{"document":{"slug":"rec-20260918-5346","title":"Joint Comments, Request for Clarification and Limited Protest of Coalition of MISO Transmission Customers et al. to Midcontinent Independent System…","issued":"2026-09-18","accession":"20260918-5346","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"CMTC et al.","kind":"protest","file":"sources/filings/text/20260918-5346_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5346","tier":"record","ocr":true,"sha256":"48ecf0be58966e64238e9e5fc99e323aca65821ad43ca87f6f743644fee83cec","pages":23,"tokens":12774,"emptyPages":[],"textThemes":["registry","study"]},"pages":[{"page":1,"startToken":0,"endToken":215,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nMidcontinent Independent System Operator, Inc.\n) Docket No.ER26-3650-000\nJOINT COMMENTS,\nREQUEST FOR CLARIFICATION,\nAND\nLIMITED PROTEST OF THE LARGE ENERGY USERS\nPursuant to the Federal Energy Regulatory Commission's (\"Commission\" or \"FERC\")\nAugust 31, 2026 Combined Notice of Filings #1 and Rule 211 of the Commission's Rules of\nPractice and Procedure,' the Coalition of MISO Transmission Customers iCMTC), the Illinois\nIndustrial Energy Consumers (\"IIEC), the Association of Businesses Advocating Tariff Equity\n(\"ABATE®), the NIPSCO Large Customer Group (\"NLCG), the Louisiana Energy Users Group\n(\"LEUG\"), and the Texas Industrial Energy Consumers (\"TIEC\") (collectively, \"the Large Energy\nUsers') submit these Joint Comments, Request for Clarification, and Limited Protest, to the\nMidcontinent Independent System Operator, Inc. (\"MISO) filing proposing revisions to its Open\nAccess Transmission, Energy and Operating Reserve Markets Tariff (\"Tariff\"), to establish certain\nInterconnection Reliability Requirements for Large Loads (the \"IRR Proposal\"). The Large Energy\nUsers appreciate MISO's work and responsiveness during the stakeholder process, but submit these\nComments and Limited Protest to ensure that the proposed Tariff language is consistent with the\nunderlying interconnection reliability objectives and to ensure that matters that significantly affect\nrates are appropriately delineated in the Tariff and not reserved for future development in business\npractice manuals.\n1 18 CFR § 385.211."},{"page":2,"startToken":215,"endToken":515,"text":"RELEVANT BACKGROUND\nOn August 28, 2026, MISO submitted a Federal Power Action Section 205 rate filing\nproposing revisions to its Tariff in response to the Commission's Order Instituting Proceeding\nUnder Section 206 of the Federal Power Act? On August 31, 2026, the Commission issued\nCombined Notice of Filings #1, which set the deadline for interested parties to file Comments by\nSeptember 18, 2026. CMTC, MLEC, and ABATE filed motions to intervene in the above-\ncaptioned matter on August 31, 2026, September 2, 2026, and September 15, 2026, respectively.\nTEC and the Louisiana Energy Users Group both filed a motion to intervene in the above-captioned\nmatter on September 14, 2026. TIEC filed a doc-less intervention on September 17, 2026. NLCG\nplans to file a doc-less intervention on September 18, 2026.\nThe Large Energy Users are a collection of ad hoc associations of large industrial and\ninstitutional end-users of electricity that consume substantial amounts of electricity at various\nfacilities throughout the MISO footprint. Members operate one or more manufacturing or large,\nenergy-intensive facilities in the MISO region and purchase electric delivery service or bundled\nelectric service from at least one MISO transmission owner. The Large Energy Users will be\ndirectly affected by the outcome of this proceeding and have been active stakeholders contributing\nto the Large Load Working Group, which informed MISO's development of the Tariff proposals.