{"document":{"slug":"rec-20260903-5148","title":"Motion of Ohio Energy Leadership Council to Intervene","issued":"2026-09-03","accession":"20260903-5148","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Ohio Energy Leadership Council","kind":"motion","file":"sources/filings/text/20260903-5148_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5148","tier":"record","sha256":"03b93b319aa8fa6c8cb3b9f5c27767ac7f9484227398ed8fb28e216b2120c057","pages":11,"tokens":1840,"emptyPages":[],"textThemes":["registry"]},"pages":[{"page":1,"startToken":0,"endToken":151,"text":"UNITED STATES OF AMERICA \nBEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  \n \n \nPJM Interconnection, L.L.C. \n  \n \n) \n) \n) \n \n \nDocket No. ER26-3515-000 \n \n \n \nMOTION OF OHIO ENERGY LEADERSHIP COUNCIL TO INTERVENE \n \n \nPursuant to Rules 212 and 214 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (the “Commission” or “FERC”), 18 C.F.R. §§ 385.212 and 385.214, Ohio \nEnergy Leadership Council (“OELC”) respectfully submits this motion to intervene in the above-\ncaptioned proceeding. \nI. \nCOMMUNICATIONS AND CORRESPONDENCE \n \nThe names and addresses of the individuals who are to be served with future notices, orders, \npleadings, correspondence, and other documents in this proceeding are stated below: \n \nDavid F. Proaño \n \n         \n \nDavid F. Proaño (Counsel of Record) \n \nBenjamin A. Kurtz \n \nBAKER & HOSTETLER LLP  \n \n127 Public Square, Suite 2000 \n \nCleveland, OH 44114 \n \n216-621-0200 / Fax 216-696-0740 \n \nEmail: dproano@bakerlaw.com  \n \nEmail: bkurtz@bakerlaw.com  \n \n \n*Willing to Accept Service by Email*  \n \n \nCOUNSEL FOR OHIO ENERGY  \n \nLEADERSHIP COUNCIL"},{"page":2,"startToken":151,"endToken":451,"text":"2 \n \nII. \nMOTION TO INTERVENE \n \nOn August 13, 2026, PJM Interconnection, L.L.C. (“PJM”) filed, pursuant to section 205 \nof the Federal Power Act (“FPA”), 16 U.S.C. § 824d, proposed revisions to the PJM Open Access \nTransmission Tariff (“Tariff”) and the Reliability Assurance Agreement Among Load Serving \nEntities (“RAA”) to establish Interim Resource Adequacy Service (“IRAS”) and a Large Load \nRegistry. PJM proposes that IRAS be available beginning with the 2027/2028 Delivery Year \nduring periods in which system conditions indicate insufficient resources to reliably meet demand \nin real-time operations. PJM also requests that the Commission accept the proposed Tariff and \nRAA revisions effective October 12, 2026. \nOELC is a not-for-profit trade association that represents its members’ interests in utility \nand ratemaking matters in Ohio. OELC advocates for fair, transparent, and reasonable utility tariffs \nand rates so that Ohio remains an attractive place for businesses and enterprises to remain, grow, \nand invest. OELC’s members include energy-intensive manufacturing, industrial, educational, \ninstitutional, information-technology, and retail business customers in Ohio. Collectively, OELC’s \nmembers annually consume many billions of kilowatt-hours of electricity and are major \ncontributors to Ohio’s economy and employment sector. \nOELC has a direct, immediate, and substantial interest in this proceeding. OELC’s \nmembers include large commercial and industrial energy customers in Ohio that are served in the \nPJM Region. PJM’s proposed IRAS framework would establish a new mechanism for real-time \nload-reduction actions in Electric Distributor zones or areas during specified emergency \nconditions. Under the proposal, PJM may direct an Electric Distributor zone or area to reduce load \nup to the capacity quantity attributable to Eligible New Large Loads in that zone or area. The \nproposed Large Load Registry, related definitions of Large Load and New Large Load, \nrequirements concerning new capacity for New Large Loads, and proposed revisions affecting the"},{"page":3,"startToken":451,"endToken":713,"text":"3 \n \nVariable Resource Requirement Curve may also affect the reliability, rates, terms, and conditions \nof electric service received by OELC’s members. \nOELC’s interests include ensuring that the Commission’s disposition of PJM’s proposed \nIRAS and Large Load Registry protects existing commercial and industrial customers through just, \nreasonable, and not unduly discriminatory rates, terms, and conditions; that the proposed \nframework does not result in inappropriate cost shifts; and that it appropriately accounts for the \nreliability and affordability effects of the proposed revisions on Ohio customers. These interests \ndirectly implicate OELC’s mission to promote customer-driven policies supporting adequate, \nreliable, and efficient delivery and supply of energy at competitive, reasonable, and transparent \nrates. \nOELC’s participation is in the public interest and will assist the Commission in developing \na full and complete record. OELC and its members have substantial experience with electric-utility \nrates, tariffs, resource adequacy, reliability, infrastructure planning, and the economic effects of \nelectricity costs on Ohio businesses and institutions. OELC can provide the Commission the \nperspective of large commercial and industrial customers that depend on reliable and competitively \npriced electricity service and may be affected by the proposed IRAS framework and related Tariff \nand RAA revisions. \nNo other party can adequately represent OELC’s interests. OELC’s members have distinct \ninterests as large energy consumers in Ohio and as customers potentially affected by the proposed \nIRAS framework, including its load-reduction mechanisms, resource-adequacy requirements, \nLarge Load Registry, and related Tariff and RAA revisions. This motion is timely, will not unduly \ndelay or prejudice any party, and satisfies the requirements for intervention under 18 C.F.R. § \n385.214."},{"page":4,"startToken":713,"endToken":793,"text":"4 \n \nIII. \nCONCLUSION \nWHEREFORE, OELC respectfully requests that the Commission grant this motion to \nintervene and permit OELC to participate fully in this proceeding for all purposes. \n \n \nDate: September 3, 2026 \nRespectfully submitted, \n \n \n \n \n/s/ David F. Proaño \n \n         \n \nDavid F. Proaño (Counsel of Record) \n \nBenjamin A. Kurtz \n \nBAKER & HOSTETLER LLP  \n \n127 Public Square, Suite 2000 \n \nCleveland, OH 44114 \n \n216-621-0200 / Fax 216-696-0740 \n \nEmail: dproano@bakerlaw.com  \n \nEmail: bkurtz@bakerlaw.com  \n \n \n*Willing to Accept Service by Email*  \n \n \nCOUNSEL FOR OHIO ENERGY  \n \nLEADERSHIP COUNCIL"},{"page":5,"startToken":793,"endToken":970,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that on this third day of September 2026, I served the foregoing document by \nelectronic means on each person listed on the Federal Energy Regulatory Commission’s official \nservice list in Docket No. ER26-3515-000.  \n \n \nchum@wrightlaw.com; \ncollins@wrightlaw.com; \ncraig.glazer@pjm.com; \nmark.stanisz@pjm.com; \njesse.jacobe@pjm.com; \nneil@persistenceanalyticsgroup.com; \nSuzette.Krausen@monitoringanalytics.com; \njeffrey.mayes@monitoringanalytics.com; \nJoseph.Bowring@monitoringanalytics.com; \ndmabry@mwn.com; \nsbruce@mcneeslaw.com; \nlhuff@mwn.com; \nNancyB@epsa.org; \nblipman@rpa.nj.gov; \ndwand@rpa.nj.gov; \nrglover@rpa.nj.gov; \ndlayugan@rpa.nj.gov; \nmorris.schreim@maryland.gov; \njoey.chen@maryland.gov; \nRansom.Davis@Maryland.gov; \ndslifer@gtpowergroup.com; \ngthomas@gtpowergroup.com; \nlaurac@chappelleconsulting.net; \nscott.metzger@ilag.gov; \nkimberly.janas@ilag.gov; \nandrew.obeso@ilag.gov; \nsusan.satter@ilag.gov; \naleksandar.mitreski@brookfieldrenewable.com; \nnathalie.godard@brookfieldrenewable.com; \nOBustami@mintz.com; \nsshparber@mintz.com; \nemily.starobin@huschblackwell.com; \nlinda.walsh@huschblackwell.com; \nemmanix.simon@edf-re.com; \ntemujin.roach@edf-re.com; \npaul.youchak@bpu.nj.gov; \nsteven.chaplar@law.njoag.gov;"},{"page":6,"startToken":970,"endToken":1142,"text":"2 \n \nIan.Oxenham@bpu.nj.gov; \njordan.mitchell@law.njoag.gov; \nMahala.Lahvis@bpu.nj.gov; \nelizabeth.vanwinkle@law.njoag.gov; \nairi.kogishi@bpu.nj.gov; \namanda.lescano@bpu.nj.gov; \ntimothy.randazzo@bpu.nj.gov; \nalexander.cary@bpu.nj.gov; \nmichael.youth@ncemcs.com; \nrelliott@mccarter.com; \ncharlie.bayless@ncemcs.com; \nataylor@mccarter.com; \nsbeeny@mccarter.com; \nppolacek@ctenterprises.org; \nppolacek@ctenterprises.org; \nFrank.Swigonski@vistracorp.com; \narnie.quinn@vistracorp.com; \nandrew.weinstein@vistracorp.com; \ntoba.pearlman@illinois.gov; \nChristine.Ericson@illinois.gov; \njudith.judson@calibrantenergy.com; \nmichael.west@ky.gov; \nthomas.lacy@ky.gov; \nclbumgarner@aep.com; \njccrespo@aep.com; \ntlaios@aep.com; \nlturner@aep.com; \ntslocum@citizen.org; \ngabe@verrusdata.com; \nckennedy@duqlight.com; \nmbrechlin@duqlight.com; \nmelatieh@paoca.org; \njharmar@paoca.org; \ncmarquis@advancedenergyunited.org; \nkkoenig@advancedenergyunited.org; \nmhaugh@advancedenergyunited.org; \njgordon@advancedenergyunited.org; \nmalfano@seia.org; \nmona.tierney-lloyd@enel.com; \njuan.diaz9@enel.com; \nFERCe-filings1@Constellation.com; \ncarrie.allen@constellation.com; \njohn.white@constellation.com; \nerik.heinle@constellation.com; \nadrien.ford@constellation.com; \ndenise.cronin@ekpc.coop;"},{"page":7,"startToken":1142,"endToken":1301,"text":"3 \n \nanasantana@eversheds-sutherland.com; \nAllisonSalvia@eversheds-sutherland.com; \nDanielFrank@eversheds-sutherland.com; \nkellycuthbertson@eversheds-sutherland.com; \nwilliam.fields@maryland.gov; \nmichael.sammartino@maryland.gov; \nphilip.sussler@maryland.gov; \njordan.kwok@exeloncorp.com; \nalejandro.bautista@exeloncorp.com; \ncarlos.isaac@exeloncorp.com; \ndpierpont@lspower.com; \ncsummers@citizensutilityboard.org; \nedebellis@citizensutilityboard.org; \nRobert.Gardinor@pseg.com; \nViet.Ngo@pseg.com; \nRobert.Gardinor@pseg.com; \nViet.Ngo@pseg.com; \nRobert.Gardinor@pseg.com; \nViet.Ngo@pseg.com; \nRobert.Gardinor@pseg.com; \nViet.Ngo@pseg.com; \njcliatt@thompsoncoburn.com; \naclair@thompsoncoburn.com; \nleetwood@eei.org; \nkhuyler@eei.org; \nAmber.Thornhill@nationalgrid.com; \nhugheys@michigan.gov; \nClarkA55@michigan.gov; \nmolly.suda@duke-energy.com; \nmolly.suda@duke-energy.com; \nmolly.suda@duke-energy.com; \nmolly.suda@duke-energy.com; \nkhelfrich@ohioec.org; \nlkaleps@ohioec.org; \ngrant.glazer@mn8energy.com; \ncaplan@acore.org; \nhushijima@jpowerusa.com; \nBerthiaumeS@Coned.com; \nsavagep@coned.com; \nhaggartr@coned.com; \nAlvarezh@coned.com; \ncmcgeady@equinix.com; \nahaubenstock@equinix.com; \nkribrown@pa.gov; \nebarnes@pa.gov; \ntiftran@pa.gov;"},{"page":8,"startToken":1301,"endToken":1460,"text":"4 \n \njames.g.davis@dominionenergy.com; \nwesley.walker@dominionenergy.com; \nJRohrbach@acespower.com; \nDamon.Krieger@SMECO.coop; \nEugene.Bradford@smeco.coop; \nfrederick.ochsenhirt@scc.virginia.gov; \nradkins@psc.state.wv.us; \nalan.trotta@uinet.com; \nnoelle.kinsch@avangrid.com; \nkevin.kilgallen@avangrid.com; \nleonard.rodriguez@avangrid.com; \nptoulme@novec.com; \narobbins@washingtonenergylaw.com; \nrsweeney@novec.com; \ndroby@washingtonenergylaw.com; \ntsteiger@washingtonenergylaw.com; \npcolvin@washingtonenergylaw.com; \nkabreu@voltus.co; \ntfodor@imea.org; \ndchung@imea.org; \njeffrey.levine@engie.com; \nsarah.bresolin@engie.com; \nanna.bautista@delaware.gov; \ndavid.crumplar@delaware.gov; \nben@opsi.us; \nellen@opsi.us; \nferccompliance@invenergy.com; \ntoconnor@crowell.com; \nnluckey@invenergy.com; \nferccompliance@invenergy.com; \ntoconnor@crowell.com; \nnluckey@invenergy.com; \nferccompliance@invenergy.com; \ntoconnor@crowell.com; \nnluckey@invenergy.com; \nbshpall@wsgr.com; \nbriangeorge@google.com; \neomsavage@google.com; \nmchristiansen@wsgr.com; \nmbloodworth@americaspower.org; \nzina@basepowercompany.com; \nahosea@basepowercompany.com; \nmadeline@basepowercompany.com; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com;"},{"page":9,"startToken":1460,"endToken":1645,"text":"5 \n \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com;"},{"page":10,"startToken":1645,"endToken":1808,"text":"6 \n \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \nmichael.yuffee@bakerbotts.com; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nBRIANNA.ANDERSON@NRG.COM; \njoe.bower@bakerbotts.com; \ncortney.slager@nrg.com; \nmichael.yuffee@bakerbotts.com; \nBRIANNA.ANDERSON@NRG.COM; \nbwhite@cleanpower.org; \nmgarber@mcneeslaw.com; \njustin.vickers@sierraclub.org; \nerilling@cpv.com; \nmlitchfield@cpv.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nedean@firstenergycorp.com; \nmparke@firstenergycorp.com; \nshaun@shaunneal.com; \nmax@nicholasneal.com;"},{"page":11,"startToken":1808,"endToken":1840,"text":"7 \n \ndgoulet@mccarter.com; \nangela.obrien@occ.ohio.gov; \njohn.mccaffrey@stinson.com; \nlmcalister@amppartners.org; \nghull@amppartners.org; \ncnorton@amppartners.org; \n \n \n \n \n \n \n \n/s/ David F. Proaño \n \n         \n \n \nDavid F. Proaño   \n \n \nCounsel of Record"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":520,"startToken":0,"endToken":74},{"p":1,"at":520,"title":"I. COMMUNICATIONS AND CORRESPONDENCE","method":"printed heading","endPage":2,"endAt":5,"startToken":74,"endToken":152},{"p":2,"at":5,"title":"II. MOTION TO INTERVENE","method":"printed heading","endPage":4,"endAt":5,"startToken":152,"endToken":714},{"p":4,"at":5,"title":"III. CONCLUSION","method":"printed heading","endPage":5,"endAt":0,"startToken":714,"endToken":793},{"p":5,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":256,"startToken":793,"endToken":1840}]}