{"document":{"slug":"rec-20260903-5193","title":"Motion to Intervene and Comments of Sunrun Inc. in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy…","issued":"2026-09-03","accession":"20260903-5193","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Sunrun Inc.","kind":"comments","file":"sources/filings/text/20260903-5193_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5193","tier":"record","sha256":"d61a398adbf05da09bfb8df375574c04b971aa4815b5c20dc5acc19c7f01f732","pages":15,"tokens":3283,"emptyPages":[],"textThemes":["adequacy","registry"]},"pages":[{"page":1,"startToken":0,"endToken":155,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C.                   ​\n​\n​\n Docket No. ER26-3515-000 \n \n \nMOTION TO INTERVENE AND COMMENTS OF SUNRUN INC. \nPursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“Commission”), 18 C.F.R. sections 385.211 and 385.214 \n(2026), Sunrun Inc. (“Sunrun”) respectfully submits this Motion to Intervene and Comments \nin the above-captioned proceeding. This filing responds to the proposal by PJM \nInterconnection, L.L.C. (“PJM”) to establish Interim Resource Adequacy Service (“IRAS”) \nand a Large Load Registry, filed on August 13, 2026 under Section 205 of the Federal Power \nAct, 16 U.S.C. section 824d, Accession No. 20260813-5118, with a requested effective date \nof October 12, 2026. \nCommunications regarding this filing should be directed to: \nS. Becca Smith \nSr. Assistant General Counsel \nSunrun Inc. \n202.689.5882 \nbecca.smith@sunrun.com \nSeptember 3, 2026"},{"page":2,"startToken":155,"endToken":412,"text":"I. Introduction and Summary \nPursuant to Rules 211 and 214 of the Commission’s Rules of Practice and Procedure, \n18 C.F.R. §§ 385.211, 385.214 (2026), Sunrun Inc. (“Sunrun”) respectfully moves to \nintervene and submits these comments in the above-captioned proceeding. On August 13, \n2026, PJM Interconnection, L.L.C. (“PJM”) filed proposed tariff revisions under Section 205 \nof the Federal Power Act to establish Interim Resource Adequacy Service (“IRAS”) and a \nLarge Load Registry. Accession No. 20260813-5118. PJM requests an effective date of \nOctober 12, 2026. \nSunrun is the nation’s largest residential solar and battery storage company and \noperates as a distributed energy resource (“DER”) aggregator serving customers across \nmultiple PJM transmission zones. PJM’s proposed treatment of DERs, aggregation rules, and \nIRAS compliance obligations directly affects Sunrun’s market participation and its \ncustomers’ interests. \nSunrun’s comments address five substantive issues: (1) verified Peak Shaving \nAdjustment (“PSA”) megawatts under qualifying state programs should offset IRAS \nobligations on a megawatt-for-megawatt basis; (2) battery storage injections must be settled \nseparately from net-metered solar exports through device-level submetering; (3) residential \nDERs require broader multi-nodal aggregation across electric distribution company service \nterritories or transmission zones; (4) PJM’s existing registration process requires transparency \nand accountability measures to address uneven state and EDC readiness; and (5) routine \nportfolio additions and like-for-like substitutions should receive expedited, ministerial \ntreatment rather than retriggering full review or being barred during a Delivery Year. \nSunrun respectfully requests that the Commission accept PJM’s filing subject to a \ndiscrete clarification or compliance filing confirming that verified PSA values reduce IRAS"},{"page":3,"startToken":412,"endToken":680,"text":"obligations, with appropriate measurement, verification, performance scoring, reconciliation, \nand no-double-counting safeguards, or, in the alternative, reject the filing without prejudice. \nFor the remaining DER implementation issues, Sunrun requests that the Commission convene \na technical conference or direct a coordinated follow-up proceeding. \nII. Motion to Intervene \nPursuant to Rules 211 and 214 of the Commission’s Rules of Practice and Procedure, \n18 C.F.R. §§ 385.211 and 385.214 (2026), Sunrun Inc. (“Sunrun”) respectfully moves to \nintervene in the above-captioned proceeding. \nSunrun is a leading provider of residential solar energy and battery storage systems \nand operates as a distributed energy resource (“DER”) aggregator. Sunrun maintains \ncustomers and direct market interests across multiple PJM Interconnection, L.L.C. (“PJM”) \nterritories. Based on a recent bilateral partnership, Sunrun plans to participate in wholesale \nmarkets and programs administered by PJM and is directly affected by PJM's tariff provisions \ngoverning DER participation, aggregation, and resource adequacy.   \nPJM’s August 13, 2026 filing in this docket proposes to establish an Interim Resource \nAdequacy Service (“IRAS”) and a Large Load Registry. The proposed tariff revisions, \nincluding the treatment of DERs, aggregation rules, Peak Shaving Adjustments, and IRAS \ncompliance obligations, directly affect Sunrun’s ability to participate in PJM markets and to \nserve its customers. The outcome of this proceeding will shape the terms under which \nSunrun’s DER fleet can contribute to resource adequacy and the conditions under which \nSunrun’s customers may benefit from or be burdened by IRAS-related requirements. \nSunrun’s intervention is in the public interest. Sunrun will bring the perspective of a \nresidential DER provider and aggregator that no other party is positioned to represent with"},{"page":4,"startToken":680,"endToken":945,"text":"the same specificity. No existing party’s interest will be prejudiced by Sunrun’s participation, \nand Sunrun’s intervention will assist the Commission in developing a complete record. \nSunrun respectfully requests that the Commission grant this motion. \nIII. Comments \nSunrun respectfully submits the following comments on PJM’s August 13, 2026 \nSection 205 filing proposing Interim Resource Adequacy Service and a Large Load Registry. \nThese comments address six related subjects, organized in Sections III.A through III.F below. \nOne request is appropriately resolved within the Section 205 standard of review: \nPJM’s filed tariff and registry already collect each Large Load’s Peak Shaving Adjustment \nvalue under a qualifying state program, yet the filing does not specify how verified PSA \nmegawatts reduce a Large Load’s IRAS obligation. The Commission can and should direct a \ndiscrete clarification or compliance filing on that point, consistent with the principle that a \nutility’s Section 205 filing must be just and reasonable in its own terms. See 16 U.S.C. \nsection 824d(a). If PJM cannot demonstrate that its proposal adequately accounts for verified \nPSA values, the Commission should reject the filing without prejudice to allow PJM to cure \nthe deficiency. \nThe remaining four subjects, addressed in Sections III.B through III.E, concern \nimplementation details that extend beyond the four corners of the instant filing: the separate \nsettlement of battery injections and net-metered solar exports, multi-nodal aggregation \ngeography, EDC registration readiness, and portfolio substitution rules. These issues bear \ndirectly on whether DERs can meaningfully participate in IRAS, but they are better addressed \nthrough a technical conference or coordinated follow-up proceeding rather than through"},{"page":5,"startToken":945,"endToken":1217,"text":"conditions imposed on this filing. Section III.F explains how the full set of requested reforms \npreserves reliability and avoids double counting. \nA. The Commission Should Ensure That Verified Peak Shaving Adjustments Reduce \nIRAS Exposure \n1. PJM’s Proposal Recognizes Approved PSA Values but Does Not Explain Their Effect \non IRAS. PJM’s proposed Large Load Registry includes a field for a Peak Shaving \nAdjustment value under a qualifying state program. The registry does not itself create or \napprove that value. Under PJM’s existing PSA process, an authorized entity voluntarily \nsubmits a Peak Shaving Adjustment Plan, officer certification, and supporting state \nauthorization for PJM review. PJM then approves a peak-shaving megawatt quantity by zone \nfor inclusion in its load forecast. See PJM Manual 19: Load Forecasting and Analysis, \nAttachment D, at 39–43. The registry records the resulting PSA value. However, the IRAS \nproposal does not clearly explain how that value affects IRAS allocations. Because an \napproved PSA lowers forecast peak demand and the associated resource-adequacy need, \nexcluding it from the IRAS calculation would overstate reliability risk and disregard verified \nload reductions. \n2. Virginia’s Enacted Framework Shows Qualifying State Programs Are Concrete and \nMeasurable. Virginia SB 371 (identical to HB 284), 2026 Va. Acts chs. 377-378, codified at \nVa. Code § 56-596.7, became effective July 1, 2026. The statute defines demand flexibility \nand capacity-reduction credits and directs Dominion Energy Virginia and Appalachian Power \nCompany to petition the Virginia State Corporation Commission