\nThe Large Energy Users greatly appreciate MISO's efforts to incorporate multiple\nstakeholder perspectives into the proposed Tariff revisions. Stakeholder feedback has significantly\ninfluenced the revised Tariff language and supports overall system reliability. While great strides\nhave been made towards consensus, under significant time and resource constraints, the Large\n2 Midcontinent Independent System Operator, Inc., Order Instituting Proceeding Under Section 206 of the Federal\nPower Act, 195 FERC 1 61,212 (2026) (#Show Cause Order).\n2"},{"page":3,"startToken":515,"endToken":862,"text":"Energy Users file these brief Comments requesting clarification, and file a Limited Protest\nrequesting revised Tariff language.\nEXECUTIVE SUMMARY\nThe Large Energy Users appreciate the collaboration resulting from the Large Load\nWorking Group and MISO's willingness to listen to stakeholder concerns. These Comments focus\non two topics where the Large Energy Users submit that clarifications are necessary to ensure just\nand reasonable practices affecting rates and to avoid adverse economic consequences and\nunnecessary regulatory burdens to large loads, especially existing manufacturing and institutional\nloads that have not triggered the regulatory and legislative efforts responding to concerns associated\nwith high-impact, large computational loads. First, the proposed tariff language in Section 37A\nII.2(a) lacks an explicit exemption for existing loads in service that experience incremental growth\nof less than 25 MW in total. Second, the proposed tariff language in Section 37A.4 is ambiguous\nand, if not clarified, creates the possibility of burdensome real-time forecasting requirements for all\nLarge Loads including conforming or non-computational loads' where the terms of such real-time\nforecasting requirements are not specified in the tariff, contrary to the Commission's Rule of\nReason requiring that practices that significantly affect rates must be clearly delineated in the legally\nbinding tariff on file with the Commission and not left to implement through non-binding guidance\nat MISO's discretion (i.e., business practice manuals). The Large Energy Users emphasize that,\nbecause current reliability efforts undertaken by the North American Electric Reliability\nCorporation (\"NERC\") and federal legislation in the Ratepayer Protection Act focus on addressing\n3 Similar to SPP's approved Tariff definitions and different reliability forecast requirements between Conforming\nLoad that is reasonably predictable and Non-Conforming Load that does not follow a predictable pattern, MISO's\nproposed Tariff changes are to be applied differently depending on whether the Large Load consists of\nComputational Load or instead is a traditional non-computational load, where the former is less predictable and\npresents a greater risk to reliability that the National Electric Reliability Corporation is creating standards to address.\n4 See https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads (last\naccessed Sep. 17, 2026).\n3"},{"page":4,"startToken":862,"endToken":1227,"text":"large computational loads, the Commission must avoid approving unnecessary new regulations\nand requirements for traditional manufacturing loads and non-computational loads.\nII. _ COMMENTS AND LIMITED PROTEST®\nA. The Commission Should Require MISO to Clarify Exemption Scenarios in\nSection 37A I1.2 - Fully Exempt Large Load.\nMISO's proposed Tariff language includes transition provisions which exempt certain\nLarge Loads. Section 37A II.2, subsection (a) states, \"A Large Load that has a Service\nCommencement Date on or prior to December 4, 2026, shall be exempt from all requirements set\nforth in this Section 37A with respect to the portion of the Large Load that has procured\nTransmission Service as of the Service Commencement Date. Any modification or series of\nmodifications to a Load that meets the MTEP/EPR Condition, which results in a cumulative\nincrease of 25 MW or more in Transmission Service for such Load and with a Service\nCommencement Date after December 4, 2026, shall be subject to subsection (2)(b) belowi\nConsistent with the