{"document":{"slug":"rec-20260908-5260","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to certain comments and protests re the PJM Reliability Backstop Procurement…","issued":"2026-09-08","accession":"20260908-5260","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260908-5260_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5260","tier":"record","sha256":"5c0f992eaa3b8eb15d9a443363f7f73ea5c79f451d1a6bdb898202801038cbe6","pages":12,"tokens":3614,"emptyPages":[],"textThemes":["credit","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":337,"text":"1 \n \nUNITED STATES OF AMERICA \n \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n) \nPJM Interconnection, L.L.C. \n \n \n) \n \nDocket No. ER26-3380-000 \n \n \n \n \n \n \n \n) \n \nMOTION FOR LEAVE TO ANSWER  \nAND ANSWER OF CONSTELLATION ENERGY GENERATION, LLC \nPursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s (“FERC” \nor the “Commission”) Rules of Practice and Procedure,1 Constellation Energy Generation, LLC \n(“Constellation”) respectfully moves for leave to answer and answers certain comments and \nprotests filed in this proceeding (“Answer”). Constellation seeks to provide additional information \nand context that will assist the Commission in its decision-making process.2 \nI. \nBACKGROUND \nOn July 31, 2026, PJM Interconnection, L.L.C. (“PJM”) submitted revisions to the PJM \nOpen Access Transmission Tariff (“Tariff”) and the Reliability Assurance Agreement Among \nLoad Serving Entities (“RAA”) to establish the Reliability Backstop Procurement (“RBP”).3  \n \n1  18 C.F.R. §§ 385.212, 385.213. \n2 Although the Commission’s Rules of Practice and Procedure do not generally permit answers to answers unless \notherwise ordered by the decisional authority, the Commission has made exceptions where an answer provides useful \nand relevant information that will assist the Commission in its decision-making process, corrects factual inaccuracies \nand clarifies the issues, or assures a complete record in the proceeding. See, e.g., Pioneer Transmission, LLC v. N. \nInd. Pub. Serv. Co., 140 FERC ¶ 61,057, at P 94 (2012) (accepting answers that “provided information that assisted \nus in our decision-making process”); Entergy Servs., Inc., 126 FERC ¶ 61,227, at P 76, order on clarification & reh’g, \n127 FERC ¶ 61,225 (2009); New Power Co. v. PJM Interconnection LLC, 98 FERC ¶ 61,208, at p. 61,756 (2002) \n(answer accepted to provide new factual and legal material to assist the Commission in decision-making process). \n3 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming \nfrom Large Loads, Docket No. ER26-3380-000 (filed July 31, 2026) (the “PJM Proposal”).  Capitalized terms used \nbut not otherwise defined herein have the meaning as defined in the Tariff, the RAA, or the PJM Proposal, as \napplicable."},{"page":2,"startToken":337,"endToken":773,"text":"2 \nNumerous parties filed comments and protests addressing the proposal, including Constellation.4  \nAnd many of these protests raised similar concerns, underscoring that the RBP as-proposed \nincludes serious design flaws. \nII. \nANSWER \nA. \nRequest for Additional Clarification on Resources Eligible to Supply \nQualifying RBP Offset UCAP MW \nConstellation maintains the arguments and requested relief set forth in its Limited Protest \nconcerning the treatment of RBP Resources in subsequent RPM Auctions.5  The NRG Companies, \nthe Independent Market Monitor for PJM, the New Jersey Board of Public Utilities (“NJBPU”), \nand the Office of the Ohio Consumers’ Counsel raised similar concerns regarding PJM’s \nmandatory price-taker requirement. Constellation will not repeat those arguments here but \nunderscores the seriousness of this issue for market integrity going forward.6   \nConstellation also maintains the arguments and requested relief for the limited \nmodifications to other Tariff provisions described in its Limited Protest, with one additional \nclarification.  