{"document":{"slug":"rec-20260903-5222","title":"Protest of the Electric Power Supply Association to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5222","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Electric Power Supply Association","kind":"protest","file":"sources/filings/text/20260903-5222_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5222","tier":"record","sha256":"ede2899f6b17e652883179f8877d1e0dd17ca7a694c6215523fb25bee4ba32ff","pages":72,"tokens":25896,"emptyPages":[],"textThemes":["adequacy","flex","study","registry"]},"pages":[{"page":1,"startToken":0,"endToken":347,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C.\n)\nDocket No. ER26-3515-000\nPROTEST OF THE ELECTRIC POWER SUPPLY ASSOCIATION \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“FERC” or the “Commission”),1 the Electric Power \nSupply Association (“EPSA”)2 submits this protest to the August 13, 2026, filing by PJM \nInterconnection, L.L.C. (“PJM”) proposing to establish Interim Resource Adequacy \nService (“IRAS”).3  EPSA’s members stand ready to supply the power necessary to \nmeet surging demand in PJM and to support the development of data centers in the \nregion.  Regrettably, however, PJM’s IRAS proposal4 will hinder, rather than advance, \nthose goals and undermine reliability and competition in the PJM footprint.  While the \nIRAS proposal suffers from numerous legal defects, any number of which would, on \n \n1  \n18 C.F.R. § 385.211 (2025). \n2 \nEPSA is the national trade association representing competitive power suppliers in the \nU.S.  EPSA members provide reliable and competitively priced electricity from environmentally \nresponsible facilities using a diverse mix of fuels and technologies.  EPSA seeks to bring the \nbenefits of competition to all power customers.  This filing represents the position of EPSA as an \norganization, but not necessarily the views of any particular member with respect to any issue.  \nEPSA has separately moved to intervene in this proceeding.  See (doc-less) Motion to Intervene \nof the Electric Power Supply Association, Docket No. ER26-3515-000 (filed Aug. 14, 2026). \n3  \nProposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy \nService and a Large Load Registry to Address System Reliability, Docket No. ER26-3515-000 \n(filed Aug. 13, 2026) (the “August 13 Filing”).  Capitalized terms not defined herein have the \nmeaning set forth in the August 13 Filing or, if not therein defined, the Reliability Assurance \nAgreement Among Load Serving Entities (the “RAA”) and the PJM Open Access Transmission \nTariff (the “Tariff”), as applicable. \n4  \nThe August 13 Filing also proposes to establish a Large Load Registry.  EPSA does not \nobject to this aspect of the August 13 Filing."},{"page":2,"startToken":347,"endToken":608,"text":"2 \ntheir own, compel rejection of that proposal, EPSA is particularly concerned about the \nblatantly discriminatory element of the IRAS proposal that would only allow new \ncapacity resources (referred to as “Bring Your Own New Capacity” or “BYONC”) to be \nused to serve New Large Loads without interruption.  This aspect of PJM’s proposal is \nnot only legally defective but also represents the type of market design choice that \nundermines confidence in PJM and the durability of its market structures, precisely at a \ntime when PJM needs to be rebuilding investor confidence for the long-term benefit of \nconsumers.   \nFortunately, there are alternatives, including one described below, to the flawed \napproach put forth by PJM that would address the policy concerns underlying the IRAS \nproposal.  And importantly, the alternative approach described below avoids the serious \nharm to the Reliability Pricing Model (“RPM”) construct and the undermining of its ability \nto ensure reliability and the illegal discrimination against existing resources that would \nresult from the IRAS proposal. \nI. \nPROTEST \nAs detailed herein and in the affidavit of Paul M. Sotkiewicz, Ph.D., provided as \nAttachment A hereto (the “Sotkiewicz Affidavit”), the IRAS proposal set forth in the \nAugust 13 Filing is unduly discriminatory and preferential and otherwise unlawful and \nmust therefore be rejected in its entirety.   \nA. \nPJM’s BYONC Requirement for New Large Loads is Unduly \nPreferential and Discriminatory, and Otherwise Unlawful under \nSection 205 of the FPA \nThe IRAS proposal and, in particular, the BYONC requirement, would, by design, \ndrive a wedge between new and existing load, and between new and existing capacity"},{"page":3,"startToken":608,"endToken":1058,"text":"3 \nresources in the RPM market.  Under PJM’s IRAS proposal, a New Large Load will be \n“eligible to provide IRAS as [an] Eligible New Large Load,” unless it has obtained \nBYONC sufficient to meet its capacity needs.5  While PJM attempts to soft pedal the \nnature of its proposal by describing these new loads as “eligible” to provide the new \n“service” (IRAS), Eligible New Large Loads will, in fact, be required to provide IRAS, \nand the “service” they will be providing is to be put at the front of the line for \ncurtailment.6  The only way a New Large Load can avoid becoming “eligible” is to \ncontract for sufficient new capacity (i.e., BYONC) in advance.7  On its face, this \nrestriction unduly discriminates against existing resources and New Large Loads and \ngrants an undue preference to new resources and loads other than New Large Loads, \nin direct contravention of the FPA.8  Equally importantly, and as explained by Dr. \n \n5  \nAugust 13 Filing, Transmittal Letter at 36. \n6  \nSee id., Proposed Tariff, Attachment DD-4, § IV(a) (“All Eligible New Large Loads shall \nbe available to be requested to provide Interim Resource Adequacy Service by [PJM].”). \n7  \nThis requirement suggests that PJM is seeking to dictate the terms of retail sales that \nare the exclusive provenance of the states under the FPA.  See 16 U.S.C. § 824(b); FERC v. \nElectric Power Supply Ass’n, 577 U.S. 260, 279-80 (2016) (stating that the FPA “reserv[es] \nregulatory authority over retail sales (as well as intrastate wholesale sales) to the States,” such \nthat “FERC cannot take an action transgressing that limit no matter how direct, or dramatic, its \nimpact on wholesale rates,” and that any rule that “specifies terms of sale at retail . . . is a job for \nthe States alone”).  Critically, however, even assuming that the Commission has the authority to \napprove a new PJM “service” that seeks to dictate the purchasing practices of customers and \ncurtailment priorities of load-serving entities (“LSEs”), the IRAS proposal is being implemented \nin a way that is unduly preferential to new generation and unduly discriminatory to existing \ngeneration as described herein. \n8  \nSee 16 U.S.C. § 824d(b) (2024); 16 U.S.C. § 824e(a) (2024).  See also, e.g., FPC v. \nConway Corp., 426 U.S. 271, 277 (1976) (“Section 205(b) forbids the maintenance of any \n‘unreasonable difference in rates’ or service ‘with respect to any . . . sale subject to the \njurisdiction of the Commission.’” (quoting 16 U.S.C. § 824d(b))); Wisconsin Pub. Power, Inc. v. \nFERC, 493 F.3d 239, 246 (D.C. Cir. 2007) (“Section 205 . . . prohibits undue discrimination in \nrates, charges, or terms of service.” (citation omitted))."},{"page":4,"startToken":1058,"endToken":1381,"text":"4 \nSotkiewicz, the unlawful discrimination will not help achieve PJM’s goals and will \ninstead result in higher costs for all consumers and lower reliability over the long term.9 \nTo begin, PJM’s distinctions between New Large Loads and other loads are \nutterly arbitrary and highly discriminatory.  PJM has articulated no valid reason why a \nnew 49.9 MW load will not be subject to IRAS, while load that crosses the 50 MW \nthreshold set by PJM must obtain new capacity.  Nor has it explained why load that \ngoes into service on May 31, 2027, should be treated differently from load that goes into \nservice just one day later, on June 1, 2027, or why the load that enters service after \nJune 1, 2027, should be considered “new” when it was presumably being developed for \nyears.  This arbitrary deadline is impossible to reconcile with PJM’s statement that pre-\nexisting commercial arrangements will not be impacted.  In fact, the arbitrary nature of \nPJM’s proposal is highlighted by its statement that “the relevant in-service date for a \nLarge Load to qualify as New Large Load will fluctuate based on whether or not IRAS is \nneeded . . . .”10  That is, new load coming into service in one year could be subject to \nIRAS, while load that comes into service a year later would not, even though any \ncapacity shortfall or surplus in each of those years could be the result of system \nconditions as a whole, rather than being solely attributable to new load.  PJM’s proposal \nto single out loads arbitrarily defined as New Large Loads violates not only the \nprohibition against undue discrimination in Section 205(b) of the FPA11 but also the \n \n9  \nSee Sotkiewicz Affidavit at ¶ 6. \n10  \nAugust 13 Filing, Transmittal Letter at 39 (also stating that “IRAS applies in Delivery \nYears when the amount of Capacity Resources committed falls short of the PJM Region \nReliability Requirement”). \n11  \n16 U.S.C. § 824d (2024)."},{"page":5,"startToken":1381,"endToken":1726,"text":"5 \nrequirements of Section 202(g)(3)(B) of the FPA.12  The latter provision expressly \nprovides that in the case of “any anticipated shortage of electric energy or capacity \nwhich would affect [a public] utility’s capability of serving its wholesale customers,”13 the \npublic utility must accommodate such shortage in a manner that assures that “all \npersons served directly or indirectly by such public utility will be treated, without undue \nprejudice or disadvantage.”14 \nThe unlawfully preferential and discriminatory treatment under the IRAS proposal \nis not limited to load but, because of the BYONC aspect of the IRAS proposal, extends \nto capacity resources.  The RPM market is designed to procure one product:  Unforced \nCapacity (“UCAP”).  As PJM itself explains: \n[A]t a basic level, BYONC is “megawatts of Unforced \nCapacity.”  This is consistent with how Capacity Resources \nunder PJM’s capacity market design are also MW and not the \nunderlying physical resource that supports a Capacity \nResource.  RPM Auctions clear MW of UCAP; that is the \ntraded product.15 \nSimilarly, the Commission has described RPM as procuring “a single capacity product,”16 \nwhereby there are “the same expectations for all Capacity Performance Resources \nwithout regard to technology type.”17  Indeed, RPM is premised on an understanding of \n \n12  \n16 U.S.C. § 824a(g)(1) (2024). \n13  \n16 U.S.C. § 824a(g)(1) (2024). \n14  \n16 U.S.C. § 824a(g)(3) (2024). \n15  \nAugust 13 Filing, Transmittal Letter at 51 (footnotes omitted). \n16  \nOld Dominion Elec. Coop. v. PJM Interconnection, L.L.C., 171 FERC ¶ 61,149 at P 76 \n(2020) (“ODEC”).  See also, e.g., PJM Interconnection, L.L.C., 170 FERC ¶ 61,256 at P 25 \n(2020) (“The capacity offered in PJM Base Residual Auctions is the same product offered in \nPJM Incremental Auctions.”); PJM Interconnection, L.L.C., 162 FERC ¶ 61,159 at P 4 (2018) \n(explaining that PJM had moved to “a single annual capacity product”). \n17  \nODEC, 171 FERC ¶ 61,149 at P 76.  See also Sotkiewicz Affidavit at ¶¶ 19-26 \n(discussing role of UCAP in PJM’s RPM market)."},{"page":6,"startToken":1726,"endToken":2016,"text":"6 \ncapacity as a fungible product that can be provided by various different types of \nresources, regardless of their vintage.18  Accordingly, since its inception, the RPM market \nhas been designed to “permit generation, demand response, and transmission a \nreasonable opportunity to compete in solving reliability concerns,”19 whereby each Base \nResidual Auction (“BRA”) was intentionally held sufficiently in advance to “allow new entry \nby resources to compete with existing capacity.”20  The Commission has therefore \nrejected calls for rules that would favor existing resources over future resources, given \nthat “the two resources are similarly situated in their ability to meet PJM's resource \nadequacy needs during a given Delivery Year”21 and likewise rejected a PJM proposal \nthat would have “grant[ed] more favorable treatment to resources the earlier they enter \nthe capacity market.”22  The Commission also rejected a proposal that would have \n“provide[d] additional payments to new generators but not to existing generators,” finding \nthat this would not “support our objective of achieving an efficient market overall” and \nwould “not treat all capacity suppliers equally.”23  Instead, the Commission made clear \nthat “[i]n a competitive market, all suppliers will be paid the same price.”24 \n \n18  \nSee Sotkiewicz Affidavit at ¶ 20. \n19  \nPJM Interconnection, L.L.C., 115 FERC ¶ 61,079 at P 6, reh’g denied, 117 FERC \n¶ 61,331 (2006) (“December 2006 Order”), on reh’g¸119 FERC ¶ 61,318, reh’g denied, 121 \nFERC ¶ 61,173 (2007). \n20  \nId. at P 72. \n21  \nPJM Interconnection, L.L.C., 176 FERC ¶ 61,056 at P 36 (2021). \n22  \nPJM Interconnection, L.L.C., 175 FERC ¶ 61,084 at P 108 (2021) (“April 2021 Order”). \n23  \nDecember 2006 Order, 117 FERC ¶ 61,331 at P 77. \n24  \nId."},{"page":7,"startToken":2016,"endToken":2312,"text":"7 \nNonetheless, PJM now proposes to exclude existing resources from satisfying \nthe capacity needs of New Large Load.25  Under PJM’s proposal, even if a New Large \nLoad has purchased sufficient existing capacity to meet its needs, PJM would treat the \nNew Large Load as “eligible” (meaning: “required”) to provide IRAS (meaning: first to be \ncurtailed after non-firm transmission and before demand response).  The effect of this \nrequirement will be to force New Large Loads to purchase capacity only from new \nresources, such that “one set of resources will be effectively barred from selling capacity \nto New Large Loads while the other will have that opportunity, despite both providing the \nexact same service.”26  To make matters worse, because PJM proposes to exclude New \nLarge Loads that do not have sufficient BYONC from its Variable Resource \nRequirement (“VRR”) Curve, the VRR Curve will not reflect “the true supply-demand \nbalance in the RPM market,” which will “all other things equal, . . . result in differential \npricing between Existing Capacity Resources and BYONC Resources.”27  As Dr. \nSotkiewicz observes, there is no reliability justification for this exclusion.28  This means \nthat existing resources “will presumably face lower prices and will never get the benefit \nof price formation that will price in new entry in the market as it is needed.”29  \nAccordingly, the BYONC requirement can be expected to result in lower rates for \n \n25  \nSee August 13 Filing, Transmittal Letter at 49-69.  See also Sotkiewicz Affidavit at ¶ 48 \n(“Existing Capacity Resources are, de facto, precluded from contracting with New Large Load \nas PJM is mandating that New Large Load will not be excused from IRAS unless it contracts \nwith BYONC alone.”). \n26  \nSotkiewicz Affidavit at ¶ 33. \n27  \nId. at ¶ 32. \n28  \nSee id. at ¶¶ 30-31. \n29  \nId. at ¶ 80."},{"page":8,"startToken":2312,"endToken":2708,"text":"8 \nexisting capacity, even though this type of “unjustifiable difference in rates for \nsubstantially similar service works an unlawful discrimination.”30 \nOf course, because RPM only procures “a single capacity product,”31 existing \nresources are no less capable of meeting the capacity needs of New Large Loads than \nnew resources.  That is, PJM could easily have designed its IRAS proposal to require \nNew Large Loads to “Bring Your Own Capacity,” rather than “Bring Your Own New \nCapacity.”  PJM’s decision not to do so appears to stem from a misplaced belief that \nexisting load has some preferential right to the capacity provided by existing resources, \nsuch that new load must be served with new capacity.  But this makes no sense in the \ncontext of PJM’s RPM market, which only provides year-to-year compensation.  Indeed, \nthe notion that existing loads enjoy some sort of preferential right to capacity from \nexisting resources is contrary to the fundamental economic principles underlying \ncommodity markets32 and ignores the fact that RPM was designed to allow new and \nexisting resources to compete for the benefit of consumers.33  In fact, the unduly \npreferential treatment of new resources and undue discrimination against existing \n \n30  \nTowns of Alexandria, Minn. v. FPC, 555 F.2d 1020, 1028 (D.C. Cir. 1977).  Cf. United \nStates v. Illinois Cent. R. R. Co., 263 U.S. 515, 524 (1924) (“[R]ates may lie within the zone of \nreasonableness and yet result in undue prejudice.”); Arkansas Elec. Energy Consumers v. \nFERC, 290 F.3d 362, 365 (D.C. Cir. 2002) (finding that the Commission properly rejected calls \nfor Gulf States to implement a “hold harmless” provision, finding that “it would unduly \ndiscriminate against Gulf States ‘because it requires Gulf States to contribute to the . . . energy \npool on the same basis as [other entities], but it ranks Gulf States last in line of priority for taking \nenergy from the [energy] pool.’” (citation omitted). \n31  \nODEC, 171 FERC ¶ 61,149 at P 76. \n32  \nSee Sotkiewicz Affidavitat ¶¶ 62-72 \n33  \nSee, e.g., PJM Interconnection, L.L.C., 138 FERC ¶ 61,062 at P 6 (2012) (report \nconducted by the Brattle Group found that “RPM has greatly facilitated competition among \nvarious types of capacity resources by attracting commitments from new generation and new \ndemand response resources, retaining existing generation, and supporting the upgrade of \nexisting plants at prices below the cost of new generation”)."},{"page":9,"startToken":2708,"endToken":2989,"text":"9 \nresources can be expected to “lead to even greater churn and uncertainty in the PJM \nmarkets resulting in higher costs to electricity consumers overall.”34  \nPJM nonetheless attempts to rationalize the BYONC requirement by claiming \nthat: \n[t]his aspect of the IRAS framework is consistent with the \nRatepayer Protection Pledge introduced in March 2026 and \nrecently expanded in July 2026, which recognizes that New \nLarge Loads “will voluntarily negotiate new, separate rate \nstructures with their utilities and relevant State governments \nwherever they build data centers.”35 \nWhile the goals and requirements of the Ratepayer Protection Pledge are laudable, the \nRatepayer Protection Pledge in no way justifies or necessitates PJM’s BYONC \nrequirement.  As an initial matter, by its terms, the Ratepayer Protection Pledge only \ncommits the signatory companies to “voluntarily negotiate new, separate rate structures \nwith their utilities and relevant State governments . . . .”36  While the signatory companies \nare free to voluntarily negotiate purchases of capacity only from new resources in \nfurtherance of this commitment, there is nothing in the pledge that even remotely \nsuggests that PJM should be allowed to refuse firm service to signatories, much less to \nnon-signatories, or that otherwise contemplates anything like the IRAS proposal.  As PJM \nacknowledges, the signatory companies are only “[a] representative class of the[] New \n \n34  \nSotkiewicz Affidavit at ¶ 9. \n35  \nAugust 13 Filing, Transmittal Letter at 7 (footnotes omitted) (quoting The White House, \nRatepayer Protection Pledge (Mar. 4, 2026) (the “Ratepayer Protection Pledge”), https://\nwww.whitehouse.gov/releases/2026/03/ratepayer-protection-pledge/).  See also The White \nHouse, President Trump’s Ratepayer Protection Pledge Secures American AI Dominance, \nProtects Consumers (July 23, 2026), https://www.whitehouse.gov/releases/2026/07/president-\ntrumps-ratepayer-protection-pledge-secures-american-ai-dominance-protects-consumers/. \n36  \nRatepayer Protection Pledge."},{"page":10,"startToken":2989,"endToken":3269,"text":"10 \nLarge Loads are signatories to the Ratepayer Protection Pledge,”37 and even if this \nrepresentative class could somehow be understood to have bound all New Large Loads \n(and they cannot be), the Ratepayer Protection Pledge provides no legal basis for fulfilling \nNew Large Loads’ commitments at the expense of existing resources, as PJM’s IRAS \nproposal would do.38 \nMore fundamentally, the Ratepayer Protection Pledge does not and cannot \nrewrite the FPA or override the FPA’s prohibition against unduly discriminatory or \npreferential rates and rate classifications.  Accordingly, even if the Ratepayer Protection \nPledge could be reimagined as supporting PJM’s IRAS proposal, the Commission \nwould still be statutorily bound to reject that proposal. \nB. \nThe Sotkiewicz Affidavit Identifies Other Unjust, Unreasonable, and \nUnduly Preferential and Discriminatory Aspects of the IRAS Proposal \nAs discussed above, the IRAS proposal clearly results in undue discrimination \nagainst existing resources and New Large Loads and undue preference in favor of new \nresources and existing loads and new loads other than New Large Loads.  As Dr. \nSotkiewicz explains in detail, however, the discrimination inherent in the IRAS proposal \nextends beyond the eligibility requirements and has numerous unjust, unreasonable and \nunduly discriminatory side effects. \nFirst, the IRAS proposal grants BYONC resources unduly preferential treatment \nwith respect to Effective Load Carrying Capability (“ELCC”) accreditation.  Under PJM’s \n \n37  \nAugust 13 Filing, Transmittal Letter at 101.  See also The White House, Data centers \npay their way. Ratepayers pay theirs. https://www.whitehouse.gov/ratepayer-protection-pledge/ \n(identifying signatories). \n38  \nSee, e.g., August 13 Filing, Transmittal Letter at 23 (stating that IRAS allows PJM to \n“call[] for load reductions from those New Large Loads that do not adhere to the Ratepayer \nProtection Pledge”)."