{"document":{"slug":"rec-20260903-5217","title":"Motion to Intervene and Protest of Corporate Energy Buyers Association urging Commission to reject PJM Interconnection, L.L.C.'s proposal to revise the…","issued":"2026-09-03","accession":"20260903-5217","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Corporate Energy Buyers Association","kind":"protest","file":"sources/filings/text/20260903-5217_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5217","tier":"record","sha256":"58ba0ae4c63bcdfe84588f324f174260b6bf57ff5e9795d60e8966bcb47cbf0c","pages":16,"tokens":3867,"emptyPages":[],"textThemes":["flex","retail","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":222,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \n) \nDocket No. ER26-3515-000\n \nMOTION TO INTERVENE AND PROTEST OF \nCORPORATE ENERGY BUYERS ASSOCIATION \n \nPursuant to Rules 211 and 214 of the Federal Energy Regulatory Commission’s (FERC \nor Commission) Rules of Practice and Procedure,1 Corporate Energy Buyers Association \n(CEBA) respectfully submits this motion to intervene and protest. CEBA urges the Commission \nto reject the proposal by PJM Interconnection, L.L.C. (PJM) to revise the Reliability Assurance \nAgreement Among Load Serving Entities (RAA) and the PJM Open Access Transmission Tariff \n(Tariff) to establish Interim Resource Adequacy Service (IRAS). In the alternative, and as \ndetailed below, if the Commission accepts PJM’s proposal, it should: (1) condition that \nacceptance on a minor modification needed to fully recognize customer-sponsored Peak Shaving \nAdjustments as incremental new capacity within the IRAS construct; and (2) encourage PJM to \nwork with stakeholders on reforms that unlock the full potential of Surplus Interconnection \nService to bring incremental capacity to the region quickly and cost-effectively. \nI. \nMOTION TO INTERVENE \nCEBA is a business association that activates energy buyers and their partners to drive \nlow-cost, reliable, carbon emissions-free global energy systems. Our members represent $40 \ntrillion in market value, including energy customers of all sizes, suppliers, and service \n \n1 18 C.F.R. §§ 385.211, 385.214."},{"page":2,"startToken":222,"endToken":494,"text":"2 \n \nproviders.2 CEBA members support millions of jobs, drive trillions in GDP, and anchor global \nsupply chains. Their investments are powering U.S. leadership in artificial intelligence, \nmanufacturing, retail, and economic growth. \nThe rules at issue in this docket implicate the terms and conditions of transmission \nservice connected to the provision of retail electricity to CEBA members who are bringing, or \nplan to bring, new loads to the PJM region. PJM’s proposal thus directly impacts the ability of \nour members to procure and access the affordable, reliable energy they need to power operations \nas they grow and innovate in the region. For these reasons, CEBA has a substantial interest in \nthis proceeding that cannot be adequately represented by another party, and its participation is in \nthe public interest. Good cause exists to grant CEBA’s motion to intervene. \nII. \nCOMMENTS \nCEBA supports the broader policy objectives underlying PJM’s proposal: large \ncustomers that are driving significant load growth should be encouraged to support solutions that \nhelp solve regional resource adequacy challenges. However, PJM’s proposal is fatally flawed in \nthree ways. First, IRAS fails to promote the certainty needed for large load customers to support \ninvestment in new capacity because PJM promises a benefit—exemption from curtailment \nduring IRAS Actions—for which it lacks authority. Second, IRAS impermissibly conditions \naccess to transmission service based on attributes of retail customers and, in so doing, blurs the \nline between Federal and state jurisdiction. Third, IRAS unduly preferences Capacity Resources \nover investments that reduce the underlying capacity need, such as customer-sponsored Peak \n \n2 A list of current CEBA members is accessible at: https://www.ceba.org/members/."