{"document":{"slug":"rec-20260903-5218","title":"Limited Comments of North Carolina Electric Membership Corporation on PJM Interconnection, L.L.C.’s filing proposing revisions to the Open Access…","issued":"2026-09-03","accession":"20260903-5218","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"North Carolina Electric Membership Corporation","kind":"comments","file":"sources/filings/text/20260903-5218_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5218","tier":"record","sha256":"0be499787b3118486b4edb609dad080e4221f68663af933844c0cdd648dfb09f","pages":6,"tokens":1484,"emptyPages":[],"textThemes":["adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":269,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket No. ER26-3515-000\nLIMITED COMMENTS OF NORTH CAROLINA ELECTRIC \nMEMBERSHIP CORPORATION \nPursuant to Rule 211 of the Commission’s Rules of Practice and Procedure1 and \nthe Commission’s Combined Notice of Filings #2 of August 13, 2026, North Carolina \nElectric Membership Corporation (“NCEMC”)2 submits the following comments on the \nfiling by PJM Interconnection, L.L.C. (“PJM”) proposing revisions to its Open Access \nTransmission Tariff (“Tariff”) and Reliability Assurance Agreement Among Load \nServing Entities (“RAA”) to establish Interim Resource Adequacy Service (“IRAS”).3\nPJM states that it will implement IRAS only when there are insufficient resources to \nreliably meet demand in real-time operations, and, when implanted, IRAS will enable \nPJM “to prioritize load reductions in zones/areas where New Large Loads have not \nbrought their own new capacity or had their capacity needs covered through the \nReliability Backstop Procurement (‘RBP’).”4\n1 18 C.F.R. § 385.211 (2025). \n2 NCEMC filed a (doc-less) motion to intervene in this proceeding on August 17, 2026, which, \nunopposed within 15 days, makes NCEMC a party to this proceeding by rule. See 18 C.F.R. \n§ 385.214(c)(1). \n3 PJM Interconnection, L.L.C., Docket No. ER26-3515-000, “Proposal of PJM Interconnection, \nL.L.C. To Establish  Interim Resource Adequacy Service and a Large Load Registry To Address \nSystem Reliability” (filed Aug. 13, 2026). \n4 PJM IRAS Transmittal Letter at 1-2. See PJM Interconnection, L.L.C., Docket No. ER26-3380-\n000, “Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming \nfrom Large Loads” (filed July 31, 2026)."},{"page":2,"startToken":269,"endToken":561,"text":"2 \nThus, PJM is proposing IRAS as an operational tool to address the reality that \nNew Large Loads, which are developing more quickly than generation and transmission \ncan be built to provide them firm service, may want to connect to the grid in a provisional \nmanner on an interim basis. Practically speaking, PJM seeks to create an optional path \nforward for New Large Loads that choose to be curtailable in the interim in exchange for \nquicker interconnection to the grid. As PJM notes, “the IRAS framework is not motivated \nby any desire to single out New Large Loads for reduction because of their size or \nvintage, but rather for the valid and legitimate reason that New Large Loads have led to \nperiods of insufficient resource adequacy and should, justifiably, play a significant role in \nthe remedy.”5 The IRAS framework is intended to allow PJM to identify the megawatt \n(MW) amount of New Large Load that exceeds new generation to ensure that in \nemergency conditions the New Large Load can be shut off before existing load is \nimpacted. In order to avoid perceived jurisdictional limitations, PJM proposes that it \nwould issue an IRAS Action directive to the Electric Distributor, who will then, in \ncoordination with the relevant Load-Serving Entities (LSEs) in the zone/area and the \nappropriate state and/or Relevant Electric Retail Regulatory Authority (“RERRA”), \ndetermine which loads will be shut off. \nI.\nNCEMC \nNCEMC is a generation and transmission cooperative responsible for the full or \npartial power supply requirements of its 25 members throughout the state of North \nCarolina. Those 25 distribution cooperatives, in turn, supply electricity to approximately \none million homes, farms, and businesses in which more than 2.5 million North \n5 PJM IRAS Transmittal Letter at 100."},{"page":3,"startToken":561,"endToken":832,"text":"3 \nCarolinians live and work. NCEMC distribution cooperative loads are located throughout \nthe service areas of three investor-owned public utilities: Duke Energy Carolinas, LLC, \nand Duke Energy Progress, LLC, both subsidiaries of Duke Energy Corporation, and \nVirginia Electric and Power Company, doing business as Dominion Energy Virginia in \nVirginia and as Dominion Energy North Carolina in North Carolina (hereinafter, \nDominion).  \nNCEMC is a member of PJM, which operates transmission facilities owned by \nDominion and other electric utilities. NCEMC purchases transmission services from PJM \nover Dominion’s transmission facilities to serve the loads of its six member cooperatives \nthat distribute power at retail in the Dominion transmission zone of the PJM region. \nNCEMC is a member of PJM’s Electric Distributor sector, a load-serving entity, and a \nparticipant in PJM’s energy, ancillary services, capacity, and financial transmission rights \nmarkets. \nII.