{"document":{"slug":"rec-20260918-5224","title":"Motion to Intervene and Comments of the MISO Transmission Owners re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5224","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"MISO Transmission Owners","kind":"comments","file":"sources/filings/text/20260918-5224_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5224","tier":"record","sha256":"7ebfd62d3ad318b70261e3845ccb84ee89d48d894cce7b9912bf173f18039f62","pages":10,"tokens":2336,"emptyPages":[],"textThemes":["study"]},"pages":[{"page":1,"startToken":0,"endToken":308,"text":"UNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION  \n \n ) \nMidcontinent Independent System   \n) \nDocket No. ER26-3650-000 \n \nOperator, Inc.  \n \n \n) \n) \n \nMOTION TO INTERVENE AND COMMENTS OF  \nTHE MISO TRANSMISSION OWNERS  \n \nPursuant to Rules 212 and 214 of the Federal Energy Regulatory Commission’s \n(“Commission”) Rules of Practice and Procedure,1 the MISO Transmission Owners2 \nsubmit this motion to intervene and comments on the August 28, 2026 filing by \nMidcontinent Independent System Operator, Inc. (“MISO”) in which MISO proposes \nrevisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff \n \n1  \n18 C.F.R. §§ 385.212, 385.214.   \n2  \nFor purposes of this filing, the MISO Transmission Owners consist of Ameren \nServices Company, as agent for Union Electric Company d/b/a Ameren Missouri, \nAmeren Illinois Company d/b/a Ameren Illinois and Ameren Transmission \nCompany of Illinois; Big Rivers Electric Corporation; Central Minnesota \nMunicipal Power Agency; Citizens Electric Corporation; City Water, Light & \nPower (Springfield, IL); Cleco Power LLC; Cooperative Energy; Dairyland Power \nCooperative; Duke Energy Business Services, LLC for Duke Energy Indiana, LLC; \nEast Texas Electric Cooperative, Inc.; Great River Energy; GridLiance Heartland \nLLC; Hoosier Energy Rural Electric Cooperative, Inc.; Indiana Municipal Power \nAgency; Indianapolis Power & Light Company d/b/a AES Indiana; International \nTransmission Company d/b/a ITCTransmission; ITC Midwest LLC; Lafayette \nUtilities System; Michigan Electric Transmission Company, LLC; MidAmerican \nEnergy Company; Minnesota Power (and its subsidiary Superior Water, L&P); \nMissouri River Energy Services; Montana-Dakota Utilities Co.; Northern Indiana \nPublic Service Company LLC; Northern States Power Company, a Minnesota \ncorporation, and Northern States Power Company, a Wisconsin corporation, \nsubsidiaries of Xcel Energy Inc.; Northwestern Wisconsin Electric Company; Otter \nTail Power Company; Prairie Power, Inc.; Southern Illinois Power Cooperative; \nSouthern Indiana Gas & Electric Company (d/b/a CenterPoint Energy Indiana \nSouth); Southern Minnesota Municipal Power Agency; Wabash Valley Power \nAssociation, Inc.; and Wolverine Power Supply Cooperative, Inc."},{"page":2,"startToken":308,"endToken":583,"text":"2 \n(“Tariff”) to establish Interconnection Reliability Requirements for Large Loads (“IRR \nProposal”).3  The IRR Proposal includes establishment of the new Section 37A to the Tariff \nto house the proposal’s framework, addition of definitions for the term Large Load and the \nterm Computational Load (a subset of Large Load), and requirements that directly address \naspects of the Commission’s directives related to reliable Large Load interconnection from \nits recent Show Cause Order.4   \nMISO’s proposal represents a critical step in addressing the unprecedented, \naccelerated influx of large-scale facilities that seek to interconnect in the region.  By \nestablishing tailored requirements for both Large Load and dynamic Computational Load, \nMISO proposes a scalable, risk-informed approach that protects grid operations.  MISO’s \nproposal also minimizes disruptions to late-stage commercial projects.  During \ndevelopment of this proposal, MISO demonstrated its commitment to stakeholder \nengagement on the issues, interfacing with its Large Load Working Group (“LLGW”), as \nwell as other stakeholder groups, including the MISO Transmission Owners and the \nOrganization of MISO States, Inc.  For the ultimate success of the proposed framework, \nthe MISO Transmission Owners strongly encourage MISO’s continued collaboration with \nstakeholders in the ongoing development of related Business Practice Manuals (“BPM”) \nor further Tariff provisions, as needed.  For these reasons, the Commission should accept \nthe August 28 Filing’s proposed Tariff revisions, effective December 4, 2026.   \n \n3  \nInterconnection Reliability Requirements for Large Loads of Midcontinent \nIndependent System Operator, Inc., Docket No. ER26-3650-000 (Aug. 28, 2026) \n(“August 28 Filing”).  Capitalized terms not otherwise defined herein shall have the \nmeaning set forth in MISO’s Tariff or the August 28 Filing. \n4  \nMidcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212 (2026) (“Show Cause \nOrder”)."},{"page":3,"startToken":583,"endToken":848,"text":"3 \nI. \nCOMMENTS  \nA. \nMISO’s IRR Proposal Offers a Just and Reasonable Framework to \nSupport Regional Reliability Given the Significant Large Load Growth \nThe MISO Transmission Owners generally support MISO’s IRR Proposal as a just \nand reasonable framework that will establish scalable, technically sound, and “risk-\ninformed” requirements for reliable interconnection of Large Loads while providing \ncertainty to Large Load projects already underway.5   \nThe IRR Proposal is a part of MISO’s efforts to provide speed to power for the \nrapid load growth across the region while maintaining reliability, and it is made alongside \nongoing and recently proposed initiatives.  Specifically, the IRR Proposal will complement \nMISO’s other recent strategic initiatives, including:  MISO’s proposal for a Zero Injection \nGenerator Interconnection Agreement and study process to interconnect resources that \nintend to serve load at the same substation and voltage level as existing or proposed load;6 \nthe Expedited Resource Addition Study, which provides a temporary accelerated \ninterconnection process tailored to generators needed within the region to serve important, \nnear-term new load; MISO’s improved Expedited Project Review process, part of the \nMISO Transmission Expansion Plan, which expeditiously studies network upgrades \nnecessary for new Large Loads; and the MISO-Southwest Power Pool, Inc. (“SPP”) Joint \nTargeted Interconnection Queue Study, which provides a pathway to build large-scale, \nbackbone transmission upgrades at the MISO-SPP seam.  \n \n5  \nSee August 28 Filing, Transmittal Letter at 3; id., Tab C (Prepared Direct \nTestimony of BeiBei Li, Senior Manager of Strategic Assessment) at 8 (“Li Test.”). \n6  \nZero Injection Generator Interconnection Agreement of Midcontinent Independent \nSystem Operator, Inc., Docket No. ER26-3552-000 (Aug. 18, 2026) (“ZGIA \nFiling”)."},{"page":4,"startToken":848,"endToken":1131,"text":"4 \nMISO also designed the IRR Proposal to complement MISO’s existing processes \nfor system planning, interconnection, and operations,7 while providing a framework of \nreliability-based requirements for Large Loads, including visibility requirements;8 Phasor \nMeasurement Unit (“PMU”) requirements to monitor Computational Loads;9 ramp \nrequirements addressing the rate at which Computational Loads may increase or decrease \nconsumption during stable-state transitions;10 and ride-through requirements setting \nminimum disturbance performance for Computational Load during voltage and frequency \ndisturbances.11   \nThe IRR Proposal also includes a new defined term for “Large Load.”12  As \nproposed, the term Large Load will be any load with a gross demand of 50 megawatt \n(“MW”) or more behind one or multiple Points of Withdrawal,13 owned, operated, or \ncontrolled by one or multiple entities that coordinate with respect to the profile of the Load, \nbut does not include Load exclusively used for charging an Electric Storage Resource.14  \n \n7  \nLi Test. at 7. \n8  \nAugust 28 Filing, Transmittal Letter at 15-16; Li Test. at 24-26. \n9  \nAugust 28 Filing, Transmittal Letter at 17-19; Li Test. at 26-30. \n10  \nAugust 28 Filing, Transmittal Letter at 19-20; Li Test. at 30-31. \n11  \nAugust 28 Filing, Transmittal Letter at 20-21; Li Test. at 32-34. \n12  \nAugust 28 Filing, Tab A (IRR Tariff Redlines) at Definitions – L (“Proposed IRR \nTariff”); Li Test. at 12. \n13  \nAs with the ZGIA Filing, the August 28 Filing proposes to add a definition for the \nterm “Point of Withdrawal” to mean “[t]he point(s) where a non-transmission \nfacility that is used to withdraw Energy from the Transmission System to serve \nLoad connects to the Transmission System.”  Proposed IRR Tariff at \nDefinitions – P. \n14  \nId. at Definitions – L."