{"document":{"slug":"rec-20260903-5221","title":"Protest of Vistra Corp. regarding PJM Interconnection, L.L.C.’s proposed Interim Resource Adequacy Service filing","issued":"2026-09-03","accession":"20260903-5221","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Vistra Corp.","kind":"protest","file":"sources/filings/text/20260903-5221_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5221","tier":"record","sha256":"0db4237f10ede37eaf501ca75cd8cca88b13cd08c9c221a0b46efbb907e118bf","pages":24,"tokens":8432,"emptyPages":[],"textThemes":["flex","adequacy","retail","colo"]},"pages":[{"page":1,"startToken":0,"endToken":244,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C. \n \n) \n) \n) \n \n \n \nDocket No. ER26-3515-000 \n \nPROTEST OF VISTRA CORP. \n \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission”),1 Vistra Corp. (“Vistra”) submits this protest regarding \nPJM Interconnection, L.L.C.’s (“PJM”) proposed Interim Resource Adequacy Service (“IRAS”) \nproposal.  Although Vistra recognizes PJM’s concerns regarding the resource adequacy challenges \nfacing the region, those concerns demand durable solutions that provide investors with the \ncertainty they need to maintain and expand PJM’s generation fleet.2  That is not IRAS.   \nIRAS is ill-conceived, inconsistent with the Federal Power Act (“FPA”), and will stymie \ninvestment in PJM.  With IRAS, PJM ignores the jurisdictional boundaries that Congress carefully \ncrafted and proposes rules that are unjust, unreasonable, and unduly discriminatory—each of \nwhich is a sufficient basis for the Commission to reject the proposal and for a court to overturn an \norder accepting IRAS on appeal.  In rejecting IRAS, the Commission should order PJM to develop \na durable solution that is faithful to sound market fundamentals to ensure that the region has the \ncapacity resources needed to meet load growth. \n \n \n1 18 C.F.R. § 385.211. \n2 For instance, the Commission’s proposed measures to incentivize load flexibility could provide the types of \ndurable solutions that bolster investor confidence, rather than undermine it.  See PJM Interconnection, L.L.C., 195 \nFERC ¶ 61,211, at PP 85-87 (2026)."},{"page":2,"startToken":244,"endToken":588,"text":"-2- \nAccepting IRAS would undermine the investor confidence that is critical to resource \ndevelopment because it would upset contracts negotiated in reliance on the rules in effect at the \ntime.  That is a particularly concerning result now, in PJM, where the absence of predictable market \nrules in recent years has significantly undermined investment in the generation fleet needed to \nmaintain resource adequacy.  If the Commission now casts doubt on the extent to which market \nparticipants, including both generation and load, can rely on already-executed or in-process \nbilateral contracts, it will only further impair PJM’s ability to meet its resource adequacy \nrequirements at a time when the region can least afford it.3  To avoid that outcome, the Commission \nshould reject IRAS altogether or clarify that new large loads that enter into contracts with existing \ncapacity resources before the effective date of the IRAS reforms will not be subject to IRAS \ncurtailments.   \nI. \nPROTEST \nIRAS is both unlawful and counterproductive for the PJM region and the nation.  It will \nhinder investment in generation resources and data infrastructure unless and until the Commission \nrejects the proposal.  As explained below, IRAS runs afoul of the FPA in three distinct ways. \nFirst, as a threshold matter, IRAS oversteps the FPA’s jurisdictional boundaries because it \ntargets retail customers that are outside of the Commission’s jurisdiction.  Under IRAS, PJM will \nmake wholesale curtailment decisions based entirely on whether an Electric Distribution Company \n(“EDC”) has certain specific retail customers (i.e., new large loads that do utilize the Bring Your \n \n3 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at P 5 (“This proceeding is not intended to disrupt existing \ncommercial arrangements[.]”); FERC, Chairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, \nMD (May 12, 2026), https://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-\nmeeting-baltimore-md-0 (“[W]hatever happens, we cannot disrupt finalized commercial agreements.  At FERC, I have \nno appetite to compromise investor confidence when those investors are driving the buildout of the generation that \nPJM desperately needs.  However you get there PJM, you need to figure it out.  Fast.”)."},{"page":3,"startToken":588,"endToken":1185,"text":"-3- \nOwn New Capacity (“BYONC”) pathway) in its footprint.  That cuts directly against Congress’s \ndirective that retail service be regulated by the states, not by FERC.   \nSecond, IRAS is unduly discriminatory or preferential in multiple ways.4  Most glaringly, \nIRAS and BYONC unduly discriminate against existing capacity resources.  PJM proposes that \nnew large loads that contract with new capacity resources are not supposed to be exposed to the \nIRAS curtailment regime while new large loads that contract with otherwise identical existing \ncapacity resources would be.  This is textbook undue discrimination, as one MW of capacity from \na new resource provides the exact same resource adequacy benefits as one MW of capacity from \nan otherwise identical existing resource.5  After all, electrons don’t differ based on the age of the \ngeneration facility that produced them.6  To the extent proponents of IRAS assert that these MWs \nare not identical because PJM needs one new MW of capacity for every new MW of load to solve \nits resource adequacy concerns, they are wrong for two reasons.  For one, they have not actually \ndemonstrated that the system cannot handle near-term load growth—and there are good reasons to \n \n4 See, e.g., Ala. Power Co. v. FERC, 993 F.2d 1557, 1571 (D.C. Cir. 1993) (“[T]he party filing a rate adjustment \nwith the Commission under § 205 bears the burden of proving the adjustment is lawful.”); ISO New England Inc., 136 \nFERC ¶ 61,221, at P 20 (2011) (“Where . . . a filing is made under section 205 of the FPA, the burden of proof is on \nthe filing party to show that its proposal is just and reasonable.” (footnote omitted)). \n5 PJM Interconnection, L.L.C., 128 FERC ¶ 61,157, at P 102 (2009) (“Both new entry and retention of existing \nefficient capacity are necessary to ensure reliability and both should receive the same price so that the price signals \nare not skewed in favor of new entry.”); see also Calpine Corp., 171 FERC ¶ 61,034 (2020) (Glick, Comm’r, \nDissenting at P 84) (“[A] megawatt of capacity provided by a new resource is every bit as effective as a megawatt \nprovided by an existing one.”). \n6 To underscore this point, consider how generators impact the system as a matter of physics.  Electric energy is \n“transmitted through the propagation of an electromagnetic wave;” electrons themselves do not “flow” but rather \n“oscillate in place.”  