{"document":{"slug":"rec-20260821-5315","title":"Post-Technical Conference Joint Statement of Current and Former Sector Representatives at the PJM Nominating Committee","issued":"2026-08-21","accession":"20260821-5315","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"testimony","file":"sources/filings/text/20260821-5315_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5315","tier":"record","sha256":"63658730781ae9d2b618a164cfb65f0414dff6fd04d7a2cf23ef5972ce7476d6","pages":7,"tokens":1997,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":344,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Governance and Stakeholder Reforms  \n \n \nDocket No. AD26-7-000 \n \nPOST-TECHNICAL CONFERENCE JOINT STATEMENT OF CURRENT \nAND FORMER SECTOR REPRESENTATIVES AT THE  \nPJM NOMINATING COMMITTEE \nThe undersigned Current and Former Sector Representatives at the PJM Nominating Committee \n(the “Representatives”) are submitting this Joint Statement to assist the Commission and \nparticipants in this proceeding with an understanding of the Nominating Committee process and \ntheir experience on the Nominating Committee.  Nothing in this Joint Statement is intended to \nprovide a response or opinion on the questions the Commission has circulated in preparation for \nSettlement discussions in September.1 \nGoverning Documents: Section 7.1 of the Operating Agreement establishes the Nominating \nCommittee.  This Section prescribes Board qualification requirements and Nominating Committee \ndeadlines2.  The PJM Manual 34 on the Stakeholder Process restates the Operating Agreement’s \nprovisions.  The Manual notes that the Nominating Committee has its own Charter and Code of \nConduct. \nThe Nominating Committee Charter and Formation of the Committee \nThe Members Handbook contains the Nominating Committee Charter.  Of particular importance \nis the composition of the committee: Three Board Members who are not up for re-election, of \nwhich one member cannot vote but chairs the committee.  In addition, each of the five sectors in \nPJM elects a representative annually to the committee.  The PJM President may also participate as \nan ex officio non-voting member.  Finally, the Secretary of PJM shall attend to serve as the \nsecretary of the Nominating Committee, and the Assistant to the President and PJM Board shall \nattend for the purpose of scheduling meetings.  \nThe Nominating Committee’s mission is to identify and nominate qualified Board of Managers \ncandidates for election by the Members Committee, and to report annually to the Members on the \nnomination process.  A quorum is necessary for a vote to be successful.  Votes are by blind ballot.   \n \n1 PJM Governance and Stakeholder Reforms, Docket No. AD26-7-000. \n2 Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. § 7.1, \nhttps://agreements.pjm.com/oa/18380 (last visited Aug. 19, 2026 (the “OA”)."},{"page":2,"startToken":344,"endToken":787,"text":"2 \n \nCore duties: Developing/reviewing Board qualification criteria; at its option, retaining an \nindependent consulting firm to identify candidates; vetting that firm's independence annually; and \ndistributing nominee information to the Members Committee at least 30 days before the Annual \nMeeting.3 \nThe Nominating Committee Code of Conduct. \nPrior to the commencement of the annual work of the Nominating Committee, each member of \nthe Nominating Committee and each ex officio participant in the Nominating Committee executes \na certification that he or she has read and understood the content, spirit and intent of the \nNominating Committee Code of Conduct and agrees that he or she will fully abide by its terms.  \nAlthough the Code of Conduct provides the process by which candidates are identified, \ninterviewed and then elected, the two most salient points are the confidentiality provisions and the \nrequirement that the Representatives set aside their sector interests for the greater needs of PJM: \n“1. The members of the Nominating Committee shall undertake and fulfill their duties in \nfurtherance of the best interests of PJM without regard to the individual or affiliated \ncompany interests of any member of the Nominating Committee and without regard to \nthe interests of any other PJM member or group of PJM members.” \n“2. All information that the members of the Nominating Committee receive in undertaking \nand performing their duties shall be deemed confidential information of PJM and shall \nnot be disclosed in any manner to any other member of PJM or any other person, except \nas specifically permitted by this Code of Conduct.”4 \nThe Process.  The Nominating Committee meets as frequently as necessary to accomplish their \nmission.  It has been the course of conduct that an outside consultant is hired to assist in identifying \nand vetting applicants.  