},{"page":5,"startToken":1131,"endToken":1421,"text":"5 \nMISO notes that accounting for gross load, rather than net load, will allow MISO “visibility \ninto the full electrical demand and characteristics of the facility.”15  MISO also strategically \nchose 50 MW as a reasonable threshold based on an extensive review involving “industry \npractices, consideration of reliability needs in the MISO region, and stakeholder \nfeedback”16 and because the number is an “administratively clear starting point, consistent \nwith industry precedent, and sufficiently significant to warrant application” of the IRR \nProposal’s requirements.17   \nAdditionally, MISO proposes a new defined term for “Computational Load,” which \nis a Large Load comprised of 25 MWs or more of gross demand from “information \ntechnology equipment, such as servers, storage, and networking hardware.”18  This \ndistinction is important because it reflects a more targeted and risk-informed approach, i.e., \napplying enhanced requirements only to Large Loads with operating characteristics that \nwarrant additional reliability consideration.  \nAs MISO highlights, the IRR Proposal directly responds to concerns that the \nCommission raised regarding ongoing operational requirements for transmission \n \n15  \nAugust 28 Filing, Transmittal Letter at 10. \n16  \nId.; see also Li Test. at 12 (“MISO determined that 50 MW is a reasonable threshold \nbased on industry precedent, . . . and the need for a clear and administratively \nworkable means of identifying significant, concentrated loads that warrant \nadditional reliability visibility.”). \n17  \nAugust 28 Filing, Transmittal Letter at 10. \n18  \nProposed IRR Tariff at Definitions – C; August 28 Filing, Transmittal Letter at 11; \nsee also Li Test. at 14 (“MISO’s proposed definition of Computational Load is \nclosely aligned with [the North American Electric Reliability Corporation \n(“NERC”)]’s developing definition of computational load.  Both approaches \nidentify computational load based on electric demand associated with information \ntechnology equipment, such as servers, storage, and networking hardware.”)."},{"page":6,"startToken":1421,"endToken":1685,"text":"6 \ncustomers taking transmission service on behalf of large loads.19  Critically, and consistent \nwith the Show Cause Order, MISO’s proposal provides a reasonable, tiered transition \nstructure to minimize disruption to commercial business decisions.20  Additionally, \nMISO’s IRR Proposal and other upcoming proposals are designed to align with emerging \nguidance from NERC, which works to ensure the reliability and security of the bulk power \nsystem.  While MISO proposes reliability-based interconnection requirements for the \nregion with the IRR Proposal, NERC is concurrently developing industry-wide \nguidelines.21  MISO notes that it crafted aspects of the IRR Proposal for consistency with \nthose emerging industry practices.22  Through its IRR Proposal, MISO offers a framework \nthat meets the needs of the region, addresses several of the Commission’s concerns, and \nmaintains consistency with emerging industry expectations.  For these reasons, MISO’s \nIRR Proposal is a just and reasonable package of new and improved provisions to MISO’s \nTariff. \nB. \nThe IRR Proposal Provides a Strong Foundation From Which MISO \nShould Continue Collaborating with Stakeholders to Finalize the \nProposal’s Technical Details  \nWhile the MISO Transmission Owners support the IRR Proposal as foundational \nto MISO’s response to the region’s exponential Large Load growth, substantial \ncollaborative work is still required.  MISO’s IRR Proposal can be a successful framework \n \n19  \nShow Cause Order at P 64. \n20  \nAugust 28 Filing, Transmittal Letter at 14. \n21  \nId. at 3. \n22  \nSee e.g., id. at 20 (“Consistent with emerging industry practices and NERC \nguidance, the proposed ride-through expectations are intended to establish scalable \nand reliability-based performance criteria proportional to demonstrated system risk \nand facility operating characteristics.”)."},{"page":7,"startToken":1685,"endToken":1936,"text":"7 \nfor ensuring continued system reliability, but more granular technical parameters of the \nproposal, such as details about Load Forecast measurements, ramp rates, ride-through \nrequirements, and PMU compliance, need transparent specification in the forthcoming \nmanuals and potentially further Tariff provisions to ensure successful implementation. \nThroughout its filing, MISO details the LLWG’s extensive efforts in facilitating the \ndevelopment of the IRR Proposal and other upcoming proposals to address the regional \nLarge Load growth.23  MISO should continue to engage collaboratively with the LLWG \nand other stakeholders to build out its “hub-and-spoke” BPM architecture—“consisting of \na new Large Load BPM, the ‘hub,’ supported by updates to existing BPMs and manuals, \nthe ‘spokes’”24—and develop additional Tariff revisions as needed to achieve clear and \nstandardized implementation of the IRR Proposal.   \nThe MISO Transmission Owners appreciate MISO’s collaborative and stakeholder-\nreceptive process for developing the IRR Proposal and look forward to providing input on \nthe technical details for its successful implementation. \nII. \nMOTION TO INTERVENE \nThis proceeding involves revisions to MISO’s Tariff to establish a new framework \nof reliability requirements for the interconnection of Large Load, i.e., the IRR Proposal, \nwith new Tariff definitions and a new Tariff section to house the requirements.  As \nTransmission Owners within MISO that are subject to the Tariff, each of the MISO \nTransmission Owners will be affected by whatever action the Commission takes in this \nproceeding because the Tariff and its procedures for interconnection of Large Load impact \n \n23  \nId. at 27-29. \n24  \nId. at 29."},{"page":8,"startToken":1936,"endToken":2180,"text":"8 \nthe MISO Transmission Owners and their transmission facilities.  Additionally, the MISO \nTransmission Owners have a vested interest in the MISO region’s ability to meet the need \nfor speed to power while maintaining resource adequacy and reliability as well as \naddressing aspects of the Show Cause Order’s directives, all of which the August 28 \nFiling’s proposals do.  Consequently, each of the MISO Transmission Owners has a direct, \nunique, and substantial interest in this case that is not and cannot be adequately represented \nby any other party.25  Therefore, the Commission should allow the intervention of each \nMISO Transmission Owner listed supra in note 2.   \nThe MISO Transmission Owners also request that the Commission place the \nfollowing individuals on the official service list26 for this proceeding: \nWendy N. Reed \nAnna Fernandez \nAbraham F. Johns III \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n(202) 393-1200 \nreed@wrightlaw.com \nfernandez@wrightlaw.com \njohns@wrightlaw.com \n \n25  \n18 C.F.R. § 385.214(b)(2)(ii) (stating that a motion to intervene must demonstrate \nthat “[t]he movant has . . . an interest which may be directly affected by the \noutcome of the proceeding”). \n26  \nTo the extent necessary, the MISO Transmission Owners request waiver of Rule \n203(b)(3) of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.203(b)(3), to permit all of the persons listed to be placed on the official \nservice list for this proceeding."},{"page":9,"startToken":2180,"endToken":2262,"text":"9 \nIII. \nCONCLUSION \n \nFor these reasons, the MISO Transmission Owners request that the Commission \ngrant this motion to intervene and accept the August 28 Filing as just and reasonable, \neffective December 4, 2026.   \nRespectfully submitted, \n /s/ Abraham F. Johns III \n   \nWendy N. Reed \nAnna Fernandez \nAbraham F. Johns III \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n(202) 393-1200 \nreed@wrightlaw.com \nfernandez@wrightlaw.com \njohns@wrightlaw.com \nAttorneys for the \nMISO Transmission Owners \n \nSeptember 18, 2026"},{"page":10,"startToken":2262,"endToken":2336,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \n \nDated at Washington, DC, this 18th day of September 2026. \n \n /s/ Abraham F. Johns III    \nAbraham F. Johns III \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n(202) 393-1200 \njohns@wrightlaw.com \n \nAttorney for the \nMISO Transmission Owners"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":3,"startToken":0,"endToken":584},{"p":3,"at":3,"title":"I. COMMENTS","method":"printed heading","endPage":3,"endAt":18,"startToken":584,"endToken":586},{"p":3,"at":18,"title":"A. MISO’s IRR Proposal Offers a Just and Reasonable Framework to","method":"printed heading","endPage":6,"endAt":1060,"startToken":586,"endToken":1572},{"p":6,"at":1060,"title":"B. The IRR Proposal Provides a Strong Foundation From Which MISO","method":"printed heading","endPage":7,"endAt":1148,"startToken":1572,"endToken":1844},{"p":7,"at":1148,"title":"II. MOTION TO INTERVENE","method":"printed heading","endPage":9,"endAt":3,"startToken":1844,"endToken":2181},{"p":9,"at":3,"title":"III. CONCLUSION","method":"printed heading","endPage":10,"endAt":0,"startToken":2181,"endToken":2262},{"p":10,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":480,"startToken":2262,"endToken":2336}]}