feedback and MISO tariff drafts during the discussion of this issue\nthrough the Large Load Working Group, it was represented by MISO and understood by the Large\nEnergy Users that existing loads in service were to be exempt from the new requirements until an\nexisting load grew by 25 MW or more, at which point the incremental amount of the Large Load\nwould be subject to the applicable requirements provided the resulting total load of the customer\nis 50 MW or more. Based on the proposed Tariff language, the Large Energy Users request that\neither MISO agree to clarify the proposed Tariff language or that FERC direct MISO to clarify the\n5 See Exhibit A (federal legislation proposing a new federal standard for large loads that require electric energy\nẠprimarily to operate information technology infrastructure and related systems pertaining to data storage and\ncomputational applications and servicesẠi).\n• The Large Energy Users are generally supportive of MISO's filing, but have discrete substantive concerns, thus\nnecessitating requests for clarification and a Limited Protest, especially given our request for revised tariff language.\n7 Midcontinent Independent System Operator, Inc.'s Interconnection Reliability Requirements for Large Loads, Tab\nA, Docket No. ER26-3650-000 (August 28, 2026).\n4"},{"page":5,"startToken":1227,"endToken":1678,"text":"proposed Tariff language to ensure that growth from existing loads is exempt from the new\nproposed requirements, regardless of the timing of the increase, until such growth reaches 25 MW\nby specifically including the exemption condition of increases less than 25 MW. To accomplish\nthis objective, the Large Energy Users propose the following additional redlined language:\n(2) A Transmission Customer taking Transmission Service on behalf of a Large Load shall\nensure that all Large Load shall be subject to all the requirements as set forth in this\nSection 37A, provided that:\nFully Exempt Large Load:\nA Large Load that has a Service Commencement Date on or prior to\nDecember 4, 2026, shall be exempt from all requirements set forth in this\nSection 37A with respect to the portion of the Large Load that has procured\nTransmission Service as of the Service Commencement Date, and shall also\nbe exempt from these requirements for modifications that result in a\ncumulative increase in the Load of less than 25 MW after December 4,\n2026. Any modification or series of modifications to a Load that meets the\nMTEP/EPR Condition, which results in a cumulative increase of 25 MW or\nmore in Transmission Service for such Load and with a Service\nCommencement Date after December 4, 2026, shall be subject to subsection\n(2)(b) below. Any modification or series of modifications to a Load that\ndoes not meet the MTEP/EPR Condition, which results in a cumulative\nincrease of 25 MW or more in Transmission Service for such Load and with\na Service Commencement Date after December 4, 2026, shall be subject to\nsubsection (2)(c) below.\nIf the above Tariff language is clarified, we respectfully submit that those proposed Tariff\nprovisions would then be just and reasonable. Accordingly, the Large Energy Users ask FERC to\ndirect MISO to clarify this language. Such directed clarification could occur through the issuance\nof a deficiency notice rather than outright rejection of the entire filing without prejudice.\nB.\nThe Commission Must Not Impose Unreasonably Onerous Real Time\nForecasts in Section 37A.4 for Non-Computational Loads\n& \"FERC may accept or reject the proposal. But as this Court has held, Section 205 does not authorize FERC to impose\na new rate scheme of its own making without the consent of the utility or Regional Transmission Organization that\nmade the original proposal.\" NRG Power Mktg., LLC v. FERC, 862 F.3d 108, 114 (D.C. Cir. 2017). However, FERC\nmay issue a deficiency notice signaling that a Section 205 filing may be acceptable if certain deficiencies, such as\ntariff language issues, are addressed and cured. See Midcontinent Indep. Sys., 196 FERC 1 61,134 at PP. 56-58, 104-\n106 (2026).