North Dakota v. Heydinger, 825 F.3d 912, 924 (8th Cir. 2016) (Murphy, J., concurring in part \nand concurring in the judgment); see also Brief of Amicus Curiae of Electrical Engineers et al., New York v. FERC, \n535 U.S. 1 (2002) (No. 00-568), 2001 WL 605124, at *7-8 (“The real energy transmission is accomplished through \nthe propagation of an electromagnetic wave. Each electron is induced, under the effect of the electromagnetic wave \ngenerated at the power plant, to repel the electron in the next atom. Assume that energy is being transmitted left to \nright in a wire. Each electron repels its right-hand neighbor, because they are both negatively charged and similar \ncharges repel each other. This ripple effect can be envisioned as each electron elbowing its neighbor toward the next \nright-hand neighboring electron, which in turn elbows the next electron, and so on down the power line. The electrons \nmove very little, merely oscillating in place, but the energy – the electromagnetic wave – moves at the speed of light. \nThe energized electrons making the lightbulb in a house glow are not the same electrons that were induced to oscillate \nin the generator at the generating plant.” (footnote omitted))."},{"page":4,"startToken":1185,"endToken":1617,"text":"-4- \nthink that the system can, in fact, handle that load growth.7  For the other, they misdiagnose the \nproblem: current resource adequacy concerns are caused by Load Serving Entities failing to \nprocure enough capacity to cover the entirety of their load obligation, not the contracting decisions \nof individual retail customers.  And they ignore the fact that IRAS represents an unprecedented \nsea change in how customers’ service requests are viewed from a regulatory perspective.  Vistra \nis aware of no power market in history that has imposed a policy that says new customers are not \neligible for the same service as existing customers unless they procure their own generation \nresources.8 \nThird, IRAS has not been shown to be just and reasonable in several more respects.  For \nexample, there is no assurance that new large loads will receive the purported benefit of BYONC \nbecause it is up to states and EDCs to decide curtailment orders and priorities.9  Thus, IRAS would \nimpose a burden (BYONC) without any assurance that those bearing that burden would receive \nthe purported benefits that are supposed to flow from it (firm service).  For that reason, IRAS is \nan illusory construct that is fundamentally unjust and unreasonable.  Further, IRAS violates cost \ncausation principles, and is therefore unjust and unreasonable, because it allocates capacity costs \nto new large loads that do not bring new capacity even though it does not procure capacity to serve \nthose loads.  It is also unjust and unreasonable because new large loads that do not bring new \n \n7 Ryan Hledik, Long Lam & Kate Peters, The Untapped Grid: How a Better Utilized Power System Can Improve \nEnergy Affordability, The Brattle Grp., (Mar. 2026), https://www.brattle.com/wp-content/uploads/2026/03/The-\nUntapped-Grid-Mar-2026.pdf. \n8 Vistra believes that such a policy, in addition to being unlawful, would be counterproductive for the PJM system \nbecause it will incentivize customers to pursue fully islanded systems to avoid system costs, thereby reducing the \namount of load to which those costs can be spread. \n9 PJM Interconnection, L.L.C., Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy \nService and a Large Load Registry to Address System Reliability, Docket No. ER26-3515-000, at 92 (filed Aug. 13, \n2026) (“Transmittal”) (“[I]n recognition of the jurisdictional divide between PJM and the states and/or RERRAs, PJM \nwill not direct reductions to specific New Large Loads pursuant to IRAS.  Rather, PJM is leaving it to Electric \nDistributors, in coordination with the appropriate states and/or RERRAs, LSEs, and LSE customers to determine \nwhich loads should ultimately reduce subject to IRAS.”)."},{"page":5,"startToken":1617,"endToken":1987,"text":"-5- \ncapacity would be subject to curtailment before demand response resources despite the fact that \ndemand response resources volunteer to be curtailed and are compensated as a result.  Finally, \nIRAS is unjust and unreasonable because, by removing from the Variable Resource Reliability \n(“VRR”) Curve new large loads that do not bring new capacity, it would undermine capacity \nmarket fundamentals, thereby further eroding resource adequacy in PJM.  \nA. IRAS Violates the FPA’s Division of Jurisdiction \nThe Commission is a creature of statute and can act only within the scope of authority \nconveyed by Congress.10  IRAS exceeds the scope of the authority conveyed to the Commission \nunder the FPA because the entire scheme is based on and triggered by the characteristics and \nbehavior of retail customers (i.e., new large loads), which are within the states’ exclusive sphere \nto regulate.  In this way, IRAS explicitly “aims” at or “target[s]” specific retail customers, in \nviolation of the FPA.11 \nThe FPA gives the states exclusive authority over retail sales.12  This means that the \nCommission is prohibited from specifying the rates, terms, and conditions of retail sales “no matter \nhow direct, or dramatic, [their] impact on wholesale rates” as that “is a job for the States alone.”13  \nNevertheless, “[w]holesale and retail markets in electricity . . . are not hermetically sealed from \neach other,” so to determine whether an action that affects both wholesale and retail spheres \noversteps the FPA’s bright jurisdictional line, the Supreme Court has considered “the target at \n \n10 Atl. City Elec. Co. v. FERC, 295 F.3d 1, 8 (D.C. Cir. 2002). \n11 FERC v. Elect. Power Supply Ass’n, 577 U.S. 260, 282 (“EPSA”) (quoting Oneok, Inc. v. Learjet Inc., 575 U.S. \n373, 385 (2015) (“Oneok”))). \n12 16 U.S.C. § 824(b); Niagara Mohawk Power Corp. v. FERC, 452 F.3d 822, 824 (D.C. Cir. 2006) (“Under \nsection 201(b)(1) of the Federal Power Act, 16 U.S.C. § 824(b)(1), FERC has jurisdiction over both the interstate \ntransmission of electricity and the sale of electricity at wholesale in interstate commerce. States retain jurisdiction \nover retail sales of electricity and over local distribution facilities.”). \n13 EPSA, 577 U.S. at 279-80."},{"page":6,"startToken":1987,"endToken":2485,"text":"-6- \nwhich [a] law aims.”14  FERC cannot approve a proposal where retail customers are the “target at \nwhich [the proposal] aims.”15 \nThat is IRAS to a T.  