},{"page":11,"startToken":3269,"endToken":3579,"text":"11 \nrules, capacity resources are only permitted to offer their Accredited UCAP into the RPM \nauctions, where such Accredited UCAP may vary from year to year based on each \nresource’s performance as well as system conditions.39  By contrast, the August 13 \nFiling proposes to shelter BYONC resources from ELCC variability and lets them lock-in \nthe Accredited UCAP for the RPM Auction in which they first clear.40  Similarly, New \nLarge Load that has contracted with BYONC also benefits from this unduly preferential \ntreatment, given that it is “insulated from ELCC volatility while other loads must face the \nmarket implications of that year-to-year volatility.”41  The Commission previously \nrejected a similar proposal that would have “discriminate[d] between resources in a \nclass based on vintage . . . .”42  It is vital that the Commission likewise reject this \nvintaging proposal, because the proposed preferential treatment of BYONC will likely to \nresult in its capacity contribution being overstated in RPM Auctions, which will “further \nerode[] the fidelity of the RPM BRA or IA price signal . . . .”43  This will undermine RPM’s \nability to maintain reliability, because it will “mask[] potential resource adequacy \nshortfalls in the future and send[] price signals that no new entry is needed.”44  \nSecond, the IRAS proposal also unduly discriminates against BYONC resources \nthrough 10-year offer requirements, which reflect unsupported assumptions regarding \n \n39  \nSee Sotkiewicz Affidavit at ¶ 39. \n40  \nSee id. at ¶¶ 40-41. \n41  \nId. at ¶ 42. \n42  \nApril 2021 Order, 175 FERC ¶ 61,084 at P 108.  See also PJM Interconnection, L.L.C., \n176 FERC ¶ 61,056 at P 33 (2021) (rejecting arguments that ELCC should not be allowed to \nreduce a resource’s Accredited UCAP below its interconnection rights and noting that PJM \nrejected just such a proposal to “place a floor on ELCC value for earlier vintages of resources”). \n43  \nSotkiewicz Affidavit at ¶ 43. \n44  \nId. at ¶ 45."},{"page":12,"startToken":3579,"endToken":3849,"text":"12 \nBYONC arrangements and bad market design.  Specifically, PJM proposes that BYONC \nwill be required to “participate, as a price taker (i.e., $0/MW offer) in RPM Auctions for \n10 consecutive Delivery Years,”45 and cannot seek any exception to the capacity must-\noffer requirement during that period.46  As Dr. Sotkiewicz explains, this requirement \nassumes that any contracts between the BYONC resource and New Large Load will be \nsufficient to completely cover the going forward costs of the BYONC.47  Such an \nassumption is unsupported, and PJM fails to explain why BYONC should be subject to a \nprice-taker obligation when other contracted resources are not.  Moreover, while PJM \nproposes to lift these offer requirements if IRAS is not needed for three consecutive \nyears, PJM fails to explain why there is no exemption if, for example, the underlying \nBYONC contract is no longer in effect (e.g., the New Large Load fails to materialize or \nbreaches the contract). \nThird, PJM also proposes not to apply IRAS to load within the service area of \nload-serving entities (“LSEs”) that use the Fixed Resource Requirement (“FRR”) \nalternative.  That is, FRR Entities may “potentially use existing resources to meet New \nLarge Loads while other LSEs can only use existing resources to serve existing \nloads.”48  While the BYONC requirement is, as discussed in detail above, unduly \npreferential and discriminatory and must be rejected, it makes no sense for PJM to \napply this requirement only in some areas and not others. \n \n45  \nAugust 13 Filing, Transmittal Letter at 55. \n46  \nSee id. at 56. \n47  \nSee Sotkiewicz Affidavit at ¶ 36. \n48  \nId. at ¶ 28."},{"page":13,"startToken":3849,"endToken":4140,"text":"13 \nFinally, PJM proposes to compensate Eligible New Large Load for providing \nIRAS at a rate equal to 50 percent of the Non-Performance Charge Rate,49 which would \nequate to a rate of $1,565.24/MWh for the 2028/2029 Delivery Year, higher than the \ngenerally applicable $1,000/MWh offer cap for energy.50  As Dr. Sotkiewicz observes, \n“[n]o other loads on the PJM system that are curtailed, including those voluntarily doing \nso as Economic Demand Response or for peak load shaving purposes, are \ncompensated in the same manner for energy reductions as Eligible New Large Loads, \nthough the load reductions will have the same reliability benefit.”51 \nC. \nThe IRAS Proposal Should be Rejected in Its Entirety \nTo be clear, EPSA understands and appreciates the need for PJM to make \nmarket changes to address the capacity shortfall and reliability concerns in its region.  \nBut the solution to these problems cannot be to violate the FPA and embed undue \ndiscrimination in PJM’s market rules.  Even aside from being forbidden by the FPA, such \ndiscriminatory treatment simply slaps a band-aid on the problem while potentially \nmaking the underlying wound worse.  Indeed, Dr. Sotkiewicz explains that the incentives \ncreated by IRAS may aggravate the problems that are already plaguing the region.52  As \nhas been made clear by PJM’s experiences over the last few years, consumers are the \nones that will be ultimately harmed if PJM fails to ensure that existing resources are \ntreated fairly.  FTI Consulting recently cautioned that, while “[d]iscriminatory capacity \nmarkets can in some circumstances result in short-run reductions in consumer \n \n49  \nSee August 13 Filing, Transmittal Letter at 102. \n50  \nSee Sotkiewicz Affidavit at ¶ 52. \n51  \nId. at ¶ 50. \n52  \nSee Sotkiewicz Affidavit at ¶¶ 73-84."},{"page":14,"startToken":4140,"endToken":4448,"text":"14 \npayments,” any consumer benefits evaporate over the longer term because, “as more \nexisting capacity inefficiently exits as a result of the artificially low capacity price, and is \nreplaced with high-cost new capacity, the short-run consumer savings will tend to turn \ninto higher costs for future consumers.”53  Moreover, costs “will be further increased by \nthe changed expectations of investors in such a market, which will tend to raise the \nprice at which investment in new capacity occurs and likely require more shifting of risks \nfrom investors to consumers.”54 \nIn the August 13 Filing, PJM states that it consents to the Commission modifying \nor severing any element of the proposed revisions to the RAA and the Tariff to the extent \npermitted under the FPA and NRG Power Marketing, LLC v. FERC,55 and provided \n“such modification and/or severance is consistent with PJM’s overarching objectives in \nthis filing.”56  While elements of the August 13 Filing relating to the establishment of the \nLarge Load Registry may be severable from the IRAS-related elements, the IRAS \nproposal is so fundamentally flawed as to be unsalvageable under NRG-PML, because \nthe changes necessary to make the IRAS proposal lawful under Section 205 of the \nFPA57 would require the Commission to “transform the proposal into an entirely new rate \nof [its] own making.”58  Such a transformation of the IRAS proposal would violate FPA \n \n53  \nScott Harvey, et al., FTI Consulting, Discriminatory capacity market pricing designs, at 3 \n(New York ISO ICAP Working Group, May 22, 2025), https://www.nyiso.\ncom/documents/20142/51574954/2%20Workshop%20on%20Discriminatory%20Capacity%\n20Auction%20Design%20-%20052225%20icap.pdf/9d71f2ba-cd0c-08be-3851-5da9a26769a1. \n54  \nId. at 5. \n55  \n862 F.3d 108 (D.C. Cir. 2017) (“NRG-PML”). \n56  \nAugust 13 Filing, Transmittal Letter at 9. \n57  \n16 U.S.C. § 824d (2024). \n58  \nNRG-PML, 862 F.3d at 110."},{"page":15,"startToken":4448,"endToken":4820,"text":"15 \nSection 205, as interpreted in NRG-PML.59  That being the case and given the fatal \nlegal defects in the IRAS proposal described above, the Commission can, should and \nmust, as a legal matter, reject the IRAS proposal in its entirety. \nD. \nThere Are Alternatives Available to PJM and the Commission that \nWould Preserve the Integrity of the RPM Construct While Protecting \nExisting Loads \nWhile EPSA appreciates the policy concerns that PJM is attempting to address \nthrough the IRAS proposal, it is well-established that “policy interests . . . cannot \noverride the statute.”60  As discussed above, the IRAS proposal is inherently \ndiscriminatory and otherwise unlawful and must be rejected.  Importantly, however, it \ndoes not follow that PJM, the Commission and state regulators are powerless to protect \nother loads from the resource adequacy issues presented by new large loads, as there \nare alternative approaches to address the concerns underlying the IRAS proposal.  For \nexample, PJM could require LSEs that are deficient capacity to designate load – either \ntheir own load or contracted demand response – that will be curtailed in the event PJM \nis in a load shed event.  This requirement will achieve the same goals as the IRAS \nproposal:  generation-deficient LSEs will have an incentive to contract for capacity, \nincluding new capacity, and load shed designations can be structured to protect \n \n59  \nSee id.  See also City of Winnfield v. FERC, 744 F.2d 871, 875-76 (D.C. Cir. 1984) \n(suggesting that a utility acquiescing to a Commission proposal that “involved the Commission’s \nown original notion of a new form of rate” could “remove[] the Commission from an essentially \npassive and reactive role envisioned by § 205 and place[] it in a more active role of the sort it \noccupies under § 206”). \n60  \nNational Fuel Gas Supply Corp., 167 FERC ¶ 61,007 at P 20 (2019).  See also, e.g., El \nPaso Elec. Co. v. FERC, 76 F.4th 352, 361 (5th Cir. 2023) (stating that “statutory \nmandates . . . can [not] be sacrificed . . . for some separate policy interest”); Southern Cal. \nEdison Co. v. FERC, 195 F.3d 17, 18-19 (D.C. Cir. 1999) (stating that “[w]hile there is a certain \nappeal to FERC’s [position], neither FERC nor the court can ignore the plain terms of the \nstatute”)."},{"page":16,"startToken":4820,"endToken":4963,"text":"16 \nresidential customers.  And this alternative approach would position state regulators to \nprotect other loads without the serious harms to the RPM construct and undermining of \nits ability to ensure reliability or the discrimination against existing resources that would \nresult from the IRAS proposal as described above. \nII. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, EPSA respectfully requests that the \nCommission reject the August 13 Filing. \nRespectfully submitted, \nELECTRIC POWER SUPPLY ASSOCIATION \nBy: \n  /s/ David G. Tewksbury \n \n \nDavid G. Tewksbury \nStephanie S. Lim \nMCDERMOTT WILL & SCHULTE LLP \nThe McDermott Building \n500 North Capitol Street, NW \nWashington, DC  20001 \nNancy Bagot \nSenior Vice President \nSharon Royka Theodore \nVice President, Regulatory Affairs \nStephanie E. Johnson \nAssistant Vice President, Regulatory Affairs \nElectric Power Supply Association \n1401 New York Ave, NW, Suite 950 \nWashington, DC  20005 \nOn behalf of the  \nElectric Power Supply Association \nDated:  September 3, 2026"},{"page":17,"startToken":4963,"endToken":5021,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day caused the foregoing document to be served \nupon each person designated on the official service list compiled by the Secretary of the \nFederal Energy Regulatory Commission in this proceeding. \nDated at Washington, D.C., this 3rd day of September 2026. \n  /s/ David G. Tewksbury \n \n \nDavid G. Tewksbury"},{"page":18,"startToken":5021,"endToken":5026,"text":"Attachment A \nThe Sotkiewicz Affidavit"},{"page":19,"startToken":5026,"endToken":5237,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n) \n \n \n \n \n \n        Docket No. ER26-3515-000 \n \n \n \nAFFIDAVIT OF PAUL M. SOTKIEWICZ, PH.D.  \nON BEHALF OF ELECTRIC POWER SUPPLY ASSOCIATION \nI. INTRODUCTION AND SUMMARY \n1. \nMy name is Dr. Paul M. Sotkiewicz.  I am the President and Founder of E-Cubed Policy \nAssociates, LLC (“E-Cubed”) and formerly served as the Chief Economist in the Market \nService Division of PJM Interconnection, L.L.C. (“PJM”).  I have been retained by the \nElectric Power Supply Association (“EPSA”) to submit this affidavit in support of its \nprotest to PJM’s Interim Resource Adequacy Service (“IRAS”) proposal in Docket No. \nER26-3515-000.1  \n2. \nThe IRAS Filing proposes to establish new criteria for the participation of New Large \nLoads, 2 associated new capacity that enters to serve New Large Loads called BYONC or \n \n1 Proposal of PJM Interconnection, L.L.C. To Establish Interim Resource Adequacy Service and Large \nLoad Registry to Address System Reliability in Docket No. ER26-3515-000, August 13, 2026 (“IRAS \nFiling”) \n2 New Large Loads are defined as being greater than or equal to 50 MW and coming into service on or after \nJune 1, 2027. Proposed PJM Tariff, Definitions L-M-N “New Large Load”, Proposed RAA, Definitions, \n“Large Load”, Transmittal Letter at 31-36."},{"page":20,"startToken":5237,"endToken":5528,"text":"2 \n \n“Bring Your Own New Capacity”3 in the PJM Reliability Pricing Model (“RPM”) market \nand for Fixed Resource Requirement (“FRR”) entities in the RPM construct and the PJM \nReliability Assurance Agreement among Load Serving Entities in the PJM Region \n(“RAA”).4  \n3. \nPJM’s IRAS proposal, by design, creates an unjust, unreasonable and unduly \ndiscriminatory and preferential treatment of loads and Capacity Resources within PJM that \nheretofore did not exist within the PJM RPM rules and RAA. Currently, RPM and the RAA \ntreats all capacity as a fungible commodity regardless of the source of supply and treats all \nLoad Serving Entities (“LSE”) identically regardless of the size or type of load.   \n4. \nThe IRAS proposal is replete with broad categories of undue discrimination and \npreferential treatment. These include: \na. Differential treatment of the supply of capacity based on its 1) In-service \ndate, and 2) Contractual arrangements. \nb. Differential treatment of loads and LSEs based upon the 1) Size of the \nindividual loads, and 2) In-service dates of Large Loads. \n5. \nExamples of this kind of unduly discriminatory treatment include: \na. The implicit restrictions on the LSEs and loads with whom Existing \nCapacity Resources can contract relative to Planned Capacity Resources;5 \nb. Differential capacity accreditation between BYONC resources and all other \n \n3 BYONC is defined as new Accredited UCAP that enters service on or after June 1, 2027 and is specifically \ndesignated to serve New Large Loads. Proposed Tariff, Definitions, A-B and Proposed Tariff, Attachment \nDD-4, Section IV. Transmittal Letter at 49-53. \n4 PJM Reliability Assurance Agreement among Load Serving Entities in the PJM Region (“RAA”). \n5 See Proposed Tariff, Attachment DD-4, Section V which states the only way of IRAS is through \ncontracting with BYONC and no other Capacity Resources."},{"page":21,"startToken":5528,"endToken":5873,"text":"3 \n \nresources;6 \nc. Offer requirements into RPM Base Residual Auctions (“BRA”) or \nIncremental Auctions (“IA”) that differ between BYONC and Existing \nCapacity Resources;7 \nd. Different treatment of loads by size, category, and in-service date for \ncompensation for load reductions;8 \ne. Inclusion or exclusion of loads from the Variable Resource Requirement9 \n(“VRR”) Curve in the RPM BRAs or IAs based on size and in-service date.     \n6. \nThe kind of undue discrimination and preferential treatment proposed by PJM in IRAS will \nhave deleterious effects on the efficiency and liquidity of trading of UCAP in PJM’s RPM \ncapacity market10 leading to higher overall costs over time as well as eroding reliability \nand creating a cycle of “bust and boom” periods with capacity shortfalls and capacity \nsurpluses if/when new loads do not materialize, and back to shortfalls when differentially \ntreated Existing Capacity Resources in service prior to June 1, 2027 exit the market.   \n7. \nFurther, PJM’s IRAS proposal (particularly in conjunction with the Reliability Backstop \nProcurement (“RBP”)) also raises serious concerns about the future viability of PJM’s \n \n6 See Proposed Tariff, Attachment DD-4, Section VII (i)(i). See in contrast to the current RAA Schedule \n9.2 Section D in conjunction with Schedule 4, Section C. To further examine the disparate treatment of \nBYONC versus other Capacity Resources see “Preliminary ELCC Class Ratings For Use in the Reliability \nProcurement \nBackstop \n(RBP)” \navailable \nat \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/cifp-rbp/postings/preliminary-elcc-class-ratings-for-period-dy28-dy42.pdf.  \n7 See Proposed Tariff, Attachment DD-4, Section VIII (e). Examine this in contrast to current PJM Tariff, \nAttachment DD, Section 6.6 for Existing and Planned Generation Capacity Resources.  \n8 See Proposed Tariff, Attachment DD-4, Section X(a). \n9 See Proposed Tariff, Definitions, E-F for “Excludable LDA New Large Load Amounts” and “Excludable \nRTO New Large Load Amounts” and Attachment DD, Sections 5.4(c), 5.10(a)(i), 5.10(a)(vi)(B), \n5.11(a)(iii), 5.12(b)(ii)-(iii).  \n10 RPM capacity market refers to transactions for UCAP done bilaterally and through RPM BRAs and IAs."},{"page":22,"startToken":5873,"endToken":6250,"text":"4 \n \nwholesale markets in general. Markets are made possible due to the clear assignment and \nrecognition of property rights as discussed by Nobel Laureate Ronald Coase.11 Absent \nwell-defined property rights, the ability to buy or sell commodities is hindered as there is \nno clear chain of ownership or possession that can be transferred at a price that is amenable \nto both sides of the transaction. \n8. \nPJM IRAS Proposal implicitly expropriates and reallocates the property rights to capacity \nfrom Existing Capacity Resources to the existing loads in PJM and/or to future new loads \nthat are not New Large Loads without the benefit of any kind of contractual arrangements \nthrough rules that are intended to give New Large Loads and their LSEs credit for BYONC \nonly. Further, in its implementation of IRAS for New Large Loads without BYONC, there \nis the implicit assignment of property rights to energy to serve New Large Loads, as they \nwould be paid 50% of the PAI Penalty rate for their load reduction.  \n9. \nFor the above reasons, the Commission must reject PJM’s IRAS Filing as it will not solve \nthe immediate reliability or long-term problem and will lead to even greater churn and \nuncertainty in the PJM markets resulting in higher costs to electricity consumers overall. \nThe better approach would be simply to allow markets to work and reflect the actual cost \nof capacity rather than attempting to control prices below the marginal cost of new capacity \nadditions.12   \n \n11 R. H. Coase, “The Problem of Social Cost,” Journal of Law and Economics, Volume III, October 1960. \nPages 1-44. Available at https://www.law.uchicago.edu/sites/default/files/file/coase-problem.pdf.    \n12 See Comments and Protest of E-Cubed Policy Associates, L.L.C. and Motion to File One Day Out of \nTime, in Docket No. ER26-3380 (“RBP Docket”), August 22, 2026. (“E-Cubed Protest”) This protest uses \npublicly available data to construct the possible Gross Cost of New Entry (“CONE”) and Net CONE \nrequired for new entry in PJM under varying assumptions. See also Limited Protest of NRG Companies, in \nDocket No. ER26-3380 (“RBP Docket”), August 21, 2026. (“NRG Limited Protest”). NRG also provides \nevidence regarding the Gross CONE is assumed to be far too low as assumed by PJM."},{"page":23,"startToken":6250,"endToken":6545,"text":"5 \n \n10. \nFollowing the statement of my qualifications in Section II, the remainder of my affidavit \nis organized as follows.  Section III provides a short overview of how fungible commodity \nmarkets operate and why the current PJM RPM capacity market reflects a fungible \ncommodity known as Unforced Capacity (“UCAP”). Section IV discusses the unduly \ndiscriminatory aspects of PJM’s IRAS proposal. \n11. \nSection V explains how the unduly discriminatory nature of IRAS splits the once fungible \ncommodity into two different UCAP commodities that will all be priced differently and \nhave different requirements and treatments despite providing identical services. Section VI \ndiscusses the implied property rights transfers that IRAS creates and how this ties back to \nthe differential and unduly discriminatory and preferential treatment of different forms of \nUCAP.  \n12. \nSection VII outlines the near-term and longer-term market inefficiencies and reliability \nimplications of PJM’s IRAS proposal and why this will not solve the near-term or long-\nterm reliability problems PJM hopes to address. Section VIII concludes offering a path \nforward to allow markets to work and with a historical example of what has gone wrong \nthrough differential treatments of “old gas” and “new gas” which is comparable to what \nPJM has proposed with IRAS.  \nII. QUALIFICATIONS \n13. \nPrior to founding E-Cubed, I worked as a contractor and directly for PJM in Audubon, \nPennsylvania from February 2008 until October 2016.  In my time at PJM, I first served as \na Senior Economist until March 2010 and subsequently as the Chief Economist in the \nMarket Service Division until June 2015.  From July 2015 until October 2016, I worked as \na contractor for PJM under the title of Senior Economic Policy Advisor.  Prior to joining \nPJM, I served as the Director of Energy Studies at the Public Utility Research Center"},{"page":24,"startToken":6545,"endToken":6810,"text":"6 \n \n(“PURC”), University of Florida from August 2000 until February 2008 and I was an \nEconomist at FERC from September 1998 until August 2000. I have a B.A. in History and \nEconomics from the University of Florida (1991), and an M.A. (1995) and Ph.D. (2003) in \nEconomics from the University of Minnesota. \n14. \nI have 30 years of experience in matters at the intersection of utility regulatory policy, \npower system economics, and environmental economics. In my current role, I advise \nprivate- and public-sector clients on a range of economic issues related to electricity market \ndesign and performance, power generation economics, utility regulatory policy, and the \neconomic impacts of state and federal environmental policies. At PJM, I provided expert \nanalysis, advice, and support for PJM initiatives related to market design changes in, and \nperformance of, PJM’s energy, ancillary service, and capacity markets. As an economist at \nFERC, I worked on market design issues and filings related to the newly formed \nindependent system operator/regional transmission organization (“RTO”) markets \nconcentrating primarily on the New York Independent System Operator, Inc. and the \nCalifornia Independent System Operator Corporation markets. \n15. \nMore details on my experience and work history can be found in my CV and Bio attached \nas Attachment 1. \nIII. THE CURRENT RPM CAPACITY MARKET TRADES A FUNGIBLE COMMODITY \nIN THE SAME WAY OTHER COMMODITY MARKETS OPERATE     \nA. Commodity Markets Trade Fungible Commodities \n16. \nA commodity is fungible when it can be replaced with an identical commodity, regardless \nof source of the original or replacement commodity.13 \n \n13 See https://www.merriam-webster.com/dictionary/fungible."