{"document":{"slug":"rec-20260902-5087","title":"Supplemental Comments of Persistence Analytics Group LLC re Cost-Causation Revalidation related to PJM Interconnection, L.L.C.’s proposed Reliability…","issued":"2026-09-02","accession":"20260902-5087","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260902-5087_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5087","tier":"record","sha256":"ded355354ed9236000a51cb64cf93f46f97c6a665e2927a9b769252d291cdf1e","pages":5,"tokens":1050,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":237,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nPJM Interconnection, L.L.C.\nDocket No. ER26-3380-000\nSUPPLEMENTAL COMMENTS OF\nPERSISTENCE ANALYTICS GROUP LLC\nREGARDING COST-CAUSATION REVALIDATION\nI. INTRODUCTION\nPersistence Analytics Group LLC (\"PAG\") respectfully submits these limited supplemental comments in\nDocket No. ER26-3380-000.\nPAG previously filed a Motion to Intervene and Comments on August 17, 2026 addressing the need to verify\nthe assumptions underlying PJM’s proposed Reliability Backstop Procurement (\"RBP\") before long-duration\nprocurement and cost obligations are allowed to harden around modeled need.\nThese supplemental comments address one narrower issue that has been sharpened by subsequent filings:\nwhether the original determination of cost causation should remain fixed over a long-duration RBP\nobligation when the underlying facts materially change.\nThe Attorney General of the Commonwealth of Kentucky has now raised concern that Load Serving Entities\nthat prudently planned for their own resource adequacy needs could nevertheless bear costs caused by\nothers, including where the responsible entity defaults. The Attorney General further notes that such costs\ncould continue over the 15-year term of the agreement. \nPAG agrees that this issue warrants particular attention, but approaches it from a distinct evidentiary\nperspective.\nThe relevant question is not only who is identified as the cost causer at inception.\nIt is:\nWhat evidence supports that cost-causation conclusion, what conditions must remain true for it to\ncontinue to hold, and what material change should require the conclusion to be revalidated?\n1"},{"page":2,"startToken":237,"endToken":391,"text":"II. INITIAL COST CAUSATION SHOULD NOT BE TREATED AS\nPERMANENT COST CAUSATION\nA cost-causation determination may be reasonable when made and still become stale if the underlying\nlarge-load, project, contractual, or operational facts later change.\nExamples may include material changes in:\nexpected large-load magnitude;\nproject timing or energization date;\nconstruction status;\ncustomer or developer commitment;\nbilateral supply arrangements;\nresponsible entity status;\ndefault or credit conditions;\nresource adequacy contribution;\nwithdrawal, downsizing, or cancellation of the underlying project; or\nother conditions that materially alter the basis on which the original RBP need or cost allocation was\nestablished.\nWhere one or more of those conditions materially changes, continued reliance on the original cost-causer\ndetermination may no longer be decision-grade.\nAccordingly, PAG recommends the following principle:\nInitial causation is not necessarily permanent causation.\nA long-duration cost obligation should not outlive the evidence supporting the original cost-causation\nconclusion.\n1. \n2. \n3. \n4. \n5. \n6. \n7. \n8. \n9. \n10. \n2"},{"page":3,"startToken":391,"endToken":649,"text":"III. MATERIAL CHANGES SHOULD TRIGGER COST-CAUSATION\nREVALIDATION\nPAG respectfully recommends that PJM’s implementation framework identify specific material-change\nevents that require the cost-causation determination to be revisited before continued allocation or\nreassignment of RBP-related costs.\nThe purpose of revalidation would not be to reopen every settled matter continuously.\nRather, it would ensure that where a material factual premise changes, the record is updated before a long-\nduration financial obligation continues to rely on an assumption that may no longer remain valid.\nA revalidation process should be sufficient to answer, at a minimum:\nwhat fact or condition originally established the cost-causation relationship;\nwhether that fact or condition still exists;\nwhether another entity now owns the relevant obligation or downside;\nwhether the underlying project still contributes to the need the RBP was designed to address;\nwhether any residual or default-related cost remains attributable to the original cost causer; and\nwhether assigning such cost to another Load Serving Entity would reflect actual causation or merely\nadministrative residual allocation.\nThat distinction is important.\nResidual allocation is not automatically equivalent to demonstrated causation.