{"document":{"slug":"rec-20260826-5199","title":"Comments of the Independent Market Monitor for PJM re PJM Governance and Stakeholder Reforms","issued":"2026-08-26","accession":"20260826-5199","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Monitoring Analytics, LLC","kind":"comments","file":"sources/filings/text/20260826-5199_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260826-5199","tier":"record","sha256":"b0c0b840b6d4b0613ebb0639bd3cd3237c3f422b26570b3661618d9e8020d0bd","pages":13,"tokens":4008,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":231,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms \n) \n) \n) \n \n \nDocket No. AD26-7-000 \nCOMMENTS OF THE INDEPENDENT MARKET MONITOR FOR PJM \nPursuant to the notice requesting post-conference comments issued in this \nproceeding, July 30, 2026 (“Notice”), Monitoring Analytics, LLC, acting in its capacity as the \nIndependent Market Monitor for PJM, submits this response. On July 23, 2026, the \nCommission convened a technical conference to discuss “to discuss [PJM’s] governance and \nstakeholder processes, with a particular focus on identifying and evaluating concrete, \nactionable reforms to improve PJM’s ability to address operational and market needs in a \ntimely and efficient manner.” The Market Monitor responds below to the questions included \nin the Notice. \nThe dispute over whether the PJM Board should have FPA Section 205 rights over the \nentire OA and OATT of PJM is framed incorrectly by many. The requirement to have a two \nthirds majority of the PJM Members Committee in order to make a Section 205 filing does not \nprovide “veto rights” to any sector and does not allow the members or any group or sector \nof members to “hold PJM hostage” as some have alleged. The PJM Board can make a filing \nunder FPA Section 206 at any time and without limitation. The most significant points about \nFPA Section 205 filings are that they must meet only a lower standard than FPA Section 206"},{"page":2,"startToken":231,"endToken":605,"text":"- 2 - \nfilings, and that Section 205 filings limit the ability of the Commission to modify the filing \nconsistent with Commission policy.1  \nPJM prefers the lower standard of a Section 205 filing in order to perpetuate what can \nbe thought of as “PJM deference” by the Commission to PJM rather than the more commonly \nunderstood “Chevron deference” by the courts to the Commission. To the extent that any \nChevron deference remains in practice, that translates effectively to PJM deference by the \ncourts in the case of FPA Section 205 filings by PJM.  \nPJM should not have unilateral FPA Section 205 authority over any part of the OA or \nthe OATT. PJM’s Section 205 filing authority over Attachment DD to the OATT, which \ngoverns the PJM Capacity Market, has not led to any improvements in market design \noutcomes and has not led to a more efficient process. A lower barrier to filing has resulted in \na series of poor capacity market design choices that were approved in part because they did \nnot have to meet the higher Section 206 filing standards.  \nPJM and others have cited to independence and the freedom to act quickly as reasons \nto support Section 205 rights for PJM. That has not been the result of PJM’s Section 205 rights \nover Attachment DD and no one has argued that the actual experience of PJM making 205 \nfilings related to Attachment DD demonstrates any of the alleged benefits of FPA Section 205 \nrights for PJM. In addition, the goal should be to help ensure filings that improve the PJM \nmarkets and serve the public interest. The goal is not to file quickly and the goal is not to file \nsubject to an inferior standard of review. The goal is to make good filings that serve the public \ninterest. \nMost fundamentally, the Section 205 versus Section 206 rights argument must be \nevaluated in the broader context. The PJM Board cannot be expected to make filings in the \npublic interest until the independence of the PJM Board is defined and assured. Although \n \n1 \nSee NRG Power Mktg., LLC v. FERC, 862 F.3d 108 (2017) (FERC must approve or reject a proposal in \nlight of its purpose and objectives in a Section 205 filing)."},{"page":3,"startToken":605,"endToken":936,"text":"- 3 - \nthere is a notable lack of comments on the topic, the independence of PJM staff and the goals \nof PJM staff must also be addressed. The PJM Board relies almost exclusively on PJM staff for \ninformation, for recommendations about policy and for the details of filings. The PJM Board \nwill not be independent until the PJM staff is independent. The goals and obligations of the \nPJM staff must be clearly stated, verifiable and enforceable. \nI. RESPONSES TO QUESTIONS \n1. \nShould Board members’ terms be extended to five or more years? \nComments: No. There is no reason to extend Board members’ terms from three to five \nor more years. The reasons advanced for such extension are based on Board independence. \nExtending the Board terms does not address the underlying issues undermining \nindependence and therefore does not produce the desired result. The goal