by January 15, 2027 for \nvoluntary demand-flexibility programs. Eligible measures include customer-sited storage, \nvirtual power plants, demand response, efficiency, weatherization, heat pumps, and \ngrid-enhancing technologies, with measured and verifiable results. The statute specifically"},{"page":6,"startToken":1217,"endToken":1435,"text":"contemplates high-energy-demand customers funding or purchasing capacity-reduction \ncredits from other retail customers. This legislation confirms that qualifying state programs \nare not hypothetical; they are enacted, scheduled, and designed to produce quantifiable \npeak-demand reductions. \n3. State-Recognized, Verified PSA Megawatts Should Offset IRAS Megawatts, Subject \nto Safeguards. The Commission should accept PJM’s filing only subject to a discrete \nclarification or compliance filing confirming that verified PSA megawatts reduce a Large \nLoad’s IRAS obligation on a megawatt-for-megawatt basis. To protect reliability and prevent \ndouble counting, the offset should be subject to the following conditions: \n(a)​\nMeasurement and verification protocols consistent with the applicable \nqualifying state program; \n(b)​\nPerformance scoring that accounts for actual delivery during capacity shortage \nconditions; \n(c)​\nAnnual reconciliation of PSA values against observed load reductions; and \n(d)​\nA prohibition on counting the same megawatt toward both a PSA offset and \nany other capacity resource obligation. \nB. A Workable IRAS DER Pathway Requires Separate Treatment of Battery Injections \nand Net-Metered Solar Exports \nIf DER-backed capacity is to support IRAS compliance, PJM must establish \nsettlement rules that distinguish battery storage injections from net-energy-metered solar \nexports. Without device-level submetering, a behind-the-meter battery that injects energy \nduring a capacity event may be compensated twice: once through the customer’s retail NEM \ncredit and again through wholesale capacity settlement. Conversely, requiring a customer to"},{"page":7,"startToken":1435,"endToken":1683,"text":"forfeit NEM export compensation as a condition of wholesale capacity participation would \ndeter enrollment and undermine the very DER pathway PJM purports to create. \nOther ISOs have addressed this problem. ISO-NE’s Forward Capacity Market Tariff \nsection III.13.1.4 permits passive demand resources, including distributed generation \nmeasures, to hold capacity obligations without participating in wholesale energy or ancillary \nservices markets. The Commission accepted ISO-NE’s Order 841 compliance filing requiring \ndirect metering of behind-the-meter storage. ISO New England Inc., 169 FERC para. 61,140 \n(2019), Docket No. ER19-470-000. ISO-NE’s Order 2222 compliance proceeding, Docket \nNo. ER22-983, further developed device-level parallel metering and submetering \nconfigurations; the Commission accepted later compliance changes by delegated letter order \nin ER22-983-009, dated November 19, 2024, effective November 1, 2026. \nPJM’s own October 29, 2024 Regulation Market Only problem statement identifies a \npath for battery injections at NEM customer sites for ancillary services such as regulation, \nwhile acknowledging an implementation gap. That stakeholder process material confirms \nPJM recognizes the need for separate settlement but has not yet operationalized it for capacity \npurposes. \nThe Commission should direct a technical conference or coordinated follow-up \nproceeding to develop device-level submetering protocols that settle battery injections \nindependently from NEM-compensated solar exports, preserving retail NEM treatment while \nenabling wholesale capacity value without double compensation. \nC. Broader Multi-Nodal Aggregation Is Needed for Residential DERs to Support IRAS \nPJM’s current aggregation framework generally requires that distributed energy \nresources within a single aggregation be located at the same pricing node. A limited"},{"page":8,"startToken":1683,"endToken":1944,"text":"multi-nodal exception exists, but it is capped at 167 MW across the entire RTO. These \nconstraints present a structural barrier to residential-scale DER participation in IRAS. \nResidential solar-plus-storage systems are individually small, typically ranging from 5 to 25 \nkW. To reach capacity levels meaningful for IRAS purposes, an aggregator must enroll \nhundreds or thousands of customers. Residential customers served by a single electric \ndistribution company (“EDC”) are frequently spread