\n5"},{"page":6,"startToken":1678,"endToken":2075,"text":"1. A five-minute real-time forecasting requirement, as applied to non-\ncomputational Large Loads, is unnecessary to ensure system reliability and\nhas not been demonstrated to be just and reasonable given such a\nrequirement would inflict unjustified significant burdens? and costs on end\nusers and manufacturers.\nSection 37A.4 of the Proposed Tariff includes Large Load Forecast Data Requirements as\nfollows, \"Prior to the later of the Service Commencement Date of a Large Load or September 1,\n2027, a Transmission Customer taking Transmission Service on behalf of a Large Load must\nprovide day(s) ahead and real-time Load Forecasts for a Large Load directly to the Transmission\nProvider to support the Reliability Assessment Commitment (RAC) and Security Constrained\nEconomic Dispatch (SCED) processes, along with other reliability studies. The Load Forecasts\nshall be updated to reflect the most current information on the expected Demand, in accordance\nwith the Business Practices Manual for Large Loadại\nThis section appears to require a real-time forecast to support SCED, which implies a real-\ntime forecast updated every five minutes although this time interval requirement is not explicitly\nstated in the proposed Tariff language. Requiring real-time five-minute interval forecasts for a six-\nhour basis, updated every five-minutes'\", would impose a substantial continuous operational,\nanalytical, and costly burden for Large Loads to provide without clear evidence that it will improve\nthe risks of inaccuracies within MISO's Reliability Assessment Commitment, Look Ahead\n° In defining a significant burden for the proposed real-time forecast, end users would need to acquire/assign staff\nwith technical expertise to a new function to compute and submit data to MISO, or to the MISO Transmission\nCustomer, every five minutes twenty-four hours a day on a going forward basis with unknown methods to\npotentially automate this work at additional expense. End user staff would need to forecast their operations and\nresultant load values for not just a single day but compute a breakdown of this into 12 five-minute intervals per hour\nof granularity, for each and every future hour, and submit this electronically with updates of the forward 72 five-\nThis detail of this real-time forecast requirements has been proposed in Section 3.2.1 of MISO's Business\nPractices Manual #25 at the 8/25/26 Large Load Working Group meeting, available via the link below.\nhttps://cdn.misoenergy.org/20260827%20LLWG%20Item%2011%200perational%20Forecasting%20BPM-025-\nr14%20Draft 20(LLWG-2026-4A)771225.pdf"},{"page":7,"startToken":2075,"endToken":2409,"text":"Commitment, or real time Security Constrained Economic Dispatch processes when compared to\nMISO's current method of forecasting existing non-computational loads for these processes.\nThe FERC Show Cause Order included a concern that the reliability of the transmission\nsystem could be at risk without greater visibility of Large Load additions; however, the Show\nCause Order did not specify the real-time forecast requirement in the manner currently proposed\nby MISO in the proposed Tariff languageại Such real-time forecasting for all load, especially\nnon-computational load, is significantly burdensome and unnecessary, and MISO has not met its\nburden under Section 205 of the Federal Power Act to justify the need for this requirement. The\nLarge Energy Users submitted further Joint Comments regarding this concern in the context of the\nLarge Load Working Group, which is attached hereto as Exhibit B.\n2. Specific details regarding the real-time forecasting requirement are\ninappropriately delegated to the Business Practices Manual.