobjectives, not competing ones. The Commission need not choose between supporting data-center \ngrowth and supporting domestic industry. It can do both by applying a definition that targets the \nnew load that creates the incremental requirement while maintaining reliable service to the \ntraditional industrial base.  \nPenalizing existing manufacturers for energy intensity simply weakens the very industrial \ncapacity on which the nation depends, while doing little to improve the signal sent to the new load \nthat drives the need for additional capacity. Energy prices are already a decisive component of \nmanufacturing competitiveness. Capacity charges and other demand-related costs are not absorbed \nin a vacuum. They increase the delivered energy cost of production, reduce operating margins, \nconstrain capital spending, and affect decisions about production volumes, facility expansions, and \nemployment. OELC’s members compete not only with other domestic facilities but with \ninternational producers that may operate under materially different energy, regulatory, labor, and \ncapital-cost conditions.  \nThe Commission should not introduce a new cost burden on domestic manufacturing at a \ntime when the RBP record itself demonstrates capacity-market scarcity: PJM reports that the \n2028/2029 Base Residual Auction cleared 6,831.3 MW UCAP short of the regional reliability \nrequirement at the $325/MW-day market price cap.1 The very conditions that cause a backstop \n \n1 Application (July 31, 2026), p. 7."},{"page":6,"startToken":1365,"endToken":1644,"text":"6 \n \nprocurement to be expensive make it all the more important to allocate its costs narrowly and \naccurately. \nThe likely effect of an overbroad 50 MW threshold is not confined to the affected bill. \nEnergy-intensive manufacturers transmit higher production costs through supply chains, or they \nabsorb them by reducing investment, output, or employment. Neither outcome advances reliability, \naffordability, or economic resilience. In the current inflation-sensitive environment, the \nCommission should avoid a tariff design that can add avoidable cost pressure to domestically \nproduced materials and the goods made from them. \nPJM’s own filing provides the critical factual premise for a targeted, rather than \nindiscriminate, response. PJM states that its forecast predicts 32 GW of peak-load growth from \n2024 through 2030 and that 30 GW of that growth is projected to come from data centers.2 The \nfiling also explains that the RBP is intended to address resource-adequacy challenges “primarily \ndriven by the unprecedented addition of large loads, most notably data centers, in the PJM \nRegion.”3 \nThe RBP record further shows that the projects PJM identified as prospective new large \nloads bear are distinct from historic energy-intensive manufacturers. PJM’s April 2026 request for \ninformation drew responses concerning 47 potential projects averaging 850 MW, with a median \nsize of 300 MW.4 According to PJM the “RFI revealed substantial large load interest from 21 \nentities representing 47 potential projects in the PJM Region averaging 850 MW each, with a \nmedian size of 300 MW.”5 That evidence supports a threshold that distinguishes exceptional new \ndemand from the established businesses that are already integral to Ohio’s industrial economy.  \n \n2 Id., p. 6. \n3 Id., p. 1. \n4 Id., p. 18. \n5 Id."},{"page":7,"startToken":1644,"endToken":1968,"text":"7 \n \nThe record points to data-center-driven load growth; it does not establish that existing non-\ndata-center customers with 50–149 MW of system-peak PLC are causing the resource-adequacy \nshortfall. Indeed, PJM acknowledges that its forthcoming filing, rather than the RBP filing itself, \nwill propose a regional Large Load definition. The proper policy response is to align costs with \nnew data-center load and its procurement choices—not to shift the burden to legacy industrial \ncustomers that did not make those commitments because they did not cause the underlying \ncapacity shortfall. The Commission should require PJM to develop that definition on evidence, \nwith an explicit distinction between new data centers and non-data-center customers. A 150 MW \nsystem-peak PLC threshold for non-data-center customers is a conservative and rational boundary: \nit is only one-half of the median project size PJM identifies in the record, yet it avoids recasting \nsubstantial numbers of traditional facilities as the type of extraordinary load the RBP was designed \nto address.  \nIV. \nThe Commission Should Require PJM To Use PLC Values Not a Customer’s Highest \nDemand at Any Time in the Measurement Year. \nThe definition of Large Load will be no more rational than its measurement method. OELC \nstrongly recommends that PJM measure load using a customer’s PLC values established during \nPJM system peaks, not the customer’s highest demand during any hour in the measurement year. \nCapacity procurement exists to ensure that sufficient resources are available when the PJM \nsystem faces its highest coincident peak demand. The relevant question, therefore, is not whether \na particular customer ever reached a high demand level in an isolated hour. It is whether the \ncustomer materially contributes to the regional peak conditions that establish the system’s capacity \nneed. A customer-specific annual maximum can occur in a season, hour, or operating condition \nthat does not coincide with the PJM system peak. It may reflect a one-time production event, an \noutage recovery, a weather-related operational adjustment, commissioning activity, or another"},{"page":8,"startToken":1968,"endToken":2285,"text":"8 \n \nidiosyncratic event with no meaningful relationship to the reliability condition the RBP addresses. \nUsing that noncoincident maximum would overstate the customer’s capacity responsibility and \nproduce classifications untethered from the need for incremental capacity. \nBy contrast, system-peak PLC is a familiar and objective planning construct used by PJM \nfor many years. It measures demand when capacity is most needed by the region. PJM itself relies \non load adjustments and capacity-obligation concepts that are intended to assign changes in \nforecasted load to the zone or area where they occur. The Large Load definition should employ \nthe same fundamental principle: identify load by its contribution to the relevant system condition, \nrather than by an isolated and potentially unrepresentative maximum peak demand. \nIf a customer can be classified as a Large Load based on its highest demand at any time in \na year, a single non-coincident operating hour could trigger a long-lived tariff consequence. That \napproach would be unpredictable, hard to audit, and unfair to customers with variable \nmanufacturing processes. It could also perversely encourage customers to alter operations during \nindividual high-demand hours without reducing their contribution to system peaks, thereby \nproducing no genuine reliability benefit. \nThe Commission should thus reject a methodology that confuses a facility’s maximum \noperating demand with its system-relevant contribution to capacity requirements. A capacity-\nrelated classification must be based on capacity-related data. Accordingly, the Commission should \ndirect PJM to file tariff language or an implementation manual, subject to Commission review, \nthat resolves at minimum the following issues: \n1. \nUse of PLC Values. Identify the precise PJM peak-hour set and the period used to calculate \nthe customer’s peak load for purposes of defining a “Large Load Customer,” including the \nprocess for publishing those hours and correcting data errors. OELC recommends that PJM \nbe directed to use the existing PLC methodology; an annual maximum, an unannounced \nad hoc interval, or a noncoincident peak should not be used."},{"page":9,"startToken":2285,"endToken":2611,"text":"9 \n \n2. \nNet-load treatment. Specify the treatment of behind-the-meter generation, demand \nresponse, energy storage, and other load-management arrangements, including the data \nnecessary to verify net system contribution. \n3. \nCustomer notice and verification. Provide customers with advance notice of proposed \nclassification, their underlying interval data and calculated PLC, a reasonable time to \ncorrect errors, and a transparent mechanism for challenging a classification before charges \ntake effect. \n4. \nTemporal nexus to new load. For purposes of the RBP, require PJM and the relevant \nelectric distributor to demonstrate that the customer’s qualifying PLC reflects new or \nincremental load relative to the forecast or baseline used to establish the relevant RBP \ntarget. Existing