{"document":{"slug":"rec-20260918-5262","title":"Motion for Leave to Answer and Answer of Buckeye Power, Inc. to certain Comments and Protests re PJM Interconnection, LLC’s proposal to Establish Interim…","issued":"2026-09-18","accession":"20260918-5262","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Buckeye Power, Inc.","kind":"protest","file":"sources/filings/text/20260918-5262_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5262","tier":"record","sha256":"b63bccb09d0ccbe06de9c40c5be62193c03d4a3a7730dcecb8e4a7603c86ea4d","pages":11,"tokens":3302,"emptyPages":[],"textThemes":["adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":291,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket No. ER26-3515-000 \n \nMOTION FOR LEAVE TO ANSWER  \nAND ANSWER OF BUCKEYE POWER, INC. \nPursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s \n(“Commission”) Rules of Practice and Procedure,1 Buckeye Power, Inc. (“Buckeye”)2 \nrespectfully moves for leave to answer and answers certain comments and protests filed \nin this proceeding (“Answer”). Buckeye seeks to provide additional information and \ncontext that will assist the Commission in its decision-making process, particularly as it \nrelates to the impact of PJM Interconnection, L.L.C.’s (“PJM”) Interim Resource \nAdequacy Service (“IRAS”) proposal on self-supply entities like Buckeye.  \nOn August 13, 2026, PJM submitted revisions to the PJM Open Access \nTransmission Tariff (“PJM Tariff”) and the Reliability Assurance Agreement Among \nLoad Serving Entities (“RAA”) to establish IRAS.3 Numerous parties filed comments \nand protests addressing the proposal, including Buckeye.4 Several parties raised concerns \nin their comments and protests about the problematic impact of the definition of “New \n \n1 18 C.F.R. §§ 385.212, 385.213. \n2 Buckeye timely intervened in this proceeding. See (doc-less) Motion to Intervene of Buckeye Power, Inc. \n(Aug. 20, 2026), eLibrary No. 20260820-5106.  \n3 PJM, Proposal to Establish Interim Resource Adequacy Service and a Large Load Registry to Address \nSystem Reliability (Aug. 13, 2026), eLibrary No. 20260813-5118 (“PJM Filing”). \n4 Limited Comments of Buckeye Power, Inc. (Sep. 3, 2026), eLibrary No. 20260903-5125. As Buckeye \nstated in its Comments, Buckeye generally supports this concept but raised concerns about how PJM will \ndetermine the “IRAS reduction MW quantity” it will use in IRAS Actions and sought clarification so that \nIRAS Actions do not unnecessarily and prematurely curtail existing, non-New Large Load customers."},{"page":2,"startToken":291,"endToken":676,"text":"- 2 - \nLarge Loads” on existing loads and on Load Serving Entities like Buckeye that have \nsecured sufficient generation resources to serve their load, whether new or existing \n(“Self-Supply LSE”).5 Buckeye files this answer to address those comments, and to \nexpress support for specific issues raised by East Kentucky Power Cooperative, Inc. \n(“EKPC”),6 the PJM Industrial Customer Coalition (“PJM ICC”),7 and the Public \nUtilities Commission of Ohio’s Office of the Federal Energy Advocate (“Ohio FEA”).8 \nI. \nMOTION FOR LEAVE TO ANSWER \nBuckeye respectfully requests leave to answer the comments and protests filed in \nthe above-captioned proceeding on September 3, 2026. While the Commission’s \nregulations do not permit answers to answers unless otherwise authorized by the \nCommission,9 the Commission may waive this prohibition for good cause.10 The \nCommission has found good cause exists where an answer would assist its decision-\nmaking process.11 Good cause exists here, as Buckeye’s Answer clarifies important \nissues regarding PJM’s IRAS filing.  \n \n5 Self-Supply is defined in the PJM Tariff as “Capacity Resources secured by a [LSE], by ownership or \ncontract, outside a Reliability Pricing Model Auction, and used to meet obligations under this Attachment \nor the [RAA] through submission in a Base Residual Auction or an Incremental Auction of a Sell Offer \nindicating such Market Seller’s intent that such Capacity Resource be Self-Supply. Self-Supply may be \neither committed regardless of clearing price or submitted as a Sell Offer with a price bid. A [LSE’s] Sell \nOffer with a price bid for an owned or contracted Capacity Resource shall not be deemed ‘Self-Supply,’ \nunless it is designated as Self-Supply and used by the LSE to meet obligations under this Attachment or the \n[RAA].” PJM Tariff, Definitions – Self-Supply. \n6 Limited Protest of East Kentucky Power Cooperative, Inc. (Sep. 3, 2026), eLibrary No. 20260903-5229 \n(“EKPC Limited Protest”). \n7 Comments of the PJM Industrial Customer Coalition (Sep. 3, 2026), eLibrary No. 20260903-5231 (“PJM \nICC Comments”). \n8 Comments of the Public Utilities Commission of Ohio’s Office of the Federal Energy Advocate (Sep. 3, \n2026), eLibrary No. 20260903-5190 (“Ohio FEA Comments”).  \n9 18 C.F.R. § 385.213(a)(2). \n10 Id. § 385.101(e). \n11 See, e.g., Pac. Gas & Elec. Co., 183 FERC ¶ 61,159, P 18 (2023); Pac. Gas & Elec. Co., 183 FERC \n¶ 61,202, P 30 (2023)."},{"page":3,"startToken":676,"endToken":1166,"text":"- 3 - \nII. \nANSWER \nPJM’s IRAS is aimed at addressing resource adequacy concerns that have been \nprimarily driven by new data center load.12 Data centers are not only driving the \nunprecedented load growth in PJM, they also have unique characteristics that present \ndistinct challenges to the grid.13 Despite the clear and specific cause of these problems, \nPJM’s IRAS proposal—specifically the requirement that New Large Loads face \ncurtailment if they do not have Bring Your Own New Capacity (“BYONC”)—is broadly \ntargeted at all large loads over 50 MW. That covers new manufacturing and other \ntraditional industrial and commercial loads, as well as load increases of existing similar \nloads that bring total load above 50 MW. \nBuckeye agrees with EKPC that this broad application of PJM’s IRAS proposal is \nparticularly problematic for Self-Supply LSEs, like Buckeye, that have planned for this \n \n12 PJM Filing, Transmittal Letter at 6 (“Insufficient commitments of capacity in the 2027/2028 and \n2028/2029 Reliability Pricing Model (“RPM”) Auctions, primarily driven by the unprecedented addition of \nlarge loads, most notably data centers, have given rise to resource adequacy shortfalls—and associated \nreal-time operational issues that IRAS is intended to address.” (emphasis added)); id. at 13 (“PJM hosts the \nlargest concentration of data center load in the world.”); id. at 21 (explaining that the capacity shortfall \nfacing PJM “is due to a confluence of various factors, particularly the ‘unprecedented surge in data center \nload’ at a faster pace than new supply can come online, and the ‘speed of connecting these large loads \ncreates a fundamental misalignment between demand and supply cycles’” (footnotes omitted, quoting PJM, \n2027/2028 Base Residual Auction Reserve Target Shortfall Report at 1, 4 (Feb. 9, 2026), \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-\nreserve-target-shortfall-report.pdf [https://perma.cc/TA3Y-95AX])). \n13 See Reliability Standard(s) Pertaining to Computational Load Integration, 196 FERC ¶ 61,031, P 9 \n(2026) (“We agree with [North American Electric Reliability Corporation (“NERC”)] regarding the urgent \nneed for action to assure that computational loads are reliably integrated into the operation of the Bulk-\nPower System. NERC has documented multiple grid disturbances in which computational loads have \ncaused or contributed to the instability of the Bulk-Power System.”) (citing NERC, Supplemental ANOPR \nComments at 1 n.1, Ensuring the Timely and Orderly Interconnection of Large Loads, Docket No. RM26-4 \n(Mar. 20, 2026), eLibrary No. 20260320-5091; see also NERC, Incident Review: Considering \nSimultaneous Voltage-Sensitive Load Reduction s (Jan. 8, 2025), https://www.nerc.com/globalassets/our-\nwork/reports/event- reports/incident_review_large_load_loss.pdf; NERC, Incident Review: Voltage-\nSensitive Crypto Load Reductions (Jan. 9, 2026), https://www.nerc.com/globalassets/our-\nwork/reports/event-reports/incident_review_considering_voltage- sensitive_crypto_load_reductions.pdf; \nsee also NERC, 2026 State of Reliability: Assessment Overview of 2025 Bulk Power System Performance \nat 5-6 (June 24, 2026), https://www.nerc.com/globalassets/programs/rapa/pa/ \nnerc_sor_2026_overview.pdf)."},{"page":4,"startToken":1166,"endToken":1479,"text":"- 4 - \ntraditional load growth and ensured that they own or are entitled to sufficient resources to \ncover this conventional load growth. It is not just and reasonable to impose IRAS \nrequirements on existing loads experiencing organic load growth when a Self-Supply \nLSE has planned for and obtained generation to cover that same load growth  \nTo avoid this unjust and unreasonable outcome, Buckeye requests the \nCommission clarify or direct PJM to adjust its filing to revise the definition of New Large \nLoads to apply only to data centers.14 Alternatively, the Commission should require PJM \nto limit the definition of New Large Loads to only those loads that are truly new, and \nexclude incremental growth of existing loads that are served by Self-Supply LSEs that \nhave sufficient resources to meet the demand of that load growth. At a minimum, the \nCommission should adopt PJM ICC’s proposal to change the existing New Large Load \ndefinition to only apply to existing load that has increased by 50 MW rather than \nincreased incrementally to over 50 MW to avoid absurd and problematic results.  \nA. \nBuckeye is a Self-Supply LSE. \nBuckeye, as a Self-Supply LSE, operates to ensure that it either owns or is entitled \nto sufficient generation resources to cover the needs of its member-electric distribution \ncooperatives and their retail members. For over 60 years, Buckeye has planned its \ngeneration portfolio to ensure that there are sufficient generation resources to serve not \nonly its existing load, but organic load growth. The organic load growth Buckeye plans \nfor includes increased demand needs at existing loads and the addition of new \ncommercial and industrial facilities that would locate on its member-electric distribution \n \n14 For example, the Commission has directed the North American Electric Reliability Corporation to file \nReliability Standards specific to “computational loads,” recognizing the unique nature of these specific \nlarge loads. 196 FERC ¶ 61,031, Ordering Paragraph (A)."},{"page":5,"startToken":1479,"endToken":1815,"text":"- 5 - \ncooperatives’ systems. As a result of this planning, Buckeye currently owns or is entitled \nto generation output that exceeds its members’ current load requirements, plus reserves, \nand is sufficient to meet organic load growth for many years into the future. \nBuckeye’s distribution cooperative members, and in turn their retail members, \nhave paid for this generation at-cost with the expectation that the generation in excess of \ncurrent load will be available to cover organic load growth for which it was planned. \nBuckeye agrees with EKPC that precluding such Self-Supply LSEs from relying on these \nplanned resources, particularly for growth of existing traditional loads, undermines \nsettled expectations and is potentially not just and reasonable.15 \nTo illustrate why PJM’s proposal is overly broad and not just and reasonable, \nassume a Buckeye has a retail member manufacturing facility with 45 MW of current \nload that has been in operation for decades, and that Buckeye has planned its generation \nportfolio based on this member’s existing load and potential future growth. This member \n(and others) has paid through its rates for Buckeye’s generation supply at cost for the \ndecades it has been in operation. This member seeks to expand its operations by adding 6 \nMW of load, and 100 new jobs, increasing its overall load to 51 MW—within the range \nof future load growth for which Buckeye has planned and obtained generation. Despite \nBuckeye having excess generation in its portfolio built and paid for by its members for \nthe very purpose of supplying this growth, Buckeye or the load must now go out and \nbuild or acquire an additional 6 MW of new generation to serve this growth or be subject \nto curtailment under PJM’s IRAS proposal. Faced with the cost of this proposition, the \n \n15 “[I]t is not just and reasonable to subject to IRAS curtailment the load of an LSE that has prudently \nplanned its power supply portfolio to include sufficient resources to meet its load-serving obligations, \nincluding for New Large Load.” EKPC Comments at 15."},{"page":6,"startToken":1815,"endToken":2088,"text":"- 6 - \nmember may decide not to expand, sacrificing 100 new jobs. This outcome is not only \nunfair, but it is also completely unnecessary to meet the resource adequacy challenges \nposed by hyper-scale data centers. \nThe Commission can avoid, or mitigate, this concern without losing the benefits \nof PJM’s IRAS filing by narrowing the scope of the definition of New Large Load as \nproposed below.  \nB. \nBuckeye supports limiting the definition of New Large Load to \ndata centers. \nThere is no question that the large imbalance PJM is experiencing between \nexpected load growth and available generation resources is driven primarily by data \ncenters.16 To combat this imbalance, PJM is proposing IRAS as an operational tool to \naddress the reality that data centers are seeking to interconnect to the electric grid more \nquickly than generation and transmission can be built, making it difficult for PJM to \nmaintain a reliable electric grid.17 But as the Ohio FEA recognized in its filing, PJM’s \nIRAS filing makes no distinction “between the computational loads that are directly \nresponsible for the current state of resource adequacy—such as hyperscale data centers \nand cryptocurrency miners—and traditional manufacturing loads that drive American \nindustry.”18 \nDespite data centers driving the need for IRAS, PJM has defined “New Large \nLoads” broadly to include traditional loads, both new and existing:19  \n \n16 See supra note 12. \n17 PJM Filing, Attach. C, Affidavit of Christopher Pilong on Behalf of PJM Interconnection, L.L.C., P 19 \n(“Pilong Aff.”). \n18 Ohio FEA Comments at 4. \n19 PJM Filing, Transmittal Letter at 38 (quoting id. Attach. A, Redline Tariff, Definitions – New Large \nLoad at 46)."