{"document":{"slug":"rec-20260903-5195","title":"Comments of the Chief Energy Officer Josephus M. Allmond et al. of the Commonwealth of Virginia re the PJM Interconnection, L.L.C.'s proposed Interim…","issued":"2026-09-03","accession":"20260903-5195","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260903-5195_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5195","tier":"record","sha256":"cac5e2eeef7d91110c35d21864ce9d6777c0c9f747c34bae33ff972f25589da6","pages":5,"tokens":1096,"emptyPages":[],"textThemes":["flex","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":219,"text":"UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY \nCOMMISSION \n) \nPJM Interconnection, L.L.C    \n \n) \n \nDocket No. ER26-3515-000 \n) \n \n  \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nCOMMENTS OF THE CHIEF ENERGY OFFICER  \nFOR THE GOVERNOR OF VIRGINIA \nThe Chief Energy Officer for the Governor of the Commonwealth of Virginia respectfully \nsubmits these comments regarding PJM Interconnection, L.L.C.’s (“PJM”) proposed Interim \nResource Adequacy Service (“IRAS”) and Large Load Registry. \nIntroduction \nVirginia’s central priority is straightforward: the Commonwealth must be able to meet \ngrowing electricity demand with an affordable, reliable, and clean energy system, while protecting \nhouseholds and businesses from costs driven by the rapid growth in large load demand. Achieving \nthat outcome requires that large-load customers pay their fair share for the capacity and \ninfrastructure needed to serve them, and that PJM’s market rules provide strong incentives for \nthose customers to reduce their impact on the grid. \nPJM’s proposal is an important step, but the current IRAS design does not yet establish \nsufficiently clear, robust, technology-neutral pathways for large loads to pursue and receive credit \nfor beneficial grid investments. We support refinements that ensure the program adequately \nrewards measurable peak-demand reductions, enables demand-side and distributed-energy \nresources to participate fully, and appropriately assigns curtailment risk to the loads associated \nwith the identified resource adequacy concern. \nAreas of Support  \nVirginia supports several important elements of PJM’s proposal."},{"page":2,"startToken":219,"endToken":478,"text":"First, large load customers that drive new system needs should bear an appropriate share \nof associated costs and reliability obligations. This principle is essential to protect households, \nsmall businesses, and existing customers in Virginia and throughout PJM from cost shifting as \nlarge load electricity demands grow. \nSecond, Virginia supports PJM’s proposed approach to curtailment priority. In an \nemergency, curtailment risk should fall first on new large loads that have not adequately secured \ncapacity or reduced their contribution to system peak demand, rather than on residential customers, \nsmall businesses, or demand-response participants that have already made firm and compensated \nreliability commitments. \nThird, Virginia supports PJM’s recognition that large loads can contribute to reliability by \nbringing new capacity, reducing peak demand, or deploying distributed and demand-side solutions. \nDistributed energy resources (“DERs”), demand response, energy storage, and other demand-\nflexibility tools can be deployed more quickly and cost-effectively than traditional infrastructure. \nPJM should maintain and continue to enhance its technology-neutral rules that allow all resources \ncapable of providing measurable reliability value to compete on fair terms. \nAreas of Concern  \nThe Commission should ensure that PJM’s final IRAS framework better reflects these \nprinciples. In particular, there are two areas that we encourage the Commission to address:  \n1. Credit verified peak shaving  \nPJM’s proposal does not reduce a large load’s IRAS curtailment exposure when that \ncustomer has secured verified demand reductions, including through the Peak Shaving Adjustment \nmechanism. Similarly, the proposal does not establish a clear mechanism through which \nmeasurable load reductions can reduce a large load’s allocated RBP costs. These gaps should be"},{"page":3,"startToken":478,"endToken":786,"text":"corrected so that large loads receive appropriate credit for actions that reduce their impact on the \ngrid. Properly valuing verified demand-side reductions will help address PJM’s resource adequacy \nneeds, mitigate capacity-cost pressures, and advance regional reliability and affordability. \nA