Under IRAS, PJM decides which wholesale transmission customers \nare subject to curtailment based on the characteristics of individual retail customers—that is the \ncentral feature of IRAS.16  Specifically, PJM will curtail EDCs with new large loads (i.e., retail \ncustomers) in their footprints that do not bring sufficient new capacity to offset their demand.17  \nThat makes IRAS all about the retail customer: when it comes online (before or after June 1, 2027), \nits size (more or less than 50 MW), and whether it brings offsetting new capacity (i.e., BYONC).18   \nUnder IRAS, retail customers and their characteristics are far more than “the mechanism through \nwhich [IRAS] operates,”19 they are lynchpin of the entire scheme and the determining factor for \nwhether IRAS applies.  Moreover, PJM is clear, again and again, that the purpose of IRAS is to \nshape the behavior of retail customers and to “solve” the resource adequacy challenge that PJM \nposits, a task that should be reserved for the PJM capacity market.20 \n \n14 Id. at 282 (quoting Oneok, 575 U.S. at 385) (alterations in original). \n15 Oneok, 575 U.S. at 385. \n16 See, e.g., Transmittal at 85-86. \n17 Id. at 83-84. \n18 Id. at 6, 86; see also id. at 1 n.2 (proposing to define “New Large Load” as: either: (a) a Large Load that goes \ninto service after June 1, 2027, or (b) incremental load in-service after June 1, 2027, that increases the existing end-\nuse customer load at a single electrical site that, prior to such incremental load, did not previously meet the definition \nof Large Load; id. at 32-33 (proposing to define Large Load as a load that (1) has a peak load of 50 MW or greater; \n(2) is located at a single site; and (3) is behind one or more points of interconnection.”); id. at 69 (“All New Large \nLoads shall be eligible to provide IRAS and considered Eligible New Large Loads to the extent the combination of \ntheir BYONC arrangements and Allocated RBP UCAP MW does not meet their capacity needs.”).   \n19 EPSA. 577 U.S. at 283. \n20 See, e.g., Transmittal at 7 (“IRAS would facilitate a decision by an Electric Distributor in conjunction with \nrelevant state entities, as applicable, to decide that specific Eligible New Large Loads may be reduced during a \nDelivery Year when IRAS applies, because such loads are not arranged with sufficient new capacity.”); id. at 50 (“To \nincentivize Large Loads to address the capacity shortfall caused by their rapid growth, in both speed to interconnection \nand volume of capacity needed, PJM is proposing to allow New Large Loads to remove themselves—in whole or in \npart—from the MW eligible for IRAS where such loads bring new capacity to the PJM Region.”); id. at 124 (“The"},{"page":7,"startToken":2485,"endToken":2818,"text":"-7- \nContrast IRAS with the Supreme Court’s decision in EPSA, where the Court upheld Order \nNo. 745 because (i) it did not literally regulate retail rates and (ii) the regulation did not target the \nretail customer.21  There, the demand response rule was “only about[] improving the wholesale \nmarket,” and FERC “focused wholly on the benefits that demand response participation (in the \nwholesale market) could bring to the wholesale market.”22  Any effects on the retail market were \nincidental at most and beside the point.  The same cannot be said of IRAS, which, as noted, is all \nabout specific retail loads and tailoring wholesale services to address the decisions and actions of \nthose retail loads.  Whereas EPSA upheld a FERC decision that accommodated retail customers \nby requiring RTOs/ISOs to enable them—if permitted by their state—to participate in FERC-\njurisdictional wholesale markets through a FERC-jurisdictional product, IRAS would, through \nEDCs, regulate the nature and conditions of service that retail customers receive.   \nIt is obvious from how IRAS operates that PJM is targeting retail customers.  Recall that \nPJM proposes to assign wholesale curtailment obligation to an EDC based on the size (i.e., more \nthan 50 MW) and vintage (i.e., interconnection date and ramp rate) of the relevant retail \ncustomers.23  PJM’s characterization of IRAS confirms the target, despite its veneer of regulating \nEDCs rather than retail load.  First, the PJM board directed PJM to file a proposal that “will be \napplicable to ‘[N]ew Large Loads that, as of June 1, 2027, do not bring sufficient capacity to serve \ntheir resource adequacy needs and cannot otherwise be served at the 1-in-10 reliability \n \nelements of this proposal were developed together and designed to work in lockstep and provide complementary \npieces to a multi-prong approach to incent New Large Loads to bring their own capacity to meet their resource \nadequacy needs and avoid imposing costs on ratepayers.”). \n21 EPSA, 577 U.S. at 282-83.   \n22 Id. at 282-83. \n23 Transmittal at 6."},{"page":8,"startToken":2818,"endToken":3194,"text":"-8- \nstandard.’”24  Next, PJM defined IRAS as “a new supplemental capacity product through which \nNew Large Loads provide a load reduction service that is a tool available to PJM to manage \nresource adequacy shortfalls.”25  At every turn, PJM has made clear that it designed IRAS as a \nway to curtail specific retail customers.  That these curtailments would be carried out by EDCs \ndoes not change the fact that the trigger for the curtailments is the characteristics of the retail \ncustomer—or that the curtailment directive is pursuant to a FERC-jurisdictional tariff.  Indeed, \nthat type of formalistic argument is why the Supreme Court has repeatedly emphasized the target \nat which the regulation aims.26  Finally, as yet another piece of evidence, the wholesale \ntransmission curtailments will mirror “a MW quantity equal to or less than the Electric \nDistributor’s Eligible New Large Load.”27  In other words, PJM plans to call for curtailments not \nbased on the real-time transmission conditions in an EDC’s zone, which is how PJM sheds loads \ntoday, but based on whether a zone has retail customers that have certain characteristics.  It is easy \nto see that this is not a regulation where “every aspect of the regulatory plan happens exclusively \non the wholesale market and governs exclusively that market’s rules.”28 \nIn trying to defend IRAS as jurisdictionally permissible, PJM hangs its hat on the fact that \n“‘exclusive jurisdiction’ rests with the states to ensure that the appropriate retail customers, i.e., \nNew Large Loads, including data centers—and not residential customers or small industrial \n \n24 Transmittal at 17 (alteration in original). \n25 Id. at 22. \n26 EPSA, 577 U.S. at 282 (looking at the Commission’s justification for regulating demand response and quoting \nfrom the Court’s decision in Oneok, which “consider[ed] ‘the target at which [a] law aims’ in determining whether a \nState [was] properly regulating retail or, instead, improperly regulating wholesale sales.” (quoting Oneok, 575 U.S. at \n385) (emphasis and alteration in original)); cf. Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 166 (2016) (state’s \nscheme to encourage development of generation resources overstepped its authority because it was tethered to the \nresource’s wholesale market participation).   \n27 Transmittal at 86. \n28 EPSA, 577 U.S. at 282."