},{"page":7,"startToken":2088,"endToken":2424,"text":"- 7 - \n“New Large Load” means “an end-use customer load that is \neither (a) a Large Load that goes into service after June 1, \n2027, or (b) incremental load in-service after June 1, 2027, \nthat increases the existing end-use customer load at a single \nelectrical site that, prior to such incremental load, did not \npreviously meet the definition of Large Load.”  \nPJM’s proposed definition of “Large Load,” incorporated into the term “New Large \nLoad,” is:20 \nend-use customer(s) load that has a cumulative peak load of \n50 megawatts or greater at a single electrical site behind one \nor more points of interconnection, where for configurations \ninvolving multiple affiliated load facilities or multiple points \nof interconnection with affiliated load facilities behind them, \nall affiliated load facilities within a one-mile radius will be \nconsidered a single electrical site as further described in the \nPJM Manuals. \nBuckeye agrees with the Ohio FEA that revising the definition of New Large \nLoad to apply solely to data centers would better align PJM’s IRAS proposal with the \nunderlying cause of the resource adequacy concerns it seeks to address.21 Indeed, it is \nwell established that treating differently situated entities the same constitutes undue \ndiscrimination under the Federal Power Act.22 Applying IRAS only to data centers would \nalso ensure that the generation resource portfolio that Buckeye (and other Self-Supply \nLSEs) has built over decades to serve its existing load, plus organic load growth of \nexisting load and the potential for new traditional loads, remains preserved.  \nPJM has consented to the Commission modifying its filing “where such \nmodification is consistent with PJM’s overarching objectives in this filing.”23 Limiting \n \n20 Id. at 31 (quoting id. Attach. A, Redline Tariff, Definitions – New Large Load at 123). \n21 Ohio FEA Comments at 4-5. As the Ohio FEA notes, this is the approach that all investor-owned utilities \nin Ohio have taken so far.  \n22 Ala. Elec. Coop., Inc. v. FERC, 684 F.2d 20, 27 (D.C. Cir. 1982). \n23 PJM Filing, Transmittal Letter at 122."},{"page":8,"startToken":2424,"endToken":2687,"text":"- 8 - \nthe scope of New Large Loads to data centers would be consistent with the purpose of \nIRAS because the data center loads that are driving the resource adequacy concerns \nwould still be subject to BYONC or curtailment. \nC. \nIn the alternative, Buckeye supports removing existing loads \nserved by Self-Supply LSEs from the definition of New Large \nLoads. \nIf the Commission does not limit the definition of New Large Loads to data center \nloads, Buckeye alternatively supports removing from the definition of New Large Load \nexisting loads that are served by Self-Supply LSEs with sufficient generation resources in \ntheir portfolios. As noted above, Self-Supply LSEs have planned their generation \nportfolios to provide generation supply to their existing loads along with organic load \ngrowth. These Self-Supply LSEs, and their customers, have paid for this generation \nportfolio with the expectation that excess generation will be available to cover future \ngrowth.  \nIt is not just and reasonable for PJM to now require Self-Supply LSEs, and in turn \nthe loads they serve, to either be subject to curtailment or bear the cost of building new \ngeneration capacity for existing loads that expand over 50 MW. Establishing a narrowly \ntailored exception to the scope of New Large Loads for Self-Supply LSEs with sufficient \nexcess generation available to support expansion of existing loads would avoid this \nproblem. Similar to the discussion above, this modification of PJM’s proposal would be \nconsistent with IRAS’s overall objectives, since it would still require data centers that are \ncausing the resource adequacy problems identified by PJM to be subject to either \nBYONC or curtailment."