{"document":{"slug":"rec-20260821-5307-2","title":"Affidavit of Cosica_NOVEC Protest ER26-3380","issued":"2026-08-21","accession":"20260821-5307","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"attachment","file":"sources/filings/text/20260821-5307_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5307","tier":"record","parent":"rec-20260821-5307","sha256":"38dd2039ada5930c6639780434b9ae210b0ebea4fc4f70c852828ef22295d579","pages":12,"tokens":6576,"emptyPages":[],"textThemes":["credit","adequacy","registry"]},"pages":[{"page":1,"startToken":0,"endToken":478,"text":"UNITED STATES OF AMERICA \nBEFORE THE FEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C.                    Docket No. ER26-3380-000 \n \nAFFIDAVIT OF CARL F. COSCIA, Ph.D. \nON BEHALF OF NORTHERN VIRGINIA ELECTRIC COOPERATIVE \n \nI.  QUALIFICATIONS AND ASSIGNMENT \n1. \nMy name is Carl F. Coscia. I am the Principal of Toller Energy, an independent energy consulting \nfirm. My business address is Wynnewood, Pennsylvania 19096. I hold a Ph.D. in Economics \nfrom the University of Minnesota, and a B.S. in Economics and a B.A. in Mathematics from the \nUniversity of Kansas. I have more than twenty-five years of experience in wholesale power and \ncommodity markets, concentrated in credit risk, market design and regulatory proceedings, and \nhave provided testimony, affidavits or economic analysis in more than forty proceedings before \nthe Federal Energy Regulatory Commission, the Commodity Futures Trading Commission, and \nother regulatory and self-regulatory bodies. \n2. \nFrom September 2022 to March 2026 I served as Chief Risk Officer of PJM Interconnection, \nL.L.C., where I led the corporate risk function across the energy, capacity and financial \ntransmission rights markets. The credit provisions of Attachment Q to the Open Access \nTransmission Tariff fell within my responsibility, as did the Key Risk Metrics reported to the \nRisk Management Committee. Based on that experience I am familiar with how collateral \nrequirements in the organized markets are derived from measured exposure, administered as that \nexposure changes, and released as it declines. Before joining PJM I held senior risk and \ncommercial roles at EnBW AG, Hartree Partners, LP, Constellation Energy and TXU, and earlier \nserved as a Branch Chief in the Office of Enforcement at the Federal Energy Regulatory \nCommission and at The Brattle Group. \n3. \nI have been retained by Northern Virginia Electric Cooperative (“NOVEC”) to evaluate the credit \nand collateral provisions proposed at Tariff, Attachment DD, section 18.8 as they apply to the \ncooperative and to the NOVEC zone/area. \n4. \nI have also submitted an affidavit in this docket on behalf of East Kentucky Power Cooperative \naddressing the proposed credit construct generally. Both cooperatives are aware of the other \nengagement and each has consented to it. The opinions expressed here are consistent with those \nexpressed there. This affidavit does not repeat the general analysis. Where a conclusion in this \naffidavit rests on analysis set out at length in that affidavit, I cite it rather than restate it. \n5. \nThe opinions in this affidavit are my own. My compensation is not contingent on the outcome of \nthis proceeding. \nII.  SUMMARY OF OPINIONS \n6. \nMy opinions are as follows. The cooperative's financial and operating figures stated in this \nsummary are drawn from the certified report described in Section III. \n7. \n(a)  The Reliability Backstop Procurement settles as a contract for differences. In each Delivery \nYear load pays the difference between the RBP price and the RPM clearing price, not the RBP"},{"page":2,"startToken":478,"endToken":1120,"text":"price itself. The Credit Rate was not derived that way. At $555.00/MW-day over fifteen years the \ngross contract value is approximately $3.04 million per MW, and the $1.5 million Credit Rate is \napproximately half of it — a figure computed as though the large-load-serving Load Serving \nEntity owed the full contract price rather than a difference between two prices. PJM has sized \ncollateral for a fixed-price contract and filed a contract for differences. \n8. \n(b)  The exposure can be measured. Every input to the first two Delivery Years will have been \npublished within twenty days of the commitment binding. On the prices established and PJM's \nillustrative RBP price, the exposure attributable to the NOVEC zone over those two years is \napproximately $214.7 million, against which the requirement is approximately nine times. Across \nthe full fifteen-year term the requirement exceeds the exposure under every RPM price path I \nhave examined. \n9. \n(c)  The allocation itself comes from a planning document. The cooperative's 1,302.6 MW is \ntraceable to the large load forecast it submitted to PJM's Load Analysis Subcommittee for use in \nthe annual load forecast, at a time when neither the Reliability Backstop Procurement nor section \n18.8 existed. A submission made for transmission planning has become the basis of a fifteen-year \nfinancial obligation, and the tariff provides no reconciliation of the allocated megawatts against \nthe load actually realized. \n10. \n(d)  PJM already holds collateral against this cooperative. Approximately $34.4 million secures \nall of the cooperative's existing activity in PJM's markets, for a system serving a coincident peak \nof approximately 2,360 MW. The procurement would add an obligation of 1,302.6 MW, an \nincrease of approximately 55 percent, and section 18.8(b) would require approximately $1.954 \nbillion