\nThe Commission should direct PJM to clarify that an IRAS Action \ndirective applies only to New Large Loads provisionally interconnected to \nthe grid and only to the extent of a provisionally interconnected New \nLarge Load’s load at the time of the IRAS Action directive. \nBuckeye Power, Inc. (“Buckeye”), East Kentucky Power Cooperative, Inc. \n(“EKPC”), and Southern Maryland Electric Cooperative, Inc. (“SMECO”) are submitting  \nfilings responsive to PJM’s IRAS filing on even date herewith. NCEMC generally \nsupports the need for greater clarity highlighted in the Buckeye, EKPC, and SMECO \nfilings. NCEMC specifically supports a concern articulated by Buckeye in its filing. \nBuckeye, in its Comments filed contemporaneously with these NCEMC Comments, \nstates as follows: \nPJM’s filing is largely silent as to exactly how it will \ndetermine the MW amount when issuing an IRAS Action. PJM"},{"page":4,"startToken":832,"endToken":1231,"text":"4 \nstates that the “IRAS reduction MW quantity … will be based on \nthe IRAS quantity PJM determined for the Delivery Year.” PJM’s \nfiling describes how it determines the yearly IRAS quantity based \non Eligible New Large Load Amounts, which will be less than or \nequal to the Electric Distributor’s Eligible New Large Load \nAmount for that year. But PJM’s Filing does not explain how PJM \nwill determine the IRAS quantity it directs an Electric Distributor \nto cause to be reduced in a given emergency event in real-time.  \n…  \nBuckeye is concerned that directing the Electric Distributor to \nreduce a specific amount of MW quantity based on registered peak \nload of New Large Loads determined for the Delivery Year will \nnot match the actual amount of load being used by the New Large \nLoads in real-time. If PJM were allowed to direct IRAS quantities \nin real-time that exceed the real-time demand of New Large Loads, \nthis mismatch between the peak load reported by the New Large \nLoad in the registry and the amount of load the Large Load is \nusing in real-time could require the Electric Distributor to reduce \nexisting customers, including residential loads, to make up the \ndifference. \n…  \nBuckeye asks that PJM clarify how the MW amounts Electric \nDistributors will be asked to curtail will be determined in a real-\ntime IRAS Action, and whether this determination will consider \nthe actual demand of the New Large Loads in real-time to avoid \nrequiring impacts to existing customer load described above. \nSpecifically, PJM should ensure that the amount of MWs the \nElectric Distributor is required to drop in response to an IRAS \nAction will not exceed the amount of MWs being used by the New \nLarge Loads in real-time.  This clarification will still allow the \nElectric Distributors, working with its applicable state or RERRA, \nto determine how the MW drop will be assigned to individual \nloads, while at the same time ensuring that Electric Distributors are \nnot put in the position of being forced to drop existing load (the \naction of last resort to maintain grid integrity) to comply with an \nIRAS Action.6\nNCEMC shares Buckeye’s concern. An IRAS Action directive should in no way \nrequire any existing load that is not provisionally interconnected to be curtailed. Put \n6 Limited Comments of Buckeye Power, Inc., Docket No. ER26-3515-000 at 4, 5, 6–7 (filed Sept. \n3, 2026) (emphasis original; footnotes omitted)."},{"page":5,"startToken":1231,"endToken":1419,"text":"5 \nanother way, under IRAS, it should be unambiguous that only a New Large Load that \nchoose to be curtailable in the interim in exchange for quicker interconnection to the grid \nis subject to curtailment under an IRAS Action directive.  \nTo the extent PJM does not make this important clarification on its own, the \nCommission should issue a deficiency letter directing PJM to make this clarification or \nexplain how the existing proposal is just, reasonable, and not unduly discriminatory. \nIII.\nConclusion \nFor the reasons stated above, the Commission should take these comments into \nconsideration and direct PJM to make the requested clarification. \nSeptember 3, 2026\nRespectfully submitted,  \n/s/ Michael D. Youth                           \nCharles Bayless \nSenior Vice President and General   \nCounsel \nMichael D. Youth \nVice President and Deputy General Counsel\nNorth Carolina Electric Membership \nCorporation \n3400 Sumner Blvd. \nRaleigh, NC 27616  \nCharlie.Bayless@ncemcs.com\nMichael.Youth@ncemcs.com\nSean T. Beeny \nRandolph L. Elliott \nF. Alvin Taylor \nMcCarter & English, LLP \n1301 K Street NW, Suite 1000 West \nWashington, D.C. 20005 \n(202) 753-3400 \nsbeeny@mccarter.com\nrelliott@mccarter.com\nataylor@mccarter.com\nAttorneys for North Carolina Electric \nMembership Corporation"},{"page":6,"startToken":1419,"endToken":1484,"text":"6 \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in this proceeding. \nDated at Washington, D.C. this 3rd day of September 2026. \n/s/ Randolph Elliott                              \nRandolph L. Elliott \nMcCarter & English, LLP \n1301 K Street NW, Suite 1000 West \nWashington, D.C. 20005 \n(202) 753-3428"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1422,"startToken":0,"endToken":502},{"p":2,"at":1422,"title":"I. NCEMC","method":"printed heading","endPage":3,"endAt":968,"startToken":502,"endToken":697},{"p":3,"at":968,"title":"II. The Commission should direct PJM to clarify that an IRAS Action","method":"printed heading","endPage":5,"endAt":493,"startToken":697,"endToken":1310},{"p":5,"at":493,"title":"III. Conclusion","method":"printed heading","endPage":5,"endAt":1046,"startToken":1310,"endToken":1384},{"p":5,"at":1046,"title":"F. Alvin Taylor","method":"printed heading","endPage":6,"endAt":3,"startToken":1384,"endToken":1420},{"p":6,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":429,"startToken":1420,"endToken":1484}]}