The only exception to the confidentiality provisions governing the \nNominating Committee is that the consultant is privy to confidential information and is required \nto sign confidentiality agreements. \nThe Representatives would like to highlight the confidentiality that is critical in this process.  Many \ncandidates are applying while employed and would leave their employment if chosen.  Other \ncandidates want their privacy to be respected in the event they are not chosen.  The Representatives \nbelieve that the pool of candidates could diminish if this strict adherence to confidentiality were \nnot maintained.  Additionally, the Code of Conduct explicitly states at the outset that “it is the \npolicy of PJM to attract the best qualified candidates to serve on the PJM Board.  In order to fulfill \nthat goal, it is the policy of PJM to employ nominating procedures that strictly maintain the \n \n3 https://www.pjm.com/-/media/DotCom/committees-groups/committees/nc/postings/charter.pdf. \n4 Id."},{"page":3,"startToken":787,"endToken":1338,"text":"3 \n \nconfidentiality of the identity of potential Board candidates and that ensure that those involved in \nthe nomination process strictly follow procedures that maintain such confidentiality.” \nRepresentatives may choose to meet with their sector members to discuss the open Board seats, \nwhat type of candidate would be a good fit, and to encourage stakeholder nominations as well.  \nWith respect to a Board member who could run for re-election, the Representatives may receive \ninput from others but must abide by the confidentiality provisions of the Code of Conduct. \nStakeholders may provide input with respect to an individual board member whose term is up for \nrenomination.  The Representatives may not disclose whether a Board member is seeking re-\nelection and may not disclose any non-public information.   \nThe usual practice has been that the consultant will manage the vetting of candidate’s resumes, \nwhich may be submitted by anyone, including a Member of PJM, a state regulator, or even a \nstakeholder with an interest in PJM.  In fact, the public notice of the initiation of the Nominating \nCommittee with information about the qualifications and experience being targeted includes \ninformation for how resumes may be provided to the consultant.  The consultant identifies potential \ncandidates, the Nominating Committee asks questions to understand the background, experience \nand potential conflicts of those potential candidates.  Ultimately, the Nominating Committee \nconducts a blind vote on the list of potential candidates provided by the consultant indicating which \ncandidates the Nominating Committee desires to further consider.  The consultant then narrows \nthe list down based on the candidates that received the most votes.  At this point, the candidates \nare discussed, and a decision is made about whether a candidate should proceed to the next step of \nevaluation.  In recent years, best efforts have been made to ensure candidates are interviewed by \nthe entire Nominating Committee. \nRepresentatives evaluate candidates based on the candidates’ qualifications and whether they meet \nthe requirements to fill the open Board seat.  They consider each candidate’s career, integrity, \npersonality fit with the Board, and, most importantly, whether or how the candidate would help \nfurther the best interests of PJM.  Although the Member Representatives are selected by their \nrespective sectors, their role on the nominating committee is not to advocate for the interest or \npreferred outcome of those sectors.  In evaluating candidates, representatives are expected to set \naside sector-specific commercial and policy interests and exercise independent judgement based \non the qualifications established in the Operating Agreement, the needs of the Board as a whole, \nand the best interest of PJM.  Sector affiliation provides the Committee with a diversity of \nperspectives, but it does not determine which candidate a Representative supports.  Consistent with \nthat responsibility, the Committee focuses on identifying candidates who are likely to form their \nown opinions that are supported by expertise in fields necessary for PJM to function, and question \nPJM staff, PJM management, the Independent Market Monitor and stakeholders.  The most \nchallenging discussions occur with respect to which candidate has the best qualifications to fill a \nseat when candidates could satisfy various qualifications identified in the Operating Agreement.  \nAfter a candidate has been nominated by the Nominating Committee, the consultant goes through \ntypical background checks.  Under Section 9 of the Code, the President then informs the candidates \nof their selection, as well as the Board and the Members Committee."},{"page":4,"startToken":1338,"endToken":1649,"text":"4 \n \nFinally, a Members Committee vote on the Board nominations takes place at the PJM Annual \nMeeting held in the Spring.  