against it. A 55 percent increase in obligation produces a fifty-seven-fold increase in \ncollateral. The new requirement is incremental to the existing one, which continues. Once RBP \nbilling commences, the same megawatts are secured twice — by the Credit Rate under section \n18.8(b) and again through Peak Market Activity under Attachment Q. \n11. \n(e)  Two risks arise and they fall on different parties. The first is that a Load Serving Entity fails \nto pay the RBP Charge; the parties exposed are PJM and, through the default provisions, the \nremaining Members. The second is that a large load included in the forecast fails to materialize, \nthe cooperative still owes the RBP Charge on capacity procured for it, and its native load carries \nthat cost until a replacement large load arrives; the party exposed is the cooperative's \nmembership. Section 18.8(b) collateral secures the first only. The second is the risk PJM \ndescribed when it explained why an opt-out was needed, and nothing in the filed construct \nmeasures or secures it. \n12. \n(f)  PJM identified the overbuy problem during the stakeholder process and built a remedy for it \nat section 18.1(d). It then made that remedy available only to cooperatives whose rates are not \nregulated by a state. This cooperative's rates are regulated by the Virginia State Corporation \nCommission, so it is excluded — although its customers cannot choose another supplier, no other \nLoad Serving Entity can assume the obligation, and its members would bear an overbuy in full. \nThe condition does not track the problem PJM described. \n13. \n(g)  It is highly unlikely that the collateral requirement can be met. Approximately $1.954 billion \nis roughly eight times the cooperative's cash and temporary investments, 114 percent of its total \nassets, and 212 percent of its total margins and equities. \n14. \n(h)  The consequence of a failure to post would not be confined to this cooperative. The NOVEC \nzone carries approximately nineteen percent of the Initial RBP Target, and sections 18.9(a) and \n15.2.2 distribute the resulting shortfall across the footprint."},{"page":3,"startToken":1120,"endToken":1778,"text":"III.  THE COOPERATIVE, THE ZONE, AND THE OBLIGATION \n15. \nNorthern Virginia Electric Cooperative is a member-owned distribution cooperative and a \nborrower of the Rural Utilities Service, borrower designation VA0055. For the year ended \nDecember 31, 2025 it reported 184,104 consumers served, energy sales of approximately 14.649 \nbillion kilowatt-hours, and a coincident peak demand of approximately 2,360 MW. Except where \notherwise stated, the financial and operating figures in this affidavit are taken from its Financial \nand Operating Report Electric Distribution for that period, prepared with audited data and filed \nwith the Rural Utilities Service under certification. The report is prepared on the unconsolidated \nregulatory basis of that agency and is not consolidated with the cooperative's subsidiaries. \n16. \nThe cooperative is the Electric Distributor for the zone/area PJM designates NOVEC and which \nis referred to in this affidavit as the NOVEC zone and the Load Serving Entity for the load within \nit. Virginia's retail choice provisions do not extend to the customers of a distribution cooperative. \nThe large-customer retail access provision reaches only customers of a Phase I or Phase II Utility, \nand a distribution cooperative is neither. Va. Code § 56-577(A)(3). No other Load Serving Entity \nserves load in the zone, and no customer within it can select a supplier that would assume the \nobligation. \n17. \nPJM's illustrative allocation assigns the NOVEC zone 1,302.6 RBP UCAP MW, approximately \n19.07 percent of the Initial RBP Target and the second largest allocation in the procurement. \nCroop Aff. ¶ 46. At the Credit Rate of $1.5 million per RBP UCAP MW the collateral obligation \nis approximately $1.954 billion. \n18. \nTwo features of that allocation should be stated at the outset. First, 1,302.6 MW is approximately \nfifty-five percent of the cooperative's entire coincident peak demand. Second, the allocation is \nderived from a forecast of large load additions in the zone rather than from any measurement of \nthe cooperative itself. The obligation is a function of what is projected to be built in the territory, \nnot of the entity that must pay for it. \n19. \nThe cooperative's own operations reflect that concentration. Of energy sold in 2025, 73.0 percent \nwent to 193 commercial and industrial customers taking service above 1000 KVA; 15.8 percent \nwent to 169,027 residential members; and 11.1 percent to 14,866 smaller commercial and \nindustrial accounts. Purchased power was approximately $1,310.1 million of a total cost of \nelectric service of approximately $1,454.6 million, or 90.1 percent. This is an entity whose \nbusiness consists almost entirely of purchasing power in PJM's markets and delivering it, with the \nlarge majority of that power going to a small number of large customers. \nIV.  