{"document":{"slug":"rec-20260902-5055","title":"Supplemental Comments of Persistence Analytics Group LLC re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C","issued":"2026-09-02","accession":"20260902-5055","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260902-5055_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5055","tier":"record","sha256":"4e130c4c81107e8b916c8442dc12215bd948bb3c4560be61b83b5a13218d851a","pages":6,"tokens":1354,"emptyPages":[],"textThemes":["flex","registry"]},"pages":[{"page":1,"startToken":0,"endToken":239,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nPJM Interconnection, L.L.C.\nDocket No. ER26-3515-000\nSUPPLEMENTAL COMMENTS OF\nPERSISTENCE ANALYTICS GROUP LLC\nREGARDING IRAS PERFORMANCE VERIFICATION\nAND COMPENSATION\nI. INTRODUCTION\nPersistence Analytics Group LLC (\"PAG\") respectfully submits these limited supplemental comments\nconcerning the Interim Resource Adequacy Service (\"IRAS\") proposed by PJM Interconnection, L.L.C. (\"PJM\").\nPAG filed comments in this proceeding on August 13, 2026 addressing implementation assurance, the\nLarge Load Registry, revalidation of material assumptions, and the evidentiary basis for claimed IRAS load-\nreduction capability.\nThose comments emphasized a straightforward principle: a represented ability to reduce load is not\nnecessarily equivalent to demonstrated operational capability under the conditions in which PJM may rely\non that capability.\nSubsequent filings have sharpened a related issue that warrants brief additional comment.\nThe Organization of PJM States, Inc. (\"OPSI\") requested additional time to consider the interaction among\nPJM, Electric Distributors, retail regulators, IRAS implementation, and the associated compensation\nmechanism. The Pennsylvania Public Utility Commission, Google LLC, and East Kentucky Power Cooperative,\nInc. supported that request. The Commission denied the requested extension on September 2, 2026.\nPAG does not address here the separate jurisdictional, retail-rate, or cost-recovery questions raised by those\nparties.\nPAG instead addresses a narrower evidentiary question:\nBefore compensation is assigned to claimed IRAS performance, what evidence is sufficient to\nestablish that the compensated capability was real, attributable, available when required, and\nactually performed as represented?\n1"},{"page":2,"startToken":239,"endToken":510,"text":"The existence of a compensation mechanism increases, rather than decreases, the importance of decision-\ngrade evidence.\nII. COMPENSATION ELIGIBILITY SHOULD FOLLOW DEMONSTRATED\nPERFORMANCE, NOT MERELY DECLARED FLEXIBILITY\nIRAS necessarily depends on the ability of participating Large Loads to reduce consumption or otherwise\nrespond when PJM requires relief.\nPAG's August 13 comments explained why a stated ability to reduce a quantity of load is not identical to\ndemonstrated capability under relevant timing, control, telemetry, fuel, permitting, and restoration\nconditions.\nWhen compensation is attached to that capability, the evidentiary consequence becomes greater.\nA compensation obligation should not arise merely because a Large Load has represented that it possesses\nflexibility or because an expected reduction has been incorporated into an operating arrangement.\nRather, the implementation framework should permit the relevant parties to determine whether the\nclaimed performance actually occurred and whether the amount attributed to the responding Large Load is\nsupported by evidence appropriate to the resulting payment.\nAccordingly, PAG recommends the following principle:\nCompensation eligibility should follow demonstrated capability and verified performance, not merely\ndeclared flexibility.\nThis does not require the Commission to prescribe a single measurement methodology for every Large\nLoad.\nLarge Loads differ materially in configuration, metering, onsite generation, operational controls, customer\narrangements, and retail treatment.\nThe narrower point is that a compensation determination should be supported by an evidentiary chain\nsufficient for the consequence of that determination.\nIII. THE PERFORMANCE RECORD SHOULD SUPPORT THE FULL CHAIN\nFROM EXPECTED CAPABILITY TO COMPENSATED RESULT\nWhere IRAS performance results in compensation, the relevant implementation record should permit\nauthorized parties, consistent with applicable confidentiality protections, to understand the basis for the\ncompensated quantity.\n2"},{"page":3,"startToken":510,"endToken":747,"text":"Depending on the applicable implementation structure, that record should be sufficient to address material\nelements such as:\nthe baseline or other reference quantity against which a claimed reduction is evaluated;\nthe quantity of load represented as available for reduction;\nthe PJM instruction or qualifying system condition giving rise to the response;\nthe timing of the response;\nthe actual reduction observed;\nthe duration of the reduction;\nwhether onsite generation or another mechanism contributed to the response;\nmaterial limitations affecting the claimed performance;\nrestoration or rebound conditions where relevant;\nthe basis for attributing the measured response to the participating Large Load;\nthe quantity ultimately treated as compensable; and\nmaterial changes that should require the capability or compensation eligibility to be revalidated.\nThe Commission need not resolve each implementation detail in this proceeding.\nBut the Commission should recognize that the evidentiary framework supporting compensation should be\ncapable of tracing the claimed service from represented capability through actual performance to the\ncompensated result.\nOtherwise, a compensation mechanism could create a payment obligation before the underlying\nperformance claim has reached an equivalent level of evidentiary maturity.\nA payment obligation should not mature faster than the evidence supporting the underlying\nperformance claim.\nIV. ELECTRIC DISTRIBUTORS AND RETAIL REGULATORS NEED\nSUFFICIENT EVIDENTIARY CONTEXT FOR THEIR DISTINCT\nRESPONSIBILITIES\nThe issues identified by OPSI underscore that IRAS compensation does not exist in isolation.