},{"page":25,"startToken":6810,"endToken":7062,"text":"7 \n \n17. \nCommodity fungibility is a core requirement for markets to reach efficient outcomes as the \nfungibility of the commodity allows buyers and sellers to find suitable, creditworthy \ncounterparties with whom to transact on a bilateral basis, and to understand what is being \ntransacted in centralized auction frameworks. \n18. \nCommodity fungibility gives a party who has sold a commodity the option to replace that \ncommodity on a one-for-one basis should it fail to deliver on its original commitment, and \nthe purchasing counterparty is assured that what it receives is what it paid for. In this sense, \ncommodity fungibility helps provide liquidity, which is the ability to quickly buy or sell \nthe underlying commodity, at going market prices without incurring significant transaction \ncosts such as the cost for searching for the “appropriate counterparty” to meet a specific \none-of-a-kind requirement. \nB. UCAP as a Fungible Commodity \n19. \nThe RAA defines Accredited UCAP as  \n“the quantity of Unforced Capacity, as denominated in Effective UCAP, that an \nELCC Resource is capable of providing in a given Delivery Year.”14 \n20. \nAn ELCC Resource is any generation Capacity Resource, Demand Resource, or DER \nCapacity Aggregation Resource.15 That is, Accredited UCAP is not dependent upon the \ngeneration technology, fuel type, size, or age (in-service date) but simply on what the \nELCC Resource can provide. This satisfies one part of what is needed for fungibility of \nUCAP. \n21. \nAccredited UCAP is denominated in Effective UCAP terms according to the RAA and is \n \n14 RAA, Article 1-Definitions. \n15 Id."},{"page":26,"startToken":7062,"endToken":7374,"text":"8 \n \ndefined as: \n“a unit of measure that represents the capacity product transacted in the Reliability \nPricing Model and included in FRR Capacity Plans. One megawatt of Effective \nUCAP has the same capacity value of one megawatt of Unforced Capacity.”16 \n \n22. \nUCAP is the product being transacted in the RPM market and is fungible across any entity \nthat wishes to buy or sell UCAP to satisfy its obligation under the RAA and Attachment \nDD of the PJM Tariff.17 This can be done bilaterally with trades registered in PJM’s \nCapacity Exchange18 application or through the centralized auctions such as such as the \nRPM BRAs or IAs.19 If anything, it is the fungibility that allows the use of the BRA and \nIA in RPM to transact UCAP. \n23. \nUnder the current market rules, there is no restriction regarding who suppliers of UCAP \ncan sell their available UCAP to. Similarly, there is no restriction on LSEs regarding who \nthey may purchase UCAP from to satisfy their obligations under the RAA.20 \n24. \nIn this way RPM is no different than a commodity market for agricultural products (such \nas corn, wheat or soybeans) or basic energy products (such as oil, natural gas, coal). UCAP \nis no different than electricity that is bought and sold forward and then delivered across the \nPJM system in real-time operations. The contractual relationships underlying the supply \nand demand for electricity in real-time are irrelevant to RTOs such as PJM so long as \nenergy balance, transmission security, and reserve levels are maintained. \n \n16 Id. \n17 PJM Tariff Attachment DD, Sections 5.1 to 5.4 \n18 PJM Manual 18: PJM Capacity Market Revision: 62 Effective Date: December 17, 2025, Section 10. \nAvailable at https://www.pjm.com/-/media/DotCom/documents/manuals/m18.pdf.  \n19 PJM Tariff, Attachment DD, Section 5.4. \n20 RAA, Schedule 8 and Schedule 8.1."},{"page":27,"startToken":7374,"endToken":7662,"text":"9 \n \n25. \nHistorically, RPM auctions transacted UCAP as the fungible commodity without regard to \nbilateral contractual relationships between the suppliers of UCAP and the LSEs with \nUCAP obligations under the RAA.21  \n26. \nFurther, LSE obligations did not depend on when the LSE load went into commercial \noperation, or when the load may have switched to the LSE in the case of competitive LSEs, \nor the size of any individual load being served by an LSE.22 \n \nIV. UNDULY DISCRIMINATORY AND PREFERENTIAL ASPECTS OF IRAS. \n27. \nWhat PJM is proposing with IRAS goes against every concept of UCAP being a fungible \ncommodity.  In effect, PJM is proposing to bifurcate UCAP into “vintages” based on the \nin-service date of the resource providing UCAP with differing responsibilities and \nobligations.  Further, PJM is proposing to create multiple types of loads (Large Loads 50 \nMW or greater)23 based on in-service time (New Large Loads on or after June 1, 2027)24 \nwhereby an LSEs must procure a specific type of UCAP depending on the size of the load \nand the load’s online date.25 These loads will also be treated differently in PJM’s markets.   \n28. \nPJM also proposes to treat FRR entities differently from other LSEs in that they can \npotentially use existing resources to meet New Large Loads while other LSEs can only use \n \n21 PJM Tariff, Attachment DD showing that all Existing Generation Capacity Resources have a must offer \nrequirement into RPM auctions. No exceptions are provided for anything regarding contractual \narrangements between the Existing Generation Capacity Resource and LSEs.  \n22 RAA, Schedule 8. \n23 Proposed RAA Definitions \n24 Id. \n25 Proposed PJM Tariff, Attachment DD-4 Section IV, V. VI, and VII. Proposed RAA, Article 7, Section \n7.8"},{"page":28,"startToken":7662,"endToken":8025,"text":"10 \n \nexisting resources to serve existing loads.26 \n \nA. Inclusion or Exclusion of Loads from the VRR Curve in the RPM BRAs or IAs \nBased on Size and In-Service Date  \n29. \nPJM proposes to exclude all New Large Loads that are not contracted with BYONC \nresources, defined by PJM as “Eligible New Large Loads,”27 from the VRR Curve that \nrepresents the demand for UCAP in the BRAs and IAs.28 Yet other loads, including other \nincremental loads, will be included in the VRR Curve. From a reliability standpoint, the \noverall size of the total load impacts resource adequacy reliability and thus should be \nreflected in PJM’s RPM market.    \n30. \nEligible New Large Loads under the IRAS Proposal cause the same reliability issues as \nother loads, but they are excluded from the VRR Curve. A simple example illustrates the \npoint. Suppose there is 8,000 MW of Eligible New Large Loads. With the 8,000 MW taken \nout of the VRR Curve, the price that results is $300/MW-day and signals that PJM “meets \nits reliability target.”  Yet, if the 8,000 MW were included in the VRR Curve, the price \nwould be $555/MW-day, the estimated current maximum price on the VRR Curve,29 and \nthe RTO would show it is short its reliability target by 8,000 MW. This is unduly \ndiscriminatory and differential treatment of loads by their size and vintage.   \n31. \n What PJM fails to address is the cumulative effect of new load growth that is not Eligible \n \n26 Proposed RAA, Schedule 8.1, Section D, 1.1. FRR entities can potentially sign contracts by June 1, 2027 \nwith Existing Capacity Resources, but may not have New Large Load come in service until later years and \nthe contracts not begin until later years, so long as it is “under contract.”  \n27 Proposed PJM Tarifff, Definitions E-F. \n28 Id. “Excludable LDA New Large Load Amounts” and “Excludable RTO New Large Load Amounts” and \nAttachment DD, Sections 5.4(c), 5.10(a)(i), 5.10(a)(vi)(B), 5.11(a)(iii), 5.12(b)(ii)-(iii). \n29 PJM Interconnection, L.L.C., 194 FERC ¶ 61,049 at PP 44-45."},{"page":29,"startToken":8025,"endToken":8304,"text":"11 \n \nNew Large Load could be just as impactful on reliability yet is treated differently for no \nreliability reason at all. Use the same numerical example from the previous paragraph but \nassume the 8,000 MW is new load growth that does not fall under the definition of New \nLarge Loads. All 8,000 MW would be included in the VRR Curve showing a resource \nadequacy shortfall and a price at the VRR Curve maximum. Observationally and in reality, \nthe load growth has the same impact regardless of where it comes from, yet the unduly \ndiscriminatory and preferential treatment results in very different market outcomes and \nsignals different reliability conditions. \n32. \nOn the supply side of the equation, PJM’s proposal that a New Large Load can only avoid \nbeing classified as an Eligible New Large Load by procuring BYONC results in undue \ndiscrimination against Existing Capacity Resources and undue preference for BYONC \nResources.30 Rather than Existing Capacity Resources facing a VRR Curve that is \nreflective of the true supply-demand balance in the RPM market as shown in the simple \nexample above, they are facing a lower demand for capacity that, all other things equal, \nwill result in differential pricing between Existing Capacity Resources and BYONC \nResources.31  \n33. \nBoth types of resources are providing UCAP, but one set of resources will be effectively \nbarred from selling capacity to New Large Loads while the other will have that opportunity, \ndespite both providing the exact same service. Such disparate treatment of the resources \nequally capable of supplying UCAP is unduly discriminatory and preferential. \n \n30 Proposed PJM Tariff, Attachment DD-4, Sections IV, V, VI, and VII. \n31 See supra note 12."},{"page":30,"startToken":8304,"endToken":8585,"text":"12 \n \nB. The Offer Requirements into RPM Auctions that Differ Between BYONC, RBP, \nand Planned and Existing Capacity Resources \n34. \nPJM proposes that BYONC Resources contracted with New Large Load have must offer \nrequirements into the RPM BRA and IA as price takers (offers equal to $0/MW-day \nUCAP) as such New Large Load will also be included in the VRR Curve.32 This raises \nissues regarding the treatment of BYONC versus Planned Capacity Resources that have \nthe ability to offer as they see fit, and once clearing an RPM auction, have the ability to \nchoose a non-zero Market Seller Offer Cap that reflects their going forward costs under the \nAvoidable Cost Rate (“ACR”). \n35. \nBoth BYONC and Planned Capacity Resources enter as new resources yet are treated \ndifferently for no valid reason. And going forward, once clearing an RPM auction, both \nBYONC and Planned Capacity Resources become Existing Capacity Resources, but \ncontinue to be treated differently.    \n36. \nThe price taker requirement for BYONC implicitly assumes contracts between BYONC \nand New Large Load that will cover the BYONC resource’s going forward costs are \nautomatically covered by the contract terms and conditions. There is no assurance that this \nwould be so.   \n37. \nIn contrast, Existing Capacity Resources that are not BYONC will retain the ability to make \noffers that reflect their ability to cover going forward costs and any associated risk with \nfailure to perform during a Performance Assessment Interval (“PAI”). There is only one \ninterpretation of this disparate treatment, and that is to artificially drive prices in the RPM \nAuctions down for Existing Capacity Resources to that are serving existing load and new \n \n32 Proposed Tariff, Attachment DD-4, Section VIII (e)."},{"page":31,"startToken":8585,"endToken":8762,"text":"13 \n \nload that does not qualify as New Large Loads. \n38. \nThere is no harm in allowing BYONC Resources to make non-zero offers into RPM \nAuctions to reflect their going forward costs and risks of PAI non-performance that may \nnot be covered under the contracts between BYONC and New Large Loads. To the \ncontrary, this will ensure that RPM prices properly reflect the costs of all Existing Capacity \nResources, whether BYONC or otherwise. And in the event BYONC contracts have \naccounted for PAI performance risk and cover ACR, the offers may be zero into RPM \nAuctions. The key is that contract terms and conditions for BYONC cannot be assumed in \ndeveloping market rules.     \nC. Differential Capacity Accreditation Between BYONC Resources and All Other \nResources \n39. \nCapacity Resources face ELCC risk from one Delivery Year (“DY”) to the next based upon \nPJM’s updated load forecasts, changes in fleetwide generator configuration and mix, and \nany updates. Table 1 shows the variation in ELCC values for all resource types from the \n2025/2026 BRA through the upcoming 2029/2030 BRA."},{"page":32,"startToken":8762,"endToken":9197,"text":"14 \n \n \nTable 1: Variation in ELCC Values for RPM Auctions for the 2025/2026 Delivery Year \nthrough the 2029/2030 Delivery Year33 \n25/26 \nBRA34 \n25/26 3rd \nIA35 \n26/27 \nBRA36 \n26/27 3rd \nIA37 \n27/28 \nBRA38 \n28/29 \nBRA39 \n29/30 \nBRA40 \nDate Published\nFeb-24\nJan-25\nMar-25\nJan-26\nJul-25\nFeb-26\nJul-26\nOnshore Wind\n35%\n38%\n41%\n38%\n41%\n34%\n37%\nOffshore Wind\n60%\n62%\n69%\n64%\n67%\n60%\n64%\nSolar Fixed Panel\n9%\n10%\n8%\n10%\n7%\n7%\n6%\n \n33 Waste to Energy and Oil-Fired CT categories were not recognized until the start of the 2027/2028 \nDelivery Year, and therefore do not appear in data for earlier years. \n34 “Installed Reserve Margin (IRM) and Forecast Pool Requirement (FPR) for 2025/26 BRA.” Josh Bruno,  \nPlanning \nCommittee \nFebruary \n6, \n2024, \nat \n4. \nAvailable \nat \nhttps://www.pjm.com/-\n/media/DotCom/committees-groups/committees/pc/2024/20240206/20240206-item-05---fpr-and-irm-\nupdate.pdf.  \n35 “Installed Reserve Margin (IRM), Forecast Pool Requirement (FPR), and Effective Load Carrying \nCapability (ELCC) for 2025/2026 3IA.” Josh Bruno, Markets and Reliability Committee January 23, 2025 \nat \n5. \nAvailable \nat \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mrc/2025/20250123/20250123-item-05---1-irm-fpr-and-elcc-for-25-26-3ia---\npresentation.pdf.   \n36 “2026/27 BRA IRM, FPR, and ELCC Class Ratings Shift Towards More Winter Risk.” Josh Bruno, \nMolly Mooney, Patricio Rocha Garrido Special Planning Committee March 13, 2025 at 6. Available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/pc/2025/20250313-special/2026-\n2027-irm-fpr-elcc-and-winter-risk.pdf.   \n37 “Installed Reserve Margin (IRM), Forecast Pool Requirement (FPR), and Effective Load Carrying \nCapability (ELCC) for 2026/2027 3rd IA.” Josh Bruno Members Committee January 22, 2026 at 7. \nAvailable \nat \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mc/2026/20260122/20260122-item-02---1-2026-2027-3rd-ia-fpr-and-irm-results---\npresentation.pdf.  \n38 “Installed Reserve Margin (IRM), Forecast Pool Requirement (FPR), and Effective Load Carrying \nCapability (ELCC) for 2027/2028 BRA.” Josh Bruno Members Committee July 23, 2025 at 7. Available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2025/20250723/20250723-\nitem-02---2027-2028-bra-fpr-and-irm---presentation.pdf.   \n39 “Installed Reserve Margin (IRM), Forecast Pool Requirement (FPR), and Effective Load Carrying \nCapability (ELCC) for 2028/2029 BRA.” Special Markets and Reliability Committee February 13, 2026 at \n9. \nAvailable \nat \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mrc/2026/20260213-special/item-01---2028-2029-bra-fpr--irm---presentation.pdf.  \n40 “Installed Reserve Margin (IRM), Forecast Pool Requirement (FPR), and Effective Load Carrying \nCapability (ELCC) for 2029/2030 BRA.” Patricio Rocha-Garrido Markets and Reliability Committee July \n28, \n2026 \nat \n7. \nAvailable \nat \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mrc/2026/20260728/20260728-item-06---2029-2030-bra-fpr-irm-results---\npresentation.pdf."},{"page":33,"startToken":9197,"endToken":9539,"text":"15 \n \nSolar Tracking \nPanel \n14%\n14%\n11%\n13%\n8%\n10%\n7%\nLandfill Gas \nIntermittent \n54%\n51%\n50%\n49%\n48%\n50%\n50%\nHydro Intermittent\n37%\n37%\n38%\n38%\n39%\n35%\n35%\n4-hr Storage\n59%\n55%\n50%\n54%\n58%\n59%\n57%\n6-hr Storage\n67%\n65%\n58%\n61%\n67%\n68%\n67%\n8-hr Storage\n68%\n68%\n62%\n65%\n70%\n71%\n69%\n10-hr Storage\n78%\n77%\n72%\n73%\n78%\n78%\n77%\nDR\n76%\n77%\n69%\n72%\n92%\n91%\n90%\nNuclear\n95%\n95%\n95%\n95%\n95%\n96%\n96%\nCoal\n84%\n83%\n83%\n85%\n83%\n85%\n84%\nGas CC\n79%\n78%\n74%\n77%\n74%\n78%\n75%\nGas CT\n62%\n63%\n60%\n63%\n61%\n67%\n60%\nGas CT Dual Fuel\n79%\n79%\n78%\n79%\n77%\n79%\n77%\nDiesel\n92%\n92%\n91%\n93%\n92%\n93%\n92%\nSteam\n75%\n74%\n73%\n75%\n72%\n75%\n75%\nWaste to Energy \nSteam \n83%\n84%\n83%\nOil-Fired CT\n80%\n83%\n81%\n \n40. \nBYONC resources are treated very differently, even though they change the configuration \nof the PJM generation fleet which impacts ELCC values.41  PJM’s proposed tariff language \nstates, “For any generation or storage resource, the Accredited UCAP of any BYONC shall \nbe the Accredited UCAP for the RPM Auction in which the BYONC cleared for the initial \nDelivery Year the BYONC is in an arrangement with the New Large Load.”42 The same is \nalso provided for Demand Resources and DER Capacity Aggregation Resources.43 \n41. \nOperationally, and as far as can be determined from PJM’s IRAS Filing, there is no change \n \n41 See “2025 PJM Effective Load Carrying Capability and Reserve Requirement Study (ELCC/RRS) PJM \nResource Adequacy Planning.” October 22, 2025 at 16 and 17 showing how the resource portfolio as an \ninput \naffects \nELCC \nvalues. \nAvailable \nat \nhttps://www.pjm.com/-/media/DotCom/planning/res-\nadeq/elcc/2025-pjm-elcc-rrs.pdf. \nSee \nalso \nhttps://www.pjm.com/planning/resource-adequacy-\nplanning/effective-load-carrying-capability for yearly study results and data files that show assumed \ngenerator mix as data inputs. \n42 PJM proposed Attachment DD-4, Section VII (i) (i) \n43 PJM proposed Attachment DD-4, Section VII (i) (ii)"},{"page":34,"startToken":9539,"endToken":9852,"text":"16 \n \nto ELCC modeling to reflect the different treatment of BYONC Resources, which is unduly \ndiscriminatory and preferential treatment for BYONC resources versus all other Capacity \nResources with regard to ELCC value. Take, for example, a new 4-hour battery energy \nstorage (“BESS”) resource with an ELCC value of 59% of ICAP for 2029/2030 contracts \nwith a New Large Load. This ELCC value is locked in at 59% for the duration of the \ncontract with the New Large Load. Yet, PJM’s estimates of future ELCC values show the \nELCC for 4-hour BESS resources declining over time.44 The BYONC 4-hour BESS is \ngiven more credit than PJM’s own ELCC studies would show. For example, PJM’s studies \npredict ELCC values will decline 55 percent between 2027/2028 and 2035/2036, yet the \nBYONC 4-hour BESS would not face this impact. So, even if by 2035/2036 the 4-hour \nBESS ELCC value is 28%, the BYONC would still get credit for 59% despite being the \nsame technology. Furthermore, adding the new 4-hour BESS leads to a decline in the \nELCC value of all 4-hour BESS on the system,45 yet the BYONC version of 4-hour BESS \nwill not have to face this consequence which further amplifies the unduly discriminatory \nand preferential treatment of BYONC versus other similarly situated resource \ntechnologies. \n42. \nThere is also unduly discriminatory treatment of loads in this regard. Existing loads that do \nnot qualify as New Large Load face the implications of ELCC risk in the RPM BRA and \nIAs or with any bilateral contracts they may have with Capacity Resources that do not meet \nthe BYONC definition. Those loads face the risk and uncertainty of changing ELCC values \n \n44 See “Preliminary ELCC Class Ratings for Period Delivery Year 2027/28 – Delivery Year 2035/36.” \nAvailable \nat \nhttps://www.pjm.com/-/media/DotCom/planning/res-adeq/elcc/preliminary-elcc-class-\nratings.pdf.  \n45 Id."},{"page":35,"startToken":9852,"endToken":10176,"text":"17 \n \nwithout recourse. In effect, New Large Loads and their associated BYONC are insulated \nfrom ELCC volatility while other loads must face the market implications of that year-to-\nyear volatility. From a load perspective this too is unduly discriminatory and preferential \ntreatment of one type of load over all others. \n43. \nFurthermore, given the differential treatment of BYONC and Existing Capacity Resources \nin their offer requirements into RPM BRAs and IAs, holding the ELCC values of BYONC \nat the levels of the first DY in which the contract starts misrepresents the “real supply” of \ncapacity based on ELCC values that are changing year-over-year. This is detrimental to \nreliability. The example of the BYONC version of 4-hour BESS above over-representing \nthe supply of capacity further erodes the fidelity of the RPM BRA or IA price signal by \noverstating the supply of UCAP and further resulting in undue price discrimination against \nExisting Capacity Resources. \n44. \nAgain, a simple example shows the problem. Suppose in a BRA, that there is BYONC \ninserted as a price taker under a weighted average ELCC value of 75% based on an ICAP \nvalue of 10,000 MW that has been fixed since it entered service in a previous DY. \nHowever, the PJM updated ELCC values of those 10,000 MW of BYONC ICAP has a \nweighted average ELCC value of 60% for the BRA. PJM would nonetheless runs the BRA \nas if this supply has a 75% ELCC value, resulting in the BRA clearing at $300/MW-day \nand indicating the reliability target is met. But if the BYONC had been modeled as the rest \nof the supply curve at a 60% ELCC value applicable to all other resources, the supply \nwould have been reduced by 1,500 MW, and resulting in the BRA clearing at $450/MW-\nday and showing a possible shortfall in meeting the reliability target.   \n45. \nThe unduly discriminatory and preferential treatment of BYONC thus has effect of"},{"page":36,"startToken":10176,"endToken":10464,"text":"18 \n \nmasking potential resource adequacy shortfalls in the future and sending price signals that \nno new entry is needed.  \nD. The Implicit Restrictions on the LSEs and Loads with Whom Existing Capacity \nResources Can Contract Relative to Planned Capacity Resources and BYONC \n46. \nFor New Large Loads to avoid IRAS, they must contract with BYONC. PJM’s proposal, \nby exclusion, forbids New Large Load from contracting with Existing Capacity Resources \nto cover its capacity requirement. Yet, PJM would permit new loads that are not New Large \nLoads coming onto the system to contract with Existing Capacity Resources to cover those \ncapacity needs under the RAA.  \n47. \nLoad growth, regardless of the size of any specific load, requires UCAP to cover its \nposition. Yet, PJM is explicitly engaging in undue discrimination and preferential \ntreatments of loads regarding who they can contract with to satisfy their capacity \nrequirements.   \n48. \nThe unduly discriminatory treatment of new loads cascades down to undue discrimination \nand preferential treatment of Capacity Resources based on their in-service date and with \nwhom they may contract to provide UCAP. Existing Capacity Resources are, de facto, \nprecluded from contracting with New Large Load as PJM is mandating that New Large \nLoad will not be excused from IRAS unless it contracts with BYONC alone. Existing \nCapacity Resources and BYONC as defined by PJM in its filing all provide UCAP, yet \nsome UCAP is being treated preferentially while other UCAP is being discriminated \nagainst based on the size and in-service dates of the load and generation.    \nE. Disparate Treatment of Different Loads by Size and In-Service Date for \nCompensation for Load Reductions in Real-Time Operations \n49. \nEligible New Large Loads will be required to provide IRAS. That is, they will be required"},{"page":37,"startToken":10464,"endToken":10748,"text":"19 \n \nto be curtailed prior to the deployment of Demand Resources which are Capacity Resources \nin RPM. As compensation for this “service,” the Eligible New Large Loads will get paid \n50% of PAI penalty per MWh.46 \n50. \nNo other loads on the PJM system that are curtailed, including those voluntarily doing so \nas Economic Demand Response or for peak load shaving purposes, are compensated in the \nsame manner for energy reductions as Eligible New Large Loads, though the load \nreductions will have the same reliability benefit.  In real-time operations, when system \nconditions are becoming critical, load reductions of any kind are observationally equivalent \nfrom an overall energy balance perspective yet will be compensated differently. \nF. Eligible New Large Load Providing IRAS is Compensated and Treated Differently \nfrom Load Reductions Taken by Economic Load Response, Pre-Emergency Load \nResponse, and Emergency Load Response \n51. \nEconomic Load Response, Pre-Emergency Load Response, and Emergency Load \nResponse (collectively Load Response or “LR”) are compensated at the Locational \nMarginal Price (“LMP”) in the energy market for load reductions.47 Further, LR is \naccounted for in the calculation of LMP based on their offers that are submitted into the \nenergy market.   \n52. \nIn contrast, Eligible New Large Load under IRAS is compensated for energy reductions \nmandated by IRAS at 50% of the PAI Penalty Rate.  For the RTO in the 2028/2029 DY \nthis is $1,565.24/MWh48 which is higher than the $1,000/MWh offer cap for supply \n \n46 Proposed PJM Tariff, Attachment DD-4, Section X (a). \n47 PJM Operating Agreement (OA”), Schedule 1, Section 2.5(b) and the same provisions in the PJM Tariff, \nAttachment K-Appendix.  \n48 PJM OA, Schedule 1, Section 1.10(d)."},{"page":38,"startToken":10748,"endToken":11076,"text":"20 \n \nresources, including LR, that exists except in the most extreme of circumstances.49  \nAdditionally, PJM does not propose reductions from IRAS to be considered in LMP price \nformation nor compensating IRAS reductions at LMP.  \n53. \nThis is unduly discriminatory and preferential treatment of IRAS reductions relative to LR \nreductions. First, the value of energy at the time of the reduction is LMP, and not any other \nprice, yet IRAS reductions are compensated differently. Second, LR can set the LMP if it \nis the marginal action taken to maintain energy balance, but IRAS reductions by Eligible \nNew Large Loads cannot. \n54. \nBut even worse is that the treatment of IRAS reductions sends the wrong price signal to \nthe energy market regarding system conditions. For example, say there is 2,000 MW of \nIRAS that is reduced. Prior to this reduction, assume the energy price is $800/MWh \nindicating the system is approaching possible reserve shortage conditions and is using up \nall but the most expensive of resources to maintain energy balance. When 2,000 MW of \nIRAS load is called off the system, PJM is taking an action that is priced at over \n$1,500/MWh. Intuitively, this $1,500/MWh cost should be setting LMP. However, because \nIRAS reductions do not set the LMP, this action instead results in prices declining to \n$400/MWh. In effect, PJM is declaring an Emergency Action, yet the prices are going \ndown as a result which is signaling to the market that conditions are not so dire. \n55. \nAnother implication is that IRAS, which is not a Capacity Resource, is called before LR, \nwhich are Capacity Resources but for Economic Load Response, and likely have offers \nbelow the rate at which IRAS is compensated. Such a practice violates the simple principles \n \n49 Id. Offers may go up to $2000/MWh based on verifiable costs and for LR, depending on response time \nmay include reserve penalty factors in addition to $1000/MWh."},{"page":39,"startToken":11076,"endToken":11328,"text":"21 \n \nof economic dispatch upon which PJM’s and all other RTO markets are based: lower cost \nresources should be called first. This unduly discriminatory and preferential treatment of \nIRAS relative to LR not only sends the wrong real-time reliability signal, but it also impacts \nreal-time pricing upon which many resource owners depend for earning revenues, and \nsends chilling longer-term signals to investors in potential future generation projects that \nenergy market pricing is being artificially reduced making such investments unattractive.    \n \nV. IRAS CREATES MULTIPLE UCAP COMMODITIES OUT OF A ONCE FUNGIBLE \nCOMMODITY  \n56. \nThe ultimate effect of PJM’s IRAS Filing is to take what was once a fungible commodity \nand artificially distinguish between UCAP based on the load it serves and the in-service \ndates of Capacity Resources and how those resources have entered the market. As \ndiscussed below, PJM has created distinct products that are fundamentally UCAP but differ \nnot based on any reliability considerations but purely for purposes of price discrimination.   \n \nA. UCAP from Existing Capacity Resources \n57. \nUCAP from Existing Capacity Resources can only be used to serve existing loads or new \nloads that do not qualify as New large Load. As described previously, Existing Capacity \nResources have, de facto, been forbidden from contracting with New Large Loads to help \nNew Large Loads avoid IRAS.  \n58. \nUCAP from Existing Capacity Resources cannot be used to replace BYONC or even RBP \ncapacity despite all of them providing UCAP. This clearly breaks the fungibility between \nExisting Capacity Resources and BYONC and RBP Resources."},{"page":40,"startToken":11328,"endToken":11593,"text":"22 \n \nB. UCAP from BYONC Resources \n59. \nBYONC Resources are of a different vintage than all other UCAP resource types. By \ndefinition, neither RBP Resources nor Existing Capacity Resources can be used to replace \nBYONC.  \n60. \nFurthermore, the language in the IRAS proposal implies that once BYONC is contracted \nwith a New Large Load, it cannot be used to replace other BYONC Resources unless that \nNew Large Load is completely out of service. No considerations are given for New Large \nLoad demands to fluctuate year-by-year that would allow BYONC to be resold to other \nNew Large Loads in search of BYONC to avoid application of IRAS.  \n61. \nIn short, BYONC resources once contracted to a New Large Load are permanently tied to \nthe New Large Load unless the load permanently goes away and thus different BYONC \ncannot be used to replace other BYONC thereby making each BYONC unique without any \nability to replace one-for-one.      \n \nVI. IMPLIED PROPERTY RIGHTS CREATED AND GRANTED BY IRAS \n62. \nA necessary condition for a well-functioning market is well-defined property rights to the \nunderlying commodity that is being bought and sold.50 The seller of the commodity has the \nrights to the commodity up to and until it sells the commodity to a buyer. Upon completing \nthe transaction, the buyer takes title to the commodity and then has the property right to \nthat commodity. \n63. \nFurther, well defined property rights imply that the holder of a commodity can sell that \ncommodity to any buyer that is willing to pay for the underlying commodity. It does not \n \n50 See supra Note 11."},{"page":41,"startToken":11593,"endToken":11894,"text":"23 \n \nmatter if it is “an initial sale” or a “resale” of the commodity. \n64. \nUntil now, both the organized and bilateral capacity markets in PJM adhered to these \nprinciples: the property rights to the commodity, UCAP, were vested initially in the \nproducer of that commodity (Capacity Resources), which could then sell the commodity to \nany buyer (LSE).  That buyer (LSE) could then use the UCAP to satisfy its own capacity \nobligations or sell it, bilaterally or through an RPM Auction or bilateral transaction. The \nIRAS proposal departs from this approach and these principles and effectively reallocates \nproperty rights over UCAP from Existing Capacity Resource to existing load. \nA. Property Rights of Existing Capacity Resources Have Been Reallocated to Existing \nLoad by Fiat \n65. \nWhat PJM has proposed with IRAS is a de facto, involuntary reallocation of property rights \namong various parties that is affected without any contractual agreements among the \ntransferees or compensation. The most egregious example of this is that New Large Loads \nwill not be allowed to purchase UCAP from Existing Capacity Resources to meet their \ncapacity obligations.  \n66. \nWhat PJM has indirectly, but unmistakably done, is to expropriate and reallocate the \nproperty rights of the owners of Existing Capacity Resources to the UCAP produced by \nthose resources to existing loads and new loads other than New Large Loads. This has been \nreinforced by taking Eligible New Large Loads out of the VRR Curve for UCAP, and thus, \nonly representing existing load and new load growth that is not New Large Load in the \ndemand for UCAP.  \n67. \nThis assignment of property rights has been undertaken without any contractual agreement \nbetween the Existing Capacity Resources and existing load and new loads. There has been \nno explicit transaction price that has been agreed upon by Existing Capacity Resources and"},{"page":42,"startToken":11894,"endToken":12244,"text":"24 \n \nthe existing and new load. It is simply the expropriation of rights of Existing Capacity \nResources by the fiat of a proposed tariff change. \nB. Property Rights to Energy In Real-time Operations has Been Assigned to Eligible New \nLarge Load in IRAS without any Upfront Purchase of Energy \n68. \nAs noted above PJM has proposed that Eligible New Large Load be compensated for \nenergy reductions mandated by IRAS at 50% of the PAI Penalty Rate.51 For the RTO in \nthe 2028/2029 DY this is $1,565.24/MWh which is higher than the $1,000/MWh offer cap \nfor supply resources that exists except in the most extreme of circumstances.  \n69. \nWhat the IRAS proposal does is to assign to Eligible New Large Loads property rights to \nthe energy they expect to consume without the obligation to purchase that energy up front. \nFurther, by paying Eligible New large Loads a price based on the PAI penalty rate, the \nIRAS proposal also unduly discriminates against other LR that is paid the prevailing LMP \nin the market for what is effectively the same actions with the same effect on the energy \nmarket. \n70. \nNot only is this a preferential assigning of property rights to energy, but it also flies in the \nface of the Day-ahead and Real-time two settlement system that is the foundation of all \nFERC-jurisdictional RTO energy markets. Under the two-settlement system, energy in the \nDay-ahead market is transacted and load pays for its expected usage, and suppliers are paid \nfor the committed energy. In real-time operations, loads that use less than they purchased \nin the Day-ahead market sell energy back at the real-time price. That is load has “taken \n \n51 Proposed PJM Tariff, Attachment DD-4, Section X(a). The penalty rate is defined in the PJM Tariff, \nAttachment DD, Section 10, Non-Performance Charge Rate is (Net Cost of New Entry (stated in terms of \ninstalled capacity) for the LDA and Delivery Year for which such calculation is performed * (the number \nof days in the Delivery Year / 30) / (the number of Real-Time Settlement Intervals in an hour)."},{"page":43,"startToken":12244,"endToken":12560,"text":"25 \n \ntitle” to energy Day-ahead and has then sold it back in real-time. \n71. \nWhat PJM has done is to assign a property right to energy consumption outside of the two-\nsettlement system to provide an additional payment that is not available to any other load \nfor reductions that occur prior to the use of Demand Resources. Who is on the other side \nof those payments? LSEs in the load zone in which those reductions take place as if those \nLSEs have purchased that energy directly. \n72. \nThe LSEs in the load zone who would pay this compensation are assumed to be taking title \nto that energy at a “contractual price” that is outside of the Day-ahead and Real-time energy \nmarkets. Yet, those LSEs have not necessarily requested such reduction, nor did they \nnecessarily agree to pay for those reductions at a price that differs from LMP. Suppose an \nLSE in the load zone in which an Eligible New Large Load undertakes the IRAS reduction \nhas already purchased energy in the Day-ahead energy market, but its consumption is \nunchanged in real-time. That LSE has already purchased its energy and has no real-time \nsettlement. Yet that LSE will be “billed” as if it purchased and “took title” to energy in \nreal-time it did not need nor consume. Implicitly PJM is assigning property rights in the \nform of an obligation to the other LSEs without Eligible New Large Loads that those LSEs \ndid not need nor request by paying the Eligible New large Loads under IRAS for mandated \nload reductions. \n     \nVII. \n MARKET \nINEFFICIENCIES, \nMISPLACED INCENTIVES, AND POOR \nRELIABILITY OUTCOMES THAT WILL RESULT FROM IRAS \n73. \nAnytime market rules change, the incentives for market participants are altered. What PJM \nseems to wish to achieve through the IRAS proposal is to provide incentives to generation \nand loads to take actions that will help alleviate current UCAP shortfall that are expected"},{"page":44,"startToken":12560,"endToken":12894,"text":"26 \n \nin PJM due to the growth of New Large Loads.  \n74. \nUnfortunately, as explained below, the incentives resulting from IRAS are unlikely to close \nthis shortfall, and possibly may make it even worse.    \nA. The Incentives Under IRAS Likely Will Not Bring the New Entry that PJM Expects  \n75. \nAs explained above, the treatment of New Large Loads that do not have contracts with \nBYONC in the RPM BRAs and IAs will result in lower prices in those auctions that do not \nreflect the actual reliability needs of the system. The immediate implication of this is that \nany potential new entry of UCAP will not wish to enter through the BRAs or IAs but would \nrather opt to get a long-term contract as BYONC with a New Large Load.  \n76. \nBut will New Large Loads wish to contract with BYONC? Given that New Large Loads \nhave a non-zero probability that they will not be called upon at all in any given year to \nexecute on IRAS, they may wish to forego entering into contracts with BYONC as it may \nbe lower cost in expectation given that price formation in the RPM BRAs and IAs will be \nbiased downward by having their own loads excluded. On top of this, Eligible New Large \nLoads under IRAS will get paid for reductions for energy they have not even purchased in \nadvance which makes BYONC contracting even less attractive. \n77. \nFurther, many large loads have installed back-up generation to account for potential issues \nwith disconnection due to problems on the local transmission or distribution system \nalready. New Large Loads could similarly choose to rely on back-up generation to avoid \nany loss of service. Given all these incentives, New Large Loads may simply find it easier \nand more economic to forego contracts with BYONC.   \n78. \nIf that is the case, then the new entry PJM is hoping for to serve New Large Loads will not \nmaterialize through BYONC contracts, nor will it occur through an RPM auction structure"},{"page":45,"startToken":12894,"endToken":13168,"text":"27 \n \nthat excludes Eligible New Large Loads where prices are not reflective of the costs to bring \nnew entry into service. Thus, PJM will be faced with other load growth, plus existing load \nwhile the supply of capacity remains stagnant making the reliability shortfall even more \nacute. \n79. \nFinally, PJM’s RBP filing has already anchored expectations that prices will be artificially \nkept below competitive levels, further sending signals for New Large Loads to opt to be \nsubject to IRAS rather than entering into BYONC contracts, thereby deterring new entry \nof generation.52    \nB. Existing Capacity Resources Will Have Incentives to Exit the Market if New Entry \nDoes Occur. \n80. \nSuppose IRAS does manage to attract new generation entry as PJM expects to happen. This \nwill result in increasingly unduly discriminatory treatment in pricing between Existing \nCapacity Resources and BYONC Resources. BYONC resources are required to offer their \ncapacity into the RPM auctions as price takers, and the associated demand for UCAP is \ninserted into the VRR Curve as an offset to that supply with the idea that this should not \naffect overall price formation. Existing Capacity Resources will presumably face lower \nprices and will never get the benefit of price formation that will price in new entry in the \nmarket as it is needed.      \n81. \nOver time, as ELCC values change, going forward costs increase, and most importantly, \nother opportunities become available, Existing Capacity Resources will look to sell their \ncapacity to other neighboring markets such as MISO, or non-RTO areas at higher prices \nthan they can get in PJM as Existing Generation Capacity Resources. This is not a \n \n52 See supra Note 12."},{"page":46,"startToken":13168,"endToken":13450,"text":"28 \n \ntheoretical consideration but has already been happening with PJM Resources selling \ncapacity into neighboring NYISO and MISO at higher prices than they can receive in PJM. \n82. \nIt is even possible, as has already been witnessed, that generation could deactivate from \nPJM and be physically taken to other markets where they may be more profitable, and \nwhere the proceeds of sales of used generators and associated equipment may be a better \nfinancial option than remaining in PJM.   \nC. New Large Loads Will Have Incentives to Inefficiently Reduce Their Size to Avoid \nIRAS \n83. \nPJM’s proposal to define New Large Loads as being greater than or equal to 50 MW allows \ncertain entities to break up their loads into smaller sizes to avoid the application of having \nto be in the Large Load Registry and be subject to IRAS.53 Many of the Large Load uses \nare for data centers or computational needs. While PJM proposes to aggregate affiliated \nnew loads within one mile of each other, there is no reason a load cannot be more widely \ndispersed to avoid application of IRAS.  \n84. \nFor those larger loads below 50 MW, they can avoid early curtailment, and also benefit \nfrom the artificially low capacity prices to which PJM has anchored market expectations \nthrough PJM’s most recent Periodic Review and RBP filing.54 At a maximum price of \n$555/MW-day UCAP, it is lower than the new cost of entry across all resource types, and \nthe “undersized” large loads can pay less than if they contracted with new capacity and \navoid IRAS altogether. \n \n53 PJM Proposed RAA Schedule 11, and Proposed PJM Tariff, Definitions E-F. \n54 See supra Note 12 and Note 29."},{"page":47,"startToken":13450,"endToken":13791,"text":"29 \n \nVIII. CONCLUSIONS AND A WAY FORWARD BY LEARNING THE LESSONS OF \nHISTORY \n85. \nPJM’s IRAS proposal suffers from a multitude of deficiencies that are unduly \ndiscriminatory and preferential and that will lead to the erosion of the RPM capacity market \nconstruct. One aspect is destroying the fungibility of the UCAP commodity as it exists \ntoday, leading to increasing difficulty in transacting UCAP which by itself will increase \ncosts for all market participants.     \n86. \nAnother major problem with the IRAS concept is the incentives that are provided to \nExisting Capacity Resources, potential new entry resources, and larger loads are not \nconducive to achieving the pricing and reliability objectives PJM has stated. If anything, \nthose incentives will work against PJM’s stated objectives.  \n87. \nA shorter way of describing this goes back to a seemingly forgotten history of the \ncommodity natural gas market following the Natural Gas Policy Act of 1978 (“NGPA”) \nwith “old gas” and “new gas.”55  So-called “old gas” from wells drilled prior to the act \nremained rate regulated. In contrast, so-called “new gas” was priced at higher prices than \n“old gas” and would eventually reflect market rates without any price regulation by 1985.56 \n“Old gas” and “new gas” were priced differently yet were really the same commodity \nplaced into the same pipeline system. This is exactly what PJM would do with UCAP in \nthe IRAS proposal. We effectively have “old UCAP” where PJM is proposing to sharply \n \n55 See NaturalGas.org, “The History of Regulation” available at https://naturalgas.org/regulation/history/. \n(“NaturalGas.org”) “See also Paul L. Joskow, “Natural Gas: From Shortages to Abundance in the United \nStates.” American Economic Review: Papers and Proceedings 2013, 103(3): 338–343. (“Joskow”). See \nalso Paul L. Joskow and Roger G. Noll, “Economic Regulation: Deregulation and Regulatory Reform in \nthe 1980s” in Chapter 6, “Economic Regulation,”, Martin Feldstein, editor, American Economic Policy in \nthe 1980s, University of Chicago Press, January1994. Section 6.2.3 Natural Gas (“Joskow and Noll”). \nAvailable at http://www.nber.org/chapters/c7757.   \n56 NaturalGas.org."},{"page":48,"startToken":13791,"endToken":14127,"text":"30 \n \ncontrol the price paid to Existing Capacity Resources and “new UCAP” in the form of \nBYONC that is paid a market driven rate for UCAP.  \n88. \nThe history of “old gas” and “new gas” tells us that bifurcated pricing of the commodity \ndoes not lead to “curing the shortages” that resulted from the old, regulated pricing regime \nthat led to NGPA in the first place.57 It was believed that pricing “new gas” on a trajectory \nto market prices while leaving “old gas” at regulated pricing would help shield natural gas \ncustomers from the pricing shock of the price of “new gas” and that eventually all gas \nwould be “new gas” whose price was fully deregulated by 1985.58 That did not, in fact, \noccur.  The “old gas”/“new gas” construct failed to cure the ongoing shortage problem and \nproduction was unable to keep up with demand for natural gas as consumers switched from \noil to natural gas in the wake of the 1979-1980 oil crisis.59  \n89. \nThe current situation in which PJM finds itself is hauntingly similar to that of the natural \ngas industry from nearly 50 years ago.  PJM capped UCAP at prices that were artificially \nlow relative to market prices based on the cost to build akin to the old, regulated pricing \nregime of natural gas prior to the 1978 NGPA. The shortages of gas were not immediately \ncured through “old gas” and “new gas”, nor will PJM’s shortfall of UCAP. In fact, what \nPJM proposes in curtailing certain customers under IRAS goes back to the natural gas \nindustry practices prior to the NGPA in curtailing certain customers.60   \n90. \nThe issue in natural gas was resolved very simply under the Natural Gas Wellhead \nDecontrol Act in 1989 where natural gas commodity prices would be market driven based \n \n57 Joskow and Noll at 385, Joskow at 338. \n58 Joskow and Noll at 385. \n59 Joskow and Noll at 386. Joskow at 339. \n60 Joskow at 338. Joskow and Noll at 385."},{"page":49,"startToken":14127,"endToken":14242,"text":"31 \n \non the fungibility of the commodity and were fully deregulated by the end of 1992.61  The \nway forward for PJM is moving in the same direction.  Let the price of UCAP be market \ndriven based on the real costs of new entry as they are, and not as we wish they would be, \nand allow prices to rise commensurate with the cost of bringing new UCAP into service. \nNot only will this provide incentives for the new entry PJM seeks, but it will also likely \nprovide a check on New Large Load growth forcing them to face the true cost of bringing \nthose new loads into service. \n \n61 Joskow at 339. NaturalGas.org."},{"page":50,"startToken":14242,"endToken":14305,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \nPJM Interconnection, L.L.C., \n \n \n \n \n \n \n \n) \n \n \n \n \n \n        Docket No. ER26-3515-000 \n \n \n \n \n \n \n \nAFFIDAVIT \nI, Paul M. Sotkiewicz, Ph.D., hereby state, under penalty of perjury, that the statements \ncontained in the foregoing Affidavit on behalf of Electric Power Supply Association are true and \ncorrect to the best of my knowledge and belief. \n \n \n \n \n \n \nPaul M. Sotkiewicz, Ph.D."},{"page":51,"startToken":14305,"endToken":14307,"text":"ATTACHMENT 1"},{"page":52,"startToken":14307,"endToken":14833,"text":"Curriculum Vitae \nSotkiewicz Page 1 \n \n \n \n \n \nEDUCATION \nPAUL M SOTKIEWICZ, Ph.D. \nPresident and Founder, E-Cubed Policy Associates, LLC \n5502 NW 81st Avenue, Gainesville, FL 32653 \nE-mail : paul.sotkiewicz@e-cubedpolicy.com  \nPhone : +1-352-234-9500 Mobile: +1-610-955 2411 \n \nPhD, Economics, University of Minnesota, 2003 \nM.A., Economics, University of Minnesota, 1995 \nB.A. (High Honors), History/Economics, University of Florida, 1991 \nPROFESSIONAL AND ACADEMIC EXPERIENCE \n2016- \nPresident and Founder, E-Cubed Policy Associates, LLC, Gainesville, FL \n• \nFounded to provide expert advice, testimony, and policy research to private sector and government \nclients at the intersection of energy, environmental, and economic policy, and regulation. \n• \nSupporting litigation defending market participants against accusations of market manipulation in \nPJM’s markets.  \n• \nWorked with the Ontario Independent System Operator (IESO), in conjunction with the Brattle \nGroup, to help implement new settlement logic and protocols in their move to LMP-based market \ndesign. \n• \nAssisted Brattle Group and NYISO in developing strategies and analysis to move the NYISO \nmarkets toward a less carbon intensive future in response to state climate change initiatives.  \n• \nConducting analysis of recent past and future expected profitability of nuclear power plants under \nconsideration for state subsidies to keep these facilities in commercial operation and providing \nreports and testimony in front of state legislative bodies. \n• \nProvide capacity market design and expertise to the ENMAX Corp. in Calgary, AB regarding the \nAESO capacity market proposal filed in late 2018. \n• \nSupporting ENMAX Corp. during the AESO redesign of the energy and ancillary service market in \n2024-2025. \n• \nSupported litigation for a reactive power rate case for Panda Stonewall explaining the history \nbehind markets and that the filed rate from Panda Stonewall was consistent with precedent and \nlost market opportunities. \n• \nProviding PJM expertise to JPower USA Ltd in its development of new combined cycle gas \nfacilities in PJM and help move the project through the PJM interconnection processes as well as \nadvising on existing facilities in the PJM and NYISO market. \n• \nProvide ongoing stakeholder process representation and support in PJM for JPower USA Ltd. \n• \nProvided capacity market design expertise to the Alberta Electric System Operator in 2017 as they \nstarted their transition from an energy-only market to a combined energy and capacity market. \n• \nSupporting the Greek Electricity Market authoring, through ECCO International, a whitepaper on \nmarket power mitigation with a special look at buyer side market power mitigation in the energy \nmarket with the different indices that could be indicative of buyer market power.  \n• \nAuthored a Meter Data Study for the NYISO encompassing a survey of metering requirements for \ndemand resources and distributed energy resources in key ISO/RTO markets, the current use of \ndemand response baseline methodologies and use of such baselines for distributed energy \nresources in the context of REV in New York. \n• \nWork with clients in generation and merchant transmission development projects in various parts of \nPJM related to helping them through the interconnection process, understanding market rules, and \nregulatory policy and economic advice in the face of changing market rules. \n• \nSupporting clients in docketed proceedings at FERC and at the Florida Public Service Commission \nproviding expert testimony and analysis used in regulatory proceedings. These proceedings \ninclude need determinations, rate filings, RTO market design changes, and policy related"},{"page":53,"startToken":14833,"endToken":15440,"text":"Curriculum Vitae \nSotkiewicz Page 2 \n \nproceedings. \n• \nSupporting US government initiatives in exporting knowledge and experience regarding US electric \npower market and gas market development to the Chinese and Indian governments as they \nundertake green energy initiatives and look to improve the overall efficiency of the power system. \n• \nProvided expertise and litigation support to LS Power in is FPA Section 206 Complaint regarding \nthe calculation of energy and environmentally limited opportunity costs. \n• \nDeveloped expert testimony for two different coalitions of generation owners and for EKPC reading \nthe penalties and bonuses assessed during December 2022.   \n• \nSupporting Dairyland Power Cooperative in initiating PJM membership, purchase of exiting \ngenerating assets in PJM, and the use of transmission to move the purchased assets to MISO to \nserve Dairyland loads in MISO.   \n \n2015-2016 Contractor, YOH Inc. and working under the title of Senior Economic Policy Advisor, PJM \nInterconnection, L.L.C., Audubon, PA \n2010-2015 Chief Economist, Market Services Division, PJM Interconnection, L.L.C., Audubon, PA  \n2008-2010 Senior Economist, Market Services Division, PJM Interconnection, L.L.C., Audubon, PA \n• \nProvide analysis and advice with respect to the PJM market design and market performance \nincluding demand response mechanisms, intermittent and renewable resource integration, market \npower mitigation strategies, capacity markets, ancillary service markets, and the potential effects of \nenvironmental policies on the PJM markets. \n• \nCo-authored papers related to effects of the proposed Waxman-Markey climate change bill in 2009, \nthe implementation of the Mercury and Air Toxics Standards (MATS) and Cross State Air Pollution \nRule in 2011, and the potential effects of the EPA-proposed Clean Power Plan in 2015. \n• \nLed the Stakeholder Process to implement reserve shortage pricing in PJM in 2009-2010 and \nprovided expert testimony associated with FERC filings in 2010. \n• \nCo-authored paper to explain various market and policy concepts for PJM and its stakeholders \nincluding a paper explaining generator costs and compensation in 2010, a paper on alternatives for \ntransmission cost allocation in 2010, and a whitepaper on capacity market issues in 2012. \n• \nAdvised PJM executives on market power mitigation issues related to the Three Pivotal Supplier \ntest and cost-based offers used for market power mitigation in the PJM Energy Market in 2008-2009 \n• \nAdvised PJM executives and Board of Managers on demand response compensation prior to the \nissuance of FERC Order 745. \n• \nSupported and advised the Capacity Market Operations staff and PJM executives on all matters \nrelated to the Reliability Pricing Model (RPM) capacity market including implementation of the \nMinimum Offer Pricing Rule in its various iterations, administered determinations and/or \nreasonableness of Market Seller Offer Caps during disputes between Capacity Market Sellers \nand the Independent Market Monitor. \n• \nProvided advice to Capacity Market Operations staff and PJM executives on the RPM Triennial \nParameter Review Process in 2011 and in 2014 including supporting legal staff in making filings, \nproviding expert testimony, and providing expert advice during the 2011 and 2012 hearing and \nsettlement process at FERC. Supported and provided advice to Capacity Market Operations staff and \nPJM executives on Capacity Performance through stakeholder presentations, regulatory filings, and \nworking jointly with the IMM in developing the ideas and concepts taken from ISO New England’s Pay for \nPerformance design for us in PJM. \n• \nSupported the Federal State Government Policy outreach through by providing subject matter \nexpertise during one-on-one meetings with regulatory staff and Commissioners related to any \nissues of mutual interest and import between PJM and state commission, state environmental \nregulators, FERC staff, and EPA staff as needed. \n• \nCo-authored and co-led PJM’s responses to the Independent Market Monitor’s (IMM’s) State of the \nMarket Reports as well as remaining in communication with the IMM on various matters of concern \nand interest related to PJM market performance and design."},{"page":54,"startToken":15440,"endToken":15978,"text":"Curriculum Vitae \nSotkiewicz Page 3 \n \n• \nLed technical and non-technical external outreach efforts to promote PJM markets or explain PJM \npositions on policy or market design issues of current interest to industry stakeholders including \nacademic audiences and invited presentations at industry sponsored events. \n• \nProvided support in gas/electric coordination discussions within PJM and the between the power \nand gas industries, as well as operations support during critical operating periods in January 2014 \nthrough calls and inquiries to PJM generators and pulling environmental permits to better \nunderstand generator operating limitations on back-up fuel. \n• \nProvided periodic reports on market performance and the state of PJM’s markets to the PJM Board \nof Managers Competitive Markets Committee including the relationship between PJM’s markets and \nmajor fuel market, environmental policy, and macroeconomic trends. \n• \nActed in the role of an internal consultant and advisor to all PJM departments and divisions, as \nneeded, to address any questions or concerns surround market performance, market design, and \ngeneral economic or environmental policy questions. \n• \nSupported development and issuance of the PJM Renewable Integration Study by outside vendors. \n \n2000–2008  Director of Energy Studies, Public Utility Research Center and Lecturer, \nDepartment of Economics, University of Florida, Gainesville, FL \n• \nDesigned and delivered executive education and outreach programs in electric utility and regulatory \npolicy and strategy for professionals in government, regulatory agencies, and industry primarily for \ndeveloping countries. \n• \nCreated and delivered electricity regulatory policy curriculum for the PURC/World Bank \nInternational Training Program on Utility Regulation and Strategy offered twice per year for 65 to \n95 industry and regulatory professionals in each course. \n• \nServed as the electricity expert and liaison to the Florida electric utilities who were \ncontributing members of PURC. \n• \nDeveloped electricity related topics and obtained speakers for the PURC Annual Conferences held \neach February on matters related to environmental policy, wholesale market restructuring, so-called \n“hurricane hardening” of power systems after the 2004-2005 hurricane seasons, and other policy \nrelated matters of interest to the state of Florida. \n• \nServed the PURC liaison to the consultants retained by PURC to evaluate the hardening of \nelectricity infrastructure in the wake of the 2004 and 2005 hurricane seasons. \n• \nConducted original academic research related to electricity regulation and policy and published in \npeer reviewed academic and policy journals \n• \nDeveloped customized regulatory training courses or sessions jointly prepared with other \norganizations for on-site delivery in Panama, Trinidad & Tobago, Brazil, Mexico, Peru, Bolivia, \nArgentina, Grenada, South Africa, Zambia, Namibia, and Cambodia \n• \nServed as an advisor and subject matter expert on wholesale restructuring and market issue to \nFlorida Governor Jeb Bush’s Energy 2020 Study Commission 2000-2001. \n• \nTaught classes as needed in the Economics Department on environmental economics, regulatory \neconomics, and a large lecture class of managerial economics \n \n1999–2000  Economist, Office of Markets, Tariffs, and Rates, United States Federal Energy \nRegulatory Commission, Washington, DC \n1998–1999  Economist, Office of Economic Policy, United States Federal Energy \nRegulatory Commission \n• \nProvided analysis and research related to filings made by ISO/RTO markets as they commenced \noperations as centralized wholesale power markets. \n• \nLed the economic analysis and evaluation of the NYISO wholesale power market in its initial filings \nof its market design and subsequent filings after operations commenced. \n• \nLed economic analysis and evaluation of multiple filings by the California ISO related to requested"},{"page":55,"startToken":15978,"endToken":16458,"text":"Curriculum Vitae \nSotkiewicz Page 4 \n \nmarket design changes filed after starting operations in 1998. \n• \nSupported analysis and evaluation of other ISO/RTO markets as needed. \n• \nSupported and provided analysis on merger applications as needed. \n• \nConducted original research while on the staff of the Chief Economic Advisor in the Office of \nMarkets, Tariffs, and Rates related to unit commitment models used in day-ahead electricity \nmarkets and pricing in the presence of lumpy decisions and operational characteristics (technically \nknown as non-convexities). \n \n1992–1998 Instructor, Department of Economics, Augsburg College, Minneapolis, MN \n• \nTaught small classes of introductory microeconomics, labor economics, money and banking, and \nenvironmental economics \n \n1992–1998 Instructor, Department of Economics, University of Minnesota, Minneapolis, MN \n• \nTaught large lecture classes of primarily introductory microeconomics to classes of up to six \nhundred students three times per year, managing a staff of teaching assistants and graders \nand developing curriculum and exams. \n• \nTaught smaller classes of introductory microeconomics as well as environmental economics. \n \n \nPUBLICATIONS AND BOOK CHAPTERS \nErik Ela; Farhad Billimoria; Kenneth Ragsdale; Sai Moorty; Jon O’Sullivan; Rob Gramlich; Mark Rothleder; Bruce Rew; \nMatti Supponen; Paul Sotkiewicz, “Future Electricity Markets: Designing for Massive Amounts of Zero-Cost Variable \nRenewable Resources,” IEEE Power and Energy Magazine, Volume 17, Issue 6, November/December 2019, Page 58-\n66.  \nCovino, Susan, Andrew Levitt, and Paul Sotkiewicz, “The Fully Integrated Grid: Wholesale and Retail, Transmission and \nDistribution,” in Future of Utilities- Utilities of the Future: How Technological Innovations in Distributed Energy Resources \nWill Reshape the Electric Power Sector, Fereidoon P. Sioshansi, editor, Chapter 22, pp.417-434, 2016. \n \nM. Ahlstrom; E. Ela; J. Riesz; J. O’Sullivan; B. F. Hobbs; M. O’Malley; M. Milligan; P. Sotkiewicz; J. Caldwell, “The \nEvolution of the Market: Designing a Market for High Levels of Variable Generation,” IEEE Power and Energy \nMagazine, Volume: 13, Issue: 6, 2015, Pages: 60 – 66. \n \nAnthony Paul, Chair, Meghan McGuinness, Walter Short, Paul Sotkiewicz, John Weyant, “Integrated Planning Model \n(IPM) Base Case Version 5.13 Peer Review,” Peer Review Report Prepared for the U.S. Environmental Protection \nAgency, Clean Air Markets Division through RTI International, October 2014. \n \nP. Sotkiewicz, G. Helm, M. Abdur-Rahman, “A Forward Capacity Market as a Necessary Condition for Integrating \nRenewable Resources,” CIGRE Study Committee C5, C5-307, CIGRE Sessions and Proceedings, 2014. \n \nJ. Smith, M. Ahlstrom, J. Dumas, P. Eriksen, J. O’Sullivan, P. Sotkiewicz, “Market Evolution for RES Integration in the \nUS and Europe,” CIGRE Study Committee C5, C5-308, CIGRE Sessions and Proceedings, 2014.  \n \nBresler, Stuart, Paul Centollela, Susan Covino, and Paul Sotkiewicz, “Smarter Demand Response in RTO Markets: The \nEvolution Towards Price Responsive Demand in PJM,” in Energy Efficiency: Towards the End of Demand Growth, \nFereidoon P. Sioshansi, editor, Chapter 16, pp.419-442, 2013. \n \nCovino, Susan, Pete Langbein, and Paul Sotkiewicz, “The Fully Integrated Grid: Wholesale and Retail, Transmission \nand Distribution,” in Smart Grid: Integrating Renewable, Distributed, and Efficient Energy, Fereidoon P. Sioshansi, editor, \nChapter 17, pp.421-452, 2012."},{"page":56,"startToken":16458,"endToken":16943,"text":"Curriculum Vitae \nSotkiewicz Page 5 \n \n \nP. M. Sotkiewicz, “Value of Conventional Fossil Generation in PJM Considering Renewable Portfolio Standards: A Look \ninto the Future,” IEEE Power and Energy Society General Meeting, 2012.  \n \nR. F. Chu; P. F. McGlynn; P. M. Sotkiewicz, “Transmission Planning for Generation at Risk due to Environmental \nRegulations and Public Policy Initiatives” IEEE Power and Energy Society General Meeting, 2012.  \n \nP. M. Sotkiewicz; J. M. Vignolo, “The Value of Intermittent Wind DG under Nodal Prices and Amp-mile Tariffs,” \nTransmission and Distribution: Latin America Conference and Exposition (T&D-LA), 2012 Sixth IEEE/PES. \n \nHelman, Udi, Harry Singh, and Paul Sotkiewicz, “RTOs, Regional Electricity Markets, and Climate Policy,” in Generating \nElectricity in Carbon Constrained World, Fereidoon P. Sioshansi, editor, Chapter 19, pp.527-564, 2010. \n \nJ. C. Smith; S. Beuning; H. Durrwachter; E. Ela; D. Hawkins; B. Kirby; W. Lasher; J. Lowell; K. Porter; K. Schuyler; \nP. Sotkiewicz, “The Wind at Our Backs,” IEEE Power and Energy Magazine, Volume: 8, Issue: 5, 2010 Pages: 63 - \n71 \n \nJ. C. Smith; S. Beuning; H. Durrwachter; E. Ela; D. Hawkins; B. Kirby; W. Lasher; J. Lowell; K. Porter; K. Schuyler; P. \nSotkiewicz, “Impact of Variable Renewable Energy on US Electricity Markets,” Power and Energy Society General \nMeeting, 2010 IEEE \n \nHolt, Lynne, Paul M. Sotkiewicz, and Sanford V. Berg. 2010. \"Nuclear Power Expansion: Thinking About Uncertainty\" \nThe Electricity Journal, 235:26-33. \n \nHolt, Lynne, Sotkiewicz, Paul, and Berg, Sanford, “(When) To Build or Not to Build? The Role of Uncertainty in Nuclear \nPower Expansion.” Texas Journal of Oil, Gas, and Energy Law, Volume 3, Number 2, 2008, pp. 174-217. \n \nSotkiewicz, Paul M. and Vignolo, J. Mario, “Towards a Cost Causation Based Tariff for Distribution Networks with DG.” \nIEEE Transaction on Power Systems, Vol. 22, No. 3, August 2007, pp. 1051-1060. \n \nSotkiewicz, Paul and Vignolo, Jesus Mario. \"Distributed Generation.\" The Encyclopedia of Energy Engineering and \nTechnology, Vol. 1, pp 296-302. Ed. Barney Capehart. New York: CRC Press, Taylor, and Francis Group, 2007. \n \nSotkiewicz, Paul. \"Emissions Trading.\" The Encyclopedia of Energy Engineering and Technology, Vol. 1, pp. 430-437. \nEd. Barney Capehart. New York: CRC Press, Taylor, and Francis Group, 2007. \n \nVignolo, Jesus Mario and Sotkiewicz, Paul M., “Towards Efficient Tariffs for Distribution Networks with Distributed \nGeneration,” Cogeneration and On-site Power Production, November-December 2006, pp. 67-75. \n \nJamison, Mark A. and Sotkiewicz, Paul M., “Defining the New Policy Conflicts,” Public Utilities Fortnightly, July 2006, pp. \n36-40, 50. \n \nSotkiewicz, Paul M. and Vignolo, Jesus Mario “Nodal Pricing for Distribution Networks: Efficient Pricing for Efficiency \nEnhancing DG.” IEEE Transaction on Power Systems, Vol. 21, No. 2, May 2006, pp. 1013-1014. \n \nSotkiewicz, Paul M. and Vignolo, Jesus Mario “Allocation of Fixed Costs in Distribution Networks with Distributed \nGeneration,” IEEE Transaction on Power Systems, Vol. 21, No. 2, May 2006, pp. 639-652. \n \nSotkiewicz, Paul M., and Lynne Holt, \"Public Utility Commission Regulation and Cost Effectiveness of Title IV: Lessons \nfor CAIR.