{"document":{"slug":"rec-20260902-5075","title":"Motion for Leave to Answer and Answer of the Attorney General of the Commonwealth of Kentucky to the comments and protests of PJM Interconnections, L.L.C.’s…","issued":"2026-09-02","accession":"20260902-5075","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Kentucky Attorney General","kind":"protest","file":"sources/filings/text/20260902-5075_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5075","tier":"record","sha256":"68fdb98af2b5463dee549c916cef244aeb97c2cbadc913f9c553593f705495a0","pages":3,"tokens":813,"emptyPages":[],"textThemes":["cost"]},"pages":[{"page":1,"startToken":0,"endToken":256,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \n \nDocket No. ER26-3380-000 \n \nMOTION FOR LEAVE TO ANSWER, \nAND ANSWER, OF \nTHE ATTORNEY GENERAL OF THE COMMONWEALTH OF KENTUCKY \n \nPursuant to Rules 212 and 213 of the Commission’s Rules of Practice and Procedure, 18 \nC.F.R. §§ 385.212 and 385.213 (2025),1 the Attorney General of the Commonwealth of Kentucky \n(“Kentucky Attorney General” or “Attorney General”)2 hereby moves for leave to answer, and \nanswers, comments on and protests of the July 31, 2026 filing by PJM Interconnection, L.L.C. \n(“PJM”) in this proceeding.3 \nI. \nMOTION FOR LEAVE TO ANSWER \nRule 213(a)(2) of the Commission’s Rules of Practice and Procedure generally prohibits \nanswers to protests and other pleadings unless otherwise ordered by the decisional authority. The \nKentucky Attorney General is authorized by statute to represent the interests of ratepayers in the \nCommonwealth of Kentucky and through this Answer offers its comments on the comments on \nand protests of the PJM Reliability Backstop Procurement (“RBP”) Filing.4 Good cause justifies \nthe Commission’s granting this motion and accepting this Answer because the Answer provides \n \n1 18 C.F.R. §§ 385.212 and 385.213 (2026). \n2 The Kentucky Attorney General submitted a timely, doc-less motion to intervene in this proceeding on August 6, \n2026. \n3 PJM Interconnection, L.L.C., Docket No. ER26-3380-000, “Reliability Backstop Procurement to Address Resource \nAdequacy Concerns Stemming from Large Loads” (filed July 31, 2026) (“PJM RBP Filing”). \n4 KRS 367.150(8)."},{"page":2,"startToken":256,"endToken":621,"text":"2 \ninformation that may assist the Commission in its decision-making process and ensures a complete \nrecord.5 For these reasons, the Commission should accept this Answer. \nII. \nCOMMENTS \nOn August 21, 2026, East Kentucky Power Cooperative, LLC (“EKPC”) filed a protest in \nthis docket. EKPC’s protest states several important concerns related to the RBP proposed by \nPJM.6 The Attorney General is equally concerned that steps should be taken to ensure that \nratepayers are protected from the potential unjust and unreasonable cost allocation that could occur \nunder the proposal. \nOf particular concern is whether Load Serving Entities who have met their obligations are \nprotected from cost allocation in the event of default by the cost causer.  As detailed on pages 11, \net seq, of the EKPC protest and in the Testimony of Adam Bednarczyk, the potential appears to \nexist for inappropriate cost shifting in the instance of default by responsible entities.  This potential \nis exacerbated by the lack of protection for Reliability Pricing Model entities who have prudently \nplanned to fully serve their load. Under the RBP proposal, it does not appear that PJM \nappropriately decrements the target, or otherwise provides sufficient offsets, for utilities who have \nalready taken appropriate actions to serve their load.7   \nIn general, the Kentucky Attorney General is concerned with the potential for others to free \nride on the prudent resource adequacy decisions made by Load Serving Entities in Kentucky.  By \nallocating these costs unjustly, Kentucky utilities who have steel in the ground to serve their load \n \n5 See, e.g., Southwest Power Pool, Inc., 190 FERC ¶ 61,018 at P 18 (2025) (accepting answers to protests and answers \nbecause they provided information that assisted the Commission in its decision-making process); PJM \nInterconnection, L.L.C., 189 FERC ¶ 61,110 at P 22 (2024) (accepting answers to protests and answers because they \nassisted the Commission in its decision-making process); Potomac-Appalachian Transmission Highline, LLC, 140 \nFERC ¶ 61,229 at P 102 (2012) (accepting answer to an answer because it provided material evidence that corrected \nthe record and informed the Commission’s decision-making process). \n6 See Protest of East Kentucky Power, Inc. filed August 21, 2026. \n7 Id. at 13-14, 28, et seq."},{"page":3,"startToken":621,"endToken":813,"text":"3 \ncould effectively be required to fund redundant resources from which they do not earn an \nadditional reliability benefit. These concerns are particularly striking given that these costs could \ncontinue to compound over the 15-year term of the agreement, resulting in large potential penalties \nto utilities who have planned their systems prudently. Thus, great effort should be made to ensure \nthat ratepayers are protected from unjust and unreasonable cost shifting that could occur pursuant \nto the foreseeable consequences of PJM’s RBP proposal. Importantly, doing otherwise would run \nafoul of the President’s Ratepayer Protection Pledge, which prohibits such cost shifting.8 \nFERC simply must not allow the RBP to proceed unless reasonable assurance is provided \nthat Kentucky ratepayers will be held harmless from the costs caused by others, whether those \ncosts are driven by usage or insufficient planning.   \n \nRUSSELL COLEMAN \nATTORNEY GENERAL \n \n/s/ J. Michael West \nJ. MICHAEL WEST \nT. TOLAND LACY \nASSISTANT ATTORNEYS GENERAL \n1024 CAPITAL CENTER DRIVE SUITE 200 \nFRANKFORT, KY 40601-8204 \nPHONE: (502) 696-5433 \nFAX: (502) 573-1005 \nMichael.West@ky.gov \n \n \n \n \n \n \nThomas.Lacy@ky.gov  \n \n \n \n \n8 Ratepayer Protection Pledge, https://www.whitehouse.gov/releases/2026/03/ratepayer-protection-pledge/, March 4, \n2026."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":634,"startToken":0,"endToken":103},{"p":1,"at":634,"title":"I. MOTION FOR LEAVE TO ANSWER","method":"printed heading","endPage":2,"endAt":172,"startToken":103,"endToken":282},{"p":2,"at":172,"title":"II. COMMENTS","method":"printed heading","endPage":3,"endAt":1332,"startToken":282,"endToken":813}]}