\nThe proposed language of Section 37A.4 of the Tariff imprecisely requires the forecasts to\n\"be updated to reflect the most current information\" but does not include enough clarity for\naffected market participants (and ultimately affected end users) to understand the significance of\nthe requirements and fails to explicitly indicate that MISO intends to impose not just an hourly\nreal-time load forecast requirement on non-computational and computational Large Loads, but\nalso a five-minute interval real-time load forecast requirement. Instead, MISO has deferred\ndevelopment of the specific requirements to the non-binding Business Practices Manual. Such a\ndeferral is inappropriate when a requirement has the ability to inflict significant burdens and costs\non a market participant (which are then imposed on the end-user).\n\" Show Cause Order at P 64 noted a concern that \"MISO's Tariff does not require transmission customers to\nprovide MISO hourly forecasts, telemetry data, and other data to ensure sufficient visibility..ạồi Emphasis added on\nhourly as the Commission concern did not require consideration of more granular five-minute forecasts nor the\nconsideration of benefits versus the costs of providing such.\n7"},{"page":8,"startToken":2409,"endToken":2747,"text":"In City of Cleveland v. FERC, 249 U.S. App. D.C. 162, 773 F.2d 1368 (D.C. Cir. 1985),\nthe D.C. Circuit Court of Appeals held that utilities must file, \"only those practices that affect rates\nand service significantly, that are realistically susceptible of specification, and that are not so\ngenerally understood in any contractual arrangement as to render recitation superfluous.\"12 This\ndoctrine, known as the Rule of Reason, requires utilities to file with FERC practices that\nsignificantly affect rates and service, and are easily reduced to writing. While the Rule of Reason\nrecognizes that there is an infinitude of practices affecting rates and services, 13 and affords the\nCommission ample discretion to apply the rule as it sees fit, this discretion is not unlimited. In\nKeyspan-Ravenswood, LLC V. FERC, the D.C. Circuit Court of Appeals found that The New York\nIndependent System Operator's (\"NYISO) method for translating installed capacity into unforced\ncapacity should have been filed with FERC because the translation methodology reduced the\ninternal reserve margin by nearly a third which significantly affected its compliance with reliability\nrules set by the New York State Reliability Council. 4\nAs discussed herein, a five-minute interval real time forecasting requirement is a costly\nand burdensome proposal that would substantially affect rates and services and specifically the\noperational costs of manufacturers across the Midwest. Similarly to NYISO's conversion\nmethodology at issue in Keyspan-Ravenswood, LLC v. FERC, the real time forecasting specifics\nproposed in MISO's Tariff should be filed with FERC. As such, the details regarding the real time\nforecasting requirement should be detailed in the Tariff, not in the Business Practices Manual.\nAnd when the details are filed with FERC, new forecasting requirements must be just and\nreasonable practices affecting rates. Taken together with undue burden that would be imposed on\n12 City of Cleveland v. FERC, 249 U.S. App. D.C. 162, 773 F.2d 1368, 1376 (D.C. Cir. 1985).\n13 Id.\n14 Keyspan-Ravenswood, LLC v. FERC, 474 F.3d 804 (2007)."},{"page":9,"startToken":2747,"endToken":2976,"text":"non-computational Large Loads by a five-minute interval real-time load forecast requirement,\nFERC should clarify that any approval of MISO's proposed real-time load forecast requirement in\nthis proceeding is limited to requiring an hourly load forecast. If MISO wishes to purse a five-\nminute real-time load forecast requirement, it must do so in a separate new filing with the\nCommission explicitly requesting such a requirement - it may not impose such an additional\nrequirement through its Business Practice Manuals alone.