},{"page":9,"startToken":3194,"endToken":3542,"text":"-9- \ncustomers—are reduced when system conditions call for PJM to require load reductions,”29 but \nthe fact that PJM is not the party that physically “flips the switch” to curtail specific retail loads \ndoes not save IRAS.  Creating the conditions by which a state must take the final step of curtailing \nretail customers that PJM has already singled out for curtailment does not retroactively cure the \njurisdictional defects inherent in IRAS.    \nIRAS also exceeds the Commission’s authority for the related reason that PJM seeks to \nregulate retail customers and their rates—albeit indirectly—which the FPA and EPSA prohibit.  It \nbears repeating that the Commission cannot regulate retail customers, even indirectly, in ways that \ntarget the retail customer.30  But that is IRAS in a nutshell.  The whole point of IRAS is to have \ncertain retail loads curtailed under PJM-defined conditions.31  Deciding when certain large loads \nshould be curtailed is a condition of retail distribution service, not something to be decided by an \nRTO, as PJM would be doing here.   \nPJM also proposes to overstep its jurisdictional limits by setting forth how retail customers \nare compensated when they are curtailed under IRAS.32  Under IRAS, PJM would compensate \nEDCs for IRAS curtailments at a rate that is equal to 50% of the Non-Performance Charge Rate.33  \nSpecifically, PJM proposes to pay a wholesale rate to EDCs that curtail under IRAS, but if a new \nlarge load waives curtailment compensation at the retail level, the wholesale IRAS rate will be \n \n29 Transmittal at 90-91. \n30 EPSA, 577 U.S. at 282-83.   \n31 See Transmittal at 22 (defining IRAS as “a new supplemental capacity product through which New Large Loads \nprovide a load reduction service that is a tool available to PJM to manage resource adequacy shortfalls.”). \n32 PJM indicates that the ultimate wholesale rate for IRAS would not be reviewed under FPA section 205.  See \nid. at 102.  To the extent that PJM is proposing to charge rates that differ from what is on file with the Commission, \nthis would violate the filed rate doctrine.  \n33 Id."},{"page":10,"startToken":3542,"endToken":3922,"text":"-10- \nreduced to zero dollars.34  In other words, PJM is creating a mechanism within the wholesale rate \nthat determines retail compensation, namely the waiver election on the part of the new large load, \nwhich controls whether a payment is made to an end-use customer.  That is a direct regulation of \nthe retail customer.    \nThus, IRAS regulates the retail customer, which is why it differs from other issues \ninvolving large loads that lie at the confluence of federal and state jurisdiction.  For example, in \nthe PJM Large Load Order to Show Cause,35 the Commission has asserted jurisdiction over \ndiscrete aspects of the interconnection of large loads to the transmission system based on the \nCommission’s jurisdiction over the interstate transmission of electricity.  That regulation does not \ncome close to touching the ultimate sale of electricity to the retail customer, whereas IRAS directly \nregulates it.  Instead, the Large Load Order to Show Cause is all about “ensur[ing] that transmission \nprovider and/or transmission owner tariffs include sufficiently clear and consistent provisions \ngoverning how transmission service to Eligible Customers”—i.e., the entity taking wholesale \ntransmission service—“on behalf of large loads interconnecting to the transmission system will be \nstudied.”36  To the extent that the regulation affects retail customers, such effects are incidental to \nthe purpose of the Large Load Order to Show Cause.  Further, as Vistra has previously explained, \nthe Commission’s jurisdiction over the transmission of electricity in interstate commerce—the \nbasis for Commission action in the Large Load Order to Show Cause—is plenary and therefore \nbroader than its jurisdiction with respect to sales wholesale sales of electricity—the basis for IRAS, \n \n34 Id. at 105; Proposed Tariff, attach. DD-4, § X(a) (“The rate for the provision of Interim Resource Adequacy \nService shall be 50% of the Non-Performance Charge Rate specified in Tariff, Attachment DD, section 10A(e), unless \nany Eligible New Large Load elects to (i) accept in its retail rates a sum less than 50% of the Non-Performance Charge \nRate as compensation for the provision of wholesale Interim Resource Adequacy Service, or (ii) waive receipt in its \nretail rates any compensation for the provision of wholesale Interim Resource Adequacy Service . . . . ”). \n35 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211.  \n36 Id. P 45 (emphasis added)."},{"page":11,"startToken":3922,"endToken":4312,"text":"-11- \nwhich operates through PJM’s wholesale capacity market and is all about the supply of electricity \nin the region.37   \nB. IRAS Is Unduly Discriminatory \nIRAS is also unduly discriminatory because it treats similarly situated entities differently.38  \n“Similarly situated” does not mean that there are no differences between the two entities, but rather \nthat there are no differences “that are material to the inquiry at hand.”39  PJM bears the burden to \nexplain how its proposal to treat entities differently is justified by factors that render those entities \nnot “similarly situated.”  PJM fails to meet that standard for several reasons. \n1. IRAS Unduly Discriminates Between EDCs \nTo start, IRAS would unduly discriminate among EDCs based on the characteristics of \nretail customers within those EDCs’ footprints.  Specifically, IRAS would subject EDCs to \ncurtailment based on the size, timing, and contracting decisions of its retail customers.  Those retail \ncustomers are outside the Commission’s jurisdiction to consider and therefore cannot be “material \nto the inquiry at hand.”40  Providing differing levels of wholesale market treatment depending on \nlegally irrelevant characteristics of entities sitting outside the Commission’s jurisdiction is, by \ndefinition, unduly discriminatory.   \nEven if the characteristics of the retail customers within an EDC’s territory could, in theory, \nbe a lawful basis to discriminate among wholesale customers, the retail characteristics on which \n \n37 See Interconnection of Large Loads to the Transmission Sys., Docket No. RM26-4-000, Initial Comments of \nVistra Corp., at 7 (filed Nov. 21, 2025). \n38 16 U.S.C. § 824d(b); see also Transmission Agency of N. California v. FERC, 628 F.3d 538, 551 (D.C. Cir. \n2010) (citing Sacramento Mun. Util. Dist. v. FERC, 474 F.3d 797, 802 (D.C. Cir. 2007)). \n39 See N.Y. Indep. Sys. Operator, Inc., 162 FERC ¶ 61,124, at PP 10, 14 (2018) (“To say that entities are similarly \nsituated does not mean that there are no differences between them; rather, it means that there are no differences that \nare material to the inquiry at hand”); see also Ala. Elec. Coop. v. FERC, 684 F.2d 20, 27 (D.C. Cir. 1982) (explaining \nthat if the costs of providing service to two groups are different, the two classes are differently situated in that \n“important respect” for cost-of-service ratemaking). \n40 N.Y. Indep. Sys. Operator, Inc., 162 FERC ¶ 61,124 at P 10."