{"document":{"slug":"rec-20260821-5300","title":"Comments of Calibrant Energy requesting clarification re the PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and the…","issued":"2026-08-21","accession":"20260821-5300","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Calibrant Energy","kind":"rehearing request","file":"sources/filings/text/20260821-5300_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5300","tier":"record","sha256":"bcd10e4fccba0a04b95bf37b0c5b6041011c61c7653c156e44b7aec694575a7c","pages":6,"tokens":1408,"emptyPages":[],"textThemes":["colo","flex","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":249,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \nPJM Interconnection, LLC \n) \nDocket No. ER26-3380-000 \n) \n \nREQUEST FOR CLARIFICATION OF CALIBRANT ENERGY \n \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (Commission) \nRules of Practice and Procedure,1 Calibrant Energy (Calibrant) respectfully submits this request \nfor clarification of PJM Interconnection, LLC’s (PJM) proposed revisions to its Open Access \nTransmission Tariff (Tariff) and the Reliability Assurance Agreement Among Load Serving \nEntities (“RAA”) to establish the Reliability Backstop Procurement (“RBP”). Calibrant seeks \nonly a narrow clarification of proposed Tariff Attachment DD Section 18.2 (c) in order to \neliminate confusion or ambiguity and the potential, if read wrongly, to result in unjust and \nunreasonable or unduly discriminatory barriers to the participation of resources that could \notherwise contribute as part of the solution to the region’s resource adequacy challenges. \nSpecifically, Calibrant seeks to clarify that bilateral contracts between loads and behind-the-\nmeter generation resources to support load response are sufficient evidence to support Qualifying \nRBP Offset UCAP eligibility under proposed Tariff Attachment DD Section 18.2 (c).    \nCalibrant develops energy generation and storage assets throughout the United States, \nincluding in the PJM footprint. Calibrant participated in PJM’s stakeholder process to ensure that \nthe behind-the-meter generation projects that it develops in the region, which are new “steel-in-\nthe-ground” projects capable of reliably serving the long-term capacity needs of the region with a \nfaster development timeline than front-of-the-meter new capacity resources, are fully eligible to \n \n1 18 C.F.R. § 385.211."},{"page":2,"startToken":249,"endToken":550,"text":"2 \nparticipate either as Qualifying RBP Offset UCAP that reduces the RBP target for procurement \nor as RBP Resources. Specifically, Calibrant sought to ensure that its behind-the-meter \ngeneration projects would be eligible to provide capacity as demand response via RBP.  \nCalibrant is appreciative of PJM’s engagement during the stakeholder process and PJM’s \nrecognition of the potential for behind-the-meter generation projects to contribute to addressing \nthe region’s resource adequacy challenges through its inclusion of pathways for demand \nresources to qualify as both Qualifying RBP Offset UCAP and RBP Resources. Calibrant here \nseeks a limited clarification of PJM’s proposed tariff provisions only regarding the evidence that \nmust be submitted to be eligible as Qualifying RBP Offset UCAP under proposed Tariff \nAttachment DD Section 18.2 (c), which is consistent with PJM’s position during the stakeholder \nprocess. \nI. \nREQUEST FOR CLARIFICATION \nPJM’s Proposed Tariff Attachment DD Section 18.2 (c) sets forth the evidence that must \nbe submitted during the RBP bid submission window in order for new capacity that will serve \nthe region to be eligible as Qualifying RBP Offset UCAP MW. Three types of supporting \nevidence may qualify under this provision, each of which is subject to differing additional \ncriteria. Under proposed Section 18.2 (c)(i), a signed bilateral contract may qualify; under (ii) a \nRERRA-approved or accepted integrated resource plan may qualify; and under (iii) a signed \ncommitment with a Curtailment Service Provider or DER Aggregator may qualify. As a \ndeveloper of behind-the-meter generation projects, Calibrant expects that it would provide as \nqualifying evidence pursuant to Section 18.2 (c)(i) a signed bilateral contract with an end-use \ncustomer to enable load response. Under this pathway, a contract would qualify if its term is for \nprovision of Qualifying RBP Offset UCAP MW for at least five Delivery Years with a"},{"page":3,"startToken":550,"endToken":861,"text":"3 \ncommercial operation date for the project prior to the 2032/2033 Delivery Year, and matched \nwith load indicating that it will come online in the 2027/2028 or 2028/2029 Delivery Year. \nCalibrant notes that nothing in the requirements under Section 18.2 (c)(i) or definition of \nQualifying RBP Offset UCAP MW limit applicability of the bilateral contract evidentiary path to \ncapacity that is front-of-meter rather than behind-the-meter generation that can support load \nresponse. \nIn contrast, proposed Section 18.2 (c)(iii) appears to apply to the commercial relationship \nbetween curtailment service providers and flexible loads that may not be supported by physical \nassets, and incorporates additional limitations that would not appropriately apply to Qualifying \nRBP Offset UCAP MW provided by behind-the-meter generation