Constellation agrees with the sentiment expressed by other commenters that Section \n18.2 of the proposed Tariff, describing resources eligible to supply Qualifying RBP Offset UCAP \n \n4 PJM Interconnection, L.L.C., Limited Protest of Constellation Energy Generation, LLC, Docket No. ER26-3380-\n000 (filed Aug. 21, 2026) (“Limited Protest”). \n5 See Limited Protest at 10–13. \n6 See, e.g., PJM Interconnection, L.L.C., Limited Protest of the NRG Companies, Docket No. ER26-3380-000 at 10–\n11 (filed Aug. 21, 2026) (“[T]he proposed requirement that resources with RBP commitments offer as price-takers \ninto RPM Auctions for the associated Delivery Years ‘is antithetical to creating a normal capacity market,’” and \n“‘send[s] the wrong signals [to] potential investors of PJM generation capacity.’”); PJM Interconnection, L.L.C., \nProtest of the Independent Market Monitor for PJM, Docket No. ER26-3380-000 at 11 (filed Aug. 21, 2026) (“Pay as \nbid is inefficient and does not facilitate competition.”); PJM Interconnection, L.L.C., Protest and Request for Rejection \nof Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings by Office of the Ohio \nConsumers’ Counsel, Docket No. ER26-3380-000 at 7–8 (filed Aug. 21, 2026) (“OCC Protest”) (explaining that PJM \nhas not supported the RBP’s proposed departure from the single clearing price approach to a pay-as-bid approach, \nwhich is “diametrically opposite what it has supported for over 20 years in its RPM auctions”); PJM Interconnection, \nL.L.C., Comments of the New Jersey Board of Public Utilities, Docket No. ER26-3380-000 at 5 (filed Aug. 21, 2026) \n(“NJBPU Comments”) (“[t]he Board has concerns that the pay-as-bid market structure, compared to PJM’s uniform \nclearing price in the capacity market, would create inefficient market outcomes or allow for market manipulation.”)"},{"page":3,"startToken":773,"endToken":1226,"text":"3 \nMW, requires additional clarity and should be adjusted to avoid unintentionally “limiting [the] \npool of qualifying resources.”7  Consistent with the request in Constellation’s Limited Protest with \nrespect to resources qualifying as RBP Resources, the Commission should similarly condition \nacceptance of PJM’s RBP proposal on PJM revising the eligibility criteria for Qualifying RBP \nOffset UCAP MW.8  In particular, Energy Resources seeking new Capacity Interconnection Rights \n(CIRs) through an Interconnection Request should be able to satisfy the criteria for resources \neligible to supply Qualifying RBP Offset UCAP MW.   \nB. \nCredit and Collateral Requirements of Load Serving Entities \nThe remainder of this Answer addresses the distinct load serving entity (“LSE”) credit and \ncollateral issues raised in the responsive pleadings. Multiple commenters raised substantial \nconcerns regarding PJM’s proposed LSE credit and collateral provisions. EKPC states that the \nmagnitude of the proposed requirement “stands apart from anything in PJM’s experience.”9 \nNOVEC characterizes the requirement as excessive and onerous.10 The NJBPU cautions that the \nsize of the collateral requirement may challenge LSEs’ ability to obtain the required collateral and \n \n7 PJM Interconnection, L.L.C., Protest of Northern Virginia Electric Cooperative, Inc., Docket No. ER26-3380-000 \nat 7–8 (filed Aug. 21, 2026) (“NOVEC Protest”); see also See PJM Interconnection, L.L.C., Comments of Equinix \nInc. on the PJM Interconnection, LLC Filing Regarding its Reliability Backstop Procurement to Address Resource \nAdequacy Concerns Stemming From Large Loads, Docket No. ER26-3380-000 at 2 (filed Aug. 21, 2026) (“Equinix \nComments”). \n8 See Limited Protest at 13–14 (requesting modifications to the proposed Tariff to add Energy Resources seeking new \nCIRs as a category of resource eligible under 18.5(b)(iii)(2) to qualify as an RBP Resource).  Notably, the PJM \nProposal explained that “Qualifying RBP Offset UCAP MW has been deliberately designed to be more inclusive than \nthe resources that qualify to sell RBP UCAP MW [i.e., RBP Resources].”  PJM Proposal at 42.  Because PJM has \nexplicitly stated that the criteria for resources qualifying as RBP Resources are more restrictive, while the pool of \nQualifying RBP Offset UCAP MW is intended to be more inclusive, it logically follows that the relief requested in \nConstellation’s Limited Protest extends to the criteria for resources eligible to supply Qualifying RBP Offset UCAP \nMW.  