\nTV. CONCLUSION\nWHEREFORE, the Coalition of MISO Transmission Customers, the Illinois Industrial\nEnergy Consumers, Association of Businesses Advocating Tariff Equity, the NIPSCO Large\nCustomer Group, the Louisiana Energy Users Group, and the Texas Industrial Energy Consumers\nrespectfully request that the Commission consider these Comments and direct MISO to clarify the\nproposed tariff language, or, in the alternative, issue a Deficiency Notice directing MISO to\nprovide clarification regarding the issues discussed above.\nRespectfully submitted,\ns/ Kenneth R. Stark\nKenneth R. Stark\nVictoria A. Geddis\nRebecca Kimmel\nMcNees Wallace & Nurick LLC\n100 Pine Street\nHarrisburg, PA 17101\nTelephone: (717) 237-8000\nkstark(@mcneeslaw.com\nvgeddis@mcneeslaw.com\nrkimmel(@mcneeslaw.com\nCounsel to the Coalition\nTransmission Customers\n/s/ Katherine L. Coleman\nKatherine L. Coleman\nJohn Russ Hubbard\nO'Melveny & Meyers LLP\n303 Colorado St., Suite 2750\nAustin, TX 78701\nPhone: (737) 261-8600\nkcoleman@omm.com\njhubbard@omm.com\nAttorneys for Texas Industrial Energy\nConsumers\nof MISO"},{"page":10,"startToken":2976,"endToken":3118,"text":"/s/ Edward Fitzhenry\nEdward Fitzhenry\nAttorney at Law\nedfitzhenrylaw@gmail.com\n(314) 707-1212\nCounsel to the Illinois Industrial Energy\nConsumers\ns/ Benjamin J. Holwerda\nBenjamin J. Holwerda (P82110)\nClark Hill PLC\n215 South Washington Square, Suite 200\nLansing, MI 48933\nPhone: (517) 318-3012\nbholwerda@clarkhill.com\nCounsel to the Association of Businesses\nAdvocating for Tariff Equity\nDate: September 18, 2026\n/s/ Randy Young\nRandy Young (#21958)\nCarrie R. Tournillon (#30093)\nGordon D. Polozola (#23900)\nKEAN MILLER LLP\nPost Office Box 3513\nBaton Rouge, LA 70821\nPhone: (225) 387-0999\nrandy.young@keanmiller.com\ncarrie.tournillon@keanmiller.com\ngordon.polozola@keanmiller.com\nAttorneys for Louisiana Energy Users Group\n/s/ Joseph P. Rompala\nJoseph P. Rompala, Ind. Atty. No. 25078-49\nLEWIS & KAPPES, P.C.\nOne American Square, Suite 2500\nIndianapolis, Indiana 46282-0003\nTelephone: (317) 639-1210\nJRompala(@Lewis-Kappes.com\nCounsel to NIPSCO Large Customer Group\n10"},{"page":11,"startToken":3118,"endToken":3169,"text":"CERTIFICATE OF SERVICE\nI hereby certify that I have this day served the foregoing document upon each person\ndesignated on the official service list compiled by the Secretary in this proceeding. Dated this 18th\nday of September 2026.\nIs/ Victoria A. Geddis\nCounsel to the Coalition of MISO\nTransmission Customers\n11"},{"page":12,"startToken":3169,"endToken":3171,"text":"Exhibit A"},{"page":13,"startToken":3171,"endToken":4520,"text":"H5656\nKamlager-Dove\nKaptur\nKeating\nKelly (IL)\nKennedy (NY)\nKhanna\nKrishnamoorthi\nLandsman\nLẺrsen (WA)\nLarson (CT)\nLatimer\nLee (NV)\nLee (PA)\nLeger Fernandez\nLevin\nLiccardo\nІЛен\nLofgren\nLynch\nMagaziner\nMannion\nMatsui\nMeBath\nMcBride\nMcClain Delaney\nMcClellan\nMcCollum\nMcDonald Rivet\nMcGarvey\nMcGovern\nMcIver\nMeeks\nMejia\nMenefee\nMenendez\nMeng\nMfume\nMin\nMoore (WI)\nMorelle\nMorrison\nMoskowitz\nMoulton\nMrvan\nMullin\nNadler\nNeal\nNeguse\nNorcrosa\nNorman\nOcasio-Cortes\nOlszewski\nOmar\nPallone\nPanetta\nPappas\nPelosi\nPeters\nPettersen\nPingree\nPocan\nPou\nPressley\nQuigley\nKamirez\nRandall\nRaskin\nRiley (NY)\nRivas\nKuiz\nDonalds\nDunn (FL)\nGaramendi\nSalinas\nSanchez\nSeanlon\nSchakowsky\nSchneider\nScholten\nSchrier\nScott (VA)\nNOT VOTING 8\nHoyle (OR)\nMills\nRoy\nSewell\nSherman\nSimon\nSorensen\nSoto\nStansbury\nStanton\nStevens\nStrickland\nSubramanyam\nSuozzi\nSykes\nTakano\nThanedar\nThompson (CA)\nThompson (MS)\nTitus\nTlaib\nTokuda\nTonko\nTorres (CA)\nTorres (NY)\nTrahan\nTran\nUnderwood\nVargas\nVasquez\nVeasey\nVelâzquez\nVindman\nWahab\nWalkinshaw\nWasserman\nSchultz\nWaters\nWatson Coleman\nWhitesides\nWIlliams (GA)\nWilson (FL)\nSmith (WA)\nTiffany\nANNOUNCEMENT BY THE SPEAKER PRO TEMPORE\nThe SPEAKER pro tempore (during\nthe vote). There are 2 minutes remain-\ning.\n• 1727\nSo the resolution was agreed to.