},{"page":3,"startToken":494,"endToken":806,"text":"3 \n \nShaving Adjustments, when both approaches have the same practical effect as bringing new \ncapacity to the region. For these reasons, the Commission should reject PJM’s proposal. In the \nalternative, as discussed infra §§ II.C and II.D, if the Commission chooses to accept PJM’s \nproposal, it should: (1) condition that acceptance on PJM making minor modifications to ensure \nthat customer-sponsored Peak Shaving Adjustments can help a large load customer avoid taking \nIRAS just the same as a Capacity Resource can; and (2) urge PJM to advance reforms to Surplus \nInterconnection Service to, in relevant part, enable New Large Loads to procure incremental \ncapacity at scale through this pathway.  \nA. \nIRAS FAILS TO PROMOTE THE CERTAINTY NEEDED TO SUPPORT \nINVESTMENT IN NEW CAPACITY IN THE PJM REGION \nPJM asserts that IRAS will incent large load customers to help underwrite the cost of new \ncapacity in the PJM region—either through long-term bilateral contracts or through the \nallocation of capacity costs from the Reliability Backstop Procurement (RBP).3 CEBA agrees \nthat large energy customers can play an important role in advancing resource development \nthrough long-term contractual commitments that help make new generation projects financeable. \nIndeed, our members have a well-documented track record of doing that across markets \nnationwide.4 However, such commitments are only viable when the customer has a clear \n \n3 PJM Filing, Transmittal at 50. \n4 CEBA and REsurety, Corporate Demand Drives Clean Energy (Sept. 2025), https://ceba.org/wp-\ncontent/uploads/2025/09/CEBA-Report-Corporate-Demand-Drives-Clean-Energy.pdf (empirical evidence shows \nthat corporate procurement through long-term contracts plays a critical role in getting clean energy projects financed \nand built, including in PJM); CEBA, Deal Tracker (2025), https://ceba.org/programs/deal-tracker/ (from 2014 to \n2025, CEBA members have contracted for at least 21.0 GW of new capacity in PJM. PJM is also a target market for \nmember deals involving clean firm technologies)."},{"page":4,"startToken":806,"endToken":1084,"text":"4 \n \nunderstanding of the benefits they will receive in exchange for undertaking those substantial \nobligations. \nIRAS fails that test. Under PJM’s proposal, a large load customer could enter into \ndecade-plus commitments to support the development of new capacity resources that satisfy the \nrequirements necessary to avoid taking IRAS. Yet, PJM cannot ensure that those commitments \nwill result in any defined level of curtailment protection or service reliability for that customer. \nAs PJM itself acknowledges, those are fundamentally terms and conditions of retail service, \nwhich are not governed by PJM’s tariffs but instead fall squarely within state jurisdiction.5  \nMore specifically, PJM issues load curtailment directives to Electric Distributors. \nIndividual Electric Distributors then determine which retail customers, such as Large Loads, are \ncurtailed in response to any PJM directive based on the specific conditions at the time, consistent \nwith state laws and regulations. Under this split construct, PJM has no authority or ability to \nensure that an individual New Large Load that brings its own new capacity and/or is allocated \ncapacity through the RBP can avoid curtailment when PJM initiates an IRAS Action. That is \nbecause policies and procedures regarding curtailment of retail customers sit within each Electric \nDistributor’s retail tariff, which are subject to exclusive state jurisdiction.  \nAs a result, PJM’s proposal attempts to induce investment by promising a benefit that \nPJM itself lacks the legal authority to offer. In other words, a large load customer could secure \nnew capacity to avoid curtailment under IRAS, have that new capacity recognized appropriately \nin the Large Load Registry, and yet the customer could still be curtailed during an IRAS Action \n \n5 PJM Filing, Transmittal at 86–88, 90–92."