load should not be reclassified solely because it is large. \nThese elements are indispensable. Without them, customers cannot forecast their exposure, \nevaluate the accuracy of their bills, or meaningfully participate in any state retail-cost-allocation \nproceeding. Ambiguity in the definition and measurement of load invites inconsistent results, \ndisputes, and cost shifting—the opposite of the transparent and reasonable tariff administration \nOELC seeks. \nV. \nPJM’S RBP RESOURCE-SELECTION METHODOLOGY IS NOT JUST AND \nREASONABLE BECAUSE IT DOES NOT ADEQUATELY INCENTIVIZE NEW \nDISPATCHABLE GENERATION. \nIn addition, the Commission should reject or condition the RBP’s resource-selection \nprovisions. The question is not simply whether PJM can procure a numerical quantity of UCAP at \nthe lowest levelized price. The question under Federal Power Act section 205 is whether the \nproposed procurement practice is just and reasonable in light of the specific resource-adequacy \nproblem PJM says it is trying to solve. On this record, the answer is no. \nPJM seeks a long-term reliability backstop because the 2028/2029 Base Residual Auction \n(BRA) cleared materially short of the regional reliability requirement. A just-and-reasonable \nremedy must be designed to obtain the resources most capable of serving load during the \nreliability-risk conditions for which the backstop is being created. PJM’s proposal does not do so. \nIt treats capacity as substantially homogeneous for selection purposes, although resources differ in"},{"page":10,"startToken":2611,"endToken":2893,"text":"10 \n \ntheir ability to start, dispatch, sustain output, perform in stress conditions, operate through \nextended events, and respond to changing reliability needs during a commitment that can extend \nthrough the 2042/2043 Delivery Year. \nNot all resources accredited in UCAP terms are equally useful for meeting a reliability \nshortfall. A resource capable of dispatchable, sustained generation during system stress provides \na different reliability service from a resource whose capacity depends on load curtailment, \ncustomer participation, a limited operating duration, or changing conditions outside PJM’s direct \noperational control. That distinction is particularly important for a one-time, 15-year procurement \nintended to provide a durable reliability backstop. The Commission should direct PJM to \nseparately evaluate and reflect in the methodology the dispatchability, firm availability, duration, \nfuel assurance, operational control, and demonstrated performance during the conditions that drive \nthe RBP need. \nOELC understands that the 2028/2029 BRA Effective Load Carrying Capability (ELCC) \nvalues used in the proposal assign Demand Response an ELCC value of 91%, while assigning Gas \nCombined Cycle an ELCC value of 78%.6 If PJM uses those values as a dispositive measure of \nthe relative capacity contribution of these resources for RBP selection, it sends the wrong \ninvestment signal. It can advantage demand response over new dispatchable combined-cycle \ngeneration even though the latter adds new, controllable supply capable of sustained operation. \nPJM has not shown why an accreditation comparison developed for the 2028/2029 BRA should \ngovern a procurement expressly designed to address a longer-term reliability problem. \nThe problem is not that demand response has no role in reliability. Properly contracted, \nmeasurable, and dispatchable demand response can provide tremendous value, and for many years \n \n6 See Application (July 31, 2026), p. 32."},{"page":11,"startToken":2893,"endToken":3216,"text":"11 \n \nOELC has advocated for PUCO-approved interruptible programs operated by Ohio’s electric \ndistribution utilities. The problem is that PJM has not demonstrated that the 2028/2029 BRA’s \nmethodology properly captures the distinct reliability value of new dispatchable generation in the \nRBP context. The Commission should require PJM to make that showing before it permits an \naccreditation construct to drive 15-year resource commitments and the resulting charges to load. \nVI. \nCONCLUSION AND RECOMMENDATIONS. \nOELC does not oppose the development of new resources to meet incremental demand. To \nthe contrary, a reliable electric system is essential to OELC’s members. OELC’s concern is that \nthe cost of that reliability must be assigned in a manner consistent with the actual source of the \nneed. PJM itself represents that its proposal respects the distinction between wholesale and retail \nauthority and that states will determine how costs assigned to a load serving entity are collected \nfrom retail customers. PJM further states that each state may use its own definitions of data centers \nand large loads when allocating RBP charges at retail.  \nThe Commission should ensure that PJM’s federal tariff framework facilitates, rather than \nfrustrates, a properly targeted Ohio retail allocation. A clear 150 MW system-peak PLC guardrail \nfor non-data-center customers will provide a principled and administrable floor of protection for \nexisting manufacturers. It does not prevent Ohio or another state from adopting additional \nsafeguards for its retail customers. Nor does it impair PJM’s ability to procure needed capacity \nfrom resources. It simply prevents the definition from capturing a broad group of established \nindustrial customers based on a low, non-causal threshold. \nPJM’s record also makes clear that it expects states to protect existing customers when \nassigning RBP costs: the filing states that the appropriate retail customers are new large loads, \nincluding data centers, “and not residential customers or small industrial customers.” OELC agrees \nwith the principle but urges the Commission not to treat it as limited to only “small” industrial"},{"page":12,"startToken":3216,"endToken":3398,"text":"12 \n \ncustomers. Traditional manufacturers do not become a cause of load growth merely because they \nare energy intensive. The requested 150 MW threshold ensures that the protection is meaningful \nfor the existing industrial base. \nThe Commission can advance resource adequacy without sacrificing affordability, \ndomestic competitiveness, or the industrial base that remains indispensable to Ohio and the United \nStates. Accordingly, OELC respectfully requests that the Commission condition its action to \nrequire: (1) a 150 MW system-peak PLC threshold for non-data-center customers; (2) PLC \nmeasurement based on established PJM system peaks, rather than any customer-specific peak \nduring the measurement year, and a clear and transparent process for categorizing and notifying \ncustomers of those values; (3) a resource-selection methodology that materially values new \ndispatchable generation’s reliability attributes and, thus, encourages their development. \nDate: August 21, 2026 \nRespectfully submitted, \n \n \n \n \n/s/ David F. Proaño \n \n         \n \nDavid F. Proaño (Counsel of Record) \n \nBenjamin A. Kurtz \n \nBAKER & HOSTETLER LLP  \n \n127 Public Square, Suite 2000 \n \nCleveland, OH 44114 \n \n216-621-0200 / Fax 216-696-0740 \n \nEmail: dproano@bakerlaw.com  \n \nEmail: bkurtz@bakerlaw.com  \n \n \n*Willing to Accept Service by Email*  \n \n \nCOUNSEL FOR OHIO ENERGY  \n \nLEADERSHIP COUNCIL"},{"page":13,"startToken":3398,"endToken":3447,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that on this 21st day of August 2026, I served the foregoing document by electronic \nmeans on each person listed on the Federal Energy Regulatory Commission’s official service list \nin Docket No. ER26-3380-000.  \n \n \n \n \n \n \n/s/ David F. Proaño \n \n         \n \n \nDavid F. Proaño   \n \n \nCounsel of Record"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":508,"startToken":0,"endToken":64},{"p":1,"at":508,"title":"I. SUMMARY AND REQUESTED COMMISSION ACTION","method":"printed heading","endPage":2,"endAt":991,"startToken":64,"endToken":373},{"p":2,"at":991,"title":"II. OELC’S INTEREST AND EXPERIENCE","method":"printed heading","endPage":7,"endAt":1079,"startToken":373,"endToken":1805},{"p":7,"at":1079,"title":"IV. The Commission Should Require PJM To Use PLC Values Not a Customer’s Highest","method":"printed heading","endPage":9,"endAt":1251,"startToken":1805,"endToken":2455},{"p":9,"at":1251,"title":"V. PJM’S RBP RESOURCE-SELECTION METHODOLOGY IS NOT JUST AND","method":"printed heading","endPage":11,"endAt":478,"startToken":2455,"endToken":2961},{"p":11,"at":478,"title":"VI. CONCLUSION AND RECOMMENDATIONS.","method":"printed heading","endPage":13,"endAt":0,"startToken":2961,"endToken":3398},{"p":13,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":13,"endAt":347,"startToken":3398,"endToken":3447}]}