THE ALLOCATION IS DERIVED FROM A PLANNING SUBMISSION \n20. \nThe cooperative's allocation of 1,302.6 RBP UCAP MW is approximately 19.07 percent of the \nInitial RBP Target of 6,831.3 MW. That share is not derived from the cooperative's load, its \ncredit, or its participation in any procurement. It traces to the large load forecast the cooperative \nsubmitted to PJM's Load Analysis Subcommittee under Manual 19, Attachment B. PJM states the \nderivation directly: the initial allocation to each Electric Distributor zone or area “will be based \non Load Adjustments, as set forth in PJM Table B9b from the 2026 PJM Load Forecast, and each \nzone/area’s share of the Initial RBP Target of 6,831.3 MW.” Croop Aff. ¶ 46. The accompanying \ntable records a Load Adjustment of 1,722.4 MW for the zone PJM designates NOVEC, a 19.07 \npercent share, and an initial allocation of 1,302.6 RBP UCAP MW. \n21. \nThe cooperative made those submissions in October 2024 and again in September 2025. Their \nstated purpose was the annual load forecast, which is the input to transmission planning and to the \nreliability requirement. The submissions are prepared on that basis. They distinguish contracted"},{"page":4,"startToken":1778,"endToken":2414,"text":"capacity from metered demand and apply a utilization rate, because a data center's contracted \ncapacity and its actual usage differ substantially and for extended periods. \n22. \nNo participant in that process was told, and none could have known, that the figures submitted \nwould be used to allocate a collateral obligation. The Reliability Backstop Procurement did not \nexist. Section 18.8 did not exist. The cooperative supplied a planning estimate, and PJM has \nconverted it into a fifteen-year financial commitment of approximately $1.954 billion in collateral \nand approximately $109.4 million a year in charges. \n23. \nThe consequence for this cooperative is direct. It is among the most diligent participants in the \nload forecast process. It prepares a long-term forecast annually, updates a medium-term forecast \nmonthly, coordinates with Dominion Energy's transmission planners, and appears before the \nSubcommittee to document its methodology. That diligence is what produced the largest \ncooperative allocation in the procurement. An Electric Distributor that had forecast \nconservatively, or not at all, would carry a smaller obligation. \n24. \nA forecast is an estimate, and PJM has treated this one as a fixed quantity. The tariff provides no \nreconciliation of the allocated RBP Obligation MW against realized load at any point in the \nfifteen-year term. Where the forecast load does not materialize, section 18.8(b)(i)(B)(2) directs \nthe resulting charge to the cooperative's native load. The estimate becomes binding on the \nmembers without ever being tested against what was actually built. \nV.  PJM ALREADY MEASURES THIS COUNTERPARTY \n25. \nPJM is not a stranger to this cooperative. It bills the cooperative weekly, observes whether it \npays, and has an unbroken record of that performance for as long as the cooperative has taken \nservice in its markets. Under Attachment Q, PJM measures the cooperative's credit exposure \ncontinuously through Peak Market Activity, calculated on actual observed billings, and adjusts \nthe collateral required as that measurement changes. PJM also monitors the cooperative's \nfinancial condition outside the Peak Market Activity calculation, through external and internal \ncredit rating systems, through the annual recertification required of Members, and through the \nfinancial statements the cooperative provides to PJM. The measurement is current, it is specific to \nthis counterparty, and it is PJM's own. \n26. \nThe result of that measurement is reported. At December 31, 2025 the cooperative reported \napproximately $34.4 million of cash collateral posted to PJM, held as an investment and earning \napproximately 3.8 percent. Against a coincident peak of approximately 2,360 MW that is \napproximately $14,590 per MW of peak, and it secures every activity the cooperative conducts in \nPJM's markets — energy, capacity, transmission and financial transmission rights alike. \n27. \nSection 18.8(b) would require approximately $1.954 billion. Stated as quantities, PJM today \nholds approximately $34.4 million against a system serving approximately 2,360 MW of \ncoincident peak; the procurement adds a forecast 1,302.6 MW, and the collateral demanded rises \nby a factor of approximately fifty-seven. Stated as a rate, the $1.5 million per RBP UCAP MW is \napproximately 103 times the $14,590 per MW of peak that PJM's own continuous measurement \nof this counterparty presently produces. \n28. \nI do not suggest that these two figures secure the same obligation; they do not, and I address the \ndistinction in Section V. The point is narrower and does not depend on their being comparable in \nscope. Whatever explains a hundredfold difference, it is not the credit quality of the counterparty. \nPJM measures that credit quality continuously, and it is not what changed. Section 18.8(b) makes \nno reference to the cooperative's credit quality at any stage. \n29. \nThe two requirements are also additive. Nothing in section 18.8 relieves the cooperative of its \nobligations under Attachment Q, and the activities giving rise to them continue. Total credit"},{"page":5,"startToken":2414,"endToken":3041,"text":"support demanded of this cooperative would therefore rise from approximately $34.4 million to \napproximately $1.988 billion. The two requirements also overlap. Once the first Delivery Year \nbegins and RBP Charges are billed, those charges enter the cooperative's Peak Market Activity \nthrough the ordinary operation of Attachment Q and are secured a second time by the financial \nsecurity that Peak Market Activity requires. Section 18.8 does not net the two. For the period in \nwhich RBP Charges are being billed, the cooperative would post against the same megawatts \ntwice. \n30. \nPJM measured the obligated population before it filed. In the Credit and Securitization Overview \npresented to stakeholders on March 4, 2026, PJM identified 105 Load Serving Entities, of which \n24 were investment grade and 81 sub-investment grade.1 This cooperative is one of the 24. \n31. \nA requirement of approximately $1.954 billion would place that standing at risk. The cooperative \nwould have to fund or secure an amount exceeding its total assets, and the ratings that presently \nmake it one of the stronger counterparties in the obligated population reflect a balance sheet that \ncarries no such obligation. In my opinion the requirement would imperil the cooperative's current \nrating and would call into question whether investment grade standing could be maintained at all. \nThe construct would therefore operate to weaken the credit of the participants on which PJM \nrelies, which is the opposite of what a credit policy is for. \nVI.  