across multiple pricing nodes. The \nsingle-node requirement forces aggregators to form numerous small, sub-scale aggregations \nrather than a single portfolio-level resource, increasing administrative burden and reducing \nthe commercial viability of participation. The 167 MW RTO-wide multi-nodal cap, if fully \nsubscribed by even a few aggregators, would foreclose additional residential participation \nentirely. \nSunrun respectfully requests that the Commission, through a technical conference or \ncoordinated follow-up proceeding, examine whether PJM should permit residential DER \naggregations across an EDC service territory or, at minimum, across a transmission zone. \nSuch geographic flexibility would allow residential portfolios to reach the scale necessary to \nprovide meaningful capacity contributions under IRAS while remaining subject to \nappropriate distribution reliability limits. EDC-level or zonal aggregation is consistent with \nthe Commission’s objectives in Order No. 2222, which directed RTOs to remove barriers to \nDER aggregation and recognized that overly narrow geographic constraints can impede \nparticipation. See Participation of Distributed Energy Res. Aggregations in Mkts. Operated \nby Reg’l Transmission Orgs. & Indep. Sys. Operators, Order No. 2222, 172 FERC para. \n61,247 (2020). Distribution reliability screening by the relevant EDC would remain in place, \npreserving the safety and operational review that PJM’s framework contemplates."},{"page":9,"startToken":1944,"endToken":2210,"text":"D. PJM Has Outlined Registration Timing, but State and EDC Readiness Requires \nTransparency and Accountability \nSunrun does not ask the Commission to require PJM to create a registration process \nwhere none exists. PJM has already outlined a sequential process for DER aggregation \nregistration in its 2026 Order 2222 compliance materials and the February 2, 2026 \nDistributed Resources Subcommittee (“DISRS”) process materials. See PJM, 2222: \nAggregate PNODE Creation, Distributed Resources Subcommittee (Sept. 1, 2026); PJM, \nDISRS Process Materials (Feb. 2, 2026). That process comprises three phases: (1) a 15-day \nlocation review; (2) a 15-day PJM and EDC data verification period; and (3) a 45-day EDC \ndistribution reliability review. The 60-day EDC review window (phases two and three) is \ndistinct from the full end-to-end processing timeline. Under this framework, PJM creates \naggregate pricing nodes, while EDCs provide electrical location data, locational factors, and \ndistribution reliability review. PJM has also stated that FERC declined to assert jurisdiction \nover DER interconnection, which remains governed by state and local processes. \nThe primary implementation risk is uneven state and EDC readiness. Some EDCs \nmay lack the staffing, data systems, or procedures to complete reviews within tariff deadlines, \nand state regulatory frameworks vary in their treatment of DER aggregation. A qualifying \nresource should not lose IRAS value solely because of administrative delay outside the \naggregator’s control. At the same time, an overbroad deemed-approval mechanism could \nbypass legitimate distribution safety review. \nSunrun respectfully requests that the Commission, through a technical conference or \ncoordinated follow-up proceeding, address the following measures to ensure accountability: \n(e)​\nUniform data requirements for EDC submissions and aggregator applications \nacross PJM."},{"page":10,"startToken":2210,"endToken":2453,"text":"(f)​\nTransparent status tracking so that aggregators can monitor the progress of \neach registration phase. \n(g)​\nA requirement that EDC denials be supported by reasoned, written \nexplanations citing specific reliability concerns. \n(h)​\nAdherence to tariff-specified deadlines, with periodic state and EDC readiness \nreporting to PJM and the Commission. \n(i)​\nA mechanism, short of automatic deemed approval, that prevents qualifying \nresources from forfeiting IRAS value when delays are attributable to EDC or state \nadministrative processes rather than substantive reliability concerns. \nE. Routine Additions and Like-for-Like Substitutions Should Not Restart Full Review \nor Be Barred Throughout a Delivery Year \nPJM’s March 9, 2026 DER Aggregator Participation Model materials state that \nmodifications to a DER Capacity Aggregation Resource retrigger the full 60-day EDC review \nperiod and that inventory linked to such a resource may not be modified during the Delivery \nYear. PJM, DER Aggregator