},{"page":5,"startToken":1084,"endToken":1310,"text":"5 \n \nbecause of policy choices made by state regulators with respect to curtailment priority among \nretail customers. \nThis deficiency undermines PJM’s central premise that IRAS will stimulate investment in \nnew generation resources. Customers considering long-term commitments to support new \ncapacity require confidence that the benefits associated with those commitments are clearly \ndefined, enforceable, and durable over the life of the investment. Where the principal benefit \nremains uncertain and dependent on decisions outside PJM’s authority, customers face \ndiminished incentives to undertake the long-term obligations necessary to finance and develop \nnew generation resources. \nIf policymakers wish to encourage large customers to support the development of new \ngeneration resources through long-term contractual commitments, the foundation for such a \nframework should instead be established at the retail level, where curtailment rights and service \nobligations are determined. It is the states that each must decide the specific benefits available to \ncustomers that make qualifying investments, including the extent of any curtailment protection \nor service rights associated with those investments. \nB. \nIRAS IMPROPERLY CONDITIONS ACCESS TO TRANSMISSION \nSERVICE BASED ON ATTRIBUTES OF RETAIL CUSTOMERS  \nPJM’s proposal, if accepted, would also set troubling precedent for gatekeeping access to \ntransmission service6 based on attributes of individual retail customers. To implement IRAS, \n \n6 In this case, full Network Integration Transmission Service (NITS) taken by a load-serving entity acting on behalf \nof a large load customer."},{"page":6,"startToken":1310,"endToken":1619,"text":"6 \n \nPJM would classify a retail customer based on its size, location, affiliation, in-service date, ramp \nschedule, capacity arrangements, backup generation, and contracts or service agreements. That \ninformation would be used to determine whether the customer is an Eligible New Large Load \n(i.e., eligible to provide IRAS) and the amount of its load that may be subject to curtailment. \nPJM’s assertion that it is merely directing load reductions in the aggregate by Electric Distributor \nzone/area7 is a misdirection from the fact that those directives are calculated based on the \nidentities and retail service characteristics of individual customers.8 This approach risks blurring \nthe Federal Power Act’s division between Commission-jurisdictional transmission and wholesale \nservice and state-jurisdictional retail service. \nThe Supreme Court has repeatedly emphasized that the Federal Power Act preserves a \nmeaningful jurisdictional distinction between regulation of wholesale markets and regulation of \nretail service. In EPSA, the Court upheld the Commission’s demand response rules because they \n“address[] only transactions occurring on the wholesale market” and were directed at “enhancing \nthe wholesale, not retail, electricity market.”9 By contrast, IRAS conditions wholesale treatment \non customer-specific retail characteristics, raising the question whether the proposed tariff \nrevisions remain targeted at wholesale market regulation or instead reach into matters \ntraditionally reserved to the states. Likewise, Hughes and Oneok caution that regulators must \n \n7 In this pleading, “Electric Distributor zone/area” has the same meaning as PJM uses it in its IRAS filing and \nassociated tariff revisions. PJM Filing, Transmittal at 26, n.73; PJM Filing, Attach. A, Proposed Tariff, Attach. DD-\n4, § III(a). \n8 PJM Filing, Transmittal at 36–44, 82. \n9 FERC v. Elec. Power Supply Ass’n., 577 U.S. 260, 282, 287 (2016) (upholding Commission action because it \n“addresses—and addresses only—transactions occurring on the wholesale market” and is directed at “enhancing the \nwholesale, not retail, electricity market”)."