large load that secured verified demand reductions to reduce its impact on peak demand \nshould receive a corresponding reduction in its IRAS curtailment exposure. Large loads that take \nmeasurable steps to reduce their impact on the grid—whether through verified demand reductions \nor by bringing new capacity online—should receive a corresponding reduction in curtailment \nexposure and be curtailed only after other large loads that have not taken such steps. \nThis should also apply to reduction in Reliability Backstop Procurement (RBP) cost \nallocations, with large loads that secure verified demand reductions (such as through the Peak \nShaving Adjustment) being appropriately credited for their reduction in impacts on the grid.  \nVirginia has already acted to establish pathways for voluntary demand-flexibility programs \nthat enable large loads to secure measurable and verifiable load reductions (see Virginia Code § \n56-596.7). PJM’s rules should provide a clear, timely, and administrable process through which \nthese state-supported arrangements can be recognized in IRAS as well as the RBP cost allocation, \nwith such reductions accounted for in a customer’s curtailment exposure and related obligations.  \nThis is an essential area for PJM to clarify to enable demand-side programs to be viable \nand valuable in supporting PJM’s capacity needs.  \n2. Enable meaningful DER participation \nAs we previously shared with the PJM Board,1 Virginia supports PJM’s effort to create \npathways for DERs and demand-side resources to participate through peak-shaving mechanisms \nand through opportunities for large loads to bring new capacity. But eligibility on paper is not \n \n1 Virginia Chief Energy Officer Letter to PJM Interconnection in re: Integrating DERs and Demand Response in \nReliability Backstop Auction. June 29, 2026."},{"page":4,"startToken":786,"endToken":1040,"text":"enough. The rules must work in practice for the resources that can provide reliability value most \nquickly. \nPJM should avoid requirements that arbitrarily limit or disadvantage demand-side \nresources relative to traditional generation. In particular, PJM should ensure that its definitions of \nqualifying or “new” capacity recognize incremental capacity additions, including upgrades and \nreactivations, new investments at existing sites, or returning sites that have not recently \nparticipated.  \nA technology-neutral structure that evaluates resources based on their demonstrated \nreliability contribution—not the particular technology or business model used to deliver it—will \nexpand competition, strengthen reliability, and reduce costs for consumers. \nConclusion \nVirginia is committed to continuing its leadership in addressing resource adequacy, \nprotecting ratepayers, and advancing cost-effective energy solutions. Just this year, the \nCommonwealth acted to dramatically expand energy storage requirements for utilities,2 ease the \npath for large load customers to fund new zero-carbon dispatchable resources,3 support fair cost \nallocation,4 create a voluntary demand flexibility program for large loads,5 and other tools needed \nto meet this moment responsibly. \nPJM must now do its part. The Commission should ensure that the IRAS framework fairly \nassigns responsibility to new large loads, prioritizes those loads for curtailment when they have \nnot sufficiently addressed their reliability obligations, and provides meaningful credit for verified \npeak shaving, DERs, and other demand-side resources in addition to bring-your-own-new-capacity \n \n2 2026 Va. Acts Ch. 695.  \n3 2026 Va. Acts Ch. 43.  \n4 Comments of the Chief Energy Officer of the Governor, Case No. PUR-2026-00056.  \n5 2026 Va. Acts Ch. 378."},{"page":5,"startToken":1040,"endToken":1096,"text":"frameworks. With these improvements, IRAS can better support the shared goals of reliability, \naffordability, fairness, and a resilient energy system for Virginia and the PJM region. \n \nRespectfully submitted, \n \n \n \nJosephus M. Allmond, Chief Energy Officer \nLouise G. White, Deputy Energy Officer  \nOffice of the Governor of Virginia \n1111 East Broad Street \nRichmond, Virginia 23219 \n \nSeptember 3, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":485,"startToken":0,"endToken":63},{"p":1,"at":485,"title":"Introduction","method":"printed heading","endPage":4,"endAt":759,"startToken":63,"endToken":885},{"p":4,"at":759,"title":"Conclusion","method":"printed heading","endPage":5,"endAt":406,"startToken":885,"endToken":1096}]}