Participation Model (Mar. 9, 2026). These restrictions are \nincompatible with the operational reality of residential DER portfolios and, if applied to \nIRAS-linked commitments, will render those commitments unacceptably fragile. \nResidential solar-plus-storage portfolios experience ordinary customer turnover: \ncustomers move, cancel service, or replace equipment. A static-inventory requirement that \nfreezes the composition of an aggregation for an entire Delivery Year ignores this reality. The \naggregator’s performance obligation is measured at the portfolio level, not at the level of any \nindividual device or customer. When a departing customer’s capacity is replaced by an \nequivalent resource at a comparable electrical location, the aggregate MW, the distribution"},{"page":11,"startToken":2453,"endToken":2660,"text":"system impact, and the reliability contribution remain unchanged. Requiring a full 60-day \nreview for such a substitution imposes delay disproportionate to any incremental reliability \nconcern and creates a gap during which the aggregation may fall below its committed \ncapacity. \nSunrun requests that the Commission direct PJM to adopt expedited, ministerial \ntreatment for routine additions and like-for-like substitutions that satisfy each of the \nfollowing conditions: \n(j)​\nThe substitution or addition does not increase the aggregate committed MW of \nthe DER Capacity Aggregation Resource. \n(k)​\nThe replacement resource does not materially change the relevant electrical \nlocation of the aggregation. \n(l)​\nThe change does not introduce a new distribution reliability concern as \ndetermined through targeted EDC screening. \nUnder this framework, qualifying changes would proceed on a notice basis, with the \nEDC retaining authority to conduct a targeted screening rather than a full 60-day restart. \nMeasurement, verification, and performance accountability would continue to apply at the \naggregation level, preserving the Commission’s and PJM’s reliability objectives. This \napproach is consistent with the portfolio-level performance construct that PJM itself has \nadopted for DER aggregations and prevents qualifying resources from losing IRAS value due \nto routine portfolio management. \nF. These Reforms Preserve Reliability and Avoid Double Counting While Making \nPJM’s Stated DER Pathway Usable"},{"page":12,"startToken":2660,"endToken":2877,"text":"The clarifications and process reforms described in Sections III.A through III.E are \nconsistent with PJM’s stated reliability objectives and with the Commission’s directives in \nOrders 2222 and 841. Each request is designed to complete PJM’s own DER pathway, not to \nrewrite the Interim Resource Adequacy Service proposal. \nThe safeguards Sunrun proposes operate in concert to protect reliability and prevent \ndouble counting: \n(m)​\nMeasurement and Verification: PSA offsets and DER capacity contributions \nwould be validated through defined protocols before any IRAS obligation is reduced, \nensuring that only demonstrated load reductions receive credit. \n(n)​\nPerformance Scoring: Aggregation-level performance obligations hold DER \nproviders accountable for delivery during capacity shortage emergencies, consistent \nwith PJM’s existing performance assessment framework. \n(o)​\nReconciliation: Post-delivery-year reconciliation would true up any \ndiscrepancy between credited capacity and actual performance, preserving the \nintegrity of resource adequacy accounting. \n(p)​\nNo-Double-Counting Provisions: Device-level submetering of battery \ninjections, separate from NEM-compensated solar exports, prevents the same \nmegawatt-hour from receiving both retail net-metering compensation and wholesale \ncapacity or energy credit. PSA megawatts credited against IRAS obligations would be \nexcluded from any other capacity supply commitment. \n(q)​\nDistribution Reliability Screening: Targeted EDC review for routine \nsubstitutions and additions, rather than full 60-day restarts, preserves the EDC’s \nauthority to identify and address legitimate safety and reliability concerns while \nremoving unnecessary administrative barriers."