{"document":{"slug":"rec-20260904-5197-4","title":"2026-09-03 Final EQIX IRAS Comments","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"attachment","file":"sources/filings/text/20260904-5197_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","parent":"rec-20260904-5197","sha256":"6f09b9a08a70133ed740dd7d5de221993c73a6f0af7d301de79e8847fd9f15ad","pages":18,"tokens":5452,"emptyPages":[],"textThemes":["registry","flex","retail","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":301,"text":"UNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n) \n \nPJM Interconnection, L.L.C.  \n \n) \nDocket No. ER26-3515 \n \n \n) \n \nPROTEST, REQUEST FOR CLARIFICATION AND  \nCOMMENTS OF EQUINIX INC. ON THE  \nPROPOSAL OF PJM INTERCONNECTION, L.L.C. TO  \nESTABLISH INTERIM RESOURCE ADEQUACY SERVICE AND A  \nLARGE LOAD REGISTRY TO ADDRESS SYSTEM RELIABILITY \n \nEquinix Inc. (“Equinix”) appreciates this opportunity to contribute its protest, request for \nclarification and comments in response to the filing by PJM Interconnection, L.L.C. (“PJM”) \nentitled “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy \nService and a Large Load Registry to Address System Reliability” (the “IRAS Filing”), which \nPJM submitted on August 13, 2026.1  We respectfully provide this submission for consideration \nby the Federal Energy Regulatory Commission (“Commission” or “FERC”) pursuant to Rule \n211 of its Rules of Practice and Procedure, 18 C.F.R. § 385.211, and the Commission’s notice \nissued in this docket.2  \nI. \nSUMMARY \nConsistent with its own U.S. Community Principles,3 and as a signatory to the Ratepayer \nProtection Pledge, Equinix supports the general principle behind the IRAS Filing: that new large \n \n1 PJM Interconnection, L.L.C., “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource \nAdequacy Service and a Large Load Registry to Address System Reliability,” Docket No. ER26-3515-000, \nTransmittal Letter (August 13, 2026) (“IRAS Transmittal”). Capitalized terms not defined herein have the meanings \ngiven in the Transmittal, the PJM Open Access Transmission Tariff (“PJM Tariff”), or the PJM Reliability \nAssurance Agreement among Load Serving Entities (“RAA”). \n2 PJM Interconnection, L.L.C., Docket No. ER26-3515-000, Combined Notice of Filings, (Aug. 13, 2026) \n(establishing a comment date of Sept. 3, 2026). Equinix filed a timely doc-less motion to intervene in this \nproceeding on Aug. 21, 2026.. \n3 Available at https://equinixtogether.com/community-principles/."},{"page":2,"startToken":301,"endToken":624,"text":"2 \nloads should bear the obligation to bring sufficient new capacity to the system to meet its needs, \nand that those who have not procured new capacity should bear curtailment risk during periods \nof grid stress. The alternative would unjustly shift that risk resulting from the pressure new large \nload growth places on system resources on other customers.4 \nEquinix appreciates that objective, and PJM’s intent to achieve it. The IRAS Filing’s \napproach unfortunately and unnecessarily blurs the jurisdictional line between federal and state \nauthority, creating complexities and uncertainties that undermine the very objective it is meant to \nserve: to have large loads procure new capacity. As explained below, this approach makes it very \ndifficult for large loads to procure new capacity with any confidence that doing so will protect \nthem from IRAS curtailment or Reliability Backstop Procurement (“RBP”)5 cost allocation. \nEquinix accordingly protests and seeks clarification of four targeted aspects of the IRAS \nFiling. First, the definitions of Large Load and New Large Load fail to protect loads already \nunder final retail service contracts, which would effectively override those contracts and the \nfinancial expectations built on them— and which would be particularly damaging for facilities \nthat have already commenced energization. Second, the one-mile aggregation rule improperly \ntreats independently developed legacy facilities as a single electrical site based on distance alone, \nwithout regard to long-standing legitimate commercial reasons for siting that have no relation to \nenergy. Third, Schedule 11 permits PJM to rely on Large Load Registry information without \nrequiring notice to, verification by, or a meaningful correction process for the affected Large \nLoad. Fourth, Equinix seeks clarification, or in the alternative protests, PJM’s failure to credit a \nverified, customer-sponsored Peak Shaving Adjustments on a basis comparable to other \n \n4 IRAS Filing at 4–5 & n.10 (identifying Equinix, Inc. among the data centers that have joined the \nRatepayer Protection Pledge). \n5 PJM’s RBP proposal is before the Commission in Docket ER26-3380."