{"document":{"slug":"rec-20260831-5121","title":"Answer of Google LLC in Support of the Organization of PJM States, Inc.’s 08/28/2026 Motion for Extension of Time","issued":"2026-08-31","accession":"20260831-5121","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Google LLC","kind":"answer","file":"sources/filings/text/20260831-5121_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-5121","tier":"record","sha256":"fda34b1d7aff1b4834ec2f2ad785c351773d2462a5a47c7e49c1c1ab6407117c","pages":3,"tokens":354,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":229,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C. \n \n) \n) \n) \n) \n) \n \nDocket No. ER26-3515-000 \n \nANSWER OF GOOGLE LLC \n \nPursuant to Rule 213 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission”),1 Google LLC (Google) respectfully submits answer in \nsupport of the Organization of PJM States, Inc.’s motion for an extension of time in which to \nrespond to PJM Interconnection L.L.C.’s (“PJM”) filing in the above-captioned proceeding.  \nSimply put, this is a proceeding motivated by and largely about retail customers and how they are \nregulated—matters over which the Federal Power Act reserves exclusive jurisdiction to the States. 2  \nFor that reason, it is absolutely vital that the States have the time they need to formulate a fulsome \nresponse to PJM’s proposal.  The Commission cannot issue a well-reasoned decision without that \ninput.  Accordingly, Google urges the Commission to grant the request for an extension.     \n \n \nRespectfully submitted, \n \n[Signatures on next page] \n \n \n \n \n \n \n \n1 18 C.F.R. § 385.213 (2026). \n2 16 U.S.C. § 824(b); FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 279 (2016) (FPA Section 201(b) “‘limit[s] \nFERC’s sale jurisdiction to that at wholesale,’ reserving regulatory authority over retail sales (as well as intrastate \nwholesale sales) to the States.” (quoting New York v. FERC, 535 U.S. 1, 6 (2002))."},{"page":2,"startToken":229,"endToken":295,"text":"-2- \n \n \n/s/ Brian George \nBrian George \nSr. Lead, US Energy Markets  \nElizabeth Savage \nStrategic Negotiator \nGoogle LLC \n655 New York Ave., NW \nWashington, DC 20001 \n(202) 999-0990 \nbriangeorge@google.com \neomsavage@google.com  \n \n \n                    \nMatthew Christiansen \nBryan Shpall \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006 \n(617) 598-7871 \nmchristiansen@wsgr.com  \nbshpall@wsgr.com \n \nCounsel for Google LLC \n                     \n \n \nDated:  August 31, 2026"},{"page":3,"startToken":295,"endToken":354,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary of the Commission in these \nproceedings. \n \nDated:  August 31, 2026 \nWashington, D.C. \n \n \n/s/ Bryan Shpall \nBryan Shpall \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":0,"startToken":0,"endToken":295},{"p":3,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":3,"endAt":387,"startToken":295,"endToken":354}]}