should be to \ndirectly ensure Board independence and to separately directly ensure PJM staff \nindependence. \n2. \nShould there be a maximum number of years that a Board member may serve \n(e.g., 10 years)? \nComments: No. There is no reason to limit the duration of Board members’ service. \nThe reasons advanced for such a limitation are based on Board independence. But limiting \nthe duration of Board members’ service does not address the underlying issues undermining \nindependence and therefore does not produce the desired result. The goal should be to \ndirectly ensure Board independence and to separately directly ensure PJM staff \nindependence. \n3. \nShould the Board member qualification rules be revised to provide a preference \nfor some Board members that reside in the PJM region? \nComments: Yes. It would be preferable for some Board members to have resided in \nthe PJM region for a reasonable period of time and not simply to move to the region if added \nto the Board. Moving to the PJM region after selection as a Board member or moving to the \nPJM region in order to establish residency to become eligible for Board membership should"},{"page":4,"startToken":936,"endToken":1275,"text":"- 4 - \nnot qualify as meeting this requirement. If the purpose of the requirement is to provide some \nassurance that the Board member understands the region, such moves do not qualify. Most \nimportantly, such a preference for PJM residency should not override the current \nrequirement that there be no conflict of interest.2 Avoiding conflicts of interest should take \nprecedence over residency preference. \n4. \nShould the conflict-of-interest rules be revised to reduce the cooling off period \nfor Board members from two years to one year? \nComments: No. Avoiding conflicts of interest of all kinds is definitional in maintaining \nan independent Board. As part of ensuring the independence of the Board, it is essential to \nlimit the potential influence of future job prospects on Board decision making. This \nrequirement is core to maintaining Board independence. For those who do not view \nmembership on the PJM Board as a steppingstone to their next job with a PJM market \nparticipant, this requirement should not be a hardship.3 Directly working for government \nagencies whose purpose is to serve the public interest should not be considered a conflict of \ninterest, e.g. a public utility commission. \n5. \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \nComments: No. Rather than permitting additional lobbying by those market \nparticipants with more resources and specific financial interests in detailed rules, the current \nrules should remain in place or be strengthened. The ex parte rules are essential to prevent \nhidden and undisclosed lobbying by influential participants and to maintain public \nconfidence in the PJM markets. The goal should be more open communication with the Board \nby all parties with an interest in PJM markets. All Board meetings should be open and public \n \n2  \nOA § 7.2. \n3  \nOA § 7.2 (“A Board Member shall not be, and shall not have been at any time within two years of \nelection to the PJM Board, a director, officer or employee of a Member or of an Affiliate or Related \nParty of a Member.”)."},{"page":5,"startToken":1275,"endToken":1629,"text":"- 5 - \nwith the exception of those meetings or parts of meetings that address security or personnel \nissues. \n6. \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning? \nComments: Yes. All Board meetings should be open and public. Board votes should \nbe public, recorded and posted publicly. The Board should be required to explain the reasons \nfor its actions and why its actions are in the public interest. \n7. \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nComments: Yes. All Board meetings should be open and public with the exception of \nthose meetings or parts of meetings that address security or personnel issues. It is essential \nthat the Board meetings and decision making process be public and open to scrutiny. The \nBoard makes decisions affecting 67 million people living in the PJM area, the financial well \nbeing of those 67 million people, and the financial health of the current and future members \nof PJM. \n8. \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \nComments: Yes. PJM and the PJM Board make decisions affecting 67 million people \nliving in the PJM area, the financial well being of those 67 million people, and the financial \nhealth of the current and future members of PJM. PJM acts as an unelected and unappointed \nregional government with extraordinary powers. PJM’s history and the recent negative \nreactions of the PJM Board and PJM staff to the active role of state governments in the PJM \nrule making process illustrate the fact that the elected and appointed representatives of the \npeople of PJM need to be assured that it is the explicit obligation of the PJM Board and the \nPJM staff to serve the public interest. It is equally important that both the PJM Board and the \nPJM staff have that obligation. Both the PJM Board and the PJM