{"document":{"slug":"rec-20260821-5297","title":"Comments of North Carolina Electric Membership Corporation re PJM Interconnection, L.L.C.'s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5297","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"North Carolina Electric Membership Corporation","kind":"comments","file":"sources/filings/text/20260821-5297_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5297","tier":"record","sha256":"760a118a2d290fd4eeabedb87a686d132bedfe787463d1c1b280f47237890a2b","pages":6,"tokens":1180,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":217,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket No. ER26-3380-000\nCOMMENTS OF NORTH CAROLINA ELECTRIC MEMBERSHIP \nCORPORATION \nPursuant to Rules 211 and 212 of the Commission’s Rules of Practice and \nProcedure1 and the Commission’s Combined Notice of Filings #1 of August 3, \n2026, North Carolina Electric Membership Corporation (“NCEMC”)2 submits the \nfollowing comments on the filing by PJM Interconnection, L.L.C. (“PJM”) \nproposing revisions to its Open Access Transmission Tariff (“Tariff”) and \nReliability Assurance Agreement Among Load Serving Entities (“RAA”) to \nestablish a Reliability Backstop Procurement (“RBP Proposal”).3\nPJM states that the RBP Proposal will be a one-time procurement of new \ncapacity resources intended to address previously identified resource adequacy \nchallenges that have arisen as a result of insufficient capacity commitments in the \n2027/2028 and 2028/2029 Reliability Pricing Model (“RPM”) Capacity Market \nAuctions. NCEMC shares the reliability concern that PJM is attempting to \naddress; however, PJM’s proposed fix gives rise to a key cost-allocation concern \n1 18 C.F.R. § 385.211 & .212 (2025). \n2 NCEMC filed a (doc-less) motion to intervene in this proceeding on August 12, 2026. \n3 PJM Interconnection, L.L.C., Docket No. ER26-3380-000, “Reliability Backstop Procurement \nto Address Resource Adequacy Concerns Stemming from Large Loads” (filed July 31, 2026)."},{"page":2,"startToken":217,"endToken":424,"text":"2 \narticulated in the Protest of East Kentucky Power Cooperative, Inc. (“EKPC”) \nbeing filed in this proceeding today (“EKPC Protest”). \nI.\nNCEMC \nNCEMC is a generation and transmission cooperative responsible for the \nfull or partial power supply requirements of its 25 members throughout the state of \nNorth Carolina. Those 25 distribution cooperatives, in turn, supply electricity to \napproximately one million homes, farms, and businesses in which more than 2.5 \nmillion North Carolinians live and work. NCEMC distribution cooperative loads \nare located throughout the service areas of three investor-owned public utilities: \nDuke Energy Carolinas, LLC, and Duke Energy Progress, LLC, both subsidiaries \nof Duke Energy Corporation, and Virginia Electric and Power Company, doing \nbusiness as Dominion Energy Virginia in Virginia and as Dominion Energy North \nCarolina in North Carolina (hereinafter, Dominion).  \nNCEMC is a member of PJM, which operates transmission facilities owned \nby Dominion and other electric utilities. NCEMC purchases transmission services \nfrom PJM over Dominion’s transmission facilities to serve the loads of its six \nmember cooperatives that distribute power at retail in the Dominion transmission \nzone of the PJM region. NCEMC is a member of PJM’s Electric Distributor \nsector, a load-serving entity, and a participant in PJM’s energy, ancillary services, \ncapacity, and financial transmission rights markets."},{"page":3,"startToken":424,"endToken":672,"text":"3 \nII.\nThe RBP Proposal Allocates Costs to Non-Cost-Causers, including \nNCEMC and its Member Cooperatives. \nNCEMC shares EKPC’s concern that “[t]he PJM RBP Proposal does not \nadequately define who is responsible for the charges (which affects how much of \nthe zone/area assigned costs any individual LSE [Load-Serving Entity] may \nreceive) or how the charges are tied to incremental cost causation.” EKPC Protest \nat 19. EKPC points out that “PJM has failed to provide ‘clear and transparent \nprocedures’ to allow an LSE to determine the amount of costs it may be allocated \nunder the PJM RBP Proposal.” Id. at 17 (citation omitted). EKPC explains the \nuncertain cost allocation that LSEs face:  \nMost concerning, PJM’s proposal for a default \nallocation methodology, should the Electric Distributor \nnot report an RBO [“RBP Obligation”], is that all \nLSEs in the zone/area will be held accountable to pay \nthe costs PJM assigns to the zone/area, regardless of \nwhether they serve any large load or contributed to the \nneed for backstop procurement. The uncertainty of \nbeing assigned costs, as well as the magnitude of the \ncosts that may be assigned, should the large loads not \nmaterialize in each zone/area as PJM anticipated in \nestablishing the procurement target, will itself impact \nwhether large loads materialize as forecasted. It is \nnearly impossible for an LSE, based on the \ninformation available to it in PJM’s RBP Proposal, to \ndetermine the amount of costs it may be allocated.  \nId. at 17–18 (citation omitted)."},{"page":4,"startToken":672,"endToken":979,"text":"4 \nPJM could and should clearly identify entities which will not bear costs under the \nRBP Proposal.4 With regard to NCEMC, PJM has not done so. EKPC provided the \nfollowing helpful example:  \nIt is also unclear whether PJM is properly using the \ninformation from Table B9b from the 2026 PJM Load \nForecast to ensure Electric Distributor zone/areas \nreceive correct allocations from PJM. For example, \n[NCEMC] is located in the Dominion Energy zone. \nBut, the NCEMC area is not currently reflected as “0” \nin PJM’s Initial Allocation to Electric Distributor \nzone/area table. Therefore, as initially presented by \nPJM, NCEMC could be subject to some kind of cost \nallocation if the cross-state cost allocation is not \nappropriately determined.   \nId. at 20 (citation omitted).  \nPJM should be required to clearly identify entities which will not bear costs \nunder the RBP Proposal’s primary cost-allocation methodology as well as under \nits alternative “default methodology.” EKPC’s Protest explains the deficiency of \nPJM’s proposed default methodology:  \nPJM’s proposal to use a default allocation based on \nDaily Unforced Capacity Obligation if the more \ntargeted allocation process does not produce an LSE-\nspecific result is also unjust and unreasonable. When a \nstate or RERRA [Relevant Electric Retail Regulatory \nAuthority] has not determined an RBO for LSEs \nwithin a zone/area, PJM defaults to allocating costs \nbased on each LSE’s Daily Unforced Capacity \nObligation ratio share. This backup methodology \nsocializes RBP costs across all load within the zone—\n4 Indeed, as EKPC points out, if PJM had designed its proposal to align with the only stakeholder \nproposal to receive the required two-thirds sector-weighted member support, PJM would not have \nproposed “a mandatory procurement, especially one that did not identify or track with specificity \nwho would bear the costs of, or who receives the RBP MW credit resulting from, the \nprocurement.” EKPC Protest at 9."},{"page":5,"startToken":979,"endToken":1115,"text":"5 \nincluding LSEs serving customer bases that \ncontributed nothing to the capacity shortfall. \nId.\nIII.\nConclusion \nPJM’s proposal does not adequately address the cost-allocation concerns \nset forth above and is not just and reasonable. Based on this particular ratepayer-\nprotection issue, NCEMC supports the relief requested in the EKPC Protest.  \nAugust 21, 2026\nRespectfully submitted,  \n/s/ Michael D. Youth                           \nCharles Bayless \nSenior Vice President and General   \nCounsel \nMichael D. Youth \nVice President and Deputy General \nCounsel \nNorth Carolina Electric Membership \nCorporation \n3400 Sumner Blvd. \nRaleigh, NC 27616  \nCharlie.Bayless@ncemcs.com\nMichael.Youth@ncemcs.com\nSean T. Beeny \nF. Alvin Taylor  \nRandolph L. Elliott \nMcCarter & English, LLP \n1301 K Street NW, Suite 1000 West \nWashington, D.C. 20005 \n(202) 753-3400 \nsbeeny@mccarter.com\nataylor@mccarter.com\nrelliott@mccarter.com\nAttorneys for North Carolina Electric \nMembership Corporation"},{"page":6,"startToken":1115,"endToken":1180,"text":"6 \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon \neach person designated on the official service list compiled by the Secretary in this \nproceeding. \nDated at Washington, D.C. this 21st day of August, 2026.\n/s/ Randolph Elliott                              \nRandolph L. Elliott \nMcCarter & English, LLP \n1301 K Street NW, Suite 1000 West \nWashington, D.C. 20005 \n(202) 753-3428"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":137,"startToken":0,"endToken":237},{"p":2,"at":137,"title":"I. NCEMC","method":"printed heading","endPage":3,"endAt":3,"startToken":237,"endToken":425},{"p":3,"at":3,"title":"II. The RBP Proposal Allocates Costs to Non-Cost-Causers, including","method":"printed heading","endPage":5,"endAt":99,"startToken":425,"endToken":993},{"p":5,"at":99,"title":"III. Conclusion","method":"printed heading","endPage":5,"endAt":720,"startToken":993,"endToken":1077},{"p":5,"at":720,"title":"F. Alvin Taylor","method":"printed heading","endPage":6,"endAt":3,"startToken":1077,"endToken":1116},{"p":6,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":428,"startToken":1116,"endToken":1180}]}