},{"page":7,"startToken":1619,"endToken":1997,"text":"7 \n \nrespect the line between federal and state spheres of authority and focus on the field at which a \nregulatory regime is aimed, rather than using one jurisdictional domain as a vehicle to regulate \nthe other.10 While the Court has recognized that Federal and state jurisdiction are not \n“hermetically sealed from each other,”11 overlap is permissible only where the regulation \nremains genuinely directed at a wholesale-market function. The more PJM’s tariffs condition \nwholesale treatment on customer-specific retail characteristics, the more difficult it is to \ncharacterize those rules as merely incidental to wholesale regulation. \nSimply stated, because curtailment of retail customers is not a practice affecting \nwholesale rates, the Commission is likely barred under this precedent from approving tariffs that \nattempt to regulate which retail customers are curtailed. Commission acceptance of PJM’s \nproposal would thus introduce unnecessary legal risk at precisely the wrong moment given the \nresource adequacy challenges facing the region. To the extent that the Commission supports the \npolicy objectives underlying IRAS, those instead could be addressed in a more legally durable \nmanner by calling on the PJM states to make the necessary reforms to retail tariffs.12 PJM could \nthen work to recognize those retail arrangements in its own tariffs. \n \n10 See Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 165 (2016) (reaffirming that the Federal Power Act leaves \nretail regulation to the states and prohibiting state action that fails to “give effect” to federally regulated wholesale \nrates); Oneok, Inc. v. Learjet, Inc., 575 U.S. 373, 385–86 (2015) (examining the “target at which [a] law aims” and \ndistinguishing measures aimed at matters within state jurisdiction from those aimed directly at the federal field). \n11 EPSA, 577 U.S. at 276–77 (quoting FERC v. Mississippi, 456 U.S. 742, 759 (1982)). \n12 For example, the Virginia State Corporation Commission (VA SCC) is already working in partnership with the \nData Center Coalition (DCC) to develop model retail tariff structures and regulatory frameworks that state regulators \nacross PJM could consider as they craft large load tariffs that target similar policy objectives as those underlying \nPJM’s proposal. VA SCC and DCC, Letter to the PJM Board (June 30, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/cifp-rbp/2026/20260630/20260630-written-comments---va-scc-and-data-center-\ncoalition.pdf."},{"page":8,"startToken":1997,"endToken":2278,"text":"8 \n \nC. \nIRAS UNDULY PREFERENCES CAPACITY RESOURCES OVER \nINVESTMENTS THAT REDUCE THE UNDERLYING CAPACITY NEED  \nCEBA supports PJM’s objective of ensuring that significant new load growth does not \nexacerbate existing resource adequacy challenges. But a framework intended to encourage large \ncustomers to support solutions should not unnecessarily dictate the form those solutions must \ntake. Customers should be able to address the incremental resource adequacy needs associated \nwith their growth through the most efficient available means—whether by supporting new \ngeneration, reducing the underlying capacity requirement through qualifying demand-side \ninvestments, or making efficient use of existing interconnection capability. \nUnder IRAS, a New Large Load can seek to reduce its curtailment exposure by securing \nnew Capacity Resources that qualify as Bring Your Own New Capacity (BYONC) or through an \nallocation of capacity procured through the RBP. But PJM provides no comparable credit for \ninvestments that directly reduce the amount of capacity the system needs. \nThat distinction is difficult to justify within PJM’s existing framework. PJM’s rules \nexpressly recognize qualifying Peak Shaving Adjustments as reductions to forecast peak demand \nand, therefore, to the capacity requirement PJM must satisfy.13 Indeed, PJM recognizes this \nresource adequacy benefit in its RBP proposal, where qualifying Peak Shaving Adjustments \nreduce the capacity need to be addressed through the centralized procurement.14 Both \nincremental Capacity Resources and incremental qualifying Peak Shaving Adjustments can \n \n13 PJM, Intra-PJM Tariffs, Open Access Transmission Tariff, Attach. DD-2 (1.0.0); PJM, Manual 19, Load \nForecasting and Analysis, § 3.2, https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf. \n14 PJM Filing, Docket No. ER26-3380-000, Transmittal at 45–46; PJM Filing, Docket No. ER26-3380-000, Attach. \nA, Proposed Tariff, Attach. DD, § 18.1(d)."