THE CONSTRUCT ADDRESSES ONE RISK AND PJM DESCRIBED ANOTHER \n32. \nTwo distinct risks arise under the Reliability Backstop Procurement, and the filed construct \naddresses only one of them. \n33. \nThe first is counterparty credit risk: that a Load Serving Entity fails to pay the RBP Charge. The \nparty exposed is PJM, and through section 18.9(a) and Operating Agreement, section 15.2.2, the \nremaining Members. This is the risk section 18.8(b) collateral secures, and it is the risk \nAttachment Q measures. \n34. \nThe second is the overbuy risk: that a large load included in the forecast fails to materialize, that \nthe cooperative nonetheless owes the RBP Charge on capacity procured against that forecast, and \nthat its native load carries the cost until a replacement large load arrives. The party exposed is the \ncooperative's membership. Section 18.8(b)(i)(B)(2) directs that consequence to native load \nexpressly. \n35. \nThe distinction matters because PJM described the second risk, not the first, when it explained the \nopt-out at section 18.1(d). It stated that cooperatives had raised the concern that an Electric \nDistributor would be forced to have its customers absorb the costs of an overbuy if a particular \nlarge load included in the forecast were to fail to materialize. That is this cooperative's position \nprecisely, and for the reasons set out in Section VIII the opt-out is not available to it. The risk \nPJM identified is therefore borne here without either the security the construct provides or the \nremedy the tariff offers. \n36. \nSection 18.8(b) does nothing about the second risk. Collateral posted under it secures PJM against \nnon-payment, and if drawn it is applied to the unpaid RBP Charge. It does not reduce what the \ncooperative owes when a forecast large load fails to appear, and section 18.8(b)(i)(B)(2) directs \nthat charge to native load whether or not collateral has been posted. The members therefore fund \nsecurity against the exposure PJM bears, while the exposure they bear themselves is neither \nmeasured nor secured anywhere in the filed construct. \n \n1 PJM Interconnection, L.L.C., Credit & Securitization Overview 7 (Reliability Backstop Procurement Workshop Mar. 4, 2026), \navailable at https://www.pjm.com/-/media/DotCom/committees-groups/workshops/rbpw/2026/20260304/20260304-item-03---\ncredit-and-securitization-overview---pjm-presentation.pdf."},{"page":6,"startToken":3041,"endToken":3642,"text":"37. \nThe two risks would also be sized differently. Securing the second would mean securing the \ninterval between a failed large load and its replacement, and the measurable quantity for that is \nthe RBP Charge on the at-risk megawatts over the expected replacement period. At the cleared \n2028/2029 price that charge is $83,950 per MW-year, so a three-year bridge would be \napproximately $252,000 per MW, applied only to the megawatts actually at risk. The filed \nrequirement is $1.5 million per MW applied to every megawatt, at risk or not. \nVII.  THE EXPOSURE CAN BE MEASURED \nA.  The instrument is a contract for differences \n38. \nThe RBP settles as a contract for differences. In each Delivery Year the cooperative pays the \ndifference between the RBP price and the RPM clearing price for that year, multiplied by its \nallocated RBP UCAP MW. It does not pay the RBP price. Where RPM clears above the RBP \nprice the payment runs in the opposite direction. \n39. \nThe Credit Rate is not derived from that difference. At an RBP price of $555.00/MW-day, fifteen \nyears of the gross contract price is approximately $3.04 million per RBP UCAP MW, and the \nCredit Rate of $1.5 million per MW is approximately 49 percent of that figure. It is half the gross \nvalue of a contract on which only a difference is ever payable. \n40. \nBecause the Credit Rate makes no reference to RPM, the requirement bears no stable relationship \nto what the cooperative will owe. Where RPM clears close to the RBP price the difference \napproaches zero while the collateral does not move. Where RPM clears far below it the difference \nwidens and the collateral is unchanged again. A requirement calibrated to exposure would vary \nwith the second price; this one is fixed against the first. \nB.  