staff should have that explicit \nobligation memorialized in the PJM OA and OATT. The PJM staff has a very significant"},{"page":6,"startToken":1629,"endToken":1963,"text":"- 6 - \nimpact on the PJM Board through the control of information to the Board and through the \nprovision of options to the Board. Board independence cannot be assured without PJM staff \nindependence. The goal of the PJM staff should not be to be a “member driven organization” \nwith an assumption that the goals of influential PJM members be accommodated. The explicit \nand verifiable and enforceable goal of the PJM staff should be to serve the public interest even \nwhen opposed by influential members of PJM. \n9. \nShould state representatives have at least one voting member on the \nNominating Committee? \nComments: Yes. The composition of the Nominating Committee is one of the key \nelements of ensuring and maintaining Board independence. It is essential to ensure the \nindependence of the PJM Board from influence by PJM members that state representatives \nhave multiple voting members on the Nominating Committee. The number of the state \nrepresentatives plus the number of Board representatives should constitute a majority of the \nNominating Committee in order to ensure the independence of the PJM Board and to ensure \nthat narrow financial interests of any group or coalition of members do not determine the \nselection of Board members. In addition, the process should ensure that the consultant chosen \nto select and pre screen Board candidates not look in all the usual places for Board members. \nThe consultant should be required, by contract, to search much more broadly for Board \nmembers to include, for example, public advocates and private citizens with an interest in \nensuring that PJM power markets serve the public interest, and should allow self \nnominations. \n10. \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \nComments: Yes. PJM management compensation should be tied to their success in \nreaching their defined and enforceable and verifiable obligation to serve the public interest. \nEqually important, PJM management compensation should be in no way whatsoever linked \nto the satisfaction of PJM members. This is essential to ensuring that the PJM staff is"},{"page":7,"startToken":1963,"endToken":2237,"text":"- 7 - \nindependent from member influence and ensuring that PJM staff decisions and \nrecommendations are not made with the goal of addressing the concerns of specific members \nor groups of members. \n11. \nShould the stakeholder process be advisory, i.e., stakeholder votes only inform \nthe Board? \nComments: No. Approval of the Members Committee should continue to be a \nrequirement of PJM and the PJM Board making filings under Section 205 of the Federal Power \nAct.  \nThe OA constitutes PJM as an LLC, which makes the senior committees part of the \nPJM governance structure, along with PJM staff and the PJM Board. The Courts essentially \nrecognized this broad governance structure as the “public utility” insofar as PJM Section 205 \nfilings are concerned in NRG. 4 The Court decided that PJM staff could not voluntarily agree \nto conditions in Commission orders changing the core purpose of a proposal because the \nproposal is the product of decisions made in the stakeholder process. PJM’s proposal to have \nunilateral FPA Section 205 rights is inconsistent with the Court’s finding in NRG.5 \nPJM does not need and should not be granted FPA Section 205 rights over the OA and \nOATT. PJM’s current FPA Section 205 rights over Attachment DD to the OATT should be \nrevoked. \n12. \nShould PJM have Section 205 filing rights over the energy market and ancillary \nservices unencumbered by the requirement to obtain approval of two-thirds of \nthe Members Committee? \nNo. Approval by the Members Committee is not an encumbrance. Approval by the \nMembers Committee is an essential part of PJM governance. \n \n4  \nSee NRG Power Mktg., LLC v. FERC, 862 F.3d 108 (2017). \n5  \nId."},{"page":8,"startToken":2237,"endToken":2580,"text":"- 8 - \nThe essential point about Section 205 filing rights is that such rights simply lower the \nstandard for the Commission to accept a filing. Section 205 rights permit the PJM Board to \nmake filings that are not the best option but that meet only the vaguely defined just and \nreasonable standard even if they are demonstrably inferior to submitted alternatives. The \nPJM Board and PJM should be required to meet the tests of a Section 206 filing when PJM \nmakes filings to change the PJM rules by following the rules of Section 206 filings and having \nthe Commission apply Section 206 standards of approval. \nPJM does not need Section 205 filing rights over energy market and ancillary services \nmarket rules, which are included in Schedule 1 to the Operating Agreement. PJM must obtain \napproval of two-thirds of the Members Committee in order to make filings under Section 205.  \nThere is nothing in the FPA that limits PJM from making an FPA Section 206 filing \nover any matter within their purview. PJM has the right to make filings under Section 206 of \nthe Federal Power Act without stakeholder approval. \nSection 7.7(vi) of the Operating Agreement provides: \nIn accordance with this Agreement, the PJM Board shall supervise \nand oversee all matters pertaining to the PJM Region and the LLC, \nand carry out such other duties as are herein specified, including \nbut not limited to the following duties and responsibilities: …  \nPetition FERC to modify any provision of this Agreement or any \nSchedule or practice hereunder that the PJM Board believes to be \nunjust, unreasonable, or unduly discriminatory under section 206 \nof the Federal Power Act, subject to the right of any Member or the \nMembers to intervene in any resulting proceedings... \nStakeholders cannot prevent a Section 206 filing by PJM, with the support of the PJM \nBoard, proposing to change any of its market rules. PJM has successfully exercised this \nauthority in the past, including the filing to reform the PJM capacity market rules.6 \n \n6  \nSee, e.g., Docket No. EL05-148-000 (RPM Filing)."},{"page":9,"startToken":2580,"endToken":2933,"text":"- 9 - \nUnlike filings under Section 205, under FPA Section 206 PJM must also show that the \nexisting rules are unjust and unreasonable before its proposed remedy will be considered. \nPJM cannot expect the same deference to its proposals that PJM could expect for proposals \nfiled under Section 205. Once the Commission has determined that the existing rules are \nunjust and unreasonable, the Commission has the responsibility to determine the \nappropriate, just and reasonable remedy.7 The Commission could require that PJM \nimplement PJM’s proposal, an alternative proposal, the Commission’s own solution or some \ncombination of the foregoing. With FPA Section 206 filings, the Commission is unhampered \nby limitations applicable to its ability to reject undesirable elements of Section 205 proposals.8 \nUnlike filings under FPA Section 205, Section 206 filings there is no limitation on the \nability of the Commission to choose a solution that best promotes efficient and competitive \nmarkets and best promotes and protects the public interest. Unlike filings under FPA Section \n205, under Section 206 filings the Commission can proceed to direct implementation of an \noptimal remedy without delay. Filings submitted under Section 206 afford the Commission \nthe maximum opportunity to advance its policy goals and to fairly balance competing \nstakeholders’ interests. \nAn important limit on PJM’s use of Section 206 is the requirement that PJM prove \nthat the current rules are unjust and unreasonable. This limitation is appropriate for \nsituations where the proposal is controversial and cannot obtain supermajority stakeholder \nsupport. Controversial rule changes that meet the Section 206 requirements are precisely \nwhere the Commissions’ ability to ensure implementation of the best, pro competitive and \npublic interest solution is needed. Section 205 filings, and the deference they are typically \n \n7  \nSee 16 U.S.C. § 824e(a) (“…  the Commission shall determine the just and reasonable rate, charge, \nclassification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall \nfix the same by order”). \n8 \nSee NRG Power Mktg., LLC v. FERC, 862 F.3d 108 (2017) (FERC must approve or reject a proposal in \nlight of its purpose and objectives in a Section 205 filing)."},{"page":10,"startToken":2933,"endToken":3272,"text":"- 10 - \nafforded, is only appropriate in situations where there is broad support and PJM can obtain \nsupport of two thirds of PJM stakeholders.  \nThe question does not address PJM’s unilateral rights to change the PJM Manuals \nwithout any Commission oversight or approval.9 Given the significance of the rules included \nin the Manuals, PJM should be required to submit any substantive changes to PJM Manuals \nto the Commission for comment, review and approval or rejection. \n13. \nShould PJM have Section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nComments: No. Approval of the Members Committee is not an encumbrance. \nApproval by the Members Committee is an essential part of PJM governance. \n14. \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights over \nresource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \nComments: Yes/No. If PJM is granted FPA Section 205 rights over all parts of the OA \nand OATT, states should have corresponding jump ball rights, with the state decision process \nremaining the sole purview of each state. If PJM is not granted unilateral FPA Section 205 \nrights over the OA and OATT, there is no reason for jump ball filings. As anyone who has \nobserved Victor Wembanyama in a jump ball situation knows, the outcome of a jump ball \ndepends primarily on relative heights. The value of jump ball filings is overrated. \n \n9  \nSee for example the case of change reserve requirements which are fundamental to PJM markets. \nPJM unilaterally changed the rules in the manuals and noted that PJM did not require approval or \neven consideration by the members. Starting in May 2023, to compensate for poor unit specific \nresource performance, PJM unilaterally increased the synchronized reserve reliability requirement, \nwhich in turn increased the primary reserve reliability requirement. See Monitoring Analytics, LLC, \n2025 Annual State of the Market Report for PJM, Volume 2, Section 10: Ancillary Service Markets. \n(March 12, 2026)."