},{"page":9,"startToken":2278,"endToken":2559,"text":"9 \n \naddress the resource adequacy need associated with load growth—one by increasing available \nsupply and the other by reducing the capacity requirement. \nIRAS, however, does not provide equivalent recognition for these two means of \naddressing resource adequacy. A New Large Load may be able to make a long-term contractual \ncommitment to finance distributed storage or other demand-side capability across an Electric \nDistributor zone/area. If those investments support a qualifying Peak Shaving Adjustment and \nproduce an incremental, measurable reduction in PJM’s peak forecast, they reduce the amount of \ncapacity that PJM must procure. Yet, IRAS provides no mechanism for the sponsoring New \nLarge Load to receive recognition for that contribution comparable to the credit available for \nBYONC. More precisely, PJM’s calculation of Eligible New Large Load Amount—which \ndetermines the IRAS curtailment exposure of an individual New Large Load—does not \nexplicitly account for Peak Shaving Adjustments associated with that load.15 \nThe proposed Large Load Registry does not cure this problem. PJM proposes to identify \nPeak Shaving Adjustments associated with the New Large Load itself, which may permit PJM to \naccount for peak shaving occurring at the individual customer’s site.16 But even assuming such \non-site peak shaving is appropriately reflected in the New Large Load’s Registered Peak Load, \nthe proposal provides no mechanism for a New Large Load to sponsor incremental peak-shaving \ncapability elsewhere in the relevant Electric Distributor zone/area and receive credit for the \nresulting reduction in PJM’s capacity need. The distinction matters because some of the most \n \n15 PJM Filing, Attach. A, Proposed Tariff, Attach. DD-4, § V(b). \n16 PJM Filing, Transmittal at 37; PJM Filing, Attach. A, Proposed RAA, Sched. 11, § B.1(a)."},{"page":10,"startToken":2559,"endToken":2922,"text":"10 \n \nscalable near-term demand-size investments may occur across a broader portfolio of customers \nor facilities rather than behind the meter of the sponsoring New Large Load. \nPJM has offered no explanation for this limitation, despite this limitation appearing to be \nan intentional design choice by PJM.17 If a New Large Load finances new generation that \nqualifies as BYONC, IRAS recognizes that investment in determining the load’s curtailment \nexposure. But if the same customer finances incremental distributed storage or other qualifying \npeak-shaving capability that reduces PJM’s forecast capacity requirement, IRAS provides no \ncorresponding recognition. That distinction turns on the form of investment rather than its \ndemonstrated contribution to resource adequacy. \nIf the Commission chooses to accept the IRAS proposal, at a minimum the Commission \nshould require PJM to amend its proposal to provide a clear tariff-based mechanism for New \nLarge Loads to receive recognition for incremental, customer-sponsored Peak Shaving \nAdjustments that reduce PJM’s capacity requirement, including qualifying investments located \nelsewhere within the relevant Electric Distributor zone/area. Such a directive would be precisely \nthe kind of permissible, minor modification that the NRG court contemplated.18 Here, directing \nPJM to recognize customer-sponsored Peak Shaving Adjustments in the calculation of a New \nLarge Load’s Eligible New Large Load Amount would not alter the fundamental IRAS \n \n17 PJM explains in its RBP filing that “even if the Electric Distributor zone/area qualifies for and receives an opt-out \nfrom the RBP, the load in that zone/area may be subject to load reduction under the forthcoming proposal to \nimplement an IRAS.” PJM, Filing, Docket No. ER26-3380-000, at 46 (filed July 31, 2026). CEBA member Equinix \nhighlighted that this disparate treatment between the RBP and IRAS risks undermining the use case of customer-\nsponsored Peak Shaving Adjustments. Equinix, Comments, Docket No. ER26-3380-000, at 12 (filed Aug. 21, 2026). \n18 NRG Power Mktg., LLC v. FERC, 862 F.3d 108, 115–16 (D.C. Cir. 2017) (recognizing that the Commission may \nrequire modifications to a utility’s FPA section 205 filing where the utility consents, while cautioning only against \nmodifications that result in an “entirely different rate design” or “eviscerate[] the terms of the bargain” embodied in \nthe original proposal)."