\nIV. DEFAULT RISK SHOULD NOT AUTOMATICALLY TRANSFER COSTS\nWITHOUT A FRESH EVIDENTIARY DETERMINATION\nThe Kentucky Attorney General has specifically raised concern regarding the potential for prudent Load\nServing Entities to bear costs following default by the responsible entity.\nThat circumstance makes revalidation especially important.\nA default may change the identity of the party that can pay an obligation, but it does not by itself establish\nthat another Load Serving Entity caused the underlying need or should bear the resulting cost.\n• \n• \n• \n• \n• \n• \n3"},{"page":4,"startToken":649,"endToken":869,"text":"Before residual costs migrate to another party, the implementation record should support a fresh\ndetermination of:\nthe remaining obligation;\nthe continuing causal relationship;\nthe responsible entity;\nthe basis for any reassignment;\nand the extent to which the reassigned party receives a corresponding reliability benefit.\nPAG therefore recommends that default-related cost transfer not occur solely as an administrative\nconsequence of nonpayment where the evidentiary basis for causation has materially changed or become\nincomplete.\nV. LONG-DURATION OBLIGATIONS REQUIRE LONG-DURATION\nEVIDENTIARY DISCIPLINE\nThe RBP contemplates obligations that may extend for many years.\nThe longer the obligation, the greater the likelihood that material conditions will change.\nThat does not mean the original determination was wrong.\nIt means the original determination may require revalidation.\nThe appropriate principle is:\nThe duration of the financial obligation should not exceed the durability of the evidence supporting\nthe causation conclusion without a defined mechanism for revalidation.\nThis approach would improve ratepayer protection without displacing PJM’s operational authority or the\njurisdiction of state regulators.\nIt would simply require the evidentiary basis for long-duration cost allocation to remain aligned with the\nfacts on which that allocation depends.\nVI. CONCLUSION\nPAG respectfully recommends that the Commission ensure, through PJM’s tariff, implementation guidance,\nmanuals, or other appropriate mechanism, that:\nthe initial RBP cost-causation determination is supported by an identifiable evidentiary basis;\n• \n• \n• \n• \n• \n1. \n4"},{"page":5,"startToken":869,"endToken":1050,"text":"material changes in large-load status, timing, commitment, responsible entity, default condition, or\nresource adequacy contribution trigger appropriate revalidation;\nresidual or default-related costs are not automatically reassigned to prudent Load Serving Entities\nwithout a fresh evidentiary determination supporting continued causation; and\nlong-duration cost obligations remain tied to evidence that continues to support the underlying\ncausation conclusion.\nThese recommendations would complement, rather than replace, the ratepayer-protection concerns\nalready raised in this proceeding.\nThey would also help ensure that:\nA 15-year cost obligation does not outlive the evidence supporting the original cost-causer\ndetermination.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid™\n82 Spring Lake Blvd.\nWaretown, NJ 08758\nneil@persistenceanalyticsgroup.com\n609-464-9055\nDated: September 2, 2026\nCERTIFICATE OF SERVICE\nI hereby certify that on September 2, 2026, I served the foregoing Supplemental Comments of Persistence\nAnalytics Group LLC electronically on all persons appearing on the official service list in Docket No.\nER26-3380-000 in accordance with Rule 2010 of the Commission's Rules of Practice and Procedure.\nNeil P. Osnato\nPersistence Analytics Group LLC\nDated: September 2, 2026\n2. \n3. \n4. \n5"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":221,"startToken":0,"endToken":28},{"p":1,"at":221,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":0,"startToken":28,"endToken":237},{"p":2,"at":0,"title":"II. INITIAL COST CAUSATION SHOULD NOT BE TREATED AS","method":"printed heading","endPage":3,"endAt":0,"startToken":237,"endToken":391},{"p":3,"at":0,"title":"III. MATERIAL CHANGES SHOULD TRIGGER COST-CAUSATION","method":"printed heading","endPage":3,"endAt":1291,"startToken":391,"endToken":568},{"p":3,"at":1291,"title":"IV. DEFAULT RISK SHOULD NOT AUTOMATICALLY TRANSFER COSTS","method":"printed heading","endPage":4,"endAt":535,"startToken":568,"endToken":721},{"p":4,"at":535,"title":"V. LONG-DURATION OBLIGATIONS REQUIRE LONG-DURATION","method":"printed heading","endPage":4,"endAt":1371,"startToken":721,"endToken":835},{"p":4,"at":1371,"title":"VI. CONCLUSION","method":"printed heading","endPage":5,"endAt":940,"startToken":835,"endToken":986},{"p":5,"at":940,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":5,"endAt":1351,"startToken":986,"endToken":1050}]}