{"document":{"slug":"rec-20260901-5250","title":"Answer of East Kentucky Power Cooperative, Inc. in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in…","issued":"2026-09-01","accession":"20260901-5250","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"East Kentucky Power Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20260901-5250_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260901-5250","tier":"record","sha256":"223ede6a6f1dfeefbc4b6477ec7d9e6541c4d96061eaa991ff7def27621308af","pages":3,"tokens":480,"emptyPages":[],"textThemes":["procedure"]},"pages":[{"page":1,"startToken":0,"endToken":268,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \n) \nDocket No. ER26-3515-000 \n \nANSWER OF \nEAST KENTUCKY POWER COOPERATIVE, INC. TO \nMOTION FOR EXTENSION OF TIME TO FILE COMMENTS \n \nPursuant to Rule 213 of the Commission’s Rules of Practice and Procedure1 and the August \n31, 2026 Notice Shortening Answer Period in this proceeding,2 East Kentucky Power Cooperative, \nInc. (“EKPC”)3 submits this Answer in support of the Motion for Extension of Time filed by the \nOrganization of PJM States, Inc. (“OPSI”).4 In this proceeding, PJM Interconnection, L.L.C. \n(“PJM”) has proposed revisions to its Open Access Transmission Tariff (“Tariff”) and Reliability \nAssurance Agreement Among Load Serving Entities (“RAA”) to implement Interim Resource \nAdequacy Service (“IRAS”). PJM’s proposal is complex and materially different from the \n“Connect and Manage” (the predecessor to IRAS) proposal considered in the stakeholder process. \nAllowing participants additional time to review PJM’s proposal and provide substantive comments \nwill provide for a more thorough and complete record for the Commission to review as it considers \nPJM’s proposal. An extension of time to September 14, 2026 is reasonable given the complexities \nof PJM’s proposal, and the requested extension is consistent with Commission precedent in recent \n \n1 18 C.F.R. § 385.213 (2026). \n2 PJM Interconnection, L.L.C., “Notice Shortening Answer Period,” Docket No. ER26-3515-000 (Aug. 31, 2026).  \n3 EKPC filed a doc-less motion to intervene in this proceeding on August 18, 2026. \n4 PJM Interconnection, L.L.C., “Motion for Extension of Time of The Organization of PJM States, Inc.,” Docket No. \nER26-3515-000 (filed Aug. 28, 2026) (“Motion”)."},{"page":2,"startToken":268,"endToken":430,"text":"2 \nproceedings that involve similarly complex issues.5 Therefore, EKPC respectfully requests that the \nCommission grant OPSI’s request for an extension of the comment deadline in this proceeding.  \n \nRespectfully submitted, \n \n \nDenise R. Foster Cronin \nChief Compliance Officer and Senior Vice \nPresident \nEast Kentucky Power Cooperative, Inc. \n4775 Lexington Road, P.O. Box 707 \nWinchester, KY 40392-0707 \nTel.: 859-745-9615 \nEmail: denise.cronin@ekpc.coop \n \nOn behalf of \nEast Kentucky Power Cooperative, Inc. \n \n \n/s/ Daniel E. Frank \n \n \nDaniel E. Frank \nAllison E. S. Salvia  \nKelly A. Cuthbertson \nAdriana J. Santana \nEversheds Sutherland (US) LLP \n700 Sixth St., N.W., Suite 700 \nWashington, DC 20001-3980 \nTel.: 202-383-0100 \nEmail: danielfrank@eversheds-sutherland.com \nallisonsalvia@eversheds-sutherland.com \nkellycuthbertson@eversheds-sutherland.com \nanasantana@eversheds-sutherland.com \n \nCounsel for \nEast Kentucky Power Cooperative, Inc. \n \n \nDated: September 1, 2026  \n \n \n \n5 See, e.g., Pennsylvania Public Utility Commission v. PJM Interconnection, L.L.C., “Notice of Extension of Time,” \nDocket No. EL26-98-000 (Sept. 1, 2026) (granting extension of time for complaint involving complex issues)."},{"page":3,"startToken":430,"endToken":480,"text":"Certificate of Service \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Washington, DC this 1st day of September, 2026. \n/s/ Allison E. S. Salvia  \nAllison E. S. Salvia"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":0,"startToken":0,"endToken":430},{"p":3,"at":0,"title":"Certificate of Service","method":"printed heading","endPage":3,"endAt":304,"startToken":430,"endToken":480}]}