\" Electricity Journal 18(8): 68-80, October 2005."},{"page":57,"startToken":16943,"endToken":17263,"text":"Curriculum Vitae \nSotkiewicz Page 6 \n \nO’Neill, Richard P., Sotkiewicz, Paul M., Hobbs, Benjamin F., Rothkopf, Michael H., and Stewart, William R. Jr., \n“Efficient Market Clearing Prices in Markets with Non-Convexities.” European Journal of Operational Research, Volume \n164, Issue 1, 1 July 2005, Pages 269-285. \n \nSotkiewicz, Paul M., “The Impact of State-Level Public Utility Commission Regulation on the Market \nfor Sulfur Dioxide Allowances, Compliance Costs, and the Distribution of Emissions” Ph.D. \nDissertation, Department of Economics, University of Minnesota, January 2003. \n \nO’Neill, Richard P., Helman, Udi, Sotkiewicz, Paul M., Rothkopf, Michael H., and Stewart, William R. Jr., “Regulatory \nEvolution, Market Design, and the Unit Commitment Problem” The Next Generation of Unit Commitment Models, B. \nHobbs, M. Rothkopf, R. O’Neill, and H.P. Chao editors. 2001. \n \nSotkiewicz, Paul M. “Opening the Lines,” Forum for Applied Research and Public Policy, Special Issue on the Role of \nPublic Power in Utility Restructuring, Summer 2000, pp. 61-64. \n \nSELECTED WORKING PAPERS AND UNPUBLISHED MANUSCRIPTS \n \nHolt, Lynne, and Paul M. Sotkiewicz. \"Understanding Fuel Diversity Trade-Offs and Risks: Making Decisions for the \nFuture (pdf)\" University of Florida, Department of Economics, PURC Working Paper, 2007. \n \nO’Neill, Richard P., Sotkiewicz, Paul and Rothkopf, Michael. “Equilibrium Prices in Exchanges with Non-convex Bids.” \nPURC Working Paper, January 2006, updated September 2007. \n \nSotkiewicz, Paul M. \"Cross-Subsidies That Minimize Electricity Consumption Distortions\" University of Florida, \nDepartment of Economics, PURC Working Paper, 2003. \n \n \nCONSULTING AND ADVISING EXPERIENCE PRIOR TO JOINING PJM IN 2008 \n \n2007 \nAdvisor to the Government of Vietnam regarding the design and experience of wholesale electricity markets \nas Government looked at the creation of US style ISOs to attract investment in generation assets for IPPs \n2007 \nIndependent Expert in the Matter of the Public Utilities Commission of Belize Initial Decision in the 2007 \nAnnual Review Proceeding for Belize Electricity Limited \n2006 \nAdvisor to the Division of Air Resource Management, Florida Department of Environmental Protection \n(FDEP) Regarding Implementation the Clean Air Interstate Rule (CAIR)"},{"page":58,"startToken":17263,"endToken":17578,"text":"Curriculum Vitae \nSotkiewicz Page 7 \n \n \nHONORS AND AWARDS \n2007 \nFulbright Senior Specialist Grant in Economics with a specific request for expertise in electricity markets, \nelectricity regulation, and distribution tariff design, Universidad de la República, Montevideo, Uruguay. \n2007 \nPrincipal Investigator, PPIAF/World Bank Grant to conduct two on-site training courses on the regulation of \nthe electric power sector and on independent power producers and power purchase agreements for the \nElectricity Authority of Cambodia. Grant award $59,900. \n \n2006 \n“Efficient Market Clearing Prices in Markets with Non-Convexities” published in European Journal of \nOperational Research received New Jersey Policy Research Organization Bright Idea Research Award in \nDecision Sciences. \n \n2003 \nTransportation and Public Utilities Group, Ph.D. Utilities Dissertation Award for “The Impact of State-Level  \nPublic Utility Commission Regulation on the Market for Sulfur Dioxide Allowances, Compliance Costs, and \nthe Distribution of Emissions” \n1992-97 \nDistinguished Instructor, Department of Economics, University of Minnesota \n1995-96 \n1994-95 \nWalter Heller Award for Outstanding Teaching of Economic Principles, Department of Economics, \n1993-94 \nUniversity of Minnesota \n1992-93 \n \n1991-92 \nDistinguished Teaching Assistant, Department of Economics, University of Minnesota \n1991 \nPhi Beta Kappa, University of Florida \nReferee and Review Experience \n \nIEEE Transactions on Power Systems  \nIntegrated Planning Model (IPM) Base Case Version 5.13 Peer Review, Prepared for US EPA Clean Air Markets \nDivision, October 2014, prepared by Anthony Paul, Chair, Meghan McGuinness, Walter Short, Paul Sotkiewicz, John \nWeyant through RTI International. \nDetermining the Economic Value of Coastal Preservation and Restoration on Critical Energy Infrastructure, prepared for \nThe Economic and Market Impacts of Coastal Restoration: America’s Wetland Economic Forum II, September 28, \n2006, Washington, DC \nNational Research Council of the National Academy of Sciences report entitled “Changes in New Source Review \nPrograms for Stationary Sources of Air Pollutants,” February 2006 \n \nEcological Economics \nEnvironmental Science and Technology \nCalifornia Energy Commission (CEC) Energy Innovations Small Grant (EISG) Program \nEnergy Journal \nJournal of Environmental Economics and Management \nIEEE PES Letters"},{"page":59,"startToken":17578,"endToken":18198,"text":"Curriculum Vitae \nSotkiewicz Page 8 \n \nIASTED International Journal of Power and Energy Systems \nThe Next Generation of Unit Commitment Models B. Hobbs, M. Rothkopf, R. O’Neill, and H.P. Chao editors \n2001. \nProfessional Affiliations \n \nAmerican Economic Association \nInternational Association for Energy Economics \nAssociation of Environmental and Resource Economists \nIEEE Power and Energy Society \nEnergy Systems Integration Group (ESIG) \n \nEXPERT TESTIMONY \n \nPJM Interconnection, L.L.C. FERC Docket No. ER09-1063-004, Affidavit in Support of PJM’s Compliance Filing \nwith Order No. 719 and Order on Compliance Filing PJM Interconnection, L.L.C., 129 FERC ¶ 61,250 (2009). June \n18, 2010 \nIn support of its compliance filing to establish a mechanism that ensures appropriate pricing during periods of \noperating reserve shortages, as required by Commission Order No. 719, I provided the following: 1) A high-level overview \nof PJM markets, planning, and operations, including a description of what is meant by an operating reserve shortage, and \nhow such shortages arise; 2) An overview of PJM reserve requirements, current reserve market structure, and data on \nPJM‘s prices and operations at times when the grid it manages has experienced operating reserve shortages; 3) A \nshowing why PJM’s then current scarcity pricing not satisfy the Commission‘s Order No. 719 criteria for operating reserve \nshortage pricing mechanisms; 4) Description of the main elements of PJM‘s proposal to comply with Order No. 719‘s \nshortage pricing policy, and how PJM‘s proposal satisfies the six criteria for reserve shortage pricing set by Order No. 719.  \n \nPJM Interconnection, L.L.C. FERC Docket No. ER09-1063-004, Affidavit in Support of Answer to Comments and \nMotion for Leave to Answer to Protests, August 23, 2010. The purpose of this affidavit is to provide the following \nregarding PJM’s proposed shortage pricing mechanism: 1) The complementary relationship between capacity adequacy \nin the Reliability Pricing Model (“RPM”) and shortage pricing; 2) Additional evidence showing why PJM’ shortage pricing \nproposal leads to energy prices that reflect the cost and/or value of energy, allocates energy to those who value it most, \nenhance operational reliability, and leads to efficient market outcomes while the alternate proposal from the Independent \nMarket Monitor (IMM) fails to achieve any of these goals; 3) An explanation of how the proposed mechanism is consistent \nwith shortage pricing mechanisms in the New York Independent System Operator (“NYISO”) and ISO New England (“ISO-\nNE”) that the Commission has already approved as Order 719 compliant. \n \nPJM Interconnection, L.L.C. FERC Docket No. ER12-513, Affidavit in Support of Filing to Update its RPM Auction \nParameters (aka Triennial Review) December 1, 2011. This affidavit was submitted in support of three aspects of PJM’s \nproposed changes related to PJM’s capacity market, known as the Reliability Pricing Model (“RPM”) including: 1) the \ncontinued use of a nominal levelized approach to calculating the estimated Cost of New Entry (“CONE”) that is used in \nRPM’s Variable Resource Requirement (“VRR”) Curve; 2) retention of a combustion turbine (“CT”) as the \nReference Resource.  \n \nPJM Interconnection, L.L.C. FERC Docket No. ER-14-2490, Affidavit in Support of Filing to Update its RPM \nAuction Parameters (aka Quadrennial Review) September 25, 2014 This affidavit was submitted in support of five \naspects of PJM’s proposed changes related to PJM’s capacity market, known as the Reliability Pricing Model (“RPM”): 1) \nadoption of The Brattle Group’s (“Brattle”) recommended VRR Curve shape right shifted by 1% of the Installed Reserve \nMargin (“IRM”); 2) continued use of a nominal levelized approach to calculating the estimated Cost of New Entry (“CONE”) \nthat is used in RPM’s Variable Resource Requirement (“VRR”) Curve; 3) retention of a combustion turbine (“CT”) as the \nReference Resource: 4) use of a composite of Bureau of Labor Statistics (“BLS”) indices to adjust Gross CONE estimates"},{"page":60,"startToken":18198,"endToken":18998,"text":"Curriculum Vitae \nSotkiewicz Page 9 \n \nin between periodic VRR parameter reviews; and 5) adoption of the labor estimates provided by the PJM Independent \nMarket Monitor (“IMM”) to determine Gross CONE values. \n \nGrid Reliability and Resilience Pricing FERC Docket No. RM18-1, Affidavit in Support of the Electric Power Supply \nAssociation (EPSA), October 23, 2017. This affidavit provides evidence the Department of Energy Notice of Proposed \nRulemaking (“NOPR” or “Proposal”) released on September 28, 20171 and appearing in the Federal Register on October \n2, 2017, does nothing to enhance reliability or “resiliency” of the bulk power system and will only succeed in distorting \nwholesale power markets while also raising costs. Consequently, my affidavit supports EPSA’s contention the NOPR \nshould be rejected outright by the Commission. \n \nISO New England Inc. and New England Power Pool Participants Committee, FERC Docket No. ER18-620-000, \nAffidavit in Support of the Protest of the New England Power Generators Association, Inc. January 29, 2018.  \n \nIn summary, my affidavit explains that the proposed updated DDBT from $5.50/kW-month to $4.30/kW-month: 1) Relies \non a flawed and logically inconsistent methodology that differs from the DDBT methodology approved by the Commission \nthree years ago; 2) Sets a dangerous precedent in ISO-NE taking a position on the direction of its Forward Capacity \nMarket (\"FCM\") in terms of supply-demand balance and expected market prices that could anchor expectation of market \nparticipants. The anchoring of such expectations can change FCA bidding and operational behavior that could harm \nreliability; 3) The previous methodology approved by the Commission of using Static De-List Bids from oil steam and oil \ncombustion turbine generators remains the appropriate methodology for determining the DDBT; and 4) The cost-based \nDDBT is likely higher than for FCAs 10-12 given that net going forward costs for oil steam and oil combustion turbine units \nhas likely increased given their age, and other risks and opportunity costs that may be coming into play. My affidavit \nconcludes that retaining the current DDBT until such time as a new DDBT threshold can be determined using the current \nCommission-approved methodology following the discovery of the actual costs and risks faced by oil units. \n \nPetition for Determination of Need for Seminole Combined Cycle Facility in Docket No. 20170266-EC and Joint \nPetition for Determination of Need for Shady Hills Generating Facility in Docket No. 20170267-EC, January 29, \n2018. Testimony and Exhibits on Behalf of Quantum Pasco Power, LP, Michael Tulk, and Patrick Daly. My \ntestimony supports the notion that there is no need for either combined cycle facility as Seminole Electric has consistently \nover-forecast its load growth since the “great recession” and that once correcting for these large errors, there is no need to \nbuild two new combined cycle facilities when there were other lower cost merchant generator facilities that offered their \ncapacity to Seminole. \n \nPJM Interconnection, L.L.C. FERC Docket No. E18-34, Affidavit in Support of EPSA’s Filing and Comments in \nPJM’s Fast Start Pricing Proposal, March 14, 2018 My affidavit in this proceeding provides support for PJM’s desire to \nallow resources with up to two-hour start up times to be considered “fast start” resources and to set price in accordance \nwith the fast start pricing principles the Commission has enumerated in its Fast Start Pricing NOPR. I explain PJM’s use of \nIT SCED and request to allow two-hour start time resources to set prices as fast start resources are entirely consistent \nwith the ideas the Commission has enumerated with respect to fast start pricing. \n \nPJM Interconnection, L.L.C. Capacity Repricing or in the Alternative MOPR-Ex Proposal: Tariff Revisions to \nAddress Impacts of State Public Policies on the PJM Capacity Market, FERC Docket No. ER18-1314-000, Affidavit \nis Support of Comments of American Petroleum Institute, JPower USA Development, Ltd., and Panda Power \ngeneration Infrastructure Fund, LLC May 7, 2018. My affidavit provides evidence that 1) The PJM Capacity Repricing \nProposal is not just and reasonable and is unduly discriminatory and results in an inefficient commitment of resources; 2) \nThe alternative proposal from PJM, MOPR-Ex, is just and reasonable and results in the most efficient and cost-effective \nse of resource commitments; and 3) The current and previous iterations of the MOPR are not just and reasonable and are \nunduly discriminatory because they do not apply to existing resources and they only apply to gas-fired resources. \nFurthermore, my affidavit provides evidence that MOPR has always been viewed as a market power mitigation \nmechanism that was originally intended to thwart or mitigate the exercise of buyer-side market power. I show in this \naffidavit that MOPR and MOPR-Ex are still powerful market power mitigation tools that mitigate the \nexercise of supplier market power facilitated by the current round of state subsidies to generation. Moreover, I show that \nCapacity Repricing helps facilitate the exercise of supplier market power through three different means."},{"page":61,"startToken":18998,"endToken":19806,"text":"Curriculum Vitae \nSotkiewicz Page 10 \n \n \nGrid Resilience in Regional Transmission Organizations and Independent System Operators, FERC Docket No. \nAD18-7-000, Affidavit is Support of Comments of the American Petroleum Institute, May 9, 2018. This affidavit \nfocuses of the comments submitted by PJM and: 1) Supports the idea that in the context bulk power system markets and \noperation resilience and reliability are indistinguishable and that markets and well-designed incentives are the best \navenue to achieve a resilient and reliable bulk power system; 2) Explains why market mechanisms rather than suspension \nof market and command and control regimes are better at achieving resiliency/reliability even during emergency \nconditions and that PJM has not made a case for being given the authority to suspend markets; 3) That PJM has not \nmade the case that price formation through integer relaxation is linked to resilience/reliability while other price formation \nthat are crucial to reliability/resilience, such as shortage pricing and fast start pricing, be considered concurrently; and 4) \nSo-called “fuel security” is only a minimal contributor to resilience/reliability while transmission and distribution \nassets are the leading causes for shedding firm load and outages of gas-fired units are not the leading category of \ngeneration outages. With respect to generator reliability/resilience, simply providing additional compensation (or minimize \npenalties) to generators in wholesale markets, without any ties to generator performance, does nothing to enhance \nreliability/resilience of generators to withstand or minimize the impact of adverse events on the bulk power system. \nExperience in PJM prior to and following the discussion and implementation of capacity performance has shown this to be \nthe case as generator performance has improved even in the face of lower energy market prices. \n \nNew England Power Generators Association, Complainant v. ISO New England Inc., Respondent. FERC Docket \nNo. Docket No. EL18‐154‐000, Affidavit in Support of Complaint and Request for Expedited Consideration of the \nNew England Power Generators Association, Inc. May 24, 2018. This affidavit in support of NEPGA’s complaint shows \nthe impact of treating Mystic Units 8 and 9 as a price taker on the ISO-NE markets as well as NEPGA’s proposed \nalternative to accommodating the participation of the Mystic units. Discussions include: 1) treating Mystic and other \nresources retained for fuel security as price takers will do significant harm to the competitiveness of the FCM market and \nis inconsistent with the first principles of capacity markets articulated by the Commission; 2) the proposal to insert an \nabove market cost resource into the FCM as a price taker does exactly the same harm as an exercise of buyer-side \nmarket power, which he Commission has found to be unjust, unreasonable, and unduly discriminatory; and 3) the \nproposed remedy offered by NEPGA does not distort the results of the Forward Capacity Auction, results in competitive \npricing outcomes in FCA, does not displace otherwise economic resources, and provides better reliability outcomes for \nISO-NE load than the current ISO-NE proposal. \n \nNew England Power Generators Association, Complainant v. ISO New England Inc., Respondent. FERC Docket \nNo. Docket No. EL18‐154‐000, Affidavit in Support of the Motion for Leave and Answer of the New England Power \nGenerators Association, Inc. June 19, 2018. This affidavit in support of NEPGA’s answer refutes the answer of ISO-NE \nand protesters and responds that nothing in ISO-NE’s answer to the Complaint or the protests to the Complaint provides a \nbasis for ignoring that treating the Mystic Units as price takers would suppress prices below competitive levels and \ninefficiently displace otherwise economic resources in a manner that is observationally equivalent to the harm done by an \nexercise of buyer-side market power. \n \nPanda Stonewall, LLC. FERC Docket No. ER17-1821-002, Testimony is Support of Panda Stonewall, LLC Reactive \nPower Filing, July 2, 2018. This testimony supports Panda Stonewall’s reactive power rate case that has gone to hearing \nand supports the inclusion of firm gas pipeline transportation, the use of proxy cost of capital values from the PJM CONE \nstudy and supports the inclusion of other administrative and overhead costs consistent with fixed, going forward costs \nincurred by Panda Stonewall to remain in commercial operation. Furthermore, the testimony puts the costs of reactive \npower into the context of the wider PJM market and other opportunities for compensation and well as providing historical \ncontext around the Commission-approved AEP Methodology for reactive power rates.  \n \nISO New England Inc. FERC Docket No. ER18-2364-000, Affidavit in Support of the Protest of the New England \nPower Generators Association, Inc. September 21, 2018. This testimony supports NEPGAs protest that the proposed \nISO-NE treatment of resources held for winter fuel security as price takers in the FCA makes no sense since winter fuel \nsecurity is not associated with overall resource adequacy which is based on the summer peak. Moreover, the testimony \nclearly shows the artificial price suppression that would occur based on ISO-NE proposed treatment of resources held for"},{"page":62,"startToken":19806,"endToken":20566,"text":"Curriculum Vitae \nSotkiewicz Page 11 \n \nwinter fuel security in the FCA.  \n \nCalpine Corporation v. PJM Interconnection, L.L.C. Docket No, EL16-49; PJM Interconnection L.L.C. Docket No. \nER18-1314-000, ER18-1314-001, EL18-178 Affidavit in Support of the Electric Power Supply Association, October \n2, 2018. This testimony refutes the idea that the Commission proposed remedy a resource specific FRR Alternative \nequally removes both demand and supply from the market and therefore does no harm. Such a mechanism is the \nequivalent of an exercise of buyer side market power, artificially reduces price below competitive levels, inefficiently \ndisplaces lower cost, economic resources with higher cost resources, shifts cost and benefits between market \nparticipants, and reduces overall market efficiency. Additionally, PJM market simulations for scenarios from the 2020/2021 \nauction show the kind of damage that done to the market through the proposed remedy or equivalently buyer sider market \npower by showing prospective price decreases and generation displacement, and the level of subsidy that could facilitate \na successful exercise of buyer-side market power. \n \nPanda Stonewall, LLC. FERC Docket No. ER17-1821-002, Rebuttal Testimony is Support of Panda Stonewall, LLC \nReactive Power Filing, October 12, 2018. This rebuttal testimony supports Panda Stonewall’s reactive power rate case \nresponding to interveners and FERC staff and supports the inclusion of firm gas pipeline transportation, the use of proxy \ncost of capital values from the PJM CONE study and supports the inclusion of other administrative and overhead costs \nconsistent with fixed, going forward costs incurred by Panda Stonewall to remain in commercial operation. Furthermore, \nthe testimony puts the costs of reactive power into the context of the wider PJM market and other opportunities for \ncompensation and well as providing historical context around the Commission-approved AEP Methodology for reactive \npower rates. \n \nIn the Matter of the Implementation of L. 2018, c. 16 Regarding the Establishment of a Zero Emission Certificate \nProgram for Eligible Nuclear Power Plants, New Jersey Board of Public Utilities, BPU Docket No. EO 18080899, \nTestimony in Support of PJM Power Providers, October 22, 2018. This testimony responds to questions posed by the \nBPU in this docket and provides analysis showing that the nuclear units in New Jersey seeking ZECs are not in need of \nthem to remain in commercial operation. The testimony shows that these resources, given know forward prices for energy \nand capacity prices can cover their going forward costs in the absence of subsidies in the form of ZECs and will remain in \ncommercial operation despite warnings these resources will retire in the absence of ZEC payments. \n \nCalpine Corporation v. PJM Interconnection, L.L.C. Docket No, EL16-49; PJM Interconnection L.L.C. Docket No. \nER18-1314-000, ER18-1314-001, EL18-178 Affidavit in Support of the Electric Power Supply Association, \nNovember 6, 2018. This testimony responds to the Illinois Commerce Commission’s protest that suggests eliminating the \nRPM Capacity Market and replacing it with an energy-only market construct because the capacity market is not a market \nat all. It also responds to the notion that markets should account directly for environmental policy and because they do \nnot, it justifies Illinois zero emission credit program for nuclear resources. The testimony refutes these ideas by describing \nin detail that all markets have administrative rules, and those markets can account for environmental policies when \nproperly formulated to put a price on emissions rather than subsidizing resources out-of-market. Moreover, this testimony \nprovides evidence of the need for the RPM Capacity Market to maintain resource adequacy as an energy only construct \nwould not result in sufficient resources covering going forward costs in the energy market alone.  \n \nAlberta Utilities Commission, Consideration of ISO Rules to Implement and Operate the Capacity Market, \nProceeding No. 23757, Evidence in Support of ENMAX Corporation, February 28, 2019. This evidence outlines the \nelements of the Alberta Electric System Operator (AESO) proposed capacity market framework that require changes to \nmake align the capacity market with fair, efficient, and openly competitive market principles. The evidence addresses the \nresource adequacy model, capacity value of resources, penalties and bonuses, market power mitigation, Net CONE \ndetermination, and interactions with the energy market framework. The evidence also provides a high-level overview of \nthe objectives of a capacity market and how it should interact with the energy and retail markets in Alberta.  \n \nIn the Matter of the Implementation of L. 2018, c. 16 Regarding the Establishment of a Zero Emission Certificate \nProgram for Eligible Nuclear Power Plants, New Jersey Board of Public Utilities, BPU Docket No. EO 18080899, \nResponse to Staff Questions on Accounting for Risk in Support of PJM Power Providers, March 8, 2019. This is a"},{"page":63,"startToken":20566,"endToken":21319,"text":"Curriculum Vitae \nSotkiewicz Page 12 \n \nresponse to BPU staff questions regarding market risk. This response discusses the mitigation of overall market risk \nbased on changing conditions, optimal energy market offers and mitigation of energy market operational risk, and optimal \noffers and risk mitigation in the capacity market that are available to all generation resources including nuclear resources.  \n \nIn the Matter of the Implementation of L. 2018, c. 16 Regarding the Establishment of a Zero Emission Certificate \nProgram for Eligible Nuclear Power Plants, New Jersey Board of Public Utilities, BPU Docket No. EO 18080899, \nReply Testimony in Support of PJM Power Providers, March 19, 2019. This reply testimony responds to PSEG \ncomments regarding the need for ZECs for New Jersey’s nuclear units. This reply testimony updates the economic \nanalysis showing New Jersey nuclear units are currently profitable and expected to remain profitable in the future. \nFurthermore, this reply points out that PSEG did not dispute the costs used in the initial analysis or the idea that new entry \nof combined cycle gas generation can reduce emissions at zero cost at the margin given these resources will enter the \nmarket absent subsidies. The reply argues, contrary to PSEG’s position, the threat to retire is not credible given the \nstatements and evidence provided by PSEG in its Securities and Exchange Commission (SEC) filings. This reply also \nprovides evidence that it would be infeasible for PSEG to buy out of its capacity commitments in Incremental Auctions \n(IAs) given the supply and demand conditions present in IAs to date. \n \nAlberta Utilities Commission, Consideration of ISO Rules to Implement and Operate the Capacity Market, \nProceeding No. 23757, Reply Evidence in Support of ENMAX Corporation, April 4, 2019. This evidence replies to the \ncomments of other interveners regarding various elements of the Alberta Electric System Operator (AESO) proposed \ncapacity market framework. The reply evidence responds to intervener comments on elements of the Net CONE \ndetermination, capacity and energy market power mitigation, the capacity value of resources inconsistencies between the \nresource adequacy model and offered supply, and penalties and bonuses.  \n \nPJM Interconnection, L.L.C. FERC Docket Nos. ER19-1486 and EL19-58, Affidavit in Support of EPSA’s Filing and \nSupporting Comments in PJM’s Enhanced Price Formation in Reserve Markets Proposal, May 15, 2019. This \naffidavit supports PJM’s proposed extension of the ORDC concept to the Day-ahead Energy Market and further \nrefinements to the ORDC construct that employs methods of using history of reserve levels, load forecast error, and \ngeneration output and reserves to determine an ORDC based on a loss of load probability. The affidavit also explains and \nsupports other refinements proposed by PJM such as explicitly pricing what was known as Tier 1 reserves to accurately \nreflect the value those reserves provide to the system. Finally, I argue reserve pricing and the ORDC must explicitly \naccount for operator discretion in making reliability commitments outside of the market framework.  \n \nPJM Interconnection, L.L.C. FERC Docket Nos. ER19-1486 and EL19-58, Supplemental Affidavit in Support of \nEPSA’s Reply Comments in PJM’s Enhanced Price Formation in Reserve Markets Proposal, June 26, 2019. This \nsupplement affidavit rebuts assertions made during the initial comment period. First, positive reserve prices do not imply \nreserve shortage or scarcity conditions, but the price of reserves based on the value reserve provides beyond the \nMinimum Reserve Requirement. Second, that PJM’s proposed ORDC appropriately accounts for out of market operator \nactions that would otherwise result in the wrong price signal to the market regarding reserve position and system needs. \nThird, that the proposed claw back of any revenues earned under the PJM proposal is inefficient and not just and \nreasonable and confuses capacity market concepts with short-term operational needs.  \n \nColorado Public Utilities Commission in the Matter of the Commission’s Implementation of §§ 40-2.3-101 and 102, \nC.R.S. The Colorado Transmission Coordination Act, PROCEEDING NO. 19M-0495E, in Support of the \nIntermountain Rural Electric Association, November 15, 2019. This evidence provides the Colorado Commission with \nan overview of the benefits of RTO markets for electric cooperatives.  \n \nAmerican Transmission Systems Incorporated, Docket No. ER20-1740 Affidavit is Support of Buckeye Power Inc. \nCounter the Capacity Market Benefits of ATSI Moving from MISO to PJM and Recovery of Transition Costs, May \n29, 2020. This affidavit provides empirical evidence and theoretical support that load connected to the ATSI transmission \nsystem paid more in capacity costs in PJM than they would have paid had ATSI stayed in MISO to counter ATSI’s \nargument that ATSI connected load would have paid more for capacity had ATSI remained in MISO."},{"page":64,"startToken":21319,"endToken":22044,"text":"Curriculum Vitae \nSotkiewicz Page 13 \n \nAlberta Utilities Commission (“AUC”) Distribution System Inquiry Proceeding 24116, Response from Kalina to \nAUC Information Request Round 2, Jointly with Regulatory Law Chambers, Terradigm Energy, Inc, and Nican \nInternational Consulting, Ltd on Behalf of Kalina Distributed Power, June 17, 2020. This response to information \nrequests provides support for an optimal distribution tariff design that rewards resources that reduce the need for \nadditional upgrades and reduce line losses and send price signals regarding the optimal location on the distribution \nsystem. This response also argues against tariff policies that would inefficiently charge such resources for costs they do \nnot cause to either the distribution system or the transmission system and argues that efficient pricing is consistent with \nthe competitive objectives of the Alberta energy market.  \n \nInvestigation into Resource Adequacy Alternative, New Jersey Board of Public Utilities, BPU Docket No. EO \n20030203, Prepared Comments in Support of PJM Power Providers, June 24, 2020. These prepared comments \naddress the benefits of Reliability Pricing Model (RPM) Participation for New Jersey customers and the additional costs of \nmoving to a Fixed Resource Requirement (FRR) Plan as proposed by PSEG and Exelon in earlier comments. These \ncomments note the extra costs could be over $700 million per year for New Jersey customers and would facilitate the \nexercise of market power by a small set of generation owners. \n \nAmerican Transmission Systems Incorporated, Docket No. ER20-1740 Reply Affidavit is Support of Buckeye \nPower Inc. Counter the Capacity Market Benefits of ATSI Moving from MISO to PJM and Recovery of Transition \nCosts, June 25, 2020. This reply affidavit supports the previously supplied empirical evidence and theoretical support that \nload connected to the ATSI transmission system paid more in capacity costs in PJM than they would have paid had ATSI \nstayed in MISO to counter ATSI’s argument that ATSI connected load would have paid more for capacity had ATSI \nremained in MISO. Additionally, the reply affidavit responds to ATSI critiques of the original affidavit and the ATSI \nresponses to answers. \n \nAlberta Utilities Commission (“AUC”) Distribution System Inquiry Proceeding 24116, Concluding Remarks of \nKalina Distributed Power, Jointly with Regulatory Law Chambers, Terradigm Energy, Inc, and Nican International \nConsulting, Ltd on Behalf of Kalina Distributed Power, July 15, 2020. These concluding remarks reiterates support for \nan optimal distribution tariff design that rewards resources that reduce the need for additional upgrades and reduce line \nlosses and send price signals regarding the optimal location on the distribution system. These concluding remarks provide \nestablished economic theory to explain why the current policies that inefficiently charge such resources for costs they do \nnot cause are not in the best interests of Alberta’s energy market or Alberta energy customers.  \n \nInvestigation into Resource Adequacy Alternative, New Jersey Board of Public Utilities, BPU Docket No. EO \n20030203, “Prospective Minimum Offer Price Rule Price Floors and Cost-Effectiveness of the PSEG/Exelon Fixed \nResource Requirement Plan for New Jersey” in Support of PJM Power Providers, July 22, 2020. This whitepaper \nresponds to the PSEG and Exelon comments submitted on June 24, 2020, and it responds to the report of the \nPSEG/Exelon Consultant assertions about the alleged cost savings of moving to a Fixed Resource Requirement (FRR) \nPlan as proposed by PSEG and Exelon in earlier comments. This paper also discusses the Minimum Offer Price Floor \nlevels for various clean energy resources to show they would not be excluded from the RPM capacity market and would \nclear the market given historic capacity prices. \n \nPJM Interconnection, L.L.C. FERC Docket No. EL19-58-003 “Forward Looking Energy and Ancillary Service \nOffset,” Affidavit in Support of Comments of the Electric Power Supply Association, September 2, 2020. Supports \nand explains PJM’s forward-looking energy and ancillary service offset filing in the context of Commission approved \nmethods that use the same framework as the energy and environmentally limited opportunity costs which uses forward \nlooking fuel and power prices in the same way as the PJM proposal. The Affidavit also calls for further analysis of the \nforward-looking methodology once there are realizations of actual power and gas prices compared to the forward prices \nused in the methodology.  \n \nAlberta Utilities Commission (“AUC”) Proceeding 26090 DG Credit Module for Fortis’s 2022 Phase II Tariff \nApplication, Evidence in Support of Kalina Distributed Power and Capstone Infrastructure Corporation, \nDecember 14, 2020. This expert report discusses the economic and electrical equivalence of distribution connected"},{"page":65,"startToken":22044,"endToken":22759,"text":"Curriculum Vitae \nSotkiewicz Page 14 \n \ngeneration (DCG) to reduced load on the distribution level and the resulting effects on transmission rates and cost \nrecovery in the Alberta power system. This report also points out that DCG is not the cause of so-called erosion of billing \ndeterminants from the transmission system costs, but those are caused by over-forecasting load and transmission \noverbuild. The report argues for retention of Fortis’s DCG Credit based on cost causation principles given DCG helps \nreduce loading on the transmission system.  \n \nAlberta Utilities Commission (“AUC”) Proceeding 26090 DG Credit Module for Fortis’s 2022 Phase II Tariff \nApplication, Reply Evidence in Support of Kalina Distributed Power and Capstone Infrastructure Corporation, \nJanuary 27, 2021. This reply report provides additional detail regarding the subjects discussed in the initial report, \nresponds to intervenor comments, and explains how DCG can enhanced the efficiency of the Alberta Energy Market as \nwell as providing cost-effective reductions in future transmission build out.  \n \nSoutheast Energy Exchange Market Agreement FERC Docket ER 21-1111, Affidavit is Support of Public Interest \nOrganizations, March 15, 2021. This affidavit points out the market design and market power shortcoming of the \nproposed Southeast Energy Exchange Market (SEEM) rules and governance structure as well as problems with the \nsupporting benefit/cost analysis supporting the proposed market design. The affidavit highlights transactional complexity, \ncomputational complexity, and rules that allow market power exercised through manipulating submitted parameters as \nwhy the Commission should not approve the proposed design and set a technical conference to discuss a more robust \nmarket for the Southeast.  \n \nJackson Generation, LLC v. PJM Interconnection in FERC Docket No. EL21-062, Affidavit in Support of Jackson \nGeneration’s Complaint, March 30, 2021. This affidavit argues that it makes economic sense for PJM and the \nIndependent Market Monitor to consider a longer asset life than 20 years and the consideration of sunk costs in \ndetermining the Minimum Offer Price that Jackson could offer into the 2022/2023 Base Residual Auction. Furthermore, I \nargued that the tariff language is explicitly consistent with the tariff language as well as previous PJM precedent in \nallowing longer asset lives and sunk costs when I served as PJM’s Chief Economist and oversaw making Minimum Offer \nPrice determinations.   \n \nSoutheast Energy Exchange Market Agreement FERC Docket ER 21-1111, Affidavit is Support of Public Interest \nOrganizations, June 28, 2021. This affidavit responds to the Southeast Energy Exchange Market (SEEM) filing \nresponding the FERC Staff’s Deficiency Letter and continues to point out the market design and market power \nshortcomings of the rules and monopoly position of the filing parties. This affidavit concentrates on data transparency and \nthe lack of truly independent market monitor to guard against market abuses by large participants, uses existing data from \nSouthern Company’s auction market to show that market participation in the prosed design will be effectively non-existent \nand that this is all by design since the incentives of large franchise monopoly supporters of SEEM are to retain their \nmonopoly positions. governance structure as well as problems with the supporting benefit/cost analysis supporting the \nproposed market design. The affidavit also highlights areas around computational complexity and the ability to foreclose \ntransactions with other parties leads to an inability to run the market in the time allotted and results in de facto market \nmanipulation. \n \nAlberta Electric System Operator Transmission Rate Design, in Alberta Utilities Commission Proceeding 26911, \nReport in Support of Industrial Power Consumers Association of Alberta (IPCAA) and the Dual Use Customers \n(DUC), March 28, 2022. Report entitled “Transmission Rate Design and Energy Market Efficiency” shows why the \nAESO’s proposed rate design to shift fixed costs into volumetric charges is inefficient and leads to uneconomic bypass \nand harms the Alberta Energy Market. This report also shows why a shift to non-coincident peak charges away from peak \ncharges leads to inefficient decision making by customers and violated cost causality principles in rate design. The \nconclusion is that the optimal rate design for bulk power transmission should be based on coincident peak charges that \nincludes all the fixed costs of the system.    \n \nRebuttal Report Regarding the Review and Evaluation of Alternatives and Benefit Cost Analysis Prepared for \nRenovo Energy Center in Clean Air Council et al. v. Pennsylvania Department of Environmental Protection, \nEnvironmental Hearing Board Docket No. 2021-055, May 2, 2022. This report responds to Appellants refuting"},{"page":66,"startToken":22759,"endToken":23500,"text":"Curriculum Vitae \nSotkiewicz Page 15 \n \nstatements regarding benefit-cost analyses, facts regarding the PJM and NYISO markets, and assertions emissions \nincreases of the proposed facility. \n \nDepartment of Environmental Protection, Environmental Hearing Board Docket No. 2021-055 Affidavit Prepared \nfor Renovo Energy Center, July 18, 2022. This responds to Appellants affidavits regarding emissions data, PA DEP not \nbeing responsible for generator entry and exit decisions, and logical flaws in Appellants Expert benefit-cost analysis.  \n \nPJM Interconnection, L.L.C., Docket No. ER22-2984-000; Periodic Review of Variable Resource Requirement \nCurve Shape and Key Parameters, Affidavit in Support of Protest of J-Power USA Development Co. Ltd., October \n21, 2022. This affidavit explains why PJM’s choice of a 20-year asset life for the Reference Resource Net CONE in the \nComEd LDA is in error due to the Climate and Equitable Jobs Act (CEJA) that requires all gas resources reach zero net \nemissions by 2045. Additionally, the affidavit explains that such LDA specific adjustments for the Energy and Ancillary \nService Offset and CONE area differences for labor are common, hence reducing the asset life in ComEd would \nreasonably be accommodated. \n \nPJM Interconnection, L.L.C., Docket No. ER22-2984-000; Periodic Review of Variable Resource Requirement \nCurve Shape and Key Parameters, Reply Affidavit in Support of Protest of J-Power USA Development Co. Ltd., \nNovember 18, 2022. In response to the answers filed by PJM and the Public Interest Entities to explain why their \nresponses are irrelevant and/or fail to address the concerns J-POWER brought up in its protest with regard to the effect of \nthe Illinois Climate and Equitable Jobs Act on the Commonwealth Edison Company Locational Deliverability Area (“LDA”) \nin the PJM capacity market. I explain here that what PJM proposes to do in its filing is a violation of the spirit \nand intent of PJM’s FERC-approved Tariff and Reliability Assurance Agreement if not a direct failure to follow the plain \nterms of the governing documents and I provided evidence showing the reliability urgency that is forthcoming in the \nComEd LDA requires a shorter asset life for the Reference Resource to be used in developing the Variable Resource \nRequirement Curve used in PJM’s capacity auctions. \n \n \nPJM Interconnection, L.L.C., Docket No. ER23-729 and EL23-19; Protest of PJM’s Filing to Change the Locational \nDeliverability Area Reliability Requirement in the midst of the 2024/2025 BRA in support of the Electric Power \nSupply Association, January 20, 2023. This affidavit argues PJM’s proposed solution is clearly retroactive rather than \nprospective, upsets settled expectations, introduces unnecessary uncertainty, and is bad market design, creates a false \nequivalence between physical reliability needs as determined by PJM’s own planning methods with its own ideas of \neconomic supply-demand balance, ignores the real reliability problems that exist in DPL-South as evidenced by \nhistorically high prices, tight supply-demand conditions, and the auction outcome PJM seeks to avoid, and the market \noutcome was easily anticipated. \n \nAurora Generation, LLC, Elwood Energy LLC, Jackson Generation, LLC, Lee County Generating Station, LLC, \nLincoln Generating Facility, LLC, LSP University Park, LLC, Rockford Power, LLC, Rockford Power II, LLC, \nUniversity Park Energy, LLC, Complainants, v. PJM Interconnection, L.L.C., Respondent. Docket No. EL23-54, \nApril 3, 2023. I show throughout Elliott, PJM power prices and underlying transmission congestion and the ComEd \nsupply-demand balance were inconsistent with the idea that PJM was in any kind of emergency condition in ComEd \nthrough the December 23 and 24 PAI intervals. ComEd Zone generators would not have been able to deploy reserves to \nthe rest of PJM. During the final 12 hours of the PAI event on December 24, energy and reserve prices were inconsistent \nwith the idea there were emergency conditions. The lack of timely commitments of generation in ComEd, the cost of gas \nfired generation in ComEd based on intra-day gas prices were inconsistent with economic dispatch of gas fired resources \nin ComEd to support the rest of PJM or exports out of PJM. I also showed PJM violated its Tariff, Operating Agreement \n(“OA”), NERC standards, and PJM Manuals by allowing exports to continue while PJM entered reserve shortages, failing \nto curtail Non-Firm export transactions prior to and during Emergency Actions, and failing to recall exports supported by \nPJM Capacity Resources, and in effect employing emergency load management to support non-firm exports. \n \nCoalition of PJM Capacity Resources, Complainants, v. PJM Interconnection, L.L.C., Respondent. Docket No. \nEL23-55, April 4, 2023. In this testimony I showed how PJM lacked situational and operational awareness leading up to"},{"page":67,"startToken":23500,"endToken":24333,"text":"Curriculum Vitae \nSotkiewicz Page 16 \n \nand during Winter Storm Elliott and violated its Tariff and operating procedures: 1) Despite the clear and consistent \nweather forecasts as early as seven days prior to Winter Storm Elliott, PJM’s demand forecast failed to account for the \nimpending weather conditions. PJM Day-ahead Energy Market commitments were inconsistent with the \nimpending reliability needs that were being signaled by other factors and that were realized in real-time operations. 