\nThe result of the vote was announced\nas above recorded.\nA motion to reconsider was laid on\nRECOGNIZING MEGAN BEL MILLER\n(Mr. SCALISE asked and was given\npermission to address the House for 1\nMr. SCALISE. Mr. Speaker, I rise\nleadership, service, and friendship have\nmeant so much to me, Team Scalise,\nand the people of southeast Louisiana.\nI am talking about my chief of staff\nand senior leadership adviser, Megan\nMegan has been part of my team\nfrom the very beginning. In fact, when\nI was first elected to Congress, she was\nthe very first person that I hired.\nAs my then-legislative director and\nlongtime Energy and Commerce Com-\nmittee staffer, Megan helped lead our\nwork on some of the biggest issues fac-\ning not only our district but the Na-\ntion, including energy and healthcare.\nAfter the Deepwater Horizon\naster, she played a critical role in\ndrafting and passing the RESTORE Act\nto help Louisiana communities recover\nWhen Megan first left our office in\n2013, I stood right here on this House\nCONGRESSIONAL RECORD - HOUSE\nSeptember 15, 2026\nfloor to recognize her service and said (H.R. 9340) to amend the Public Utility\nshe was leaving foriạibigger and better\nRegulatory Policies Act of 1978 to es-\nthingsạẠại\ntablish a Federal standard relating to\n• 1730\nLuckily for me, those bigger end bet-\nter things eventually led Megan back\nto Capitol Hill, this time as the chief of\nstaff for my personal office in 2017.\nJust months later, when I was shot, I\ncame to rely on Megan in ways that\nnone of us could have imagined.\nThrough it all, Megan's leadership\nand friendship never wavered, and Jen-\nnifer and I will always be grateful for\nthe way she helped my family and our\nteam make it through that challenging\nthe recovery of the full, incremental\ncosts of upgrades that serve large-load\ncustomers, and for other purposes, as\namended\nThe Clerk read the title of the bill.\nThe text of the bill is as follows:\nH.R. 9340\nBe it enacted by the Senate and House of Rep-\nresentatives of the United States of America in\nCongress 1ssembled,\nSECTION 1. SHORT TITLE.\nThis Act may be cited as the \"Ratepayer Pro-\nOver the years, Megan has also been\nsomeone I have relied on for her exper-\ntise on policy and knowledge of this in-\nstitution. She has become known for\nher deep knowledge of policy and proc-\ness, her strong relationships on both\nsides of the aisle, and her ability to\nbring people together.\nShe played a key role in helping se-\ncure a provision in the working fami-\nlies tax cut that increases the amount\nof revenue-sharing dollars that Lou-\nisiana and other Gulf Coast States re-\nceive each year from offshore drilling.\nMegan has always been someone I\ncould count on for good aavice, sound\njudgment, and an unwavering commit-\nment to the people we serve.\nthe \"Geaux Getter be-\ncause no matter what the problem is\nthat we have to solve, Megan just finds\na way to get it done. Her impact can be\nseen not only in the policies that she\nshaped, but in the countless constitu-\nents she helped and staff members that\nshe mentored along the way.\nMr. Speaker, I can't thank Megan\nenough for everything she has done for\nme, our office, and the American peo-\nLARGE-LOAD CUSTOMERS.\n(a) FEDERAL STANDARD RELATING TO LARGE-\nLOAD CUSTOMERS.-Section 111(d) of the Public\nUtility Regulatory Policies Act of 1978 (16 U.S.C\n2621(d)) is amended by adding at the end the\nSTANDARDS FOR LARGE-LOAD CUS-\n\"(A) RECOVERY OF FULL, INCREMENTAL COST\nOF UPGRADES.—A rate charged, or entered into,\nby an electric utility for providing electric serv-\nice to a lorge-load customer shall be designed to\nrecover from the large-load customer the full, in-\ncremental cost of any generation, transmission.\nor distribution upgrade necessary to serve the\nload of such large-load customer, including in\nthe event of such large-load customer termi-\nnating a contract or other agreement with the\nelectric utility pertaining to the sale of electric\nenergy, or otherwise ceasing the purchase of\nelectric energy from the electric utility.