},{"page":12,"startToken":4312,"endToken":4630,"text":"-12- \nPJM proposes to discriminate are irrelevant to the resource adequacy issues that IRAS purports to \nsolve, and therefore do not render the EDCs differently situated.  PJM has misdiagnosed the cause \nof the resource adequacy problem.  The regional resource adequacy problem is not caused by the \nindividual contracting decisions of each retail customer.  The resource adequacy problem is that \nsome EDCs have agreed to serve more load than they have generation.  Were PJM to continue to \nassign load shed to EDCs that are short, it is likely that EDCs that interconnect large loads without \nthe generation to serve it would be exposed to curtailment.  The current method aims at generation \ndeficient zones, with the potential they are short due to additional large loads.  PJM skips past the \nquestion of whether an EDC is generation deficient and aims simply at EDCs that have large loads \nthat do not bring their own new capacity.   \n2. IRAS Unduly Discriminates Against Existing Resources \nWhen determining whether new large loads are subject to IRAS, PJM would value identical \nnew and existing capacity resources differently even though they provide the same resource \nadequacy benefits to the system.  PJM has not explained why large loads that contract with new \ngeneration resources should be non-curtailable while those that contract with existing generation \nresource with the same capacity value should be curtailed when system conditions warrant.  Nor \ncould it.  One MW of accredited capacity from a new resource provides the same resource \nadequacy benefits as one MW of capacity from an otherwise identical existing resource.  Whether \nthe otherwise identical resources are bilaterally contracted or selling exclusively in the PJM \ncapacity market does not change the resource adequacy value to the PJM system as a matter of \nphysics. \nIndeed, the D.C. Circuit has held that is arbitrary and capricious for the Commission to \ntreat new and existing customers differently where both contribute equally to the need in"},{"page":13,"startToken":4630,"endToken":5054,"text":"-13- \nquestion.41  So too, the Commission has previously rejected efforts by PJM to treat new and \nexisting capacity resources differently, even when the avowed purpose was to incentivize new \nresource entry.42  In that case, PJM proposed to lock in capacity prices for new capacity resources \nfor seven years, which would guarantee higher prices to new entrants that were not available to \nexisting suppliers.  The Commission rejected the proposal, explaining that both new and existing \ncapacity are necessary to ensure reliability and that both should receive the same price so that the \nprice signals are not skewed in favor of new entry.43  That logic applies with force here because \nIRAS gives preferential treatment to one MW of new capacity even though one MW of existing \ncapacity is equally as effective when it comes to ensuring resource adequacy. \n3. IRAS Unduly Discriminates Based on Vintage of Load Addition \nNext, IRAS also unduly discriminates between new and existing large loads given that \ncurtailment obligations would be assigned to the EDC based on when the large loads in question \nbegan operating, a characteristic that is entirely irrelevant to reliability and resource adequacy \nconcerns.  As already discussed, the D.C. Circuit has rejected similar efforts to treat existing and \nmarginal customers differently based on the principal that, because every user of a system is \neconomically marginal, increases in demand can be attributed to every user, both new and \nexisting.44  That principle forecloses IRAS, which would treat EDCs with large loads that begin \noperations on May 31, 2027 differently than those with large loads that begin operations the next \n \n41 See BNP Paribas Energy Trading GP v. FERC, 743 F.3d 264, 268 (D.C. Cir. 2014) (“[T]he cost causation \nprinciple generally calls for giving the same treatment to new and continuing customers, based on a straightforward \neconomic rationale.  Where ‘all customers cause the incurrence of the costs . . . , whether by adding or merely \ncontinuing their usage assignment of the costs to all customers (both continuing and new) forces each set to weigh the \nmarginal benefits of the capacity to them against the marginal costs they impose on society by continuing to make \ndemands.” (internal citations and quotation marks omitted)). \n42 PJM Interconnection, L.L.C., 128 FERC ¶ 61,157 at PP 101-102. \n43 Id.; see also id. P 103 (“A market should be designed correctly so that the contribution to reliability from both \nnew entrants and existing suppliers is compensated comparably.”). \n44 See BNP Paribas Energy Trading GP v. FERC, 743 F.3d at 268-69."},{"page":14,"startToken":5054,"endToken":5435,"text":"-14- \nday, even though it is the load’s size, not the date that it started operating, that determines its effect \non resource adequacy. \nPJM’s proposal to reset the IRAS curtailment regime if the region has sufficient capacity \nto meet the reliability requirement for three consecutive delivery years further underscores the \nunduly discriminatory nature of IRAS.  Consider a hypothetical in which a new large load is \nsubject to IRAS for the first two years it is in operation, after which the resource adequacy picture \nin the region improves for three years and there are no shortfalls during that time.  At that point—\nfive years after it began operating—the new large load would no longer be subject to IRAS \ncurtailments going forward even if a shortfall returns in year six.45  But a new load coming online \nin year six that does not BYONC would be subject to curtailment.  Toggling IRAS’s curtailment \nscheme in this way makes no sense, as the demand that the large load puts on PJM’s system (i.e., \nits effect on resource adequacy) remains constant in all six years.  As this example shows, IRAS \nwould subject large loads to discriminatory treatment based solely on the resource adequacy \npicture in PJM at the time those loads begin operating rather than on the loads’ effects on resource \nadequacy—a principle that is inconsistent with the D.C. Circuit’s BNP Paribas decision.46   \nC. IRAS Is Unjust and Unreasonable \nIRAS is unjust and unreasonable for at least five reasons.  First, it is designed to require \nnew large loads to bring new capacity to avoid being curtailed even though PJM lacks the authority \nto ensure that such loads will not, in fact, be curtailed.  Second, under IRAS, new large loads that \ndo not bring new capacity are allocated costs for capacity that PJM never procures.  