3) \nPJM failed to notice that gas pipelines serving PJM gas-fired generation had issued critical notices asking or ordering \nshippers to avoid gas imbalances and adhere to nomination and flow times and 24-hour ratable takes and failed to \nunderstand the timing of gas nominations and flows on pipelines and how that would affect the intra-day scheduling and \ncommitment of gas fired resources to serve the load which had been grossly under-forecast. 4) PJM, ignoring the weather \nforecast relative to the load forecast and gas pipeline notices, failed to commit sufficient additional resources per its \nEmergency Operating Procedures to ensure sufficient generation was available. 5) PJM missed the clear signals from the \nnatural gas markets that showed extremely high gas prices throughout PJM indicating the severity of the cold weather \ncoming, contrary to the PJM load forecast.6) PJM continued to flow non-firm exports and exports that were likely \nsupported by PJM Capacity Resources and while employing emergency load management contrary to the PJM Tariff and \nemergency operating procedures. \n \nEast Kentucky Power Cooperative, Inc., Complainant, v. PJM Interconnection, L.L.C., Respondent. Docket No. \nEL23-74, May 31, 2023. I supported EKPC’s Complaint in an affidavit that builds upon testimony I have already provided \nin Complaints filed at FERC in Docket Nos. EL23-54 and EL23-55 with the following updates and additions: 1) \nIdentification of 5-minute intervals experiencing Primary or Synchronized Reserve Shortages in which there was also a \nMaximum Emergency Generation event and/or emergency demand response in place. 2) Matching the identified 5-minute \nintervals with the volume of Net Scheduled Exports delineated by different levels of transmission service as posted by \nPJM on its OASIS. 3) A description of why PAIs should not be triggered by a PJM emergency declaration alone such as \nthe call for Pre-Emergency and Emergency Demand Response and/or Maximum Generation Emergency Actions but \nshould also be accompanied by evidence of a Primary and/or Synchronized Reserve Shortages.4) Assessed what \nPrimary or Synchronized Reserve Shortages would have existed had all Non-Firm (on a transmission reservation basis) \nexports to the Tennessee Valley Authority and Duke Energy Carolinas and Duke Progress been curtailed as is required \nunder NERC EOP 011-12. I also provided a background history regarding PJM’s Capacity Performance (“CP”) design \nexplaining that CP did not envision or contemplate exports to neighboring control areas because it was assumed PJM, if it \nwere in emergency conditions, would have been a net importer of energy, and why exports to support external loads \nduring a PAI is inconsistent with cost causation principles. I also showed why the current Penalty Charge Rate based on \nNet CONE results in undesirable reliability outcomes as it can lead to a loss of multiple years of capacity revenue within \nthe span of only two days, and the loss of capacity that occurred during Elliott. \n \nLS Power Development, Inc., Complainant, v. PJM Interconnection, L.L.C. and Monitoring Analytics, LLC, as the \nIndependent Market Monitor for PJM, Respondents. Docket No. EL24-91, March 20, 2024. I supported LS Power’s \nCompliant in an affidavit that provided a background history of the Opportunity Cost methodology in PJM. I also explained \nwhy the Market Monitor calculation remained undocumented, undefined and potentially flawed based on my experience in \ndeveloping the original Opportunity Cost calculation methodology in 2009 while I was at PJM. \n \nProtest of the Electric Power Supply Association in Sierra Club, et.al., Complainant, v. PJM Interconnection, \nL.L.C., Respondent. Docket No. EL24-148, October 24, 2024. Based on my experience and knowledge of Part V of the \nPJM Tariff, I showed why reliability must run (“RMR”) are retained as transmission assets and have never been \nconsidered Capacity Resources in PJM and thus have no obligation to be included in the RPM Capacity Market. I also \ndemonstrated the market inefficiencies and distortions that would be created by inserting RMR units into the RPM \nCapacity market as requested in the Complaint. The end results would be further reliability problems as the prices on the \nRPM Capacity Market would not be consistent with the reliability needs of the system. This affidavit was also cited and \nincluded in Docket Nos. EL25-18 and ER25-1357. \n \nAnswer of the Electric Power Supply Association in Sierra Club, et.al., Complainant, v. PJM Interconnection, \nL.L.C., Respondent. Docket No. EL24-148, October 31, 2024. This affidavit responded to the Comments of the \nIndependent Market Monitor for PJM (“IMM”) explaining how the IMM’s proposed solutions were inefficient, how the IMM;s \nstatements were logically inconsistent with the treatment of RMR units in the PJM Energy Market, and how the IMM’s"},{"page":68,"startToken":24333,"endToken":24968,"text":"Curriculum Vitae \nSotkiewicz Page 17 \n \narguments regarding the calculation of certain parameters (CETO and CETL) were inconsistent with standard practice. \n \nComments of the Electric Power Supply Association in PJM Interconnection, L.L.C., Docket No. ER25-682, \nJanuary 6, 2025. My affidavit in EL24-148 on October 24, 2024 is included in support of EPA’s comments. Filing \nproposes to insert RMR units into the RPM Capacity Market Supply stack, the problem of which I addressed in my \naffidavit in EL24-148. \n \nProtest of the Electric Power Supply Association in Governor Josh Shapiro and The Commonwealth of \nPennsylvania, Complainants, v. PJM Interconnection, L.L.C., Respondent. Docket No. EL25-46, January 21, 2025. \nThis affidavit counters the arguments made in the Complaint that a cap of prices in the RPM Capacity Market is needed. I \nargue that such a policy would be economically inefficient and contrary to achieving reliability in PJM. As part of the core \nargument I provide historic data, explain that there on potential resources available in the form of demand response, and \nthe overall background for the RPM Capacity Market that was designed to periodically hit the maximum price as originally \nintended as well as occasionally not meeting the reliability requirements in all years. \n \nProtest of Indicated Merchant Generators in PJM Interconnection, L.L.C., Docket No. ER25-1357, March 17, 2025. \nThis affidavit explains the filing PJM makes in this docket to place a hard cap and floor on capacity market prices for the \n2026/2027 and 2027/2028 Base Residual Auctions would be economically inefficient, harm reliability, ignore market \nrealities and transforms financial risk into reliability risk for consumers. I also explain, contrary to PJM’s assertions, that \nthe RPM Capacity Market was designed with volatility in demand and supply conditions in mind as well as showing that \nPJM capacity prices had historically been low relative to other surrounding markets resulting in capacity wishing to leave \nPJM for other markets. \n \nPOLICY WHITEPAPERS and Reports \n \nNYISO Meter Data Study-Final Report, December 8, 2017. Available at \nhttps://www.nyiso.com/documents/20142/1391862/NYISO-Meter-Data-Study-Report.pdf/db0de386-04b1-8818-3f77-\n194bc71a8c37. This report examines the meter data policies in the NYISO in comparison to similar polices in PJM, \nCAISO, and ISO-NE and the role of entities providing meter services for DER as may be required into the future. This \nreport address and provides recommendations on 1) Baselines for DER as required and modification to existing baselines \nif needed; 2) Potential for the statistical sampling of a subset of DERs for establishing baselines and for market settlement \nin the energy, capacity, and ancillary services markets; 3) Interactions of baselines and DER aggregation; and 4) \nSimultaneous participation in both retail and wholesale markets by DERs. \n \nThe Market and Financial Position of Nuclear Resources in Pennsylvania, April 5, 2019. Available at https://citizens-\nagainst-nuclear-bailouts.prezly.com/new-report-highlights-long-term-profit-projections-for-pennsylvania-nuclear-generators and \nhttps://cdn.uc.assets.prezly.com/210b1e76-c577-4ffb-9bb9-c60c1f4299b8/-/inline/no/  \nThis paper shows that nuclear resources in Pennsylvania are profitable historically and going forward and are in no need \nof any subsides to keep these resources in service. \n \n \n \nThe Market and Financial Position of Nuclear Resources in Ohio, May 13, 2019. Available at \nhttps://img1.wsimg.com/blobby/go/30b6d3a5-dffd-4a1b-9b4d-\n0bf3451282cd/downloads/OH%20Nuclear%20Analysis%2020190513-final.pdf?ver=1559092681975  \nThis paper shows that nuclear resources in Ohio, Davis-Besse and Perry, are profitable historically and going forward and \nare in no need of any subsides to keep these resources in service as proposed under House Bill 6. \n \nEconomic Benefits to Ohio Electricity Consumers from the Repeal of House Bill 6, September 16, 2020. This paper \nshows that the Repeal of HB 6 in Ohio would lead to lower electricity bills for Ohio consumers with saving coming from \nkeeping energy efficiency and demand response programs, and the repeal of subsidies for legacy coal units and the \nDavis-Besse and Perry nuclear units."},{"page":69,"startToken":24968,"endToken":25050,"text":"Curriculum Vitae \nSotkiewicz Page 18 \n \n \nAssessment of the Fixed Resource Requirement Option for Delaware, Prepared for the Delaware Public Service \nCommission, June 29, 2021. Presented to the Delaware Public Service Commission Open Meeting, October 6, \n2021. This paper reviews the FRR Rules in PJM and analyzes the trade-offs for Delaware of opting into an FRR Plan with \nregard to costs, ability to meet RPS requirements, and overall feasibility. The meeting agenda and minutes are available \nat https://publicmeetings.delaware.gov/#/meeting/67673."},{"page":70,"startToken":25050,"endToken":25287,"text":"Energy\nEnvironment\nEconomics \nE-Cubed Policy Associates, LLC\nE3\nwww.e-cubedpolicy.com | Gainesville, Florida\nPaul M. Sotkiewicz, Ph.D. \nPresident and Founder, E-Cubed Policy Associates, LLC \n \nPaul M. Sotkiewicz, Ph.D. is the President and Founder of E-Cubed Policy Associates, \nLLC (“E-Cubed”), an energy and environmental economic consultancy based in \nGainesville, Florida that started in 2016. Dr. Sotkiewicz brings nearly 30 years of \nexperience across parts of four decades at the intersection of utility regulatory policy, \npower system economics, and environmental economics to provide analysis and advice \nto private and public sector clients on a range of economic issues related to electricity \nmarket design and performance, power generation economics, market power mitigation, \nutility regulatory policy, distributed energy resources and the economic impacts of state \nand federal environmental policies on the power and gas industries. Dr. Sotkiewicz also \nsupports law firms in litigation proceedings including rate cases, need determinations, \nrate design and market power/manipulation cases.  \n \nClients have included: \nMarket and system operators \n• Alberta Electric System Operator \n• New York Independent System Operator \n• Electric Reliability Council of Texas \n• Independent Electric System Operator (Ontario) \nTrade associations such as the  \n• Electric Power Supply Association \n• New England Power Generators Association \n• PJM Power Providers Group \n• American Petroleum Institute \n• Industrial Power Consumers Association of Alberta \n• Dual Use Customers of Alberta \nMerchant generation and transmission developers and operators in North American \npower markets \n• ITC Holdings,  \n• JPower USA Ltd. \n• Panda Power Funds \n• Vistra Energy \n• ENMAX  \n• Rockland Capital"},{"page":71,"startToken":25287,"endToken":25537,"text":"Energy\nEnvironment\nEconomics \nE-Cubed Policy Associates, LLC\nE3\nwww.e-cubedpolicy.com | Gainesville, Florida\n• Kalina Distributed Power \n• Capstone Infrastructure Corporation \n• Pine Gate Renewables \n• NextEra Energy Resources \n• PVOne \n• Bechtel  \n• Tenaska \n• Earthrise Energy, PBC \n• LS Power \n• Coalition of PJM Capacity Resources which included resources owned by \nGenOn, Talen Energy, Tyr Energy, Clean Energy Futures, and Competitive Power \nVentures among others. \nGeneration and transmission cooperatives  \n• Intermountain Rural Electric Association \n• Buckeye Power \n• East Kentucky Power \n• Dairyland Power Cooperative \nNon-Governmental Entities \n• Natural Resources Defense Council \n• Southern Environmental Law Center \nRegulatory Agencies/Governmental Entities \n• Delaware Public Service Commission \n• US Department of State (via Lawrence Berkeley National Laboratory) \n• Government of Vietnam \n• Florida Department of Environmental Protection \n• Belize Public Utilities Commission \nNatural Gas Industry Customers \n• Blue Racer Midstream \n \nPrior to founding E-Cubed, Dr. Sotkiewicz worked for PJM Interconnection, LLC in the \nrole of Chief Economist and as a Senior Economic Policy Advisor. At PJM, Dr. \nSotkiewicz provided analysis and advice regarding all aspects of PJM’s markets and \nsupported regulatory filings and implementation of market design changes. At PJM Dr. \nSotkiewicz led initiatives related to shortage pricing and real-time dispatch co-\noptimization of energy and reserves, integration of demand response in PJM’s markets \nincluding price formation and compensation of demand resources. At PJM Dr. \nSotkiewicz supported PJM’s regulatory position with respect to the application of the \nThree Pivotal Supplier Test supplier market power, helped develop an opportunity cost \ncalculator for run-limited resources used for market mitigation purposes, and \nadministered implementation of the minimum offer price rule (MOPR) to curb buyer-side"},{"page":72,"startToken":25537,"endToken":25896,"text":"Energy\nEnvironment\nEconomics \nE-Cubed Policy Associates, LLC\nE3\nwww.e-cubedpolicy.com | Gainesville, Florida\nmarket power in the PJM capacity market. Dr. Sotkiewicz also authored or co-authored \na series of policy analyses and whitepapers on ranging from transmission cost \nallocation to gas-electric coordination to the effects of environmental rules on PJM’s \nmarkets. While at PJM, Dr. Sotkiewicz was a frequent speaker at FERC Computation \nTechnical Conferences related to advances in unit commitment models and computation \nmethods that could be applied in ISO/RTO markets.  \n \nAs an economist at the United States Federal Energy Regulatory Commission (FERC) \nin the Office of Economic Policy and later, on the Chief Economic Advisor's staff at Dr. \nSotkiewicz conducted research and provided analysis and advice on market design \nissues related to the ISO/RTO markets, in particular the California ISO and New York \nISO, as they were being formed and implemented and worked on merger cases to \nanalyze any potential for market power. As part of this work, Dr. Sotkiewicz has co-\nauthored peer review articles related to unit commitment models and price formation to \naccount for discrete decisions related to start-up, shut-down, and minimum run \nconditions.  \n \nDr. Sotkiewicz is the author or co-author of multiple book chapters and publications \nrelated to wholesale market design and policy including price formation in unit \ncommitment models, the integration of demand response and distributed energy \nresources in markets and operations environmental economic policy, distribution rate \ndesign, economic decisions for nuclear resource build decisions, and renewable \nresource integration. In addition to his tenures at PJM and FERC, Dr. Sotkiewicz served \nas the Director of Energy Studies at the Public Utility Research Center (PURC), \nUniversity of Florida, and he was an Instructor in the Department of Economics at the \nUniversity of Minnesota where he earned the Walter Heller Award for Outstanding \nTeaching of Economic Principles four times.  \n \nDr. Sotkiewicz holds a Bachelor of Arts in history and economics from the University of \nFlorida (1991) with High Honors, a Master of Arts (1995) and Doctorate in Economics \nfrom the University of Minnesota (2003). Dr. Sotkiewicz is also a member of Phi Beta \nKappa academic honor society and a former Fulbright Scholar."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1094,"startToken":0,"endToken":511},{"p":2,"at":1094,"title":"I. PROTEST","method":"printed heading","endPage":2,"endAt":1410,"startToken":511,"endToken":560},{"p":2,"at":1410,"title":"A. PJM’s BYONC Requirement for New Large Loads is Unduly","method":"printed heading","endPage":10,"endAt":758,"startToken":560,"endToken":3101},{"p":10,"at":758,"title":"B. The Sotkiewicz Affidavit Identifies Other Unjust, Unreasonable, and","method":"printed heading","endPage":13,"endAt":651,"startToken":3101,"endToken":3960},{"p":13,"at":651,"title":"C. The IRAS Proposal Should be Rejected in Its Entirety","method":"printed heading","endPage":15,"endAt":240,"startToken":3960,"endToken":4489},{"p":15,"at":240,"title":"D. There Are Alternatives Available to PJM and the Commission that","method":"printed heading","endPage":16,"endAt":327,"startToken":4489,"endToken":4867},{"p":16,"at":327,"title":"II. CONCLUSION","method":"printed heading","endPage":17,"endAt":0,"startToken":4867,"endToken":4963},{"p":17,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":18,"endAt":0,"startToken":4963,"endToken":5021},{"p":18,"at":0,"title":"Attachment A","method":"printed heading","endPage":19,"endAt":271,"startToken":5021,"endToken":5058},{"p":19,"at":271,"title":"I. INTRODUCTION AND SUMMARY","method":"printed heading","endPage":23,"endAt":1345,"startToken":5058,"endToken":6452},{"p":23,"at":1345,"title":"II. QUALIFICATIONS","method":"printed heading","endPage":24,"endAt":1359,"startToken":6452,"endToken":6754},{"p":24,"at":1359,"title":"III. THE CURRENT RPM CAPACITY MARKET TRADES A FUNGIBLE COMMODITY","method":"printed heading","endPage":24,"endAt":1478,"startToken":6754,"endToken":6772},{"p":24,"at":1478,"title":"A. Commodity Markets Trade Fungible Commodities","method":"printed heading","endPage":25,"endAt":916,"startToken":6772,"endToken":6948},{"p":25,"at":916,"title":"B. UCAP as a Fungible Commodity","method":"printed heading","endPage":27,"endAt":462,"startToken":6948,"endToken":7451},{"p":27,"at":462,"title":"IV. UNDULY DISCRIMINATORY AND PREFERENTIAL ASPECTS OF IRAS.","method":"printed heading","endPage":28,"endAt":55,"startToken":7451,"endToken":7670},{"p":28,"at":55,"title":"A. Inclusion or Exclusion of Loads from the VRR Curve in the RPM BRAs or IAs","method":"printed heading","endPage":30,"endAt":6,"startToken":7670,"endToken":8305},{"p":30,"at":6,"title":"B. The Offer Requirements into RPM Auctions that Differ Between BYONC, RBP,","method":"printed heading","endPage":31,"endAt":680,"startToken":8305,"endToken":8698},{"p":31,"at":680,"title":"C. Differential Capacity Accreditation Between BYONC Resources and All Other","method":"printed heading","endPage":36,"endAt":125,"startToken":8698,"endToken":10195},{"p":36,"at":125,"title":"D. The Implicit Restrictions on the LSEs and Loads with Whom Existing Capacity","method":"printed heading","endPage":36,"endAt":1622,"startToken":10195,"endToken":10428},{"p":36,"at":1622,"title":"E. Disparate Treatment of Different Loads by Size and In-Service Date for","method":"printed heading","endPage":37,"endAt":743,"startToken":10428,"endToken":10579},{"p":37,"at":743,"title":"F. Eligible New Large Load Providing IRAS is Compensated and Treated Differently","method":"printed heading","endPage":37,"endAt":1709,"startToken":10579,"endToken":10737},{"p":37,"at":1709,"title":"Attachment K-Appendix.","method":"printed heading","endPage":39,"endAt":555,"startToken":10737,"endToken":11155},{"p":39,"at":555,"title":"V. IRAS CREATES MULTIPLE UCAP COMMODITIES OUT OF A ONCE FUNGIBLE","method":"printed heading","endPage":39,"endAt":1086,"startToken":11155,"endToken":11237},{"p":39,"at":1086,"title":"A. UCAP from Existing Capacity Resources","method":"printed heading","endPage":40,"endAt":6,"startToken":11237,"endToken":11329},{"p":40,"at":6,"title":"B. UCAP from BYONC Resources","method":"printed heading","endPage":40,"endAt":940,"startToken":11329,"endToken":11482},{"p":40,"at":940,"title":"VI. IMPLIED PROPERTY RIGHTS CREATED AND GRANTED BY IRAS","method":"printed heading","endPage":41,"endAt":688,"startToken":11482,"endToken":11701},{"p":41,"at":688,"title":"A. Property Rights of Existing Capacity Resources Have Been Reallocated to Existing","method":"printed heading","endPage":42,"endAt":148,"startToken":11701,"endToken":11919},{"p":42,"at":148,"title":"B. Property Rights to Energy In Real-time Operations has Been Assigned to Eligible New","method":"printed heading","endPage":43,"endAt":1500,"startToken":11919,"endToken":12502},{"p":43,"at":1500,"title":"VII. MARKET","method":"printed heading","endPage":44,"endAt":208,"startToken":12502,"endToken":12594},{"p":44,"at":208,"title":"A. The Incentives Under IRAS Likely Will Not Bring the New Entry that PJM Expects","method":"printed heading","endPage":45,"endAt":587,"startToken":12594,"endToken":12986},{"p":45,"at":587,"title":"B. Existing Capacity Resources Will Have Incentives to Exit the Market if New Entry","method":"printed heading","endPage":46,"endAt":493,"startToken":12986,"endToken":13246},{"p":46,"at":493,"title":"C. New Large Loads Will Have Incentives to Inefficiently Reduce Their Size to Avoid","method":"printed heading","endPage":47,"endAt":6,"startToken":13246,"endToken":13451},{"p":47,"at":6,"title":"VIII. CONCLUSIONS AND A WAY FORWARD BY LEARNING THE LESSONS OF","method":"printed heading","endPage":72,"endAt":2386,"startToken":13451,"endToken":25896}]}