},{"page":3,"startToken":624,"endToken":1043,"text":"3 \ninvestments that address the same resource-adequacy need.. \nEquinix therefore asks that FERC take the following actions to avoid otherwise unjust \nand unreasonable results: \n1) Revise the definition of “New Large Load” to exclude any load including a \ncontractual ramp, covered by a binding retail service (including transmission \nservice or electric service) agreement executed before August 13, 2026, the date \nof the IRAS filing, so as not to override existing contracts and the financial \nexpectations built on them.  \n \n2) Revise the definition of “large load” to eliminate the one-mile aggregation radius, \nwhich PJM adapted from Qualified Facility (“QF”) siting rules without \nmeaningful stakeholder input or a reasoned account of how data centers differ \nfrom QFs. In the alternative, if the Commission finds that geographic aggregation \nof existing facilities may be just and reasonable in some circumstances, we ask \nthat it direct PJM to make the one-mile rule a rebuttable presumption, allowing a \ncustomer to show that affiliated facilities are separate sites based on factors such \nas separate service arrangements, points of interconnection, ownership and \ncontrol, development history, or electrical and operational independence.6 \n \n3) Amend Schedule 11 to require PJM to provide each Large Load notice of the \ninformation attributed to it, a meaningful opportunity to correct or supplement \nthat information before PJM relies on it, and a prompt process to resolve disputes \nover New Large Load status, registered peak load, capacity coverage, and related \nLarge Load Registry determinations. \n \n4)  Revise the Tariff so that a New Large Load receives credit comparable to \nBYONC when it funds a qualifying Peak Shaving Adjustment that reduces PJM’s \ncapacity need, whether at its own site or provided by other customers. The credit \nshould reflect the reduction recognized by PJM and reduce the load’s IRAS \nobligation, subject to verification and protections against double counting. \n \nI. BACKGROUND AND INTEREST OF EQUINIX \nEquinix, based in Redwood City, California, is one of the oldest and largest data center \ndevelopers in the world, with data centers across six continents, over 35 countries, and more than \n70 metropolitan areas. The data centers Equinix develops, owns and operates are long-lived \n \n6 See Qualifying Facility Rates and Requirements Implementation Issues Under the Public Utility \nRegulatory Policies Act of 1978, Order No. 872, 172 FERC ¶ 61,041, order on reh’g & clarifying in part, Order No. \n872-A, 173 FERC ¶ 61,158 (2020); IRAS Filing at 33 & n.95 (citing Order No. 872 as the analog for PJM’s one-\nmile radius rule, which the Commission applies as an irrebuttable presumption for QF siting)."},{"page":4,"startToken":1043,"endToken":1350,"text":"4 \nassets developed against investment horizons measured in decades rather than quarters. We \ndevelop two distinct types of data centers: colocation data centers, which we call International \nBusiness Exchanges (or “IBXs”) and house as many as 400 separate customers, and larger data \ncenters, which we call “xScale” facilities, which generally house one or two customers. \nPrivate enterprises, network operators, cloud providers, governmental entities and \nnonprofits house computing equipment and interconnect with one another and with the broader \ninternet within Equinix’s International Business Exchange (“IBX”) data centers. Many of \nEquinix’s customers utilize the computing equipment in our data centers and the data \ninterconnection services we provide to enable critical services, such as emergency response, grid \noperations, medical information, and national security. Each individual IBX facility may house \nas many as 400 co-located customers. Our IBX data centers range between a few megawatts up \nto approximately 100 MW, and average in the mid-30 MWs.  \nEquinix also develops, owns and operates larger xScale data centers, which can exceed \n750 MW. Our xScale data centers generally serve one or two customers, each of which requires  \na significant dedicated proportion, or even the entirety, of these larger facilities.  \nEquinix has operated in the PJM Region for decades. Its facilities include the very first \ncommercial data center in Data Center Alley in Northern Virginia, as well as many other data \ncenters in that area and elsewhere in Northern Virginia; numerous data centers in the Chicago \narea; and numerous data centers in  New Jersey. Equinix takes retail electric service from \nElectric Distributors and Load Serving Entities across the PJM Region and, in retail choice \njurisdictions, procures its supply through competitive retail suppliers. Depending on how \nEquinix’s procurement of new capacity is credited, Equinix could be directly affected by IRAS \nload-reduction obligations. Equinix has no financial interest in the outcome of the IRAS as a"},{"page":5,"startToken":1350,"endToken":1624,"text":"5 \nprovider of capacity; its interest is entirely as a developer, owner and operator of large loads. \nEquinix has always held itself to a high standard of care for the communities it operates \nin. Recognizing that more is needed to meet the current moment, Equinix recently memorialized \nits practices explicitly through its U.S. Community Principles.7  These principles include \nEquinix’s commitment to power responsibility, ensuring it “pays the full cost of its grid \ninfrastructure needs so costs are not passed to consumers.”8 Equinix does not regard the \nreliability consequences of large load growth as someone else’s problem to solve, and it has \ncommitted capital to the long-term arrangements needed for new generating capacity and energy \ninfrastructure. \nEquinix’s interest in this proceeding is in the long-term stability, predictability, and \ndurability of the rules that govern reliability and market conditions, including resource adequacy, \nacross the PJM Region. As a load that intends to sign long-term supply commitments, Equinix \nneeds to know what those commitments will provide, what risks will remain, and how to best \naddress those remaining risks. That is the lens through which Equinix offers the comments that \nfollow. \nII.  DISCUSSION \nA. WHEN THE ROLLERSKATES AND THE KEY AREN’T SHARED, NO \nONE HAS ANY FUN: THE LACK OF COORDINATION BETWEEN \nWHOLESALE AND RETAIL RULES UNDERMINES LARGE LOAD \nCAPACITY PROCUREMENT \nWhile Equinix does not take a position on the jurisdictional questions raised by PJM’s \napproach, the Commission should be aware of the practical, commercial effect of an approach \nthat raises those questions, which is to undermines the ability of new large loads to procure new \n \n7 Available at https://equinixtogether.com/community-principles/.  \n8 Id."},{"page":6,"startToken":1624,"endToken":1953,"text":"6 \ncapacity with confidence. PJM could have chosen at least two paths that would have better \navoided this problem, but took neither.  \nUnder what might be termed a “tough love” approach, PJM could have confined itself to \nthe responsibilities that are clearly at the federal wholesale level —assessing whether the \naggregate new large load reported by PJM-jurisdictional entities is matched by aggregate new \ncapacity, procuring against any gap through the RBP, and directing zonal load reductions when \nthe gap persists during grid stress. This would leave the states, exercising their jurisdiction over \nthe retail service, to define, coordinate, and enforce customer-level procurement and curtailment \nrules.  \nUnder an approach that truly maximized “cooperative federalism,” PJM could instead \nhave convened with state authorities to align definitions and implementation mechanisms before \nfiling. While this would be challenging, it would have given load and capacity providers a more \ncoherent foundation on which to contract-- with greater certainty, lower cost and lower risk. \nInstead, the IRAS Filing has waded into matters that are at best gray areas for federal \njurisdiction and at worst squarely within state jurisdiction. Through the Large Load and New \nLarge Load definitions and the Large Load Registry, PJM has taken on the task of deciding \nwhether a retail load is new, whether it is one facility or several, and whether—and how much—\nnew capacity it has procured, rather than simply ensuring that the aggregate load and aggregate \nnew capacity is reported to PJM properly and accurately. PJM’s own view that its procurement \ndetermination is nonbinding on Electric Distributors9 offers new large loads no real comfort: it \nmeans that satisfying PJM’s definitions carries no guarantee of protection from curtailment, \nwhile satisfying state procurement requirements may still leave a load looking, on paper, like it \n \n9 IRAS Filing at p. 86, but cf. IRAS Filing at p. 41, which appears at least somewhat contradictory; PJM is \nmaking a determination, but then claims that determination has no actual impact of that determination."},{"page":7,"startToken":1953,"endToken":2282,"text":"7 \nfailed to procure. As explained below, that is far from saying the Large Load Registry would \nhave no value. To the contrary, as PJM points out, stakeholders generally supported the \nconcept.10  It simply underlines the importance of having determinations affecting retail load \nmade by those entities with jurisdiction over that load.  