\n1. \n2. \n3. \n4. \n5. \n6. \n7. \n8. \n9. \n10. \n11. \n12. \n3"},{"page":4,"startToken":747,"endToken":1042,"text":"Electric Distributors and retail regulators may have responsibilities distinct from PJM's wholesale reliability\nfunction, including questions concerning implementation, customer arrangements, compensation, and\nretail treatment.\nPAG does not take a position here on the allocation of legal authority among PJM, Electric Distributors, state\ncommissions, or other Relevant Electric Retail Regulatory Authorities.\nHowever, regardless of which entity ultimately determines or administers a particular payment obligation,\nthe evidentiary integrity of the underlying performance claim remains important.\nA state commission considering retail consequences may need to understand not merely that a Large Load\nparticipated in an IRAS arrangement, but what evidence supports the quantity for which compensation is\nclaimed.\nAn Electric Distributor administering a load-reduction arrangement may similarly need information\nconcerning the baseline, actual response, duration, attribution, and material operating conditions.\nThe Large Load Registry and associated implementation processes should therefore preserve sufficient\nprovenance to allow authorized users to distinguish among:\nrepresented capability;\ncapability supported by implementation evidence;\nactual observed performance; and\nthe quantity ultimately used for compensation.\nThose are related facts, but they are not interchangeable.\nV. MATERIAL CHANGES SHOULD TRIGGER REVALIDATION OF\nCOMPENSATION-RELEVANT CAPABILITY\nPAG's August 13 comments recommended identifiable revalidation triggers for execution-critical\nassumptions.\nThat principle is especially important where the affected assumption supports future compensation\neligibility.\nA load-reduction capability that was reasonable when initially documented may become materially different\nif, for example, the facility's operating configuration changes, onsite generation becomes unavailable,\nrelevant permits change, telemetry or control arrangements change, customer operations materially\nchange, or the quantity and timing of available reduction differ from the conditions previously relied upon.\nPAG does not recommend continuous requalification of unchanged capability.\nInstead, the framework should identify material changes that require the affected performance assumption\nto be revisited before continued reliance or compensation is based on an outdated condition.\n• \n• \n• \n• \n4"},{"page":5,"startToken":1042,"endToken":1285,"text":"The appropriate principle is:\nCompensation should follow evidence, and continued compensation eligibility should follow\ncontinued evidentiary support.\nVI. CONCLUSION\nPAG respectfully submits that the emerging compensation issues in this proceeding reinforce the\nimplementation-assurance principles identified in PAG's August 13 comments.\nPAG does not ask the Commission to resolve state retail jurisdiction, prescribe a universal performance test,\nor create a new approval layer.\nPAG instead recommends that the Commission recognize that any IRAS compensation mechanism should\nrest on evidence sufficient to connect:\nrepresented capability → qualifying instruction or condition → actual response → measured\nreduction → duration → attribution → compensable performance → revalidation.\nIn particular, PAG respectfully recommends that the Commission ensure, through PJM's tariff, Manuals,\nimplementation guidance, or other appropriate process, that:\ncompensation eligibility is supported by demonstrated capability and verified performance rather\nthan declared flexibility alone;\nthe basis for a compensated reduction is sufficiently traceable for authorized parties to understand\nthe relevant baseline, actual response, duration, attribution, and material conditions;\nElectric Distributors and relevant retail regulators receive sufficient evidentiary context to perform\ntheir distinct responsibilities; and\nmaterial changes affecting compensation-relevant capability trigger appropriate revalidation.\nThese principles would complement, rather than replace, PJM's operational authority and state regulatory\nresponsibilities.\nThey would also help ensure that a compensation obligation does not become more certain than the\nevidence supporting the performance for which compensation is being provided.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid™\n82 Spring Lake Blvd.\nWaretown, NJ 08758\n1. \n2. \n3. \n4. \n5"},{"page":6,"startToken":1285,"endToken":1354,"text":"neil@persistenceanalyticsgroup.com\n609-464-9055\nDated: September 3, 2026\nCERTIFICATE OF SERVICE\nI hereby certify that on September 3, 2026, I served the foregoing Supplemental Comments of Persistence\nAnalytics Group LLC electronically on all persons appearing on the official service list in Docket No.\nER26-3515-000 in accordance with Rule 2010 of the Commission's Rules of Practice and Procedure.\nNeil P. Osnato\nPersistence Analytics Group LLC\nDated: September 3, 2026\n6"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":240,"startToken":0,"endToken":31},{"p":1,"at":240,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":120,"startToken":31,"endToken":255},{"p":2,"at":120,"title":"II. COMPENSATION ELIGIBILITY SHOULD FOLLOW DEMONSTRATED","method":"printed heading","endPage":2,"endAt":1714,"startToken":255,"endToken":467},{"p":2,"at":1714,"title":"III. THE PERFORMANCE RECORD SHOULD SUPPORT THE FULL CHAIN","method":"printed heading","endPage":3,"endAt":1436,"startToken":467,"endToken":706},{"p":3,"at":1436,"title":"IV. ELECTRIC DISTRIBUTORS AND RETAIL REGULATORS NEED","method":"printed heading","endPage":4,"endAt":1382,"startToken":706,"endToken":920},{"p":4,"at":1382,"title":"V. MATERIAL CHANGES SHOULD TRIGGER REVALIDATION OF","method":"printed heading","endPage":5,"endAt":151,"startToken":920,"endToken":1059},{"p":5,"at":151,"title":"VI. CONCLUSION","method":"printed heading","endPage":6,"endAt":73,"startToken":1059,"endToken":1293},{"p":6,"at":73,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":472,"startToken":1293,"endToken":1354}]}