{"document":{"slug":"rec-20260904-5197","title":"Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish…","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"protest","file":"sources/filings/text/20260904-5197_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","sha256":"fa099ab22ae31a8d993b199d61d71665cabd94a4a79b1f8a4426a6106059012c","pages":2,"tokens":539,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":293,"text":"UNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C.  \n \n) \nDocket No. ER26-3515 \n \n \nMOTION FOR LEAVE TO PROTEST, \nSEEK CLARIFICATION ON AND COMMENT OUT-OF-TIME ON  \nTHE PROPOSAL OF PJM INTERCONNECTION, L.L.C. TO  \nESTABLISH INTERIM RESOURCE ADEQUACY SERVICE AND A  \nLARGE LOAD REGISTRY TO ADDRESS SYSTEM RELIABILITY \nPursuant to Rules 211 and 212 of the Rules of Practice and Procedure of Federal Energy \nRegulatory Commission (“FERC” or the “Commission”), in an abundance of caution, and after \ncompleting the instructions for refiling provided by the FERC Online team, Equinix Inc. \n(“Equinix”) is submitting this Motion for Leave to Protest, Seek Clarification on and Comment \nOut-Of-Time to the filing by PJM Interconnection, L.L.C. (“PJM”) entitled “Proposal of PJM \nInterconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load \nRegistry to Address System Reliability” (the “IRAS Filing”), which PJM submitted on August \n13, 2026 in the above-captioned docket.1   \nOn August 13, FERC publicly noticed the PJM filing and established September 3 as the \ndeadline for interventions and the submittal of comments and protests. Equinix filed a timely \ndoc-less motion to intervene in this proceeding on Aug. 21, 2026. At 4:20 pm on Sept. 3, 2026, \nprior to the 5:00 p.m. deadline, Equinix submitted what it believed to be its comments, a request \nfor clarification, and a protest of the PJM proposal.  However, as detailed in the attached, it later \nthat day received notice from FERC Online that FERC watermarks were on the document as \n \n1 PJM Interconnection, L.L.C., “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource \nAdequacy Service and a Large Load Registry to Address System Reliability,” Docket No. ER26-3515-000, \nTransmittal Letter (August 13, 2026)."},{"page":2,"startToken":293,"endToken":539,"text":"2 \nfiled, and that the document should be refiled.  After some investigation, Equinix realized the \nwrong document (a copy of PJM’s IRAS Filing, rather than its reponse to that filing) had \ninadvertently been uploaded. 2  In accordance with the instructions provided by the FERCOnline \nteam in its email, the corrected filing, accompanied by a cover letter explaining what had \noccurred, was submitted at 10:40 pm on September 3.  That cover letter and its attachments, \nincluding the correct document (last saved at 4:13 pm on Sept. 3) were accepted for filing earlier \ntoday, as is shown in the attached. \nOut of an abundance of caution, Equinix files this Motion in the event its September 3 \nfiling is deemed to have been submitted out of time.  In that event, we believe this Motion should \nbe granted as party’s interests were adversely affected by this inadvertent error, given the timing \nof the refiling, and as the steps required by the FERC Online team were followed and completed \non the same date as the original submission.  We respectfully request that this Motion is granted, \nand that the Commission consider Equinix’s Protest, Request for Clarification and Comments. \n \nRespectfully submitted, \n/s/ Arthur Haubenstock \nArthur Haubenstock \nSr. Counsel, Global Regulatory \n \nEquinix Inc. \n700 “K” Street, N.W., Suite 600 \nWashington DC, 20001 \n(202) 322-9073 \nahaubenstock@equinix.com \n \n2 PJM Interconnection, L.L.C., Docket No. ER26-3515-000, Combined Notice of Filings, (Aug. 13, 2026) \n(establishing a comment date of Sept. 3, 2026)."}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 2","method":"page range","endPage":2,"endAt":1553,"startToken":0,"endToken":539}]}