{"document":{"slug":"rec-20260821-5318","title":"Comments of Voltus, Inc. on the PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish a…","issued":"2026-08-21","accession":"20260821-5318","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Voltus, Inc.","kind":"comments","file":"sources/filings/text/20260821-5318_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5318","tier":"record","sha256":"c9ee9fb851acbad0db618501a19c4bc827f390e3d88db0ef6a4b383df3ac57a2","pages":15,"tokens":4484,"emptyPages":[],"textThemes":["adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":204,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nReliability Backstop Procurement to Address \nResource Adequacy and Large Loads \n \n \nDocket No. RM26-3380-000 \n \nCOMMENTS OF VOLTUS \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (“FERC’s” or \n“Commission’s”) Rules of Practice and Procedure, and the August 3 Combined Notice of Filings \n#1 setting a comment date, Voltus respectfully submits the following comments on PJM \nInterconnection LLC’s (“PJM’s”) Federal Power Act Section 205 filing requesting the approval \nof tariff amendments to establish a Reliability Backstop Procurement (“RBP”). \nI.​\nINTRODUCTION \nVoltus, Inc., (“Voltus”) is a distributed energy resource (“DER”) aggregator operating in \nall nine North American wholesale electricity markets. Voltus is a registered curtailment service \nprovider (“CSP”) with PJM Interconnection, L.L.C., (“PJM”) aggregating the flexible attributes \nof retail load across the footprint and offering capacity, energy, and ancillary services products \ninto PJM markets. Relevant to the provision of capacity, Voltus has participated in all Reliability \nPricing Model (“RPM”) since BRA 2022/23 (held in early 2021) and has delivered its capacity \ncommitments as Load Management in the associated delivery years. Voltus also has experience \ntransacting PJM-accredited capacity bilaterally. Voltus’s commercial experience developing \ndemand-side capacity resources closely informs these comments. \nPage 1 of 15"},{"page":2,"startToken":204,"endToken":523,"text":"​\nVoltus participated actively throughout the Critical Issue Fast Path (“CIFP”) RBP process \nand had engaged in a limited manner in the preceding CIFP on Large Load Additions1, which \nintroduced the notion of a “reliability backstop mechanism” as among the near-term tools to \naddress the capacity shortage and associated reliability risks driven by rapid data center load \ngrowth.2 Voltus’s comments herein reflect a subset of the same issues Voltus raised through \ncommentary3, proposals, and a formal Stage 4 package4 during the CIFP-RBP stakeholder \nprocess.  \nVoltus contends that incentivizing Bring Your Own New Capacity (“BYONC”) and \nrelated frameworks is generally more effective and efficient at developing new capacity than \ncentral procurement, while better protecting non-cost-causers. However, recognizing the urgency \nof the moment and substantial efforts made by PJM, industry, consumer interests, state and \nfederal government actors, and FERC to reach this point, Voltus does not oppose approval of \nPJM’s filing.  \nVoltus wishes to recognize that the inclusion of demand-side resources for either RBP or \nQRBPO was not a foregone conclusion, and Voltus commends PJM for responding to broad \nstakeholder support for including the demand side. For the benefit not only of the RBP \nframework but also to continue to incentivize investment in the demand side and for precedential \n4 See the Executive Summary and proposals filed by Voltus in Stage 4 - \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260630/20260630-item-02l---voltus---c\nm-and-rbp---executive-summary.pdf.  \n3 See the presentation from Voltus as part of the CIFP – Reliability Backstop Procurement – Stages 2 and 3 - \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260504/20260504-item-02p---voltus-pr\nesentation.pdf.  \n2 See the Joint Parties Proposal \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-lla/2025/20251024/20251024-item-04i---joint-stake\nholder-proposed-package.pdf, at slides 5-6. \n1 CIFP process on RBP (https://www.pjm.com/committees-and-groups/cifp-rbp ) and CIFP process on Large Load \nAdditions (https://www.pjm.com/committees-and-groups/cifp-lla).  \nPage 2 of 15"},{"page":3,"startToken":523,"endToken":793,"text":"reasons, demand-side eligibility as currently written in the tariff filing must, at minimum, be \nretained in the final tariff.  \nGiven that RBP is highly likely to proceed, Voltus’s main concern is that the current \nframework unduly discriminates against demand-side resources that can provide near-term but \ndurable capacity. First, the criteria for Qualifying RBO Offset (“QRBPO”) will count \n“reactivated” generation and storage resources against a zone’s RBP procurement target but not \nreactivated DR/DER sites. Not only is this difference in treatment unexplained, it also ignores \nexisting arrangements with DR sites willing to reactivate on the basis of large load revenues that \novercome the economic and operational dynamics that led the sites to drop-out in the first place.  \nIgnoring these arrangements risks overprocurement and concomitant socialization of \nmore-than-the-necessary costs to the PJM system. Second, the Stage 1 “gating criteria” for RBP \noffers do not recognize the actual commercial development pathways of distributed demand-side \nresources. If unchanged, they will function as a fence, not a gate, with the result that few if any \ndemand-side resources will actually offer, subverting PJM’s intention to afford demand-side \ndevelopers an opportunity to secure long-term price certainty to enable broad and deep new \ninvestment in behind-the-meter assets. \nVoltus addresses each of these two issues, and provides targeted tariff modifications to \naddress them, in the sections below.   \nII.​\nTHE ELIGIBILITY OF DEMAND-SIDE RESOURCES FOR QRBPO MUST BE \nCLARIFIED TO REFLECT THE CONSENSUS REACHED DURING THE \nSTAKEHOLDER PROCESS \nPJM’s proposed tariff language provides limited specification on the kinds of DR/DER \nresources that are eligible to be counted as QRBPO, introducing ambiguity as to the \nPage 3 of 15"},{"page":4,"startToken":793,"endToken":1172,"text":"requirements on the underlying sites. To reflect the consensus reached in the stakeholder process, \nand to ensure that DR/DER resources are eligible to offset RBP procurement on the same terms \nas generation and storage resources, FERC should direct PJM to amend its tariff language to \nclearly allow incremental and reactivation capacity for demand-side resources. \nA.​ The Proposed Tariff Language Is Ambiguous as to the Eligibility of New \nCapacity at Existing Locations and the Renewed Capacity of “Deactivated” \nLocations \n​\nPJM defines QRBPO resource eligibility in proposed Tariff, Attachment DD, \nsection 18.2: \n(a) Qualifying RBP Offset UCAP MW is capacity that (i) has not \npreviously supported a capacity commitment or been committed in an FRR Plan \nas of the commencement of the Reliability Backstop Procurement; and (ii) is \nsupplied by a resource that satisfies each of the criteria set forth in Tariff, \nAttachment DD, section 18.2(b). \n \n(b) Resources Eligible to Supply Qualifying RBP Offset UCAP MW \n \nA resource eligible to supply Qualifying RBP Offset UCAP MW must \nhave an expected commercial operation date, or is reasonably expected to be an \nAnnual Demand Resource or DER Capacity Aggregation Resource that will be \nregistered with the Office of the Interconnection and under a contract to perform \nbased on PJM dispatch instructions, by no later than June 1, 2032 and be: (i) a \nnew build generation resource including new resources that obtain Capacity \nInterconnection Rights transferred from deactivated resources or resources that \nhave announced deactivation as of April 10, 2026; (ii) the incremental capacity \ncreated by an uprate of existing Generation Capacity Resources, but only to the \nextent such incremental capacity is created through an increase in such \nGeneration Capacity Resource’s installed capacity and increase in Capacity \nInterconnection Rights associated with that Generation Capacity Resource; (iii) \nthe incremental capacity created by the utilization of Surplus Interconnection \nService; (iv) repowering of a deactivated generation resource that deactivated \nprior to April 10, 2026; (v) incremental capacity, whether due to greater Unforced \nCapacity or a higher level of Capacity Interconnection Rights, created by an \nexisting Generation Capacity Resource’s changing fuel type to a more efficient \nfuel type; or (vi) Planned Demand Resource or Planned DER Capacity \nAggregation Resources, as described in the RAA, Schedule 6 and Schedule 6.2. \n \n[. . .] \nPage 4 of 15"},{"page":5,"startToken":1172,"endToken":1537,"text":"Thus, to be a QRBPO UCAP MW, a unit of capacity must not have previously supported \na capacity commitment or FRR Plan (18.2(a)(i)), must be expected to be operational in time for \nDelivery Year 2032/2033 (18.2(b)), and must be backed by a resource falling into any of the \ncategories defined in 18.2(b)(i)-(vi).  \nThe first five of these categories pertain to generation/storage resources, and only the last \ncovers DR/DER. On the generation/storage side, it is explicitly specified that incremental \ncapacity tied to existing resources (18.2(b)(ii)-(iv)), and the “repowering of a deactivated \ngeneration resource” (18.2(b)(v)) may provide new capacity eligible as QRBPO if the other \nrequirements of 18.2(a)-(b) are met. By contrast, the single specified category for DR/DER, \n“Planned Demand Resource or Planned DER Capacity Aggregation Resources” (18.2(b)(vi)) \nleaves open whether (1) incremental capacity at existing locations and (2) reactivations of \nlocations that once did but are not currently participating in aggregations, could provide \nQRBPO-qualified capacity.   \nB.​ A Logical Reading of the Proposed Tariff Language Allows Incremental \nCapacity at Existing Locations and “Reactivated” Locations for QRBPO \nPurposes \nPulling out the pertinent 18.2(a)-(b) language, PJM has defined DR/DER-backed \nQRBPO UCAP MW as \n \n(a) . . . capacity that (i) has not previously supported a capacity commitment or \nbeen committed in an FRR Plan as of the commencement of the Reliability \nBackstop Procurement . . . (ii) supplied by a resource that . . . (b) . . . is reasonably \nexpected to be an Annual Demand Resource or DER Capacity Aggregation \nResource that will be registered with the Office of the Interconnection and under a \ncontract to perform based on PJM dispatch instructions, by no later than June 1, \n2032 and [is] Planned Demand Resource or Planned DER Capacity Aggregation \nResources, as described in the RAA, Schedule 6 and Schedule 6.2. \n \nThe requirement of 18.2(a)(i), that the capacity must not have previously supported a \ncapacity or FRR Plan commitment, cannot imply that incremental capacity at existing locations \nand the capacity contributions of reactivated locations are precluded. If it did, then incremental \nPage 5 of 15"},{"page":6,"startToken":1537,"endToken":1938,"text":"capacity from generation storage resources and the repowering of deactivated generators would \nalso be disqualified, nullifying the specified categories in 18.2(b)(ii)-(v).  \nNor does “Planned Demand Resource or Planned DER Capacity Aggregation Resource” \nin 18.2(b)(vi) independently limit eligibility to locations that have never before participated. In \nRAA Schedules 6 and 6.2, Planned Demand Resources and Planned DER Capacity Aggregation \nResources sit in opposition to Existing Demand Resources5 and Existing Planned DER Capacity \nAggregation Resources6. The categories are relevant for the reporting of existing and planned \nMW in the aggregator’s pre-auction Sell-Offer Plan that determines the maximum MW that an \naggregator can bid into an RPM auction. An Existing Demand Resource comprises “end-use \ncustomer sites that are registered for the current Delivery Year with PJM” as of the time of \nSell-Offer Plan submission. Any other site goes in as Planned Demand Resource. Similar logic \nholds for DER Capacity Aggregation Resource. Thus “planned” resources may include \nincremental capacity at existing locations and reactivated locations.  \nC.​ Consistent with the Purpose of the QRBPO Construct, PJM Should Include \nIncremental Capacity at Existing Locations and the Capacity of Reactivated \nLocations as Eligible to Supply QRBPO UCAP MW \nEnabling incremental capacity at existing locations and the capacity of reactivated \nlocations supports PJM’s goals, furthers the principle that large loads should cover their own \ncosts, and reflects the consensus reached during the CIFP process.   \n6 \"Existing DER Capacity Aggregation Resource\" shall mean a DER Capacity Aggregation Resource for which the \nDER Aggregator has identified existing Component DER that are registered in a DER Capacity Aggregation \nResource for the current Delivery Year with PJM (even if not registered by such DER Aggregator) and that the DER \nAggregator reasonably expects to have under a contract to generate or reduce load based on PJM dispatch \ninstructions by the start of the Delivery Year for which such DER Capacity Aggregation Resource is offered. RAA \nDefinitions. \n5 \"Existing Demand Resource\" shall mean a Demand Resource for which the Demand Resource Provider has \nidentified existing end-use customer sites that are registered for the