However, out of an abundance of caution, Constellation requests clarification and any necessary Tariff \nmodifications to confirm that Energy Resources as described herein may also be eligible to supply Qualifying RBP \nOffset UCAP MW. \n9  PJM Interconnection, L.L.C., Protest of East Kentucky Power Cooperative, Inc., Docket No. ER26-3380-000 at 26 \n(filed Aug. 21, 2026) (“EKPC Protest”) (citing Attachment 2, Affidavit of Carl F. Coscia at ¶ 61 (“Coscia Affidavit”)).  \n10 NOVEC Protest at 3."},{"page":4,"startToken":1226,"endToken":1523,"text":"4 \nobserves that additional time would have permitted development of a more thoughtful collateral \nframework.11 \nConstellation joins the chorus of voices raising concerns about the proposed LSE credit \nrequirements.  The magnitude of the proposed collateral obligation for LSEs is enormous—it \nwould rival the PJM credit holdings for all its markets combined.12 PJM proposes an initial RBP \nCredit Rate of $1.5 million for each MW of allocated RBP Obligation. Applied to the 6,831.3 MW \nInitial RBP Target, that rate could require LSEs collectively to post approximately $10.2 billion \nin collateral. In his Affidavit to the EKPC Protest, Mr. Carl Coscia puts this figure in context, \nnoting that “PJM’s monthly Key Risk Metrics reporting shows the total collateral PJM holds from \nall Members, against every market it operates, at approximately $6.2 billion on average in 2025 \nand $7.0 billion in 2025,” and approximately $10.9 billion as of July 30, 2026.13 \nImportantly, the approximately $10.2 billion collateral estimate captures only collateral \nposted by LSEs to PJM. It does not capture the additional credit support that LSEs are almost \ncertain to require from the large-load customers whose obligations they serve. In other words, if \nan LSE is required to post significant collateral to PJM as a result of its large load retail customer, \nthe LSE is likely to then require its large load retail customer to provide the same or similar \ncollateral to the LSE, more or less doubling the total collateral required for an RBP customer.  \nGiven the magnitude of the collateral PJM proposes to require LSEs to post, this “double \ncollateral” problem will strain liquidity and add significantly to already-significant financing and \ntransaction costs. \n \n11 NJBPU Comments at 5-6. \n12 Coscia Aff. ¶ 63. \n13 Id. (emphasis added)."},{"page":5,"startToken":1523,"endToken":1786,"text":"5 \nAs discussed below, Constellation (1) has significant concerns about the fixed $1.5 \nmillion/MW RBP Credit Rate and believes it is excessive; (2) suggests, to address the “double \ncollateral issue,” that the applicable large-load customer should be permitted to post qualifying \ncollateral directly for the account of the responsible LSE; and (3) given these concerns and similar \nconcerns raised by other parties, requests that the Commission sever and/or defer proposed Tariff \nsection 18.8(b) for resolution on an expedited paper hearing with a short timeline (about 125 days) \nfor resolution without delaying the RBP solicitation or the seller-side credit requirements. \n1. \nPJM’s Fixed $1.5 Million/MW Rate Is Based on Contract Notional, \nNot Measured Credit Exposure \nPJM has a legitimate interest in protecting the RBP against reasonably foreseeable \nnonpayment. But the amount of collateral imposed on LSEs must bear a reasoned relationship to \nthe exposure being secured. PJM has not made that showing for its fixed $1.5 million/MW rate, \nand it is not “reasonably tailored to the actual credit risk presented”14 nor “derived from measured \nexposure.”15 \nPJM derives the proposed rate from approximately one-half of the gross notional value of \na hypothetical fifteen-year RBP commitment priced at $555/MW-day. PJM also performs a \ndiscounted-cash-flow calculation using the capacity-market weighted average cost of capital. \nThose calculations explain how PJM arrived at the $1.5 million figure. They do not demonstrate \n \n14 PJM Interconnection, L.L.C., Protest of FirstEnergy Service Company, Docket No. ER26-3380-000 at 8 (filed Aug. \n21, 2026). \n15 EKPC Protest at 23."