Third, IRAS \n \n45 Transmittal at 58. \n46 Even if the Commission were to order PJM to apply IRAS and BYONC to a wider range of large loads (putting \naside the filed-rate doctrine issues this would raise), any scheme in which preferential treatment would turn on the \nvintage of loads in an EDC’s footprint would be patently illegal, as the D.C. Circuit has made clear.  BNP Paribas \nEnergy Trading GP v. FERC, 743 F.3d at 268-69."},{"page":15,"startToken":5435,"endToken":5778,"text":"-15- \nfails to respect existing contracts because new large loads that contract with existing capacity \nresources prior to the effective date of IRAS are nevertheless subject to the IRAS curtailment \nregime.  Fourth, it curtails loads seeking firm service before those that have volunteered to be \ncurtailed.  Finally, PJM’s proposal to remove from the VRR Curve large loads that do not bring \ntheir own capacity distorts market fundamentals and could lock in any resource adequacy gap that \nremains after the backstop auction.  Each of these flaws is a sufficient basis to reject the filing.   \n1. IRAS Does Not Ensure That BYONC Loads Get the Benefit of the \nBargain \nIRAS is unjust and unreasonable because it imposes costs on new large loads without \ncommensurate benefits.  As PJM implicitly concedes, new large loads that that seek to acquire \nfirm service via BYONC could still be curtailed under IRAS before pre-emergency load \nmanagement reductions.47  To see why, recall how IRAS is designed to work.  When called upon \nby PJM, an EDC must curtail load in an amount equal to the sum of Eligible New Large Load \nAmounts in the EDC’s footprint—i.e., the sum of new large loads that do not BYONC.48  A new \nlarge load that brings sufficient new capacity to offset its demand is not considered eligible to be \ncurtailed under IRAS.49  Nevertheless, as PJM itself concedes, “while PJM will determine the \nquantity of MW that load in a zone/area will need to be reduced by to maintain system reliability \nin the PJM Region, states may determine—under their own laws, policies, and definition of what \nconstitutes ‘large load’—which resources will be called on to reduce load.”50   \n \n47 See Transmittal at 92 (“PJM will not direct reductions to specific New Large Loads pursuant to IRAS.  Rather, \nPJM is leaving it to Electric Distributors, in coordination with the appropriate states and/or RERRAs, LSEs, and LSE \ncustomers to determine which loads should ultimately reduce subject to IRAS.”). \n48 Id.at 71-72. \n49 Id. at 69.  \n50 Id. at 87."},{"page":16,"startToken":5778,"endToken":6109,"text":"-16- \nThis means that even though BYONC large loads are not considered eligible for \ncurtailment by PJM, EDCs will decide which loads to shed according to retail tariffs and state \npolicy priorities, which could include BYONC large loads.  In other words, PJM has designed a \nscheme in which it purports to protect certain loads from being curtailed, even though PJM has no \nway to ensure that those loads are not, in fact, curtailed.  As a result, new large loads that spend \nbillions of dollars contracting with new capacity resources may be curtailed before ones that do \nnot bring new capacity because PJM has no authority to determine which retail customers to shed.  \nThe fact that the ultimate curtailment decision is a retail question does not excuse this result.  The \nCommission must determine whether the construct proposed by PJM is just and reasonable—a \nconclusion it cannot make for a program, like IRAS, that creates a burden but does not deliver the \nbenefit that it is purportedly premised on. \n2. IRAS Is Unjust and Unreasonable Because It Allocates RPM Costs to \nLoads for Capacity that They Never Procure \nIRAS is also unjust and unreasonable because it flagrantly violates bedrock cost causation \nand beneficiary pays principles.  Under IRAS, PJM would exclude from the VRR Curve new large \nloads that fail to bring new capacity while still allocating capacity charges to them.51  By design, \nPJM’s proposal would meddle with capacity market fundamentals to avoid procuring capacity to \nserve new large loads that fail to bring new capacity and yet turn around and allocate capacity \ncosts to those very same loads.  This scheme is inconsistent with the requirement that costs \nassigned to a party must be “roughly commensurate” with the benefit it receives in exchange for \n \n51 See Proposed Tariff, attach. DD, § 5.10(a) (deducting Excluded New Large Load Amounts from the Reliability \nRequirement used to establish the VRR Curve).  PJM does not propose to change how it calculates and allocates \ncapacity charges."},{"page":17,"startToken":6109,"endToken":6447,"text":"-17- \npaying those costs.52  It would be impossible for new large loads to get a benefit from capacity \nthey are paying for when that capacity is never acquired for them in the first place. \nAs discussed further below,53 this aspect of PJM’s proposal is not just unlawful, it is also \ndangerously short-sighted as a matter of policy.  In the short term, administratively suppressing \ndemand in the capacity market might help insulate existing retail customers from price increases \ndue to large loads. But it is not a lasting solution.  Instead, by removing from the VRR Curve loads \nthat will come online in the region, PJM is further eroding capacity market fundamentals, which \nwill undermine investment in the region’s generation fleet, thereby harming resource adequacy in \nthe long-term and ultimately increasing costs for the region.   \n3. IRAS Is Unjust and Unreasonable Because It Disrupts Existing \nCommercial Arrangements \nFurthermore, IRAS is unjust and unreasonable because it fails to respect existing contracts.  \nSpecifically, new large loads that contract with existing capacity resources prior to the effective \ndate of IRAS will be subject to the IRAS curtailment regime.  Despite PJM’s claim that its proposal \nwill not disrupt existing contracts, IRAS will force large loads that have already paid for capacity \nby contracting with existing generation to pay for capacity price twice by BYONC to try to avoid \ncurtailment.  Requiring an entity to pay twice for the same product or service is unjust and \nunreasonable.54  \nSubjecting new large loads that have executed contracts with existing generators to IRAS \nwill disrupt settled expectations and compound uncertainty in the PJM region, chilling investment \nin energy infrastructure when it is most needed.  Some new loads that will not come online until \n \n52 See Old Dominion Elec. Coop. v. FERC, 898 F.3d 1254, 1256 (D.C. Cir. 2018). \n53 See Infra § I.C.5. \n54 See N.Y. Indep. Sys. Operator, Inc., 155 FERC ¶ 61,076, at P 82 (2016) (rejecting proposal that would have \nrequired ratepayers to pay twice for the same capacity)."