current Delivery Year with PJM (even if not \nregistered by such Demand Resource Provider) and that the Demand Resource Provider reasonably expects to have \nunder a contract to reduce load based on PJM dispatch instructions by the start of the Delivery Year for which such \nresource is offered. RAA Definitions. \nPage 6 of 15"},{"page":7,"startToken":1938,"endToken":2268,"text":"First, a core function of QRBPO is to reduce the volumes that must be centrally procured \nwhose costs are socialized across the system. (PJM does not propose, and may be jurisdictionally \nunable, to charge large loads directly for the costs of the RBP, and other ratepayer classes may \nend up exposed depending on retail rates, large load default risk, etc.) As such, PJM has \n“defin[ed] [the QRBPO eligibility] criterion broadly to capture all meaningful sources of new \nUCAP serving new load that contribute to resource adequacy and prevent double procuring for \nnew load that is bringing new capacity to the system” (emphasis added).7 This reflects a dual \npurpose to encourage and/or enable robust bilateral contracting while ensuring such contracting \nis recognized against the RBP procurement target and associated cost allocation. Such \nrecognition benefits all ratepayers by reducing the total RBP costs to which ratepayers may be \npotentially exposed. The recognition also benefits large load buyers in the private market \nbecause capacity they procure bilaterally, if eligible for QRBPO, reduces their exposure to the \nunknown costs of the RBP over a lengthy, fifteen-year term. Ensuring inclusive and comparable \nrecognition of various sources of net-new capacity avoids tipping the scales in favor of particular \nresource classes—in this case generation/storage over DR/DER. Because uprates and \nreactivations have been included on the generation/storage side, they should equally be included \nfor DR/DER-backed QRBPO. \nSecond, PJM’s intention is that “[t]he RBP Resource eligibility criteria are comparatively \nmore restrictive than the criteria for Qualifying RBP Offset UCAP MW.”8 PJM has explicitly \nproposed to allow asset-backed “uprates” as eligible to support RBP resources: per proposed \nTariff, Attachment DD, section 18.5(c), an RBP Demand Resource may “[n]ot be reliant on or \ncomposed of registered location(s) that previously supported a Demand Resource that provided \n8 Affidavit of Danielle Croop, Page 4, para 15.   \n7 Affidavit of Danielle Croop, Page 4, para 13.   \nPage 7 of 15"},{"page":8,"startToken":2268,"endToken":2548,"text":"capacity in a prior Delivery Year unless such location represents an incremental increase in \ncapacity resulting from an investment in new generation or new storage resources at that \nlocation” (emphasis added). The italicized language makes RBP-eligible the “incremental \nincrease in capacity resulting from an investment in new generation or new storage” at an \nexisting location. Thus QRBPO, a more inclusive construct, must include, at minimum DR \nuprates. \nThird, during the CIFP process, PJM’s QRBPO DR/DER resource eligibility (defined at \nthat time by reference to BYONC resource eligibility, as the term “Qualified RBP Offset” did not \nyet exist) developed over time to include both incremental capacity and reactivations. These \ninclusions responded to stakeholder advocacy and were not heavily opposed during the CIFP \nmeetings. PJM’s final proposal on BYONC eligibility included “the incremental amount from \nany location registered in 26/27 or 27/28” (uprates) as well as locations that had been registered \nprior to Delivery Year 2026/2027.9  \nD.​ Voltus Recommends a Simple Tariff Addition to Clarify that Incremental \nCapacity at Existing Locations and the Capacity of Reactivated Locations is \nEligible to Supply QRBPO UCAP MW \nWith the RBP proposed to open in just a few weeks, PJM has asked the Commission to \nprovide specificity on any recommended changes and has indicated it would accept discrete \nchanges where the “modification . . . is consistent with PJM’s overarching objectives in this \nfiling.”  \nVoltus recommends a narrow modification to provide clarity on demand-side QRBPO \neligibility thus delivering PJM’s objective to efficiently achieve resource adequacy while \n9 See PJM’s Stage 3 Connect-and-Manage presentation, \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260611/20260611-item-02---pjm-conne\nct-and-manage-package-updates.pdf, at slide 6. \nPage 8 of 15"},{"page":9,"startToken":2548,"endToken":2799,"text":"reducing new capacity cost-exposure for non-cost-causers. Voltus recommends the following \nredline to 18.2(b)(vi), allowing QRBPO UCAP MW to be supported by. . .  \n. . . (vi) Planned Demand Resource or Planned DER Capacity Aggregation \nResources, as described in the RAA, Schedule 6 and Schedule 6.2, where such \nresources are not reliant on or composed of registered location(s) supporting a \nDemand Resource providing capacity in the 2026/2027 Delivery Year unless such \nlocation represents capacity resulting from an investment in new generation or \nnew storage resources at that location. \n \n​\nThis definition achieves the clear inclusion of new incremental capacity and \n“reactivations” for sites supporting DR/DER resources while (1) avoiding gaming incentives \n(locations cannot “sit out” the 2026/2027 Delivery Year as it has already begun and registrations \nfor the year are fixed) and (2) achieving parity in the treatment of distributed and/or \nbehind-the-meter capacity compared to utility-scale generation and storage. For simplicity and \nconsistency, this language hews closely to language PJM has used later in the proposed tariff \nwhile defining RBP resource eligibility. \n​\nFurther, Voltus recommends, and will recommend in the IRAS docket, that the same \ncriteria be used to define resource eligibility for Bring Your Own New Capacity. Such an \nalignment supports clarity and simplicity and ensures straightforward incentives for large load \nbuyers. A MW used as QRBPO UCAP MW should also qualify as BYONC to reduce a large \nload’s IRAS exposure, and Voltus understands that it is PJM’s intention to achieve this \nalignment.  \nPage 9 of 15"},{"page":10,"startToken":2799,"endToken":3118,"text":"III.​\nTHE STAGE ONE GATING CRITERIA FOR RBP OFFERS SHOULD \nACCOMMODATE \nTHE \nACTUAL \nCOMMERCIAL \nDEVELOPMENT \nPATHWAYS OF DISTRIBUTED DEMAND-SIDE RESOURCES \nA.​ The Gating Criteria Are Far More Stringent for DR/DER Than \nGeneration/Storage, Ignore How DR/DER Resources Are Commercially \nDeveloped, and Are Practically Infeasible \nPJM proposes that the evaluation of RBP offers proceed in two stages, with the first stage \ndesigned to confirm that “the proposed resource will be successfully completed and able to \nprovide capacity.”10 Sellers must present evidence “demonstrat[ing] that the resource is likely to \nbe fully developed and the seller has taken all necessary steps (at this stage) to succeed” \n(emphasis added).11  \n​\nFor generation and storage resources, the required evidence comprises “[a] critical path \nconstruction schedule”; “[e]vidence of 100% Site Control . . . for a term of at least three years” \n(emphasis added); financing and permitting plans; “[s]igned memoranda or other documentary \nevidence that the developer has or will procure the major equipment necessary; evidence of \nexperience constructing similar projects or of past or present contracts with a partner with such \nexperience; “evidence of delivery infrastructure arrangements in the form of a notice of intent or \nattestation” (emphasis added) for natural gas, where applicable; and, for resources outside of \nPJM, evidence of firm transmission arrangements up to the border of the PJM region, where such \nevidence may be “a confirmed transmission service request with completed system impact \nstudy” (emphasis added).12 These criteria match PJM’s intention to ensure that the seller has \ntaken all necessary steps for this stage of development by recognizing that a developer several \nyears ahead of expected commercial operation date (“COD”) may not have obtained all \nnecessary permits and financing, may not have already purchased all major equipment, and may \n12 Proposed Tariff, Attachment DD, sections 18.5(f)(i)(1) to (8). \n11 Transmittal letter,  p. 71-2. \n10 Transmittal letter,  p. 71. \nPage 10 of 15"},{"page":11,"startToken":3118,"endToken":3423,"text":"not have confirmed all transmission and infrastructure arrangements. The finalization of the \nabove, and the investments necessary to take a detailed and rigorous development plan to \ncommercial operation, will often depend on the acquisition of price certainty through offtake \nagreements and other arrangements.  \nThe RBP is precisely an instrument designed to provide long-term price certainty to spur \nthe realization of the potential capacity locked in projects currently in the planning phase, whose \nfinal development is uncertain. It is by design that the RBP gating criteria for storage/generation \nseek rigorous evidence of an advanced stage of project planning, but do not require evidence of \nthe final investments and commitments that are prudently made only once clarity on the revenue \nstream is in place.   \n​\nBy contrast, DR/DER RBP offers must “[i]dentify, as part of its RBP Sell Offer, for the \nfull length of the fixed term, the location(s) and associated participation contract(s)”13 and will \nonly be considered if they include “[e]xecuted customer agreements or binding commitments \ncovering the proposed RBP UCAP MW commitment, with identified locations, customer names, \nand expected curtailment/injection capability per site” (emphasis added).14 \n​\nAs Voltus wrote in the Executive Summary to its Stage 4 CIFP Proposal, “This [gating \ncriterion] inverts the development sequence. Customer contracts are entered into against a known \nprice and volume, the output of the auction. Requiring them before the auction removes the \ncommercial basis on which they would be executed.” Voltus generally executes contracts with \nnew suppliers—the retail energy customers providing the curtailment and/or injection \ncapabilities that comprise the capacity resource—on the basis of BRA clearing prices. DR and \n14 Proposed Tariff, Attachment DD, sections 18.5(f)(i)(10). \n13 Proposed Tariff, Attachment DD, sections 18.5(c)(ii), 18.5(d)(i). \nPage 11 of 15"},{"page":12,"startToken":3423,"endToken":3741,"text":"DER resources are aggregations, and there are practical constraints on the ability to execute \npotentially hundreds of underlying contracts by October 21.  \nWhile Voltus does contract with the locations it aggregates for multi-year terms, those \nterm lengths are far less than fifteen years and, with new locations, would generally be executed \ncloser to the first year in which the location would participate and receive revenue rather than \nyears ahead. It is (1) infeasible to ask retail energy customers to enter fifteen-year contracts \nwithout known pricing up to several years before participation is set to begin, (2) commercially \nimpractical for an aggregator to commit to fixed pricing with up to thousands of suppliers prior \nto knowing even whether it has cleared the RBP, and (3) generally difficult to achieve this term \nlength with a supplier whose primary use case for the energy it might curtail or the DER whose \ncapabilities it might provide is something other than earning wholesale market revenues. \nChanging rules and evolving market conditions introduce uncertainty as to the “terms” of \nparticipation (e.g., dispatch frequency). Fifteen years is a long time for a retail energy user, who \nmay be industrial, commercial, small commercial, or even residential, to commit to changing its \nhome or business operations when called upon by the system operator.  \n​\nThis does not mean that aggregators like Voltus cannot commit to fifteen-year terms. \nRather, the function of an aggregator is to accumulate and blend the capabilities of a large \nnumber of individual energy users to produce a reliable resource, sometimes known as a Virtual \nor Distributed Power Plant (“VPP” or “DPP”). Underperformance of a segment of the portfolio \nmay be probabilistically balanced by overperformance of another segment, and “churn” is \npreemptively accounted for. \n​\nApplying this logic to a fifteen-year RBP commitment, the aggregator would be \noperationally capable of “refilling” the committed UCAP with other eligible sites when a subset \nPage 12 of 15"},{"page":13,"startToken":3741,"endToken":4068,"text":"of underlying sites choose not to renew their contracts. This is in contrast to a generation or \nstorage resource; if such a resource becomes unavailable or shuts down prior to the end of the \nfifteen-year commitment, the resource owner does not have the ability to straightforwardly \nreplace the UCAP with other new development. Note also that RPM deficiency charges \ndiscipline the aggregator from bidding unrealistic volumes since RBP commitments expose the \naggregator to significant underdelivery penalties through the RPM mechanism.  \nB.