},{"page":11,"startToken":3272,"endToken":3543,"text":"- 11 - \n15. \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has Section 205 filing rights when a \nsupermajority of stakeholders approves an alternative proposal? \nComments: Yes/No. If PJM is granted FPA Section 205 rights over all parts of the OA \nand OATT, the Members Committee should have corresponding jump ball rights based on a \ntwo thirds vote. If PJM is not granted unilateral FPA Section 205 rights over the OA and \nOATT, there is no reason for jump ball filings. PJM should not have Section 205 rights over \nany part of the OA or the OATT. \n16. \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \nComments: No. The existing voting threshold requires significant agreement among \ndiverse PJM sectors. This is an appropriate threshold for an FPA Section 205 filing with its \nlower standard for Commission review. \n17. \nShould the voting rules barring affiliate votes, which apply to senior standing \ncommittees, also apply to lower-level committees? \nComments: Yes. There is absolutely no reason to perpetuate the ability of members \nwith multiple affiliates to have a disproportionate influence over which options are brought \nto the senior committees for a vote. There is good reason to have the same voting rules at all \ncommittee levels to ensure a uniform approach across committees and to prevent undue \ninfluence by those with multiple affiliates. \n18. \nIn addition to OPSI, should there be a second state representative group \nconsisting \nof \ngovernors’ \nrepresentatives \nand/or \nstate \nlegislators’ \nrepresentatives? \nComments: The structure of state representation is a matter for the states to decide."},{"page":12,"startToken":3543,"endToken":3923,"text":"- 12 - \n19. \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes? \nComments: The role of the states is a matter for the states to decide. However, if the \nstates decide that they want a formal voting role, there is no reason to limit that role to \nresource adequacy and regional transmission cost allocation. The states have interest in all \nPJM rules because all PJM rules have an impact on the costs and risks borne by the 67 million \nresidents in the PJM area. Every decision of PJM whether it is about the energy and ancillary \nmarket details or about transmission investment decisions or about the capacity market \naffects the PJM customers who elect state officials and who ultimately pay the cost of \nwholesale power determined by PJM rules. \n20. \nShould PJM be required to consult with OPSI prior to making a Section 205 \nfiling related to resource adequacy and transmission cost allocation? \nComments: Yes/No. If PJM is granted broad rights to make FPA Section 205 filings \nthen PJM should be required to consult with the states prior to making any Section 205 filing. \nIf PJM is required to achieve a two thirds majority of the Members Committee in order to \nmake a Section 205 filing, PJM should be expected to have consulted with the states as part \nof the process. More broadly, PJM should be required to consult with states on all matters \nwhere PJM is making public policy decisions that affect the public interest. The relevant \nstructure of the states’ representation is a matter for the states to decide. \nThe basis for assuming that the states are interested only in resource adequacy and \ntransmission cost allocation is unclear and unsupported. The states have interest in all PJM \nrules because all PJM rules have an impact on the costs and risks borne by the 67 million \nresidents in the PJM area. Every decision of PJM whether it is about the energy and ancillary \nmarket details or about transmission investment decisions or about the capacity market \naffects the PJM customers who elect state officials and who ultimately pay the cost of \nwholesale power determined by PJM rules."},{"page":13,"startToken":3923,"endToken":4008,"text":"- 13 - \nII. CONCLUSION \nThe Market Monitor respectfully requests that the Commission afford due \nconsideration to this statement as the Commission resolves the issues raised in this \nproceeding. \nJoseph E. Bowring \nIndependent Market Monitor for PJM \nPresident \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8051 \njoseph.bowring@monitoringanalytics.com \nRespectfully submitted, \n \nJeffrey W. Mayes \n \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8053 \njeffrey.mayes@monitoringanalytics.com \nDated: August 26, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":447,"startToken":0,"endToken":680},{"p":3,"at":447,"title":"I. RESPONSES TO QUESTIONS","method":"printed heading","endPage":13,"endAt":8,"startToken":680,"endToken":3924},{"p":13,"at":8,"title":"II. CONCLUSION","method":"printed heading","endPage":13,"endAt":645,"startToken":3924,"endToken":4008}]}