{"document":{"slug":"rec-20260826-5137","title":"PJM Interconnection, L.L.C. submits notice of Compliance Filing submitted on 08/17/2026 in compliance with the directives in the 06/18/2026 Order","issued":"2026-08-26","accession":"20260826-5137","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"notice","file":"sources/filings/text/20260826-5137_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260826-5137","tier":"record","sha256":"9c51cb967b605f89e517291c8ad98a6a41b05e0e1edd7b2f212393327c42d3d6","pages":3,"tokens":423,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":257,"text":"1200 G Street, N.W., Suite 600 \nWashington, D.C.  20005-3898 \nPhone: 202.393.1200 \nFax: 202.393.1240 \nwrightlaw.com \n \nAugust 26, 2026 \n \nHonorable Debbie-Anne A. Reese \nSecretary  \nFederal Energy Regulatory Commission  \n888 First Street, NE, Room 1A \nWashington, DC 20426 \n \nRe: \nPJM Interconnection, L.L.C., Docket No. EL25-49-000, et al. \nCompliance Filing in Docket No. ER26-1479-002 \n \nDear Secretary Reese: \nThis letter, being served on all parties to the above-referenced proceeding, confirms \nthat PJM Interconnection, L.L.C. (“PJM”) submitted on August 17, 2026, a filing in Docket \nNo. ER26-1479-002 (Accession No. 20260817-5195) in compliance with the Federal \nEnergy Regulatory Commission’s sixty-day compliance directives in the June 18, 2026 \norder1 and the notice granting an extension of time for certain compliance obligations.2  \nPJM requested an effective date of October 17, 2026, for the revisions in Parts I, III, VI, \nVII, VIII, and IX and June 1, 2028, for the provisions in Part XI.  On August 18, 2026, the \nCommission set 5 PM ET on September 8, 2026, for comments on this filing.3 \n \n1 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026). \n2 PJM Interconnection, L.L.C., Notice of Extension of Time, Docket Nos. EL25-49-002, et al. (Aug. 14, \n2026). \n3 Harquahala Sun 1, LLC, Harquahala Sun 2, LLC, HV Sun SFA Manager 1, LLC, MEC Phase 1, LLC, MEC \nPhase 2, LLC, Olympus Phase 1, LLC, Olympus Phase 2, LLC, Olympus Phase 3, LLC, Saguaro Bidco Inc., \nCombined Notice of Filings # 1, Docket Nos. EC26-140-000, et al. (Aug. 18, 2026)."},{"page":2,"startToken":257,"endToken":356,"text":"Honorable Debbie-Anne A. Reese  \nAugust 26, 2026 \nPage 2 \n \nRespectfully submitted, \n/s/ Wendy B. Warren \n \nCraig Glazer \nVice President – Federal Government Policy \nPJM Interconnection, L.L.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005 \n202-423-4743 \ncraig.glazer@pjm.com \n \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C.  \n2750 Monroe Blvd, \nAudubon, PA 19403 \n610-666-8800 \nmark.stanisz@pjm.com \n \n \nAugust 26, 2026 \n \nWendy B. Warren \nRuth M. Porter \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005 \n202-393-1200 \nwarren@wrightlaw.com \nporter@wrightlaw.com \n \n \n \n \n \n \nCounsel for \nPJM Interconnection, L.L.C."},{"page":3,"startToken":356,"endToken":423,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this 26th day of August 2026 caused a copy of the \nforegoing document to be served upon each person designated on the official service list \ncompiled by the Secretary in this proceeding. \n/s/ Ruth M. Porter \n \nRuth M. Porter \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, D.C.  20005 \n(202) 393-1200  \nporter@wrightlaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":0,"startToken":0,"endToken":356},{"p":3,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":3,"endAt":396,"startToken":356,"endToken":423}]}