},{"page":6,"startToken":1786,"endToken":2117,"text":"6 \nthat the figure measures reasonably foreseeable credit exposure. And discounting a gross payment \nstream does not convert it into a credit-exposure analysis. \nThe methodology has five material gaps. First, it assumes that every committed RBP \nmegawatt is priced at the $555/MW-day maximum willingness to pay, although accepted RBP \nprices may be lower and may vary by resource and Delivery Year. Second, it uses fifteen years of \ngross contract value rather than the net RBP Charges that LSEs actually will be billed, should RBP \nResources not be segregated from the market. Third, it does not identify the period of unpaid \ncharges to be secured, the time needed to draw collateral and reallocate any residual default, or the \nstress assumptions used to estimate net exposure. Fourth, it applies the same $1.5 million/MW \nbase rate without explaining why credit quality may increase—but never reduce—the base \nrequirement. Finally, although PJM may reduce the rate over time, the proposed Tariff establishes \nno mandatory recalculation schedule, prescribed inputs, or objective collateral-release standard. \nPJM’s proposed default rule further demonstrates the disconnect. Proposed Tariff section \n18.9(a) provides that an unpaid RBP Charge will be reallocated to the remaining LSEs responsible \nfor RBP Charges and that the defaulting LSE’s RBP Collateral may be applied as an offset. PJM \ndoes not explain why the exposure arising before collateral can be drawn and any residual default \nreallocated should be measured by one-half of a fifteen-year gross payment stream. \nAssuming for the sake of argument that it is accepted, the PJM-proposed contract-for-\ndifferences settlement further illustrates the mismatch. If the Commission rejects Constellation’s \nproposal to segregate RBP Resources and associated load from RPM and accepts PJM’s proposal, \nthe payment due to RBP Resources in any Delivery Year will only equal the amount that the RBP \nResources do not recover from RPM, which already has its own credit and collateral obligations. \nEKPC calculates that, at the $555/MW-day maximum willingness to pay and the Initial RBP"},{"page":7,"startToken":2117,"endToken":2397,"text":"7 \nTarget, one year of gross RBP payments would be approximately $1.38 billion. Using the \n$325/MW-day clearing price from the 2028/2029 BRA, EKPC calculates a first-year net payment \nof approximately $573 million. The proposed $10.2 billion collateral requirement would equal \napproximately 740% of one year’s gross commitment value, and approximately 1,790% of the \namount actually billed to load ($573 million).16 \nThose comparisons are illustrative. Neither a one-year exposure horizon nor the $325/MW-\nday clearing price necessarily supplies the appropriate collateral standard for future Delivery \nYears. But the comparisons demonstrate why a fixed percentage of the maximum fifteen-year \ngross notional value is not a reasoned measure of payment exposure.17 \nThe Commission should not replace PJM’s unsupported methodology with another \nmechanical shortcut.  In particular, if RBP Resources become price-takers in RPM, the \nreplacement RBP Credit Rate should not simply equal $555/MW-day less a single assumed future \nRPM price. A revised methodology should account for the actual accepted RBP prices and \nquantities; the net settlement structure, if accepted by the Commission; a defined default-\nmanagement and reallocation horizon; reasoned stress assumptions for future net RBP Charges; \napplicable LSE or guarantor credit quality; qualifying collateral or guarantees already held by \n \n16 EKPC Protest at 25 (emphasis added). \n17 See Coscia Aff. ¶ 187 (“The $1.5 million per MW Credit Rate does not depend on the credit quality of the LSE, a \nrecalculation of Peak Market Activity or expected exposure, or the use of other mitigation tools to address an identified \ndeficiency. It applies the same fixed rate per megawatt before unsecured credit to every LSE subject to section 18.8(b), \nregardless of those considerations.”)."