},{"page":11,"startToken":2922,"endToken":3148,"text":"11 \n \nframework. Rather, it would simply permit New Large Loads to address the resource adequacy \nconsequences of their growth through either incremental supply or an incremental reduction in \nthe capacity requirement. This clarity in the tariff is necessary to give prospective New Large \nLoads the confidence they need to make investments in Peak Shaving Adjustments with the \nunderstanding those demand-side reductions serve to reduce the sponsoring large load \ncustomer’s IRAS curtailment risk. \nAbsent this change, the Commission should reject PJM’s proposal because it is unjust \nand unreasonable insofar as PJM recognizes the capacity benefit of customer-sponsored Peak \nShaving Adjustments at the system level (through reductions to the RBP Initial Procurement \nTarget) while providing no apparent pathway for the customer whose investment creates \nincremental peak-shaving capability to receive corresponding recognition. When compared with \nPJM’s treatment of BYONC and capacity procured through the RBP, there is a clear undue \npreference for Capacity Resources over investments that reduce the underlying need for new \ncapacity. \nD. \nPJM APPROPRIATELY RECOGNIZES INCREMENTAL CAPACITY \nUNLOCKED THROUGH SURPLUS INTERCONNECTION SERVICE, \nBUT FURTHER REFORMS ARE NEEDED TO MAKE THIS PATHWAY \nCOMMERCIALLY VIABLE \nCEBA supports PJM’s recognition that capacity enabled through Surplus Interconnection \nService (SIS) may qualify as BYONC.19 SIS has the potential to facilitate incremental capacity \n \n19 PJM Filing, Transmittal at 53; PJM Filing, Attach. A, Proposed Tariff, Attach. DD-4, § VI(b)(i)(3)."},{"page":12,"startToken":3148,"endToken":3451,"text":"12 \n \nadditions, particularly storage, quickly and cost-effectively by allowing new resources to make \nmore efficient use of existing interconnection capability and, in so doing, avoid the need for \nnetwork upgrades. In practice, however, existing PJM rules can limit the ability of SIS to fulfill \nthat potential. Among other things, these rules prevent new surplus resources from participating \nindependently as a co-located Capacity Resource, despite this being the most commercially \nviable pathway for many developers and their offtakers to add a new resource behind an existing \npoint of interconnection. The only available alternative—pursuing a hybrid configuration—is \nunworkable in most cases due to the complexities of unwinding existing ownership, financing, \nand offtake arrangements.20 \nThese barriers are particularly relevant here because PJM is expressly relying on SIS as \none pathway through which New Large Loads can secure new capacity necessary to qualify for \nBYONC. One relatively straightforward rule change would be to allow an existing resource with \nunderutilized Capacity Interconnection Rights (CIRs) to allocate a portion of those rights to a \nnew resource interconnecting through SIS. Doing so would maximize opportunities to repurpose \nunderutilized interconnection capability to add incremental capacity resources in the near-term, \nall while preserving appropriate reliability, operational, and market-power safeguards.  \nCEBA is not asking the Commission to resolve these issues in this proceeding, but \ninstead respectfully requests that it encourage PJM to pursue these reforms diligently and \n \n20 Several parties have highlighted these limitations in this docket and in the RBP docket. Google LLC, Comments, \nDocket No. ER26-3380-000, at 10–11 (filed Aug. 21, 2026); Solar Energy Industries Association, Comments, \nDocket No. ER26-3515-000 at 4–6 (filed Sept. 3, 2026); Solar Energy Industries Association, Comments, Docket \nNo. ER26-3380-000, at 9–12 (filed Aug. 21, 2026); Advanced Energy United, Comments, Docket No. ER26-3380-\n000, at 11–15 (filed Aug. 21, 2026)."