{"document":{"slug":"rec-20260821-5307-3","title":"Affidavit of Rollins_NOVEC Protest ER26-3380","issued":"2026-08-21","accession":"20260821-5307","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"attachment","file":"sources/filings/text/20260821-5307_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5307","tier":"record","parent":"rec-20260821-5307","sha256":"c81c0d6df2caead1e3b3864928dc994bb68d9226ba2a49b7294a2e884651cf77","pages":6,"tokens":986,"emptyPages":[],"textThemes":["credit","retail"]},"pages":[{"page":1,"startToken":0,"endToken":20,"text":"FERC Docket No. ER26-3380-000 \nPJM Reliability Backstop Procurement Proposal \nNOVEC Protest \n \n \n \n \nAffidavit of Wilbur Rollins \nNorthern Virginia Electric Cooperative, Inc."},{"page":2,"startToken":20,"endToken":281,"text":"Affidavit of Rollins \nPage 1 of 4 \n \n \nAFFIDAVIT OF WILBUR ROLLINS ON BEHALF OF  \nNORTHERN VIRGINIA ELECTRIC COOPERATIVE, INC. \nDocket No. ER26-3380-000 \nI. \nINTRODUCTION \n1 \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n2 \nA. \nMy name is Wilbur Rollins. My business address is 10323 Lomond Dr., Manassas, VA, \n3 \n20109. \n4 \nQ. \nBY WHOM ARE YOU EMPLOYED AND IN WHAT POSITION? \n5 \nA. \nI am employed by Northern Virginia Electric Cooperative, Inc. (“NOVEC”) as Senior Vice \n6 \nPresident of Finance and Accounting. I have worked for NOVEC since March 1989 in the \n7 \nfinance and accounting department. I have been in my current position since 1998. Prior to \n8 \njoining NOVEC, I was employed by Alabama Electric Cooperative, currently known as \n9 \nPower South Energy Cooperative, beginning in September 1982. \n10 \nII. \nPURPOSE OF THIS AFFIDAVIT \n11 \nQ. \nWHAT IS THE PURPOSE OF YOUR AFFIDAVIT IN THIS PROCEEDING? \n12 \nA. \nI am providing information about the impact on NOVEC of the proposed collateral \n13 \nrequirements associated with PJM’s proposed Reliability Backstop Procurement (“RBP”). \n14 \nIII. \nPJM RELIABILITY BACKSTOP PROCUREMENT PROPOSAL \n15 \nQ. \nPLEASE DESCRIBE NOVEC AND ITS CUSTOMERS? \n16 \nA. \nNOVEC is a not-for-profit electric distribution cooperative organized and existing under \n17 \nVirginia law. NOVEC is owned by its member retail customers and seeks to provide \n18 \nreliable electric service to its retail customers at the lowest rate reasonably possible.  \n19 \nNOVEC is one of the largest electric distribution cooperatives in the country. Its peak \n20 \ndemand in 2025 was approximately 2,360 MW. NOVEC serves approximately 184,000 \n21"},{"page":3,"startToken":281,"endToken":571,"text":"Affidavit of Rollins \nPage 2 of 4 \n \n \nretail customer meters, of which about 169,200 are residential, 15,000 are commercial, and \n1 \n60 are large-load data centers. NOVEC sold approximately 14.65 million MWh of energy \n2 \nin 2025, 10.75 million MWh of which was consumed by the data centers that NOVEC \n3 \nserves. Thus, only 61 of NOVEC’s total number of customer meters consumed 73.4% of \n4 \nthe energy sold by NOVEC at retail in 2025.  \n5 \nQ. \nWHAT \nIS \nYOUR \nUNDERSTANDING \nOF \nTHE \nRBP \nCOLLATERAL \n6 \nOBLIGATIONS? \n7 \nA. \nPJM’s proposed section 18.5(b)(i)(B)(1), would require Load Serving Entities to post RBP \n8 \nCollateral equal to $1.5 million multiplied by the allocated RBP Obligation MW. That \n9 \nproposed tariff section would also allow PJM to require additional RBP Collateral “as \n10 \nappropriate” pursuant to the Unreasonable Credit Risk provisions of Attachment Q. RBP \n11 \nCollateral must be in the form of a cash deposit or a letter of credit.  \n12 \nQ. \nWHAT DO YOU ESTIMATE NOVEC’S RBP COLLATERAL REQUIREMENT \n13 \nWILL BE? \n14 \nA. \nAssuming no offsets and using the table provided in paragraph 46 of Ms. Croop’s affidavit, \n15 \nI estimate that NOVEC’s RBP Collateral will be $1.95 billion ($1.5 million * 1,302.6 \n16 \nMW).  \n17 \nQ. \nWHAT \nIS \nYOUR \nOPINION \nOF \nTHIS \nPROPOSED \nCOLLATERAL \n18 \nREQUIREMENT? \n19 \nA. \nIt is shockingly unreasonable. Putting aside the fact that PJM is designating a select few to \n20 \ncure a PJM-wide problem, suddenly requiring NOVEC to post nearly $2 billion of \n21 \ncollateral is a tremendous burden that NOVEC may not even be able to meet, and is not \n22 \nnecessary to ensure NOVEC fulfills its obligations. \n23"},{"page":4,"startToken":571,"endToken":873,"text":"Affidavit of Rollins \nPage 3 of 4 \n \n \nQ. \nWHY IS IT NOT NECESSARY TO ENSURE NOVEC PAYS THE RBP \n1 \nCHARGES? \n2 \nA. \nNOVEC has an investment-grade credit rating. Further, to my knowledge, NOVEC has \n3 \nalways paid its obligations