The tremendous value that the Large \nLoad Registry offers, of collecting the relevant facts from entities with jurisdiction over retail \nload in a central repository, would remain.11 \nEquinix has been actively engaged in procurement of new capacity, but is frankly \nfrustrated with the lack of clarity that has complicated transactions, increased their risk and \nthereby increased their cost- resulting in an unnecessary drag on both the energy and data \neconomies so important to the Nation. Since PJM’s Board first introduced the Critical Issue Fast \nPath (“CIFP”) process for large load additions in August 2025, Equinix has understood the \ndirection of policy at every jurisdictional level to be pointing toward one goal: “new” large loads \nprocuring supply from “new” capacity resources. Equinix did not wait for every detail of that \npolicy to be settled.  It quickly began to seek bilateral procurement intended to satisfy whatever \nframework eventually emerged. Defining that obligation with enough precision to contract \nagainst it has, much to the detriment of the shared objectives, proven difficult for the reasons that \nfollow.12 \nEquinix has several projects with energization dates in 2028, 2029, and beyond we view \nas “new.” It also has many facilities that have been energized for years and continue to grow \nthrough ordinary customer changes and from the multi-year ramp schedules typical of data \n \n10 IRAS Filing at p. 30-31. \n11 Cf. IRAS Filing at p. 67, for example, with the calculations PJM anticipates performing as discussed at \npp. 113 et seq. \n12 See IRAS Filing at 13 & n.33 (citing Letter of David E. Mills, PJM Board Chair, PJM Board Letter \nImplementing CIFP for Large Load Additions (Aug. 8, 2025))."},{"page":8,"startToken":2282,"endToken":2592,"text":"8 \ncenter energization. PJM’s discussion makes clear that it intends load added through a facility’s \nramp after June 1, 2027, to be treated as “New Large Load.” The Large Load Registry would \ninclude the in-service date for each increment of load, as well as the facility’s peak load and \nramp schedule, and PJM describes the in-service date of each increment as critical to \ndetermining IRAS applicability. The proposed tariff language, however, does not clearly \nimplement that intent.  \nClause (b) of the New Large Load definition applies to incremental load that enters \nservice after June 1, 2027, and increases the load at a site that, before that increment, did not \nmeet the Large Load definition. Read literally, that language appears to capture the increment \nthat causes a previously smaller site to cross the 50 MW threshold, but not subsequent \nincrements at a site that already meets the Large Load definition. It also does not clearly state \nwhether the New Large Load consists only of the qualifying increment or the entire registered \npeak load of the site.  \nThat ambiguity has direct consequences for Equinix. A facility energized in 2023, 2024, \nor 2025 may continue to ramp after June 1, 2027, under a retail service agreement that was \nnegotiated, studied, and executed years earlier. PJM’s discussion indicates that it intends to treat \nthe post-June 1, 2027, portion of that ramp as new, even though the utility may already have \ncommitted to serve the facility’s full ramp. Yet the proposed tariff does not clearly identify \nwhich increments would be treated as New Large Load or how the corresponding MW obligation \nwould be calculated. Equinix therefore cannot determine with confidence the amount of BYONC \nit would need to procure. The Commission should require PJM to clarify the definition and, more \nimportantly, exclude ramp increments covered by binding retail service agreements executed \nbefore the IRAS Filing."},{"page":9,"startToken":2592,"endToken":2920,"text":"9 \nEven the “clear” cases of new load raise open questions: must a New Large Load procure \ncapacity equal to its ultimate peak load contribution, or the design capacity it originally \nrequested from its Electric Distributor? Must it procure that full amount from the first day of \nservice, or may it ramp its procurement alongside its ramping demand? PJM’s proposal to collect \nload and BYONC ramp schedules, and to permit BYONC in excess of a load’s current Eligible \nNew Large Load Amount, suggests that procurement may track expected growth. But the \nproposed tariff does not say how PJM will translate those schedules into the registered peak load \nused to calculate the facility’s IRAS obligation. Customers served by a vertically integrated \nElectric Distributor are left with this question: has that utility’s procurement of qualifying new \ncapacity through its own supply plan already satisfied some or all of the customer’s BYONC \nobligation?  \nPJM has relied on the Large Load Adjustment to assess the magnitude and timing of \nlarge load growth that it contends requires the measures proposed here. Yet neither Equinix nor \nits Electric Distributor can determine how individual facilities are reflected in that adjustment. \nEquinix knows what information it provides to its Electric Distributor, but not what the Electric \nDistributor ultimately submit to PJM. PJM, in turn, has made adjustments to the Electric \nDistributor submissions before the Large Load Adjustments are finalized in a forecast. PJM \nexplained in the stakeholder process that the Large Load Adjustments cannot identify how an \nindividual load site is reflected or whether or not it is included in the final load forecast. That \nopacity now has direct consequences because customers cannot determine which facilities and \nramp increments PJM will treat as in service by June 1, 2027, and therefore would be outside the \ndefinition of New large Load, and which PJM will subject to IRAS. Placing large load \ninformation in a new Large Load Registry will not resolve this problem if PJM uses that"},{"page":10,"startToken":2920,"endToken":3206,"text":"10 \ninformation through the same opaque process, without allowing an affected customer to see and \ncorrect its facility’s classification, registered peak load, and ramp schedule.  \n This lack of transparency is not merely administrative. It prevents Equinix from \nidentifying the amount and timing of its IRAS obligation and, in turn, from reliably negotiating \nthe long-term, high-value bilateral commitments BYONC requires. Even if PJM recognizes a \nparticular capacity arrangement as BYONC, that determination does not establish how the \nrelevant Electric Distributor or state authorities will treat the customer for purposes of retail \ncurtailment or the allocation of RBP costs. Equinix therefore could make a substantial long-term \ncommitment without assurance that it will receive the protection from IRAS curtailment and \nRBP cost allocation that gives the commitment its value.  \nA workable framework would require greater coordination between PJM and the states \nbecause PJM cannot unilaterally determine the retail consequences of a customer’s capacity \nprocurement. Had PJM better coordinated with state authorities to develop complementary \ndefinitions and mechanisms before imposing these obligations, large loads and capacity \nproviders would have had a more coherent foundation for least-cost, least-risk contracting. The \nLarge Load Registry could then have served as a genuinely useful, customer-verified source of \ninformation—helping PJM, Electric Distributors, and state authorities apply their respective rules \nusing a common set of facts and better enabled avoid double-counting across both wholesale and \nretail regimes, in accordance with respective jurisdictional limits. Instead, the proposed Large \nLoad Registry would collect information about individual retail facilities and contracts without \nensuring that affected customers can verify that information or that qualifying BYONC will \nreceive consistent treatment under the applicable retail rules- and PJM has proposed taking it \nupon itself to calculate results based on that information."},{"page":11,"startToken":3206,"endToken":3518,"text":"11 \nB.  PJM SHOULD NOT BE ALLOWED TO VIOLATE TERMS AND \nCONDITIONS OF EXISTING RETAIL SERVICE CONTRACTS  \nPJM is a world-leading wholesale market operator, but data centers (and other retail load) \nare not wholesale customers- just as all fasteners are not nails, notwithstanding the perspective of \nthe proverbial carpenter. The further PJM strays from its wholesale market swim lane, the more \nnumerous and severe the problems it inadvertently creates.  \nPJM’s proposed Large Load and New Large Load definitions would attach new resource-\nadequacy and curtailment consequences to retail load arrangements negotiated under existing \nstate-jurisdictional service frameworks. Yet PJM did not vet the details of those definitions \nthrough a stakeholder process or meaningfully address their effect on already-energized facilities \nand contractual ramp schedules that utilities have studied and agreed to serve.  \nPJM has taken its rules for Qualified Facilities and proposed to apply them to retail large \nloads for purposes of siting and sizing, apparently presuming that the same considerations that \napply to power supply must apply equally to retail load, and that doing so was necessary to \nprevent gaming of the requirements PJM would like to impose on those retail loads. In doing so, \nPJM has strayed into a thicket without a map, threatening to infringe upon existing retail \ncontracts and the financial expectations built on them—including retail service contracts for data \ncenters that have operated for years or, in many cases, for decades. \n1. A NEW ADDITION DOESN’T MAKE THE WHOLE HOUSE \nNEW: INCREMENTAL LOAD THAT WOULDN’T ITSELF \nCOMPRISE A NEW LARGE LOAD SHOULD NOT CAUSE \nEXISTING LOAD TO BE RECATEGORIZED \nAdding a small increment of new load to an existing facility should not recategorize that \nexisting load—or the increment itself, if it is below the 50 MW threshold—as a new large load. \nThis is especially true where existing contracts already studied and addressed the impacts of the"},{"page":12,"startToken":3518,"endToken":3838,"text":"12 \nfully ramped-up project, but it is also true for existing facilities that are not changing their base \noperations or characteristics and are merely adding capacity that would not, on its own, meet the \ndefinition of “Large Load.”  \nThat incremental capacity must of course be studied and addressed in the appropriate \nretail service process and contracts, but adding it should not transform a facility that may have \noperated for decades into a “Large Load” itself—potentially disrupting its existing contracts and \nfinancial expectations, and unnecessarily pulling a small increment of new capacity into the \nIRAS framework when that increment would not, on its own, constitute a new large load. \n \n2. THE WRONG TOOL FOR THE WRONG JOB:  DATA CENTERS \nCANNOT FIT A QF-BASED PROCRUSTEAN BED \nPJM has settled on a one-mile radius to aggregate facilities as a single load entity under \nits definition of Large Load, proposing this rule without regard to existing data center clustering \npractices or the reasons—wholly unrelated to energy—for those practices. Data centers cluster \nfor legitimate commercial reasons: locating them near one another creates economic value by \nimproving latency, the reliability of data interconnection, and easy access to other customers’ or \nbusiness partners’ computational services, data, networks, and equipment.13 \nThe one-mile rule can convert incremental growth at a longstanding, separately \ndeveloped group of legacy facilities into “New Large Load” solely because PJM retroactively \naggregates those facilities into a newly defined single electrical site. In Ashburn’s \"Data Center \nAlley,\" for example, well over a hundred datacenters are located in close proximity. Any one-\nmile radius drawn in this area will capture dozens of facilities, many operated by the same \n \n13 See Qualifying Facility Rates and Requirements Implementation Issues Under the Public Utility \nRegulatory Policies Act of 1978, Order No. 872, 172 FERC ¶ 61,041, order on reh’g & clarifying in part, Order No. \n872-A, 173 FERC ¶ 61,158 (2020); IRAS Filing at 33 & n.95."},{"page":13,"startToken":3838,"endToken":4131,"text":"13 \ncompany and many operated by different companies. Many of those facilities have been \nenergized and operational for years or decades. Equinix's first data center in Virginia, DC1, was \nthe first commercial data center in that area, and was opened in 1999. That facility is still \noperational, and Equinix has developed numerous additional data centers for within one mile \nover the ensuing decades for data-related and other commercial reasons completely unrelated to \nenergy. Many of these facilities are well below 50 MW.  \nBy combining the one-mile radius with no exception for already-contracted or already-\nenergized facilities, PJM would retroactively aggregate loads that were separately developed, \nseparately studied, and separately contracted for service. The resulting Large Load designation \ncould impose new resource-adequacy and curtailment consequences on settled retail \narrangements. PJM’s anti-gaming rationale does not justify an irrebuttable presumption for \nlegacy facilities whose siting decisions predate IRAS and reflect non-energy considerations. \nState regulators and Electric Distributors are better positioned to determine whether separately \nserved retail facilities function as a single integrated electrical site. \nPJM should not apply the one-mile aggregation rule to existing, independently developed \nfacilities. Affiliated legacy facilities should be evaluated individually unless they were developed \nor are operated as a single integrated electrical site. That determination should turn on electrical \nand operational integration, service arrangements, development history, and applicable state \nrules—not distance alone. The arbitrary results produced by PJM’s proposed definition can be \nseen in three scenarios, each involving 100 MW of otherwise identical load entering service after \nJune 1, 2027 and no BYONC or Allocated RBP UCAP MW: \n    •    Scenario 1: Five 20 MW facilities, each more than one mile from the others. \nNone individually meets the 50 MW Large Load threshold, and they are not \naggregated. None is subject to IRAS."},{"page":14,"startToken":4131,"endToken":4451,"text":"14 \n    •    Scenario 2: One 100 MW facility. The facility exceeds the 50 MW \nthreshold. The 100 MW is subject to IRAS. \n    •    Scenario 3: Five 20 MW facilities, but three affiliated facilities are within \nthe one-mile radius. Those three are aggregated into a 60 MW “single electrical \nsite” and therefore meet the Large Load definition. The 60 MW aggregated site is \nsubject to IRAS, while the remaining two 20 MW facilities are not. \nThe result: Each scenario adds the same 100 MW of load, but PJM's geographic aggregation rule \nproduces 0 MW, 100 MW, or 60 MW of IRAS-eligible load, depending solely on how the load is \nphysically distributed.   \nThe distinction illustrated by the examples is particularly egregious when the new load is \nincremental to facilities that are longstanding, independently developed sites whose locations \npredate IRAS, rather than entirely new facilities. \nIf PJM retains geographic aggregation for existing facilities, the one-mile rule should \ncreate a rebuttable presumption, allowing a customer to demonstrate that affiliated facilities are \nseparate sites based on factors such as separate service arrangements, points of interconnection, \ndevelopment histories, or electrical and operational independence. \nC. YOU BOUGHT IT BUT YOU CAN’T HAVE IT: PJM GETS IT WRONG \nACCOUNTING FOR NEW LARGE LOADS’ DEMAND-SIDE \nINVESTMENTS \nPJM’s own rules clearly confirm that a Peak Shaving Adjustment reduces the same \ncapacity need that BYONC is meant to fill. The IRAS Filing indirectly acknowledges that Peak \nShaving Adjustments address the same problem as BYONC demand response, in noting that the \nsame resource cannot count as both,14 and in adding it to the Large Load Registry.15 Nonetheless, \nthe IRAS Filing does not appear to credit the investment a New Large Load may make in a Peak \n \n14 PJM’s own eligibility criteria for demand-side BYONC affirmatively exclude any location that already \nsupports a Peak Shaving Adjustment, treating the two mechanisms as mutually exclusive. IRAS Filing at 54. \n15 IRAS Filing at 37, 41."},{"page":15,"startToken":4451,"endToken":4795,"text":"15 \nShaving Adjustment program, while it explicitly recognizes the comparable investment it may \nmake in demand response.16 PJM’s calculation of a New Large Load’s Eligible New Large Load \nAmount—the figure that drives that load’s IRAS curtailment exposure—nets out only two \nthings: the load’s BYONC arrangements and its Allocated RBP UCAP MW. It does not \nrecognize Peak Shaving Adjustments at all – neither as “below the line” credit or as an “above \nthe line” deduction, in tax parlance. \n Under PJM’s proposed calculations, qualifying generation or demand response provided \nthrough BYONC reduces the amount of a New Large Load that PJM treats as uncovered for \nIRAS purposes. Although that wholesale credit does not itself ensure corresponding protection \nfrom curtailment or RBP cost allocation under applicable retail rules, PJM at least recognizes the \nresource adequacy value of the qualifying supply and proposes to calculate that value in the \nLarge Load Registry. By contrast, PJM provides no credit when a New Large Load funds \ndistributed storage or other demand-side capability that qualifies for a Peak Shaving Adjustment, \neven where PJM determines that the adjustment reduces the system’s capacity need by an \namount comparable to the qualifying supply credited through BYONC. In that circumstance, the \ntwo investments provide comparable resource adequacy value, one by increasing supply and the \nother by reducing capacity need, but the IRAS calculations would recognize only the former.17,18 \nPJM proposes to have the Large Load Registry note, for each Large Load for which it is \napplicable, a “[p]eak shaving adjustment value pursuant to a state program codified in state \n \n16 See, e.g., IRAS Filing at 55-56, 59, 67-68, 86-87. \n17 Proposed Tariff, Attachment DD-4, § V(b). \n18 Proposed Tariff, Attachment DD-4, § VI(b)(ii)(2); see also IRAS Filing at 54 (explaining that BYONC \n“may be supported by Planned Demand Resource or Planned Distributed Energy Resource . . . Capacity \nAggregation Resources” only where the underlying location did not previously “reduce the amount of capacity \nneeded to meet the PJM Region Reliability Requirement through a Peak Shaving Adjustment or Price Responsive \nDemand”)."},{"page":16,"startToken":4795,"endToken":5146,"text":"16 \nlaw.”19 But PJM describes that information only as informing operators which Large Loads “are \nmanaging their resource needs through peak shaving adjustments under a state program.”20 \nBecause the value is reported for each individual Large Load and described in relation to that \nload’s resource needs, the proposal appears to contemplate only Peak Shaving Adjustments \nassociated with the load itself. At minimum, nothing in the proposal allows a New Large Load to \nsponsor incremental peak-shaving capability elsewhere in the same Electric Distributor zone/area \nand receive credit in its IRAS calculation for the resulting reduction in PJM’s capacity need.21,22 \nThe Large Load Registry field provides information to PJM operators; it does not provide any \nsuch credit. \nPJM