{"document":{"slug":"rec-20260904-5197-2","title":"2026-09-04 FERC Acceptance for Filing in ER26-3515-000","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"attachment","file":"sources/filings/text/20260904-5197_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","parent":"rec-20260904-5197","sha256":"e2e007792c6ab7547fb30ce4c3fd862ef7e36a2aee44c16017b5b7bfe7772da3","pages":2,"tokens":354,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":314,"text":"1 of 2\nSubject:\nSubject:\nSubject:\nSubject:\n[EXTERNAL] FERC Acceptance for Filing in ER26-3515-000\nDate:\nDate:\nDate:\nDate:\nFriday, September 4, 2026 at 9:36:28 AM Eastern Daylight Time\nFrom:\nFrom:\nFrom:\nFrom:\neFiling@ferc.gov\nTo:\nTo:\nTo:\nTo:\nArthur Haubenstock, eﬁlingacceptance@ferc.gov\nPriority:\nPriority:\nPriority:\nPriority:\nHigh\nCategory:\nCategory:\nCategory:\nCategory: Red category\nCaution: This email is from an external source. Please take care when clicking links, scanning QR codes,\nor opening attachments. When in doubt, use the Report Button.\nAcceptance for Filing\n---------------------\nThe FERC Ofﬁce of the Secretary has accepted the following electronic submission for ﬁling (Acceptance\nfor ﬁling does not constitute approval of any application or self-certifying notice):\n-Accession No.: 202609045013\n-Docket(s) No.: ER26-3515-000\n-Filed By: EQUINIX INC.\n-Signed By: Arthur Haubenstock\n-Filing Type: Comment on Filing\n-Filing Desc: Protest and Comments of Equinix Inc. requesting clariﬁcations of PJM Interconnection,\nL.L.C.’s proposal ﬁled on 08/13/2026 under ER26-3515.\n-Submission Date/Time: 9/3/2026 10:40:05 PM\n-Filed Date: 9/4/2026 8:30:00 AM\nYour submission is now part of the record for the above Docket(s) and available in FERC's eLibrary\nsystem at:\nhttps://nam11.safelinks.protection.outlook.com/?\nurl=https%3A%2F%2Felibrary.ferc.gov%2FeLibrary%2Fdocinfo%3Faccession_num%3D20260904-\n5013&data=05%7C02%7Cahaubenstock%40equinix.com%7C5fbfb68632dd4504707308df0a8981b4%7\nC72adb2712fc74afea5ee9de6a59f6bfb%7C0%7C0%7C639241257883795599%7CUnknown%7CTWFp\nbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFp\nbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=z8aezd%2Fvvnx75zVJ0%2B3f%2FnggwqXFQR\nut1eWYQh81ShA%3D&reserved=0\nIf you would like to receive e-mail notiﬁcation when additional documents are added to the above\ndocket(s), you can eSubscribe by docket at:\nhttps://nam11.safelinks.protection.outlook.com/?\nurl=https%3A%2F%2Fferconline.ferc.gov%2FeSubscription.aspx&data=05%7C02%7Cahaubenstock%4\n0equinix.com%7C5fbfb68632dd4504707308df0a8981b4%7C72adb2712fc74afea5ee9de6a59f6bfb%7C0\n%7C0%7C639241257883813628%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIl\nYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%\n7C&sdata=hchgRzQBFpqHujjPWvuIWO0WzVG0ilisIR%2BmWRZe6PY%3D&reserved=0"},{"page":2,"startToken":314,"endToken":354,"text":"2 of 2\nThank you again for using the FERC Electronic Filing System.  If you need to contact us for any reason:\nE-Mail: ferconlinesupport@ferc.gov mailto:ferconlinesupport@ferc.gov (do not send ﬁlings to this\naddress)\nVoice Mail: 866-208-3676."}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 2","method":"page range","endPage":2,"endAt":242,"startToken":0,"endToken":354}]}