related to PJM membership. \n4 \nQ. \nCAN YOU EXPLAIN WHY THE RBP COLLATERAL REQUIREMENT IS A \n5 \nBURDEN TO NOVEC? \n6 \nA. \nYes. To give an idea of the relative impact on NOVEC, the RBP collateral amount exceeds \n7 \nthe $1.8 billion of assets on NOVEC’s balance sheets. I am uncertain whether financial \n8 \ninstitutions would be willing to provide NOVEC with a letter of credit in an amount that \n9 \nexceeds NOVEC’s assets. Even if NOVEC could procure a letter of credit, being so over-\n10 \nleveraged would severely damage NOVEC’s credit rating. NOVEC may not be able to \n11 \nenter into bilateral wholesale energy and capacity transactions, where the sellers would \n12 \nbegin requiring greater credit assurance even though today they do not require NOVEC to \n13 \npost collateral due to NOVEC’s strong credit rating. The resulting credit-support costs \n14 \nassociated with the bilateral transactions will increase power supply costs, which will be \n15 \npassed onto retail customers. \n16 \nQ. \nHOW ELSE WILL NOVEC BE HARMED? \n17 \nA. \nNOVEC may not be able to borrow additional money for constructing infrastructure to \n18 \nmaintain reliability. NOVEC spends approximately $70 to $90 million annually on both \n19 \n“end of life” replacements and necessary expansions, which would have to be curtailed. \n20 \nEven if NOVEC could procure a letter of credit, the collateral obligation would come with \n21 \na minimum of $20 million in annual carrying costs that NOVEC would have to flow \n22 \nthrough or include in its rates. NOVEC might be able to still borrow for any of these \n23"},{"page":5,"startToken":873,"endToken":911,"text":"Affidavit of Rollins \nPage 4 of 4 \n \n \npurposes, but it would be at a substantially higher cost that would affect rates and materially \n1 \nimpact NOVEC’s ratepayers. \n2 \nQ. \nDOES THIS CONCLUDE YOUR AFFIDAVIT? \n3 \nA. \nYes.\n4"},{"page":6,"startToken":911,"endToken":986,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket No. ER26-3380-000 \nVERIFICATION OF WILBUR ROLLINS \nI, Wilbur Rollins, declare under penalty of perjury under the laws of the United States of \nAmerica that that the information contained in the foregoing affidavit was prepared by me or \nunder my supervision, and is true and correct to the best of my knowledge, information and \nbelief. \nDate: \n2/ / 0-c& \nWilbur Rollins"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":154,"startToken":0,"endToken":42},{"p":2,"at":154,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":228,"startToken":42,"endToken":54},{"p":2,"at":228,"title":"A. My name is Wilbur Rollins. My business address is 10323 Lomond Dr., Manassas, VA,","method":"printed heading","endPage":2,"endAt":815,"startToken":54,"endToken":152},{"p":2,"at":815,"title":"II. PURPOSE OF THIS AFFIDAVIT","method":"printed heading","endPage":2,"endAt":1098,"startToken":152,"endToken":195},{"p":2,"at":1098,"title":"III. PJM RELIABILITY BACKSTOP PROCUREMENT PROPOSAL","method":"printed heading","endPage":2,"endAt":1205,"startToken":195,"endToken":210},{"p":2,"at":1205,"title":"A. NOVEC is a not-for-profit electric distribution cooperative organized and existing under","method":"printed heading","endPage":3,"endAt":524,"startToken":210,"endToken":374},{"p":3,"at":524,"title":"A. PJM’s proposed section 18.5(b)(i)(B)(1), would require Load Serving Entities to post RBP","method":"printed heading","endPage":3,"endAt":1049,"startToken":374,"endToken":464},{"p":3,"at":1049,"title":"A. Assuming no offsets and using the table provided in paragraph 46 of Ms. Croop’s affidavit,","method":"printed heading","endPage":3,"endAt":1333,"startToken":464,"endToken":513},{"p":3,"at":1333,"title":"A. It is shockingly unreasonable. Putting aside the fact that PJM is designating a select few to","method":"printed heading","endPage":4,"endAt":113,"startToken":513,"endToken":593},{"p":4,"at":113,"title":"A. NOVEC has an investment-grade credit rating. Further, to my knowledge, NOVEC has","method":"printed heading","endPage":4,"endAt":346,"startToken":593,"endToken":632},{"p":4,"at":346,"title":"A. Yes. To give an idea of the relative impact on NOVEC, the RBP collateral amount exceeds","method":"printed heading","endPage":4,"endAt":1253,"startToken":632,"endToken":781},{"p":4,"at":1253,"title":"A. NOVEC may not be able to borrow additional money for constructing infrastructure to","method":"printed heading","endPage":5,"endAt":213,"startToken":781,"endToken":908},{"p":5,"at":213,"title":"A. Yes.","method":"printed heading","endPage":6,"endAt":482,"startToken":908,"endToken":986}]}