has offered no justification for this asymmetry, and none is apparent. PJM \nrecognizes that a qualifying Peak Shaving Adjustment reduces the amount of capacity needed to \nmeet the PJM Region Reliability Requirement.23 BYONC addresses the same capacity balance \nfrom the other side by adding qualifying supply. When PJM determines that a Peak Shaving \nAdjustment reduces the capacity need by an amount comparable to the qualifying supply \ncredited through BYONC, the two investments provide comparable resource adequacy value. \nYet Attachment DD-4 credits BYONC and Allocated RBP UCAP MW when calculating a load’s \nEligible New Large Load Amount, while providing no comparable credit for a qualifying Peak \nShaving Adjustment. Crediting one form of investment and not the other is not a distinction \ngrounded in resource adequacy; it is a distinction grounded in the label PJM has attached to the \n \n19 IRAS Filing at p.43. \n20 IRAS Filing at p.41. \n21 Proposed RAA, Schedule 11, § B.1(a); IRAS Filing at 37. \n22 IRAS Filing at 41 (explaining that the peak shaving adjustment value reported for each Large Load will \n“inform PJM operators of Large Loads that are managing their resource needs through peak shaving adjustments \nunder a state program”). \n23 IRAS Filing at 54 (recognizing that a Peak Shaving Adjustment can “reduce the amount of capacity \nneeded to meet the PJM Region Reliability Requirement”); see also Tariff, Attachment DD-2."},{"page":17,"startToken":5146,"endToken":5400,"text":"17 \nmechanism, and is not just and reasonable. \nIf the Commission accepts the IRAS proposal, it should at minimum direct PJM to amend \nAttachment DD-4 so that the PJM-determined MW reduction produced by an incremental, \ncustomer-sponsored Peak Shaving Adjustment reduces the sponsoring load’s Eligible New Large \nLoad Amount on a basis comparable to BYONC. The credit should apply whether the qualifying \ncapability is located at the sponsoring customer’s site or at another customer’s site, provided the \nreduction is verified, attributable to the sponsoring customer, and protected against double \ncounting. This limited revision would recognize that a capacity need can be addressed either by \nadding qualifying supply or by producing a comparable reduction in the amount of capacity PJM \ndetermines is needed. Without that revision, the proposal is unjust and unreasonable and unduly \ndiscriminatory or preferential because it imposes different consequences on investments that \nPJM has determined provide comparable resource adequacy value.24 \nIII.   CONCLUSION \nFor the reasons discussed herein, the Commission should reject the IRAS Filing or, at \nminimum, require PJM to: (1) grandfather load and contractual ramps under final retail service \nagreements before August 13, 2026; (2) eliminate or make rebuttable the one-mile aggregation \nrule as applied to independently developed legacy facilities; (3) provide Large Loads notice and \nan opportunity to correct Large Load Registry data before PJM relies on it; and (4) credit the \nPJM-determined value of qualifying, customer-sponsored Peak Shaving Adjustments without \ndouble counting. \n \n \n \n24 IRAS Filing at 14 & n.35 (quoting Tariff, Part I, § 1, Definitions – PJM Region Reliability \nRequirement)."},{"page":18,"startToken":5400,"endToken":5452,"text":"18 \nEquinix again appreciates the opportunity to submit this protest and our comments. We \nlook forward to further participation in this and related dockets.  \n \nRespectfully submitted, \n/s/ Arthur Haubenstock \nArthur Haubenstock \nSr. Counsel, Global Regulatory \n \nEquinix Inc. \n700 “K” Street, N.W., Suite 600 \nWashington DC, 20001 \n(202) 322-9073 \nahaubenstock@equinix.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1049,"startToken":0,"endToken":154},{"p":1,"at":1049,"title":"I. SUMMARY","method":"printed heading","endPage":3,"endAt":2010,"startToken":154,"endToken":924},{"p":3,"at":2010,"title":"I. BACKGROUND AND INTEREST OF EQUINIX","method":"printed heading","endPage":5,"endAt":1248,"startToken":924,"endToken":1540},{"p":5,"at":1248,"title":"II. DISCUSSION","method":"printed heading","endPage":5,"endAt":1265,"startToken":1540,"endToken":1542},{"p":5,"at":1265,"title":"A. WHEN THE ROLLERSKATES AND THE KEY AREN’T SHARED, NO","method":"printed heading","endPage":11,"endAt":4,"startToken":1542,"endToken":3207},{"p":11,"at":4,"title":"B. PJM SHOULD NOT BE ALLOWED TO VIOLATE TERMS AND","method":"printed heading","endPage":14,"endAt":1250,"startToken":3207,"endToken":4316},{"p":14,"at":1250,"title":"C. YOU BOUGHT IT BUT YOU CAN’T HAVE IT: PJM GETS IT WRONG","method":"printed heading","endPage":17,"endAt":1049,"startToken":4316,"endToken":5298},{"p":17,"at":1049,"title":"III. CONCLUSION","method":"printed heading","endPage":18,"endAt":374,"startToken":5298,"endToken":5452}]}