If the Members Committee does not achieve a quorum or an \naffirmative vote to approve the Nominating Committee’s recommendations, then the process starts \nanew.  While there have been sector votes against specific nominees, it is rare that the majority of \nthe Members Committee does not approve the Nominating Committee’s recommendations, as \noccurred in 2025.  Overall, the Nominating Committee process has generally resulted in Board \ncandidates receiving the necessary support and has served as an important component of PJM’s \ngovernance for decades.  The membership has a high degree of confidence and respect for the \nintegrity of the Nominating Committee process that has supported a decades-long track record of \nsuccess for PJM notwithstanding the current resource adequacy and market challenges.   \nAgain, the Representatives appreciate the opportunity to provide insight into their experience on \nthe Nominating Committee in hopes of aiding the Commission in its deliberations of PJM \ngovernance. \nElectric Distributors Representatives: \nEnd Use Sector Representatives: \n \nRory Sweeney \nPrincipal, PJM & FERC Regulatory Lead \nNorthern Virginia Electric Cooperative \nP.O. Box 2710 | Manassas, VA 20108 \n(571) 866-1563 \nrsweeney@novec.com \nSusan Bruce \nCounsel to PJM Industrial Customer Coalition \nMcNees Wallace & Nurick LLC \nP.O. Box 1166 \nHarrisburg, PA  17108 \n(717) 237-5254 \nSBruce@mcneeslaw.com \nAdrien I. Ford \nWorking at Old Dominion Electric \n Cooperative during NC Service, now: \nVP, Government & Regulatory Affairs and \nMarket Development \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n(215)251-2427 \nAdrien.Ford@constellation.com \nJordan Nader \nSenior Fellow, Energy & Environment \nR Street Institute. \n1411 K Street N.W., Suite 900 \nWashington, D.C. 20005 \n(513) 257-3058 \njnader@rstreet.org \nSigning in an individual capacity \nKevin Zemanek \nVice President of Operations \nBuckeye Power, Inc \n6677 Busch Blvd. \nColumbus, Ohio 43229 \n(614) 430-7800 \nkzemanek@ohioec.org"},{"page":5,"startToken":1649,"endToken":1855,"text":"5 \n \nGeneration Owners Sector Representatives: Other Suppliers Sector Representatives: \n \nMichael R. Borgatti \nCo-Chief Executive Officer | Gabel \nAssociates, Inc. \nManaging Director | Wholesale Power & \nMarkets Services Group \n2001 Market Street, Suite 2500  \nPhiladelphia, Pennsylvania 19103 \nPhone: (732) 296-0770 \nMobile: (848) 459-6436 \nMichael.Borgatti@gabelassociates.com \nNeal A. Fitch \nSenior Director, Regulatory Affairs \nNRG Energy, Inc. \n804 Carnegie Center \nPrinceton NJ 08540 \n(713) 302-1284 \nNeal.Fitch@nrg.com \nSean Chang \nDirector, Regulatory Affairs \nShell Energy North America (US), L.P. \n1000 Main Street, Level 12 \nHouston, TX  77002 \n(713) 230-3340 \nSean.Chang@shell.com \nS. Ken Foldare \nDirector, RTO and Regulatory Affairs \nTangibl Inc. \nPhone: (610) 255-2333 \nMobile: (484) 241-1751 \nKen.foldare@tangiblinc.com \nNoha Sidhom \nExecutive Director \nEnergy Trading Institute Organization \n(571) 242-0436 \nNoha@energytradinginstitute.org \nAbhishek Josh Ghosh \nSenior Manager, Market Development \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n(610) 419-9201 \njosh.ghosh@constellation.com \nBruce Bleiweis \nBN Energy Advisors LLC \n(914) 953-8753 \nbruce@bnenergyadvisor.com \nMarjorie Philips \nSr. Vice President, Wholesale Market Policy \nLS Power Development, LLC \n250 West 55th Street, 31st Floor \nNew York, NY 10019 \n(610) 401-3612 \nmphilips@lspower.com \nJeffrey Whitehead \nJW Energy Solutions, LLC \n1486 Stirling Drive \nWayne PA 19087 \n(484) 576-9151 \njeff@jwenergysolutions.com"},{"page":6,"startToken":1855,"endToken":1856,"text":"6"},{"page":7,"startToken":1856,"endToken":1997,"text":"7 \n \nOn behalf of the Transmission Owners: \n \nJason Barker \n[Working at Exelon during Committee service] \nVice President, Regulatory Affairs \nVC Renewables LLC \n110 Edison Place, Suite 312 \nNewark, NJ 07102 \nbja@vcrenewables.com \nLaura Yovanovich \nSenior Regulatory Policy Specialist \nElectric - Transmission \nPPL Utilities Corporation \n827 Hausman Road \nAllentown, PA  18104 \n(610)235-7181 \nLYovanovich@pplweb.com \nDenise R. Foster Cronin \nChief Compliance Officer and SVP \nEast Kentucky Power Cooperative, Inc. \n4775 Lexington Road, P.O. Box 707 \nWinchester, KY 40392-0707 \nOffice: (859) 745-9615 \nCell: (610)220-6382 \ndenise.cronin@ekpc.coop \nJohn Horstmann \nSr. Director RTO Affairs \nThe Dayton Power and Light Company \n dba AES Ohio \nOffice: (610) 933-3170 \nMobile: (610)724-9084 \njohn.horstmann@aes.com \nJames G. Davis \nRegulatory and Market Policy \n Senior Strategic Advisor \nDominion Energy Services, Inc. \n120 Tredegar Street \nRichmond, VA 23219 \n(804) 819-2718 \njames.g.davis@dominionenergy.com"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1649},{"p":5,"at":0,"title":"Pages 5 to 7","method":"page range","endPage":7,"endAt":1004,"startToken":1649,"endToken":1997}]}