},{"page":13,"startToken":3451,"endToken":3741,"text":"13 \n \ncollaboratively with stakeholders.21 Particularly if the Commission accepts PJM’s proposal, \ndoing so would help ensure that PJM’s recognition of SIS under the BYONC framework \ntranslates into a meaningful and commercially viable pathway for bringing incremental capacity \nonline. If these barriers cannot be addressed expeditiously through the PJM stakeholder process, \nfurther Commission attention may be warranted to ensure that existing interconnection capability \ncan be used efficiently to support needed incremental capacity.  \nIII. \nCONCLUSION \nFor the foregoing reasons, CEBA respectfully requests that the Commission reject PJM’s \nIRAS proposal as unjust, unreasonable, and unduly preferential. CEBA members stand ready to \nmake the long-term commitments necessary to support investment in new capacity in the PJM \nregion. But those investments require a regulatory framework that provides investor certainty, \nreduces legal risk, and preserves the ability of large load customers to procure new capacity \nthrough arrangements that best align with their commercial needs. If the Commission \nnevertheless accepts PJM’s proposal, it should: (1) condition acceptance on the modifications \ndescribed above, including revisions necessary to ensure that customer-sponsored Peak Shaving \nAdjustments receive appropriate recognition within the IRAS framework; and (2) encourage \n \n21 PJM has introduced a Problem/Opportunity Statement and Issue Charge that seeks to address some of these \npractical barriers to using SIS to add incremental capacity. The proposed scope is a helpful first step but may be \ninsufficient. CEBA intends to support stakeholder discussions on these issues. PJM, Problem/Opportunity \nStatement: Hybrid Resources Market Model Selection (Aug. 5, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/mic/2026/20260805/20260805-item-04-1---hybrid-resources-\nmarket-model-selection---problem-statement.pdf; PJM, Issue Charge: Hybrid Resources Market Model Selection \n(Aug. 5, 2026), https://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mic/2026/20260805/20260805-item-04-2---hybrid-resources-market-model-selection---issue-\ncharge.pdf."},{"page":14,"startToken":3741,"endToken":3766,"text":"14 \n \nPJM to work with stakeholders on reforms that unlock the full potential of SIS to bring \nincremental capacity to the region quickly and cost-effectively."},{"page":15,"startToken":3766,"endToken":3797,"text":"15 \n \nRespectfully submitted, \n \n/s/ John Miller___________________ \nJohn Miller \nDirector, Transmission Policy \nCEBA \n1501 M Street, N.W., Suite 900 \nWashington, D.C. 20005 \n(240) 630-2201 \njmiller@ceba.org \n \nSeptember 3, 2026"},{"page":16,"startToken":3797,"endToken":3867,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Commission in this \nproceeding. \nDated at Washington, D.C., this 3rd day of September 2026. \n/s/ John Miller___________________ \nJohn Miller \nDirector, Transmission Policy \nCEBA \n1501 M Street, N.W., Suite 900 \nWashington, D.C. 20005 \n(240) 630-2201 \njmiller@ceba.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1204,"startToken":0,"endToken":171},{"p":1,"at":1204,"title":"I. MOTION TO INTERVENE","method":"printed heading","endPage":2,"endAt":884,"startToken":171,"endToken":360},{"p":2,"at":884,"title":"II. COMMENTS","method":"printed heading","endPage":3,"endAt":704,"startToken":360,"endToken":603},{"p":3,"at":704,"title":"A. IRAS FAILS TO PROMOTE THE CERTAINTY NEEDED TO SUPPORT","method":"printed heading","endPage":5,"endAt":1219,"startToken":603,"endToken":1248},{"p":5,"at":1219,"title":"B. IRAS IMPROPERLY CONDITIONS ACCESS TO TRANSMISSION","method":"printed heading","endPage":8,"endAt":5,"startToken":1248,"endToken":1998},{"p":8,"at":5,"title":"C. IRAS UNDULY PREFERENCES CAPACITY RESOURCES OVER","method":"printed heading","endPage":11,"endAt":1142,"startToken":1998,"endToken":3083},{"p":11,"at":1142,"title":"D. PJM APPROPRIATELY RECOGNIZES INCREMENTAL CAPACITY","method":"printed heading","endPage":13,"endAt":541,"startToken":3083,"endToken":3523},{"p":13,"at":541,"title":"III. CONCLUSION","method":"printed heading","endPage":16,"endAt":0,"startToken":3523,"endToken":3797},{"p":16,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":16,"endAt":450,"startToken":3797,"endToken":3867}]}