The exposure that can be measured \n41. \nA collateral requirement is ordinarily derived from an identified position, a price at which that \nposition would be replaced, and a period over which the exposure is held before replacement is \ncomplete. Those three elements are standard across margining regimes — cleared derivatives, \nbilateral credit support arrangements, and PJM's own Attachment Q, which sizes financial \nsecurity from observed billings over a defined look-back and adjusts it as those billings change. A \nrequirement derived in that manner responds to the position it secures: it rises when exposure \nrises, falls when exposure falls, and ends when the position ends. Each of those elements is \navailable here. \n42. \nRBP commitments bind when procurement results post on December 2, 2026. The 2028/2029 \nBase Residual Auction has already cleared at $325.00/MW-day. The 2029/2030 Base Residual \nAuction posts on December 22, 2026, twenty days later. Within three weeks of commitment, \ntherefore, every input to two Delivery Years of exposure will have been published. \n43. \nOn the RBP price of $555.00/MW-day that PJM has used illustratively, and taking the 2029/2030 \nyear at $333.44/MW-day, the exposure attributable to the NOVEC zone over those two Delivery \nYears is approximately $214.7 million — approximately $109.4 million and approximately \n$105.3 million respectively. I state below the assumptions on which those figures rest. \n44. \nPJM requires no collateral against that amount for approximately seventeen months. The first \nposting under section 18.8(b)(i)(B)(1) falls forty-five days before the start of the 2028/2029 \nDelivery Year, or approximately April 17, 2028. The requirement then imposed is approximately \n$1.954 billion, approximately nine times the exposure that will have been determinate throughout \nthe intervening period. \nC.  Assumptions stated"},{"page":7,"startToken":3642,"endToken":4310,"text":"45. \nI assume a two-year close-out period. I do not contend that two years is the correct period. I adopt \nit because it is the only period for which the record supplies prices that are established or will be \nestablished before any collateral is due. Substituting a different period scales the result \nproportionately: one year gives approximately $109.4 million and three years approximately $320 \nmillion. No period within any plausible range produces $1.954 billion, because the Credit Rate is \nnot derived from a close-out period at all. \n46. \nI assume an RBP price of $555.00/MW-day. That is the figure PJM has used illustratively. It also \ncorresponds closely to PJM's own estimate of what the 2028/2029 auction would have cleared at \nabsent the price collar, $554.72/MW-day.2 If the RBP clears below $555.00 the exposure falls \nand the ratio of collateral to exposure rises, so this assumption is conservative against the \nconclusion I reach. \n47. \nI assume the 2029/2030 auction clears at $333.44/MW-day. That auction has not been held, but it \nis the last auction to which the price collar extends, so its outcome is bounded above and below. \nThe proxy is the 2027/2028 clearing price, selected because the accreditation underlying that \nauction is the closest match to 2029/2030 among the observed collared outcomes. The cap is \ncalculated using the accredited capacity of the PJM reference resource, and on August 19, 2026 \nPJM reported that the Effective Load Carrying Capacity class rating for the reference resource for \n2029/2030 had fallen to a level most closely approximated by the parameters underlying the \n2027/2028 Delivery Year. The Reference Resource for the 2028/2029 and subsequent Delivery \nYears is defined in the filed Tariff as a combustion turbine generation station configured with a \nsingle 1x0 GE Frame 7HA.03 turbine with dual fuel capability. Proposed Tariff, Attachment DD, \nDefinitions (Reference Resource).3 Across the collared range the two-year exposure runs from \napproximately $200 million to approximately $290 million, and the requirement remains between \napproximately seven and ten times it at every point. The assumption affects the figure but not the \nconclusion, and it runs against the conclusion I reach: because the 2029/2030 rating is below the \nrating underlying the proxy auction, the applicable cap may be higher, and a higher clearing price \nnarrows the differential, reduces the exposure and raises the multiple. \nD.  The full term \n48. \nThe same calculation can be extended across the fifteen-year term. At the observed 2028/2029 \nclearing price of $325.00/MW-day the annual RBP Charge is $83,950 per MW, and fifteen years \nof that charge, undiscounted, is $1,259,250 per MW. The Credit Rate of $1.5 million per MW is \napproximately 119 percent of it. For the NOVEC zone, approximately $1.954 billion of collateral \nstands against approximately $1.640 billion of charges over the entire life of the commitment. \n49. \nThat comparison assumes RPM continues to clear at the collared level for fifteen years, which is \nthe least favourable assumption to the conclusion I reach. The price collar expires after the \n2029/2030 Delivery Year, and the cap thereafter reverts to a figure based on Net Cost of New \nEntry that PJM has estimated at approximately $550/MW-day. The table below sets out the \nfifteen-year exposure attributable to the NOVEC zone under alternative price paths for the \nremaining thirteen Delivery Years. \n \nRPM, Delivery Years 2030/31–2042/43 \n13-year exposure \nLifetime exposure \nCollateral as multiple \n$554.72 — PJM uncapped 2028/29 simulation \n$1.7M\n$216M\n9.0×\n \n2 PJM Interconnection, L.L.C., 2028/2029 Base Residual Auction Report 17 (July 14, 2026), available at https://www.pjm.com/-\n/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf. \n3 PJM Interconnection, L.L.C., 2029/2030 BRA IRM, FPR & ELCC Presentation 3-4 (Markets & Reliability Comm. Aug. 19, \n2026), available at https://www.pjm.com/-/media/DotCom/committees-groups/committees/mrc/2026/20260819/20260819-item-\n03---2029-2030-bra-irm-fpr---presentation.pdf."