},{"page":8,"startToken":2397,"endToken":2698,"text":"8 \nPJM; and mandatory periodic recalculation and release standards. Any change the Commission \naccepts to the RBP settlement structure should be reflected in the collateral methodology. \n2. \nLarge Load Customers Should Be Permitted to Post Collateral for the \nAccount of the Responsible LSE  \nAn excessive collateral requirement can create the very liquidity risk it is intended to \nmitigate. Under the filed design, an LSE must furnish RBP Collateral to PJM or PJMSettlement \nand may then prudently obtain corresponding support from the large-load customer associated with \nthe obligation. That structure can encumber two balance sheets and impose two layers of financing \nand transaction costs for the same payment obligation. \nThe Tariff therefore should permit the applicable large load customer, or an affiliate acting \non its behalf, to post RBP Collateral directly with PJM or PJMSettlement for the account of the \nresponsible LSE. The LSE should remain fully responsible for payment of RBP Charges; PJM or \nPJMSettlement should have direct and unconditional draw rights; and the customer-posted amount \nshould satisfy the LSE’s collateral requirement dollar-for-dollar. The same collateral should not \nbe credited against more than one obligation, and disputes between the customer and the LSE \nshould not impair PJM’s draw rights. \nThis option would not reduce PJM’s credit protection or change the entity responsible for \npaying RBP Charges. It would add the option for another entity18 to furnish the collateral and \nthereby avoid unnecessary intermediation through the LSE and duplicative credit postings. In \naddition to the advantages described above, allowing the large load to post collateral will facilitate \na seamless transition if the customer changes its LSE, the applicable RBP Obligation changes, or \n \n18 Importantly, the proposed modification to the Tariff would permit a large load customer to post RBP Collateral \ndirectly with PJM or PJMSettlement, but would not require such an arrangement."},{"page":9,"startToken":2698,"endToken":3048,"text":"9 \nthe posting arrangement otherwise terminates.19 \n3. \nThe Commission Can Preserve the RBP Procurement Schedule While \nResolving the LSE Collateral Provisions in an Expedited Paper \nHearing  \nThe procurement is urgent; the future LSE collateral methodology is not. RBP Sellers must \nsatisfy the seller-side credit requirements in connection with their RBP Sell Offers. By contrast, \nthe first LSE collateral requirement will not arise, as currently proposed, until forty-five days \nbefore the 2028/2029 Delivery Year. The Commission therefore can accept the RBP solicitation, \nselection process, commitments, and seller-side credit provisions while severing or deferring its \ndecision on only proposed Tariff section 18.8(b). That disposition would not displace \nConstellation’s separate request in its Limited Protest that the initial RBP Obligation allocations \nbe determined 365 days before the 2028/2029 Delivery Year.20 \nThe present record is sufficient to conclude that PJM has not supported the fixed $1.5 \nmillion/MW rate. The record is not sufficiently developed, however, to prescribe a durable \nreplacement methodology.21  The replacement must be conformed to the RBP settlement structure \naccepted by the Commission and supported by evidence addressing the relevant exposure horizon, \nstress assumptions, credit-quality treatment, customer-posted collateral, collateral already held by \nPJM, switching and transfer mechanics, and mandatory recalculation and release standards. \n \n19 See, e.g., NOVEC Protest at 24 (“The Commission should require PJM to allow other methods to demonstrate \ncreditworthiness besides posting the full collateral or a letter of credit.”); Equinix Comments at 2 (RBP collateral \nprovisions should be revised to “calibrate[] to reasonably foresee forward exposure” and revise “the forms of credit \nsupport” required).  \n20 See Limited Protest at 16–17. \n21 See, e.g., OCC Protest (requesting evidentiary hearings and/or settlement proceedings to adequately consider the \nRBP); NOVEC Protest at 4–9; NJBPU Comments at 5–6 (“[T]he Board is concerned that the size of the collateral \nrequirements may make it difficult for LSEs to secure the required collateral . . . . While the Board does not provide \na solution at this time, the Board and stakeholders could have used additional time to build a more thoughtful collateral \nsystem.”)."