},{"page":18,"startToken":6447,"endToken":6797,"text":"-18- \nafter June 1, 2027 have already entered into bilateral contracts to purchase capacity from existing \ngenerators or are currently in the process of negotiating such contracts that will be executed prior \nto the IRAS effective date.  If those contracts are not honored, the Commission and PJM will only \nreinforce investors’ fears that the ground in PJM can shift beneath them at any point.  That will \nthrottle investment into the region and jeopardize resource adequacy.  \nFor example, Vistra previously entered into power purchase agreements for the sale of \nnuclear power from Vistra’s operating nuclear facilities in Ohio with a data center customer.55  As \nproposed, IRAS would not extend curtailment protection to capacity procured under agreements \nof this kind, notwithstanding that these agreements were executed prior to the effectiveness of \nIRAS.  That result would create the prospect of duplicative capacity procurement and would \nunsettle the expectations of underlying agreements that were negotiated within the existing \nregulatory framework.  The Commission must not adopt IRAS in a form that operates retroactively \non existing agreements. \nEven if the Commission were otherwise inclined to accept IRAS, it must reject the proposal \nsolely for its failure to exempt contracts with existing resources.  In so doing, the Commission \nshould provide guidance that, in any future filing, PJM must grandfather contracts between new \nlarge loads and existing capacity resources negotiated according to the rules in effect at the time.  \nThis would be consistent with PJM’s own statement and FERC’s approach to honoring existing \ncontracts and reliance interests.56  Without such grandfathering, new large loads will have paid \n \n55 Vistra, Vistra and Meta Announce Agreements to Support Nuclear Plants in PJM and Add New Nuclear \nGeneration to the Grid (Jan. 9, 2026), https://investor.vistracorp.com/2026-01-09-Vistra-and-Meta-Announce-\nAgreements-to-Support-Nuclear-Plants-in-PJM-and-Add-New-Nuclear-Generation-to-the-Grid.  \n56 See, e.g., PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at PP 222-224 (2025); N.Y. Indep. Sys. Operator, \nInc., 122 FERC ¶ 61,267, at P 65 (2008); ISO New England Inc., 194 FERC ¶ 61,249, at P 34 (2026); see also FERC, \nChairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, MD (May 12, 2026),"},{"page":19,"startToken":6797,"endToken":7133,"text":"-19- \nbillions of dollars for capacity only to then be subjected to curtailment risk and double-charged for \ncapacity from the PJM market which they do not need.  That type of regulatory framework is a \nsure recipe for scaring off investment not only in PJM but any market regulated by FERC that \nmight follow PJM’s lead.    \n4. IRAS Is Unjust and Unreasonable Because it Creates a Scheme to Curtail \nLoads Seeking Firm Service Before Those That Volunteer to Be \nCurtailable \nFurther, under IRAS’s tortured curtailment scheme, new large loads that are seeking firm \nservice could be curtailed before loads that have volunteered to participate as demand response \nresources.  PJM proposes to call for an IRAS curtailment “prior to calling on Pre-Emergency Load \nManagement Reduction Actions” when it determines that system conditions warrant such action.57  \nIn practice, this means that new large loads that depend on firm service to operate but have not \nbrought new capacity for any number of reasons (e.g., because the paired generation cannot clear \nthe backlogged interconnection queue) could be curtailed before loads that have elected to be \ncurtailed whenever called upon by PJM to do so.  And to make matters worse, demand response \nresources will receive capacity payments and be curtailed after new large loads subject to IRAS.  \nCurtailing loads that have paid for firm service before those that have raised their hand to be \ncurtailable is unjust and unreasonable.   \n5. IRAS Will Undermine PJM’s Capacity Market Fundamentals, Which \nWill Further Harm Resource Adequacy in PJM  \nIRAS’s design flaws are also unjust and unreasonable because they will deter investment \nneeded to bolster resource adequacy in the region at a time when that investment is desperately \n \nhttps://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-meeting-baltimore-md-0 \n(“[W]hatever happens, we cannot disrupt finalized commercial agreements.  At FERC, I have no appetite to \ncompromise investor confidence when those investors are driving the buildout of the generation that PJM desperately \nneeds.  However you get there PJM, you need to figure it out.  Fast.”). \n57 Transmittal at 75."},{"page":20,"startToken":7133,"endToken":7496,"text":"-20- \nneeded.  PJM asserts that it is proposing to remove large load that does not BYONC from the \ndemand curve to protect other customers from high costs.58  This is counterproductive because it \nwill lock in any reliability gap that exists after the reliability backstop auction is run.   \nDr. Carl Coscia’s affidavit on behalf of P3 illustrates the sensitivity of the capacity price \nwhen load is removed from the capacity market.59  When demand growth is removed from the \nauction, even a modest amount of resource entry will drive the capacity price below the cost of \nnew entry.60  Consistent and predictable demand growth can mitigate the disincentive to enter \nbased on a single year’s capacity price because entry is less likely to reduce future capacity prices \nbelow the level that made the entry rational.  Thus, PJM’s proposal to remove load growth \nassociated with large loads that do not BYONC will likely disincentivize the entry needed to close \nany reliability gap remaining after the backstop auction. \nWith the capacity market less able to attract entry based on PJM’s proposal, one is left to \nquestion what will motivate new entry.  PJM seems to be relying on the BYONC elements of its \nproposal.  As discussed above, IRAS leaves large loads in an impossible situation:  they can either \ncontract with new capacity with nothing more than the hope that the state will honor BYONC, \nsuch that they will not be curtailed; or they can forgo BYONC, and hope that they are not curtailed, \neither because system conditions never warrant it or because states decide to curtail other loads \nfirst.  Further, removing load growth from the demand curve deepens the conundrum for any large \nload considering a costly bilateral contract for capacity.  While PJM’s proposal will likely \ndisincentivize new generation, there remains a chance that enough new resources will enter so that \n \n58 Transmittal at 109-119. \n59 PJM Interconnection, L.L.C. Protest of PJM Power Providers (P3) Group, Docket No. ER26-3515-000, Aff. of \nDr. Carl Coscia (to be filed Sep. 3, 2026).  P3 has informed Vistra that they intend to attach the affidavit of Dr. Coscia \nand has authorized us to represent that here.  \n60 Id."},{"page":21,"startToken":7496,"endToken":7833,"text":"-21- \ncapacity prices will drop significantly.  