},{"page":8,"startToken":4310,"endToken":4950,"text":"RPM, Delivery Years 2030/31–2042/43 \n13-year exposure \nLifetime exposure \nCollateral as multiple \n$550.00 — Net CONE-based cap, PJM estimate \n$30.9M\n$246M\n8.0×\n$500.00 \n$339.9M\n$555M\n3.5×\n$450.00 \n$649.0M\n$864M\n2.3×\n$400.00 \n$958.0M\n$1,173M\n1.7×\n$350.00 \n$1,267.1M\n$1,482M\n1.3×\n$325.00 — collared level persists \n$1,421.6M\n$1,636M\n1.2×\n$273.60 — collateral equals lifetime exposure \n$1,739.3M\n$1,954M\n1.0×\n \n1,302.6 RBP UCAP MW; RBP price $555.00/MW-day. Delivery Years 2028/2029 and 2029/2030 taken at \n$325.00 and $333.44 respectively, together approximately $214.7 million. Undiscounted. The final row \nstates the average RPM clearing price across the remaining thirteen Delivery Years at which the collateral \nrequired would equal the whole of the exposure it secures. \n50. \nI do not offer a forecast of RPM clearing prices for the remaining thirteen Delivery Years, and I \ndo not suggest that prices will return to the level PJM's uncapped simulation indicates. Several \nmatters now pending before the Commission would move prices in opposing directions and none \nis resolved. The Reliability Backstop Procurement is directed at a shortfall of 6,831.3 MW and \nthe quantity ultimately procured is not known. The Interim Resource Adequacy Service proposed \nin Docket No. ER26-3515 would add resources on terms not yet settled. Large loads may be \nremoved from the forecast, which would reduce the reliability requirement. Each of those would \ntend to lower RPM prices and, because the RBP settles as a contract for differences against a \nfixed price, would widen rather than narrow the exposure of load. Against them, the collar expires \nafter 2029/2030 and the supply and demand imbalance that produced three consecutive capped \nauctions has not been resolved. If the Reliability Backstop Procurement does not resolve the \nshortfall and the Interim Resource Adequacy Service is not implemented, prices would in my \nopinion almost certainly clear above the present cap once the collar comes off, at or near the level \nPJM has itself simulated. \n51. \nThe table is offered to show the range, not to select within it. The observation that matters is that \nthe filed requirement exceeds the exposure at every path in the range. \nVIII.  THE OPT-OUT WAS WRITTEN FOR THIS COOPERATIVE AND EXCLUDES IT \n52. \nPJM identified the overbuy problem during the stakeholder process and provided an opt-out at \nsection 18.1(d) to address it. Explaining that provision, PJM stated that cooperatives and \nmunicipal utilities are not governed by a state regulatory authority that would be responsible for \naddressing the potential reallocation of RBP costs, and described the difficulty as a limited \nregulatory gap faced by cooperatives and municipal utilities whose rates are not regulated by the \nstates. \n53. \nThe remedy is therefore available only to an entity whose rates are not state-regulated. The retail \nrates of Virginia distribution cooperatives are regulated by the Virginia State Corporation \nCommission. The cooperative is a utility consumer services cooperative under Chapter 9.1 of \nTitle 56 of the Code of Virginia, and its regulated utility services are subject to the jurisdiction of \nthat Commission in the same manner and to the same extent as those provided by other persons \nunder the laws of the Commonwealth. Va. Code §§ 56-231.33, 56-231.34; see also Va. Code § \n56-585.3. Its filed rate schedules provide that service is available subject to terms and conditions \nfiled with that Commission, and the cooperative states that the Commission approves its rates, \nfees and all terms and conditions of service. On the face of the provision, it is ineligible. \n54. \nThe condition and the problem are not the same question. PJM identified the absence of a \nmechanism to reallocate an overbuy. It then conditioned the remedy on the absence of state rate"},{"page":9,"startToken":4950,"endToken":5532,"text":"regulation. For an investor-owned utility in a retail choice state those may correlate. For a \nmember-owned cooperative they do not, for two reasons. \n55. \nFirst, there is no one to reallocate to. Retail choice does not reach the customers of a Virginia \ndistribution cooperative. Va. Code § 56-577(A)(3). No competitive supplier serves load in the \nNOVEC zone and none can assume the obligation. The State Corporation Commission does \nregulate the cooperative's rates, and that is what renders it ineligible for the opt-out. But rate \nregulation has no bearing on whether any party exists to which the obligation could be \nreallocated, and here none does. \n56. \nSecond, rate regulation of a member-owned cooperative is not a mechanism for shifting cost \naway from members. A cooperative has no shareholders. Its equity is patronage capital owed \nback to the members who supplied it. When a regulator approves a cooperative's rates, it \ndetermines what the members will pay; it does not identify some other party to pay instead. State \nrate regulation, applied to a cooperative, is the mechanism by which the members are confirmed \nto bear the cost. \n57. \nThe condition therefore selects against the entities the remedy was written for. The more \neffectively a cooperative's rates are regulated, the more certainly its members bear an overbuy — \nand that is precisely the circumstance in which the opt-out is withheld. The zone carrying the \nsecond largest allocation in the procurement, and the only zone in which the obligation exceeds \nthe reported assets of the entity serving it, cannot use the remedy PJM built for the problem PJM \nidentified. \nIX.  