projects. Specifically, Section \n18.2 (c)(iii) requires that the new load will either (a) participate directly as demand response \nstarting immediately in the 2028/2029 Delivery Year Second Incremental Auction or (b) \n“purchase replacement Qualifying RBP Offset UCAP MW that are eligible generation or storage \nresources.” Such provisions make little sense in the context of a behind-the-meter generation \nproject that contracts with the end-use customer to achieve a load reduction. Because behind-the-\nmeter generation projects require steel in the ground, they may, like front-of-the-meter projects \nand unlike load response unsupported by physical generation assets, have a commercial \noperation date that does not allow for participation in the 2028/2029 Delivery Year. But, as is the \ncase for front-of-the-meter generation projects, that is not a basis to disqualify them entirely from \nproviding capacity that could meet the region’s resource adequacy needs over the long-run. \nLikewise, the alternate option under Section 18.2 (c)(iii) to purchase replacement eligible \ngeneration or storage resources makes little sense in a context in which otherwise eligible \ncapacity from a behind-the-meter generation project has already been procured by the new load,"},{"page":4,"startToken":861,"endToken":1181,"text":"4 \nbut has simply not yet come online. These restrictions make more sense applied to load \nflexibility unsupported by physical assets than they do the load response enabled by behind-the-\nmeter generation in the types of configurations that Calibrant develops. \nIn addition, Section 18.2 (c)(iii) requires evidence that the “new load(s)” subject to the \nsigned commitment with a Curtailment Service Provider or DER Aggregator will participate “in \na MW quantity equal to MW quantity of the new load(s)” as Annual Demand Resources or DER \nCapacity Aggregation Resources. As an initial matter, it is unclear whether this requirement \nattaches to the quantity of new load matched to Qualifying RBP Offset UCAP MW or the \nentirety of a customer’s load at a given site. But if a new load supported by behind-the-meter \ngeneration were required to participate as demand resource or to purchase replacement \nQualifying RBP Offset UCAP MW at no less than 100% of their full load in order to constitute \nQualifying RBP Offset UCAP MW, such a constraint would be unjust and unreasonable or \nunduly discriminatory. There is no reasonable basis to bar a behind-the-meter generation project \nfrom serving a new load’s capacity needs in part, particularly where front-of-the-meter \ngeneration projects face no equivalent obligation to match 100% of the new load in order to be \neligible as Qualifying RBP Offset UCAP MW. Prohibiting smaller generation projects from \npartially enabling a larger load’s provision of load response would preclude them from helping to \naddress a resource adequacy crisis in the region; Calibrant does not believe PJM intended \nSection 18.2 (c)(iii) to impose such a constraint on participation by behind-the-meter generation \nin RBP. \nFortunately, the Tariff is broad enough to allow bilateral contracts between a behind-the-\nmeter generation project and a new load to support the resulting capacity’s qualification as \nQualifying RBP Offset UCAP MW. This pathway is best suited to the particularities of behind-"},{"page":5,"startToken":1181,"endToken":1348,"text":"5 \nthe-meter generation development and would avoid the mismatches noted above that could limit \nthe ability of behind-the-meter steel in the ground to help meet the region’s critical resource \nadequacy needs. It also reflects the fact that contracting for behind-the-meter generation to \nsupport load response looks more like contracting with front-of-the-meter assets than like the \nload flexibility unsupported by physical assets that 18.2 (c)(iii) appears tailored to. \nII. \nCONCLUSION \nFor the foregoing reasons, Calibrant respectfully requests that PJM or the Commission \nclarify that behind-the-meter generation projects can provide evidence that they are eligible as \nQualifying RBP Offset UCAP MW under Proposed Tariff Attachment DD Section 18.2 (c)(i), \nand that such projects are not restricted to demonstration via Section 18.2 (c)(iii).     \n \n \nRespectfully submitted, \n/s/ Kim Smaczniak \nKim Smaczniak \nMiles Farmer \nAvi Zevin \nNathan Lobel \nRoselle LLP \n300 New Jersey Ave. NW, Suite 300 \nWashington, DC 20001 \nkim.smaczniak@rosellellp.com \nmiles.farmer@rosellellp.com \navi.zevin@rosellellp.com \nnathan.lobel@rosellellp.com"},{"page":6,"startToken":1348,"endToken":1408,"text":"6 \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Commission in this \nproceeding. \n \nDated: August 21, 2026 \n/s/ Nathan Lobel \nNathan Lobel \nRoselle LLP \n300 New Jersey Ave. NW, Suite 300 \nWashington, DC 20001 \nnathan.lobel@rosellellp.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":932,"startToken":0,"endToken":383},{"p":2,"at":932,"title":"I. REQUEST FOR CLARIFICATION","method":"printed heading","endPage":5,"endAt":474,"startToken":383,"endToken":1250},{"p":5,"at":474,"title":"II. CONCLUSION","method":"printed heading","endPage":6,"endAt":3,"startToken":1250,"endToken":1349},{"p":6,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":376,"startToken":1349,"endToken":1408}]}