},{"page":9,"startToken":2687,"endToken":2987,"text":"- 9 - \nD. \nAt a minimum, the Commission should adopt PJM ICC’s \nproposal to apply New Large Loads only to existing loads than \nincrease by 50 MW or more. \nThe Commission should, at a minimum, adopt the PJM ICC’s proposal that the \ndefinition of New Large Load apply only to existing loads that increase by an increment \nof 50 MW, rather than existing loads that increase to over 50 MW. As proposed by PJM \nICC: “When an existing Large Load facility expands, only load growth over 50 MW \nfrom the baseline should be subject to IRAS. (That is, a 50 MW facility should not be \nsubjected to IRAS until it expands beyond 100 MW.)”24 \nThis clarification would avoid the absurd result described above where an existing \nmanufacturing load can increase its load by 6 MW (or less) and be subject to curtailment \nor be required to pay to bring 6 MW of new generation to the market. In addition, \nrequiring BYONC for small, incremental load increases may be infeasible in many \ninstances, given the lumpy nature of new capacity. This change would not undermine the \npurpose of IRAS and the resource adequacy concerns it is intended to address. As noted \nby PJM ICC, “[m]any of the new computational loads are significantly in excess of \n50 MW, whereas 50 MW is not unusual for an industrial or institutional facility.”25 \nIII. \nCONCLUSION \nTo the extent PJM does not address the issues described above on its own, \nBuckeye requests the Commission direct PJM to (i) revise the definition of New Large \nLoads to apply only to data centers, or, in the alternative; (ii) limit the definition of New \nLarge Loads only to loads that are truly new, and exclude incremental growth of existing \n \n24 PJM ICC Comments at 4. \n25 Id."},{"page":10,"startToken":2987,"endToken":3236,"text":"- 10 - \nloads that are served by Self-Supply LSEs that have sufficient resources to meet the \ndemand of the load. At a minimum, the Commission should adopt PJM ICC’s proposal to \nchange the existing New Large Load definition only to only apply to existing load that \nhas increased by 50 MW rather than increased to over 50 MW. \nAs described above, each of these changes would be “consistent with PJM’s \noverarching objectives in this filing.”26 They likewise would not result in an entirely \ndifferent rate design than what PJM has proposed,27 as the core elements of PJM’s IRAS \nproposal would be retained and still apply to the data centers causing the resource \nadequacy issues IRAS is intended to address. \n \n \n \n \n \nDated:  September 18, 2026 \nRespectfully submitted, \n/s/ Jeffrey M. Bayne \nJeffrey M. Bayne \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWashington, DC 20036 \nPhone: (202) 879-4000 \nKurt P. Helfrich \nGeneral Counsel \nLija Kaleps-Clark \nDeputy General Counsel \nBuckeye Power, Inc. \n6677 Busch Boulevard \nColumbus, Ohio 43229 \nTelephone: (614) 681-5151 \nkhelfrich@ohioec.org  \nlkaleps@ohioec.org \nCounsel for Buckeye Power, Inc. \n \n26 PJM Filing, Transmittal Letter at 122. \n27 Old Dominion Elec. Coop., 162 FERC ¶ 61,262, P 35 (2018) (“[T]he Commission may propose revisions \nto a section 205 filing that do not amount to an entirely different rate design or rate scheme, provided that \nthe filing utility consents to the changes.” (citing NRG Power Mktg., LLC v. FERC, 862 F.3d 108, 116-17 \n(D.C. Cir. 2017)))."},{"page":11,"startToken":3236,"endToken":3302,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day caused the foregoing document to be served \nupon each person designated on the official service list compiled by the Secretary in this \nproceeding. \nDated on this 18th day of September, 2026. \n /s/ Jeffrey M. Bayne \nJeffrey M. Bayne \n \nLaw Offices of: \nSPIEGEL & MCDIARMID LLP \n1818 N Street, NW \n8th Floor \nWashington, DC 20036 \n(202) 879-4000"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":509,"startToken":0,"endToken":369},{"p":2,"at":509,"title":"I. MOTION FOR LEAVE TO ANSWER","method":"printed heading","endPage":3,"endAt":7,"startToken":369,"endToken":677},{"p":3,"at":7,"title":"II. ANSWER","method":"printed heading","endPage":4,"endAt":1102,"startToken":677,"endToken":1345},{"p":4,"at":1102,"title":"A. Buckeye is a Self-Supply LSE.","method":"printed heading","endPage":6,"endAt":399,"startToken":1345,"endToken":1879},{"p":6,"at":399,"title":"B. Buckeye supports limiting the definition of New Large Load to","method":"printed heading","endPage":8,"endAt":226,"startToken":1879,"endToken":2462},{"p":8,"at":226,"title":"C. In the alternative, Buckeye supports removing existing loads","method":"printed heading","endPage":9,"endAt":7,"startToken":2462,"endToken":2688},{"p":9,"at":7,"title":"D. At a minimum, the Commission should adopt PJM ICC’s","method":"printed heading","endPage":9,"endAt":1311,"startToken":2688,"endToken":2917},{"p":9,"at":1311,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":0,"startToken":2917,"endToken":3236},{"p":11,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":406,"startToken":3236,"endToken":3302}]}