WHO BEARS THE OBLIGATION \n58. \nThe obligation is generated by one group and stands on the capital of another. The allocation of \n1,302.6 MW is derived from forecast large load additions in the zone. Large commercial and \nindustrial customers account for 73.0 percent of the cooperative's energy sales and number 193. \nThe equity that would have to support a $1.954 billion posting is patronage capital contributed by \n169,027 residential members who account for 15.8 percent of energy sales, together with the \ncooperative's other members. \n59. \nTotal margins and equities at December 31, 2025 were approximately $919.7 million, of which \napproximately $824.0 million was patronage capital. That is not permanent capital subscribed by \ninvestors. It is retained member margins, carried as an obligation to the members who provided \nthem and retired over time. The cooperative retired approximately $17.9 million of capital credits \nin 2025 and approximately $416.5 million cumulatively. \n60. \nA collateral obligation of approximately $1.954 billion is 2.4 times all patronage capital on the \nbooks, and equal to some 109 years of capital credit retirements at the 2025 rate. Compliance \nwould require the suspension of retirements to identified members for the foreseeable future. That \nis a determinate consequence to identified persons, and it does not appear in any figure PJM has \npresented. \n61. \nExpressed per member, the collateral requirement is approximately $10,614 for each of the \n184,104 consumers served. The RBP Charge those consumers would pay over the first two \nDelivery Years is approximately $1,166 each. The cooperative can tell its members what the \ncharge will cost. It cannot tell them what the collateral is calculated to secure, because the Credit \nRate is not derived from any exposure they can be shown. \nX.  THE REQUIREMENT CANNOT BE MET \n62. \nThe following figures are taken from the certified report described in Section III."},{"page":10,"startToken":5532,"endToken":6105,"text":"Measure (December 31, 2025) \nAmount \nCollateral as multiple \nCash and temporary investments \n$243.2M\n8.0×\nTotal current and accrued assets \n$575.4M\n3.4×\nTotal long-term debt \n$69.2M\n28×\nTotal margins and equities \n$919.7M\n2.12×\nNet utility plant \n$983.6M\n2.0×\nTotal assets \n$1,716.5M\n1.14×\nCash collateral posted to PJM \n$34.4M\n57×\n \n63. \nSection 18.8(b) permits two forms of collateral: a cash deposit or a letter of credit. It provides no \nunsecured credit allowance, permits no corporate guaranty, and does not accept surety bonds, \nalthough PJM held approximately $606 million of surety bonds across its markets on July 30, \n2026. \n64. \nCash is not available. The requirement is approximately eight times the cooperative's entire cash \nand temporary investments and approximately 3.4 times all of its current and accrued assets. \n65. \nA letter of credit of this size would have to be supported by the cooperative's balance sheet. The \ncooperative is a borrower of the Rural Utilities Service, which holds a mortgage over \nsubstantially all of its assets, and its loan documents restrict the incurrence of additional secured \nobligations and liens. To the extent those provisions apply, the difficulty is not that the collateral \nwould be costly. The difficulty is that neither of the two instruments the tariff permits is available \nto this cooperative on the terms the tariff assumes. \n66. \nCarrying cost compounds the problem. Taking the most favourable assumption available — that a \nletter of credit can be obtained at 100 basis points — the annual cost would be approximately \n$19.5 million. The cooperative reported patronage capital and operating margins of \napproximately $20.8 million for 2025, after existing interest expense of approximately $0.8 \nmillion. At 100 basis points the carrying cost alone would consume approximately 94 percent of \nthat margin; at 150 basis points, approximately 141 percent; at 200 basis points, approximately \n188 percent; and at 300 basis points, approximately 281 percent. Each is between approximately \ntwenty-five and seventy-five times the cooperative's entire existing annual interest expense, and \neach would recur for as long as the requirement remains outstanding. Section 18.8 provides no \nmandatory reduction schedule. \n67. \nNothing in section 18.8 tests any of this. The Credit Rate is applied per megawatt of allocated \nobligation. The financial capacity of the entity required to post is not an input to it at any stage. \nXI.  THE CONSEQUENCE IS NOT CONFINED TO THE COOPERATIVE \n68. \nSection 18.9(a) provides that a defaulted RBP Charge is socialized pro rata across the remaining \nLoad Serving Entities. Under Operating Agreement, section 15.2.2, the residual reaches PJM \nMembers that hold no RBP allocation and post no RBP Collateral. \n69. \nThe NOVEC zone carries approximately 19.07 percent of the Initial RBP Target. A failure to post \nis not a payment default. The cooperative would have paid every invoice PJM has rendered and \nwould remain willing and able to pay the RBP Charges as billed. What section 18.8(b) would \nestablish is a default triggered by the inability to post collateral in advance of any charge — a \ncredit event converted into a liquidity stress event by the size of the requirement alone. A failure \nof that kind in this zone is not a localized event. It is the largest single point of failure in the \nrequirement, and the mechanism by which it would propagate is written into the same attachment."