{"document":{"slug":"rec-20260821-5304","title":"Comments of Blue Ridge Power Agency re PJM Interconnection, L.L.C.'s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5304","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"BLUE RIDGE POWER AGENCY","kind":"comments","file":"sources/filings/text/20260821-5304_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5304","tier":"record","sha256":"4d19bbc478671a01cb911eddb944c4a4201fe0d489e6c2bf91e05434f4be0b20","pages":5,"tokens":857,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":199,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket No. ER26-3380-000\nCOMMENTS OF BLUE RIDGE POWER AGENCY \nPursuant to Rules 211 and 212 of the Commission’s Rules of Practice and \nProcedure1 and the Commission’s notice of filing of August 3, 2026, Blue Ridge \nPower Agency (“Blue Ridge”) submits the following comments on the filing by \nPJM Interconnection, L.L.C. (“PJM”) of proposed revisions to the PJM Open \nAccess Transmission Tariff (“Tariff”) and Reliability Assurance Agreement \nAmong Load Serving Entities (“RAA”) to establish a Reliability Backstop \nProcurement (the “RBP Proposal”).2\nAs set forth below, Blue Ridge is concerned that the lack of specificity in \nthe RBP Proposal as to cost allocation to load-serving entities may result in unjust \nand unreasonable rates to Blue Ridge’s members.  \nA.\nBlue Ridge \nBlue Ridge is a non-profit corporation established in 1988 under the laws of \nthe Commonwealth of Virginia. Blue Ridge is governed by its nine members, all \nof which are publicly- or consumer-owned electric distribution utilities. The Blue \n1 18 C.F.R. § 385.211 & .212 (2025). \n2 Blue Ridge filed a separate (doc-less) motion to intervene in this proceeding on August 21, \n2026."},{"page":2,"startToken":199,"endToken":435,"text":"2 \nRidge members collectively serve over 200,000 residents of the Commonwealth of \nVirginia. Blue Ridge assists its members in obtaining wholesale power and makes \nrelated transmission arrangements on their behalf. Blue Ridge is a member of PJM \nInterconnection, L.L.C., and a member of the Electric Distributor sector. Blue \nRidge members serve load in the APS, AEP, and Dominion Energy Zones of the \nPJM region.  \nB.\nComments \nIn its transmittal letter, PJM describes the RBP Proposal as “a one-time \nprocurement of new capacity resources intended to address previously identified \nresource adequacy challenges in the PJM Region arising from insufficient \ncommitments of capacity in the 2027/2028 and 2028/2029 Reliability Pricing \nModel (“RPM”) Auctions.”3 More specifically, PJM asserts that its RBP Proposal \n“is a just and reasonable means to address the influx of large loads while \nmaintaining resource adequacy, reliability, and affordability in a manner that \nrespects the divide between state and federal authorities and avoids disrupting \nexisting commercial arrangements.”4\nBlue Ridge shares PJM’s concerns and objectives and recognizes the need \nfor interim measures to address them. But Blue Ridge is concerned that the cost-\nallocation methods described by PJM are not set forth with enough specificity in \n3 PJM Interconnection, L.L.C., Docket No. ER26-3380-000, Reliability Backstop Procurement to \nAddress Resource Adequacy Concerns Stemming from Large Loads at 1 (filed July 31, 2026) \n(“PJM RBP Transmittal”). \n4 Id. at 2."},{"page":3,"startToken":435,"endToken":656,"text":"3 \nthe Tariff and RAA to ensure that load-serving entities like Blue Ridge’s members \nare charged just and reasonable rates for PJM’s interim, supplementary \nprocurement of capacity resources.  \nBlue Ridge agrees with PJM’s general proposal to allocate RBP costs \nwithin a zone/area in accordance with each load-serving entity’s “RBP \nObligation” (or “RBO”) as determined by a state or Relevant Electric Retail \nRegulatory Authority (RERRA),5 provided that the legal authority of a municipal \nRERRA (e.g., a city council or utility board) over retail electric service in the \nmunicipal service area is fully respected by PJM. Moreover, given the \nunprecedented 15-year term of PJM’s proposed capacity procurements under the \nRBP Proposal, Blue Ridge is concerned that a one-time allocation of costs may \nbecome unjust and unreasonable over this 15-year period. Finally, Blue Ridge is \nconcerned that the RBP Proposal does not have enough specificity to ensure that \nPJM allocates RBP costs to each area/zone in the PJM region in a manner roughly \ncommensurate with cost causation. For example, PJM’s discretion to make load \nadjustments or “Qualifying RBP Offsets” is not adequately specified.6 The \nproblem created by this lack of specificity is exacerbated by PJM’s “backup” cost-\nallocation method, applicable when an RBO is not determined, which socializes \n5 See RBP Transmittal at 98. \n6 See id. at 100-102."},{"page":4,"startToken":656,"endToken":792,"text":"4 \nRBP costs to all loads in an area/zone based on peak load contributions—\nirrespective of cost-causation due to a load-serving entity’s new large loads.7\nC.\nConclusion \nPJM’s RBP Proposal does not adequately address the cost-allocation \nconcerns set forth above. Blue Ridge suggests that the Commission demand more \nspecificity from PJM, or, alternatively, set this filing for hearing and settlement \nprocedures.  \nRespectfully submitted,  \n/s/ Randolph Elliott                        \nAlice J. Wolfe \nGeneral Manager \nBlue Ridge Power Agency \n730 W Main St \nP. O. Box 2310 (mailing) \nSalem, VA 24153 \n(540) 378-0193 \nawolfe@brpa.org\nF. Alvin Taylor  \nRandolph L. Elliott \nMcCarter & English, LLP \n1301 K Street NW, Suite 1000 West \nWashington, D.C. 20005 \n(202) 753-3400 \nataylor@mccarter.com\nrelliott@mccarter.com\nAttorneys for Blue Ridge Power Agency\nAugust 21, 2026\n7 See id. at 98-99."},{"page":5,"startToken":792,"endToken":857,"text":"5 \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon \neach person designated on the official service list compiled by the Secretary in this \nproceeding. \nDated at Washington, D.C. this 21st day of August, 2026.\n/s/ Randolph Elliott                              \nRandolph L. Elliott \nMcCarter & English, LLP \n1301 K Street NW, Suite 1000 West \nWashington, D.C. 20005 \n(202) 753-3428"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":868,"startToken":0,"endToken":133},{"p":1,"at":868,"title":"A. Blue Ridge","method":"printed heading","endPage":2,"endAt":416,"startToken":133,"endToken":266},{"p":2,"at":416,"title":"B. Comments","method":"printed heading","endPage":4,"endAt":156,"startToken":266,"endToken":683},{"p":4,"at":156,"title":"C. Conclusion","method":"printed heading","endPage":4,"endAt":636,"startToken":683,"endToken":750},{"p":4,"at":636,"title":"F. Alvin Taylor","method":"printed heading","endPage":5,"endAt":3,"startToken":750,"endToken":793},{"p":5,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":5,"endAt":428,"startToken":793,"endToken":857}]}