​ Voltus Recommends Reasonable Gating Criteria Appropriate to the \nPre-Auction Stage of Development \nVoltus’s recommendation on the DR/DER gating criteria address the twin concerns \ndeveloped in the previous sub-section: (1) requiring executed contracts at the bid stage inverts \ncommercial development logic, and (2) requiring fifteen-year contracts with all suppliers sets up \nan undue barrier that ignores the aggregator business model. As to the first, Voltus proposes that \nthe gating criteria for DR and DER be restructured to distinguish between pre-auction criteria, \nwhich should reflect the investment commitment made to reach auction readiness, and \npost-auction criteria, which should reflect the execution steps that follow a successful auction \noutcome. As to the second, Voltus proposes that contracts may run for a shorter term with the \nexpectation of renewal and/or replacement with other eligible net-new capabilities. Voltus \nrecommends the following redlines to proposed Tariff, Attachment DD, 18.5(c)-(d), defining \nDR/DER resource eligibility: \n(c) RBP Demand Resources \n \nTo qualify as a Demand Resource that supplies RBP UCAP MW eligible to be \noffered into the Reliability Backstop Procurement, a Demand Resource must meet \nthe requirements of Tariff, Attachment DD, sections 18.5(a), and: \n \n(i) Not be reliant on or composed of registered location(s) that previously \nsupported a Demand Resource that provided capacity in a prior Delivery Year \nunless such location represents an incremental increase in capacity resulting from \nan investment in new generation or new storage resources at that location; and \nPage 13 of 15"},{"page":14,"startToken":4068,"endToken":4373,"text":"(ii) Identify, as part of its RBP Sell Offer, for the full length of the fixed \nterm, the location(s) and associated participation contract(s). \n \n(d) RBP DER Aggregation Resources \n \nTo qualify as a DER Capacity Aggregation Resource that supplies RBP UCAP \nMW eligible to be offered into the Reliability Backstop Procurement, a Planned \nDER Capacity Aggregation Resource must meet the requirements of Tariff, \nAttachment DD, sections 18.5(b) and: \n \n(i) Identify, as part of its RBP Sell Offer, for the length of the fixed term, \nthe location(s) and associated participation contract(s). \n \nVoltus further recommends this redline to the DR/DER gating criteria in proposed Tariff, \nAttachment DD, 18.5(f)(i): \n \nRBP Sell Offers for Demand Resources or DER Capacity Aggregation Resources \nmust be accompanied by: \n \n(9) ​\nLocations within the PJM Region by Zone/Sub-zonal LDA and \naggregate capacity for RBP Sell Offers; \n \n(10) ​\nExecuted customer agreements or binding commitments covering \nthe proposed RBP UCAP MW commitment, with identified locations, \ncustomer names, and expected curtailment/injection capability per siteDetailed \ndescription of the expected composition of the offered MW and, where the \ncomposition will rely on DER asset partners, evidence of the associated \narrangements; and \n \n(11) ​\nEquipment procurement plan or evidence of deployed enabling \ninfrastructure such as metering, telemetry, load control, SCADA/dispatch \nsystems, or DER major equipment as applicable. \n \nPJM’s proposed gating criteria discriminate unnecessarily between storage/generation \nand DR/DER resources, and will very likely have the practical result that no DR/DER resources \nactually offer into the procurement. This would contravene the consensus reached among \nstakeholders as reflected in PJM’s proposals that DR/DER resources should be included, as well \nas the preferences publicly expressed by political actors. Voltus’s proposed amendments \npractically enable DR/DER resources to participate while respecting the purpose of the gating \nPage 14 of 15"},{"page":15,"startToken":4373,"endToken":4484,"text":"criteria “to provide assurance that the supply will be available for the 15-year term and manage \nthe risk of the supply being available for the full term that PJM is procuring on behalf of load in \nthe RBP.”15  \nIV.​\nCONCLUSION \n​\nVoltus thanks the Commission for this opportunity to comment and is hopeful of an \neffective procurement that incentivizes critical investment in new capacity, including distributed, \ndemand-side resources. \n \nRespectfully submitted, \n \n/s/ Kimaya Abreu \nKimaya Abreu \nSr. Manager, Regulatory Affairs \nVoltus, Inc. \n2443 Fillmore St. \nSan Francisco, CA 94115 \n609.994.7686 \nkabreu@voltus.co  \n \nDated: August 21, 2026 \n \n15 Affidavit of Danielle Croop, Page 6, para 20. \nPage 15 of 15"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":652,"startToken":0,"endToken":88},{"p":1,"at":652,"title":"INTRODUCTION","method":"printed heading","endPage":15,"endAt":218,"startToken":88,"endToken":4413},{"p":15,"at":218,"title":"CONCLUSION","method":"printed heading","endPage":15,"endAt":716,"startToken":4413,"endToken":4484}]}