A new large load that is not fully protected from IRAS \ncurtailment must weigh the certainty of costly new generation against the chance for significantly \nless costly capacity.  PJM is asking large loads to take a gamble.  Under those circumstances, it \nwould be entirely rational and predictable if new large loads choose the side of the wager that does \nnot involve them making a potentially multi-billion-dollar commitment.  In practice, that means \nan exodus of capital from the region, or a flight to fully islanded configurations, which would be \ncontrary to the stated goals of IRAS and the best interests of all PJM stakeholders. \nIn short, PJM’s proposal will likely either disincentivize new entry into the PJM capacity \nmarket but encourage BYONC, thus locking in whatever reliability gap remains after PJM’s \nplanned Reliability Backstop Procurement auction; or it will encourage new entry through the \ncapacity market and discourage BYONC, thereby creating a permanent class of load subject to \nIRAS curtailment and driving capital away from the region.  Either result will work against the \nregion’s needs, so whichever way the IRAS gamble plays out it is clear that the end state will harm \nPJM customers. \nD. IRAS Should Not Apply to Behind the Meter Load \nFinally, the Commission should require PJM to confirm that IRAS will not apply to new \nlarge loads that are co-located behind the meter of generation resources that are not capacity \nresources.  For loads in such a configuration, there is nothing to curtail because the load is not \nusing PJM capacity.  The Commission must direct PJM to provide this confirmation to ensure that \nthis proceeding does not undermine the Commission’s parallel efforts to facilitate co-location. \nPJM’s filing introduces significant ambiguity about whether it intends to subject co-located \nloads to IRAS because it deviates from the Commission’s proposed definitions concerning co-\nlocated configurations in the PJM Large Load Order to Show Cause in Docket No. EL26-67-000.  \nThere, the Commission defined a “large load” as “a new, commercial or industrial customer,"},{"page":22,"startToken":7833,"endToken":8247,"text":"-22- \nlocated at a single site behind one or more points of interconnection, and that has a peak load of \n50 MW or greater, interconnects to the transmission system at a voltage level of greater than 69 \nkV, and is not part of a co-location arrangement.”61  To contrast, PJM’s proposed definitions for \n“Large Load” and “New Large Load” specifically do not exclude load that is part of a co-location \narrangement.62  PJM’s decision not to carve out co-located load in the manner the Commission \nintended indicates that co-located loads could be subject to IRAS.   \nPJM did not and cannot explain why IRAS should apply to co-located loads.  Instead, PJM \nattempted to justify its inclusion of co-located load in these definitions by stating that it “proposed \nrules that specifically address situations in which Large Load is co-located with their own \ngeneration.”63 It is not clear what rules PJM is referring to, as nothing in PJM’s proposal clarifies \nhow IRAS will work for co-located load.64   \nIt would be manifestly unjust and unreasonable to curtail a load that is co-located behind \nthe meter of a generator that is not a capacity resource.  If PJM, in conjunction with EDCs, were \nto seek to curtail a new large load co-located with a non-capacity resource, it would need to direct \nthe co-located generator to increase output to the grid because the co-located load is not a network \nload subject to EDC direction.  But the co-located generator is not paid to be a capacity resource \nso PJM has no claim to the generator’s output.  Further, the co-located generator may no longer be \ndeliverable to all load as it is required to forfeit its capacity injection rights, and so it may not be \n \n61 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at P 58 (emphasis added). \n62 Transmittal at 31, 35-36, 38.  PJM’s proposed definition also fails to include a voltage threshold.  PJM also \nfails to justify this omission, stating only that its stakeholders “have not identified any need” to include a voltage \nthreshold.  Id. at 36.  That is not a sufficient reason to ignore a Commission directive. \n63 Id. \n64 For example, because a co-located load is behind a generator’s point of interconnection, the only way to curtail \nthat load may be to disconnect the generator.  Such an action would raise serious legal and operational issues—for \nboth the generator, the load, and the PJM system—and ultimately would be counterproductive from a resource \nadequacy perspective."},{"page":23,"startToken":8247,"endToken":8373,"text":"-23- \nable to improve system conditions.  PJM has not, and cannot, justify including co-located new \nlarge loads in IRAS.  Accordingly, the Commission should order PJM to confirm that such loads \nare not subject to IRAS curtailments. \nII. \n CONCLUSION \nFor the foregoing reasons, the Commission should promptly reject PJM’s filing.    \n \n \n \nRespectfully submitted, \n \n \n \n \n/s/ J. Arnold Quinn \nJ. Arnold Quinn \nSVP of Regulatory Policy  \n \nAndrew Weinstein \nVice President, FERC Market Policy \n \nVistra Corp. \n325 7th Street NW \nSuite 520 \nWashington, DC 20004 \narnie.quinn@vistracorp.com   \nandrew.weinstein@vistracorp.com \n \n \n \n \n                             \n \nNic Gladd \nSarah Greenberg \nBryan Shpall \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006 \n(617) 598-7871 \nngladd@wsgr.com \nsgreenberg@wsgr.com   \nbshpall@wsgr.com \n \nCounsel for Vistra Corp. \nDated:  September 3, 2026"},{"page":24,"startToken":8373,"endToken":8432,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary of the Commission in these \nproceedings. \n \nDated:  September 3, 2026 \nWashington, D.C. \n \n \n/s/ Bryan Shpall \nBryan Shpall \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":985,"startToken":0,"endToken":395},{"p":2,"at":985,"title":"I. PROTEST","method":"printed heading","endPage":5,"endAt":455,"startToken":395,"endToken":1683},{"p":5,"at":455,"title":"A. IRAS Violates the FPA’s Division of Jurisdiction","method":"printed heading","endPage":11,"endAt":125,"startToken":1683,"endToken":3942},{"p":11,"at":125,"title":"B. IRAS Is Unduly Discriminatory","method":"printed heading","endPage":14,"endAt":1394,"startToken":3942,"endToken":5287},{"p":14,"at":1394,"title":"C. IRAS Is Unjust and Unreasonable","method":"printed heading","endPage":21,"endAt":1271,"startToken":5287,"endToken":7695},{"p":21,"at":1271,"title":"D. IRAS Should Not Apply to Behind the Meter Load","method":"printed heading","endPage":23,"endAt":235,"startToken":7695,"endToken":8283},{"p":23,"at":235,"title":"II. CONCLUSION","method":"printed heading","endPage":24,"endAt":0,"startToken":8283,"endToken":8373},{"p":24,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":24,"endAt":389,"startToken":8373,"endToken":8432}]}