},{"page":10,"startToken":3048,"endToken":3284,"text":"10 \nGiven that required credit support will not be posted until sometime in April 2028, there is \ntime to consider a “more thoughtful collateral system.”22 The Commission, therefore, should \nestablish an expedited paper hearing limited to proposed Tariff section 18.8(b). Within thirty days \nafter the later of the Commission’s order or PJM’s publication of the final RBP commitments, PJM \nshould file a proposed revised LSE collateral methodology and supporting analysis. Initial briefs \nshould be due twenty days thereafter, and reply briefs fifteen days after the initial briefs. \nConstellation requests that the Commission issue an order within sixty days after the close of \nbriefing. \nThis schedule would produce a complete record approximately 125 days after the relevant \nRBP commitments and well before any LSE collateral must be posted. It also would leave the RBP \nprocurement and seller-side credit protections undisturbed. \nSetting the credit requirement and mechanism issues in a separate expedited track to \nevaluate and form consensus for the collateralization requirements will help ensure the cost \nallocation methodology keeps the RBP costs with large loads and not residential customers, \nproperly sizes collateral requirements commensurate with exposure and credit risk, and considers \nalternative solutions to credit support that will help alleviate the incredible burden faced by LSEs, \nparticularly smaller entities. The current record and procedural schedule is not adequate to address \nthe necessary details of the credit and collateral requirements. \n \n \n \n22 NJBPU Comments at 6."},{"page":11,"startToken":3284,"endToken":3557,"text":"11 \nIII. \nCONCLUSION \nIn accordance with PJM’s willingness to accept changes under NRG Power Marketing,23 \nthe Commission should (i) accept the RBP subject to the modifications Constellation discussed in \nits Limited Protest in this proceeding, with the additional clarification discussed above permitting \nEnergy Resources seeking new capacity rights to satisfy the criteria for resources eligible to supply \nQualifying RBP Offset UCAP MW, and (ii) sever the LSE credit issue discussed herein for further \nproceedings and refer that issue to an expedited paper hearing. \n \nRespectfully submitted, \nDated: September 8, 2026 \n \n23 See PJM Proposal at 3 (“PJM provides notice that it consents to the Commission’s exercise of authority to modify \nand/or sever any element of the proposed Tariff and RAA language to the extent necessary and permitted under section \n205 of the FPA and NRG Power Marketing, LLC v. FERC, where such modification and/or severance is consistent \nwith PJM’s overarching objectives in this filing”).   \n \n/s/ \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nJohn M. White \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \njohn.white@constellation.com \n \nChristopher A. Wilson \nVice President, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \nKenneth W. Irvin \nAlexandra K. Calabro \nSidley Austin LLP \n1501 K Street, N.W. \nWashington, DC 20005 \nPhone: (202) 736-8256 \nkirvin@sidley.com \nalexandra.calabro@sidley.com \n \nTerence T. Healey \nSidley Austin LLP \n60 State Street, 37th Floor \nBoston, MA 02109 \nPhone: (617) 223-0306 \nthealey@sidley.com \n \nCounsel for Constellation Energy Generation, \nLLC"},{"page":12,"startToken":3557,"endToken":3614,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Washington, D.C. this 8th day of September 2026. \n/s/ \nAlexandra K. Calabro  \nSidley Austin LLP \n1501 K Street, N.W. \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":712,"startToken":0,"endToken":93},{"p":1,"at":712,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":224,"startToken":93,"endToken":367},{"p":2,"at":224,"title":"II. ANSWER","method":"printed heading","endPage":2,"endAt":237,"startToken":367,"endToken":369},{"p":2,"at":237,"title":"A. Request for Additional Clarification on Resources Eligible to Supply","method":"printed heading","endPage":3,"endAt":633,"startToken":369,"endToken":862},{"p":3,"at":633,"title":"B. Credit and Collateral Requirements of Load Serving Entities","method":"printed heading","endPage":11,"endAt":4,"startToken":862,"endToken":3285},{"p":11,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":12,"endAt":0,"startToken":3285,"endToken":3557},{"p":12,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":12,"endAt":344,"startToken":3557,"endToken":3614}]}