},{"page":13,"startToken":2877,"endToken":3112,"text":"Taken together, these safeguards ensure that PJM’s resource adequacy framework \naccounts for verified DER contributions without compromising system reliability. The \nCommission can accept PJM’s filing subject to a discrete compliance filing on PSA \ntreatment, confident that the broader DER implementation issues identified here are \nappropriate subjects for a technical conference or coordinated follow-up proceeding. \nIV. Conclusion and Prayer for Relief \nFor the reasons set forth above, Sunrun Inc. respectfully requests that the Commission: \n(r)​\nGrant Sunrun’s motion to intervene in Docket No. ER26-3515-000; \n(s)​\nAccept PJM’s August 13, 2026 filing, Accession No. 20260813-5118, subject \nto a discrete clarification or compliance filing confirming that verified Peak Shaving \nAdjustment values under qualifying state programs reduce a Large Load’s IRAS \nobligations on a megawatt-for-megawatt basis, with appropriate measurement and \nverification, performance scoring, reconciliation, and no-double-counting safeguards; \nor, in the alternative, reject the filing without prejudice to allow PJM to refile with \nsuch provisions; \n(t)​\nConvene a technical conference or direct a coordinated follow-up proceeding \nto address: (a) separate settlement of battery storage injections and net-metered solar \nexports through device-level submetering; (b) broader multi-nodal aggregation rules \npermitting residential DERs to aggregate across an electric distribution company \nservice territory or transmission zone; (c) uniform data requirements, transparent \nstatus tracking, reasoned denials, tariff-deadline adherence, and state and EDC \nreadiness reporting for DER registration, including a mechanism to prevent qualifying \nresources from losing IRAS value solely because of administrative delay; and (d)"},{"page":14,"startToken":3112,"endToken":3188,"text":"expedited, ministerial treatment for like-for-like substitutions and routine additions to \nDER aggregation portfolios that do not increase aggregate MW, materially change the \nrelevant electrical location, or create new distribution reliability concerns; and \n(u)​\nGrant such other and further relief as the Commission deems just and \nappropriate. \nRespectfully submitted, \n/s/ S. Becca Smith \nS. Becca Smith \nSr. Assistant General Counsel \nSunrun Inc. \n202.689.5882 \nbecca.smith@sunrun.com \nSeptember 3, 2026 \n \nOn behalf of Sunrun Inc."},{"page":15,"startToken":3188,"endToken":3283,"text":"Certificate of Service \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing Motion to Intervene and Comments \nof Sunrun Inc. upon PJM Interconnection, L.L.C. and upon each person designated on the \nofficial service list compiled by the Secretary in Docket No. ER26-3515-000, in accordance \nwith the requirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 \nC.F.R. § 385.2010 (2026). \n/s/ S. Becca Smith \nS. Becca Smith \nSr. Assistant General Counsel \nSunrun Inc. \n202.689.5882 \nbecca.smith@sunrun.com \nSeptember 3, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":0,"startToken":0,"endToken":155},{"p":2,"at":0,"title":"I. Introduction and Summary","method":"printed heading","endPage":3,"endAt":352,"startToken":155,"endToken":453},{"p":3,"at":352,"title":"II. Motion to Intervene","method":"printed heading","endPage":4,"endAt":254,"startToken":453,"endToken":714},{"p":4,"at":254,"title":"III. Comments","method":"printed heading","endPage":5,"endAt":148,"startToken":714,"endToken":967},{"p":5,"at":148,"title":"A. The Commission Should Ensure That Verified Peak Shaving Adjustments Reduce","method":"printed heading","endPage":7,"endAt":1628,"startToken":967,"endToken":1648},{"p":7,"at":1628,"title":"C. Broader Multi-Nodal Aggregation Is Needed for Residential DERs to Support IRAS","method":"printed heading","endPage":9,"endAt":0,"startToken":1648,"endToken":1944},{"p":9,"at":0,"title":"D. PJM Has Outlined Registration Timing, but State and EDC Readiness Requires","method":"printed heading","endPage":10,"endAt":589,"startToken":1944,"endToken":2289},{"p":10,"at":589,"title":"E. Routine Additions and Like-for-Like Substitutions Should Not Restart Full Review","method":"printed heading","endPage":11,"endAt":1400,"startToken":2289,"endToken":2644},{"p":11,"at":1400,"title":"F. These Reforms Preserve Reliability and Avoid Double Counting While Making","method":"printed heading","endPage":13,"endAt":420,"startToken":2644,"endToken":2931},{"p":13,"at":420,"title":"IV. Conclusion and Prayer for Relief","method":"printed heading","endPage":15,"endAt":0,"startToken":2931,"endToken":3188},{"p":15,"at":0,"title":"Certificate of Service","method":"printed heading","endPage":15,"endAt":24,"startToken":3188,"endToken":3191},{"p":15,"at":24,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":575,"startToken":3191,"endToken":3283}]}