},{"page":11,"startToken":6105,"endToken":6540,"text":"70. \nThe Commission has held that the role of a Regional Transmission Organization is to balance the \ncompeting goals of minimizing risk to non-defaulting market participants while ensuring that \ncredit or collateral requirements are not so stringent that they unnecessarily inhibit access to the \nmarketplace, and has rejected a credit provision on that ground notwithstanding that it emerged \nfrom a stakeholder process and was approved by that organization's board. Sw. Power Pool, Inc., \n126 FERC ¶ 61,153, at PP 19, 21 (2009). A requirement set too low would leave native load \nbearing the cost of another party's default. A requirement set high enough that the obligated entity \ncannot meet it produces the same default it was designed to prevent, and does so at the largest \ncooperative-served allocation in the procurement. \nXII.  CONCLUSION \n71. \nPJM took the gross contractual value of a fifteen-year commitment, halved it, and called the \nresult collateral. Applied to this cooperative, that step produces a requirement of approximately \n$1.954 billion. That is roughly nine times the cooperative's exposure over the first two Delivery \nYears, the only period for which the record supplies prices; it is more than the entire charge the \ncooperative would pay across all fifteen years at the price most recently cleared; and it is greater \nthan the total assets of the entity required to post it. \n72. \nThe same record contains everything needed to derive a requirement properly. The position is \n1,302.6 RBP UCAP MW. The prices are established or will be established before any collateral is \ndue. The cooperative's financial capacity is set out in a report it files under certification with a \nfederal agency. PJM used none of it, and applied a fixed rate per megawatt to an entity whose \ncreditworthiness it measures every month. \n73. \nThis cooperative does not contend that the Reliability Backstop Procurement requires no credit \nsupport. A procurement of this size plainly does, and a default would fall on load elsewhere in the \nfootprint. My opinion is that the requirement as filed is not derived on terms that would be \nrecognized as collateral in any commercial context, including PJM's own; that the entity required \nto post it cannot determine from the filed rate what the requirement secures or when it declines; \nand that the entity cannot post it. \n74. \nThe opt-out PJM designed for this exact circumstance is closed to this cooperative by a condition \nthat does not describe the problem PJM identified. Correcting that condition would not by itself \ncure the requirement, but it would restore to the cooperative the remedy PJM represented to \nstakeholders that it had provided."},{"page":12,"startToken":6540,"endToken":6576,"text":".{*e.,‘--.--'—\nVERIFICATION OF AFFIDAVIT\nPursuant to 18 C.F.R. § 385.2005(b)(3), I verify under penalty of perjury that the \nforegoing Affidavit is true and correct.\nExecuted August 21, 2026.\nBy: _____________________________\n       Carl F. Coscia"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":243,"startToken":0,"endToken":32},{"p":1,"at":243,"title":"I. QUALIFICATIONS AND ASSIGNMENT","method":"printed heading","endPage":1,"endAt":2689,"startToken":32,"endToken":416},{"p":1,"at":2689,"title":"II. SUMMARY OF OPINIONS","method":"printed heading","endPage":3,"endAt":0,"startToken":416,"endToken":1120},{"p":3,"at":0,"title":"III. THE COOPERATIVE, THE ZONE, AND THE OBLIGATION","method":"printed heading","endPage":3,"endAt":2838,"startToken":1120,"endToken":1576},{"p":3,"at":2838,"title":"IV. THE ALLOCATION IS DERIVED FROM A PLANNING SUBMISSION","method":"printed heading","endPage":4,"endAt":1609,"startToken":1576,"endToken":2023},{"p":4,"at":1609,"title":"V. PJM ALREADY MEASURES THIS COUNTERPARTY","method":"printed heading","endPage":5,"endAt":1525,"startToken":2023,"endToken":2656},{"p":5,"at":1525,"title":"VI. THE CONSTRUCT ADDRESSES ONE RISK AND PJM DESCRIBED ANOTHER","method":"printed heading","endPage":6,"endAt":544,"startToken":2656,"endToken":3134},{"p":6,"at":544,"title":"VII. THE EXPOSURE CAN BE MEASURED","method":"printed heading","endPage":6,"endAt":580,"startToken":3134,"endToken":3140},{"p":6,"at":580,"title":"A. The instrument is a contract for differences","method":"printed heading","endPage":6,"endAt":1766,"startToken":3140,"endToken":3347},{"p":6,"at":1766,"title":"B. The exposure that can be measured","method":"printed heading","endPage":6,"endAt":3635,"startToken":3347,"endToken":3639},{"p":6,"at":3635,"title":"C. Assumptions stated","method":"printed heading","endPage":7,"endAt":2474,"startToken":3639,"endToken":4046},{"p":7,"at":2474,"title":"D. The full term","method":"printed heading","endPage":8,"endAt":2228,"startToken":4046,"endToken":4690},{"p":8,"at":2228,"title":"VIII. THE OPT-OUT WAS WRITTEN FOR THIS COOPERATIVE AND EXCLUDES IT","method":"printed heading","endPage":9,"endAt":1651,"startToken":4690,"endToken":5214},{"p":9,"at":1651,"title":"IX. WHO BEARS THE OBLIGATION","method":"printed heading","endPage":9,"endAt":3489,"startToken":5214,"endToken":5512},{"p":9,"at":3489,"title":"X. THE REQUIREMENT CANNOT BE MET","method":"printed heading","endPage":10,"endAt":2482,"startToken":5512,"endToken":5931},{"p":10,"at":2482,"title":"XI. THE CONSEQUENCE IS NOT CONFINED TO THE COOPERATIVE","method":"printed heading","endPage":11,"endAt":833,"startToken":5931,"endToken":6235},{"p":11,"at":833,"title":"XII. CONCLUSION","method":"printed heading","endPage":12,"endAt":247,"startToken":6235,"endToken":6576}]}