\n*(B) FINANCIAL ASSURANCES AND CONTRIBU-\nTIONS.-Before making any generation, trans\nmission, or distribution upgrade that is nec\nessary to serve the load of a large-load cus-\ntomer, an electric utility shall require the large-\nload customer provide to the electric utility fi-\nnancial assurances or contributions to cover the\nC) LARGE-LOAD CUSTOMER DEFINED.\nparagraph, the term 'large-load customer' means\na non-residential electric consumer that, on or\nafter the date of the enactment of this para-\ngraph, requests to enter into, or enters into, a\nThirteen years ago, I stood on this\ncontract or other agreement pertaining to the\nfloor, and I said I would miss her, as\nsale of electric energy for one or more facilities\nshe went on\nbigger and better\nthings. Today, I find myself saying it\nagain. It has been a privilege to work\nalongside her all of these years and an\ngreater privilege to call her a\nJennifer and I wish Megan, Joel,\nParker, and Caroline all the best in\nMegan and all of her friends and family\nANNOUNCEMENT BY THE SPEAKER\nPRO TEMPORE\nThe SPEAKER pro tempore (Mr.\nHARRIS of North Carolina). Pursuant to\nclause 8 of rule XX, the Chair will post-\npone further proceedings today on mo-\ntions to suspend the rules on which a\nrecorded vote or the yeas and nays are\nordered, or votes objected to under\nclause 6 of rule XX.\nThe House will resume proceedings\non postponed questions at a later time.\nRATEPAYER PROTECTION ACT\nMr. GUTHRIE. Mr. Speaker, 1 mov\nto suspend the rules and pass the bil\n\"(i) require electric energy primarily to oper-\nate information technology infrastructure and\nrelated systems pertaining to data storage and\ncomputational applications and services; and\nẠạẠii) have, in the aggregate, a peak electric\ndemand of 100 megawatts or more at a single site\nor campus.\".\n(b) CONFORMING AMENDMENTS.\n(1) OBLIGATIONS\nTO CONSIDER AND DETER-\nMINE.-\n-Section 112 of the Public Utility Regu-\nlatory Policies Act of 1978 (16 U.S.C. 2622) is\namended\n(A) in subsection (b), by adding at the end the\nfollowing:\nẠỗẠạ9)(A) Not later than 1 year after the date of\nenactment of this paragraph, each State regu-\nlatory authority (with respect to each electric\nutility for which the State has ratemaking au-\nthority) and each nonregulated electric utility\nshall commence consideration under section 111\nor set a hearing date for consideration, with re-\nspect to the standard established by paragraph\n(22) of section 111(d).\nẠỊB) Not later than 2 years after the date of\nenactment of this paragraph, each State regu-\nlatory authority (with respect to each electric\nutility for which the State has ratemaking au-\nthority) and each nonregulated electric utility\nshall complete the consideration and make the\ndetermination under section 111 with respect to\nthe standard established by paragraph (22) of\nsection 111(d.).iạị:"},{"page":14,"startToken":4520,"endToken":5958,"text":"September 15, 2026\n(i) by striking subsection (b)(2) and insert-\ning \"subsection (b)i; and\n(ii) by insertingẠạIn the case of the standord\nestablished by paragraph (22) of section 111(d),\nthe reference contained in this subsection to the\ndate of enactment of this Act shall be deemed to\nbe a reference to the date of enactment of that\nparagraph (22).\" after 'paragraph (21).\"; and\n(C) by odding at the end the following:\nCONGRESSIONAL RECORD - HOUSE\nthat we need it to develop here at home Big Tech and other data center owners\nand not in China. H.R. 9340 takes ac-\nfor the energy use and de-\ntion on behalf of our constituents so we\nthat they create. The bill re-\nmay keep costs low while ensuring the\nquires State utility regulators to con-\nU.S. leads in the next-generation econ-\ndating that the electricity prices that\nIf we cede the race for AI dominance\ndata centers pay fully account for all\nto China, then China will set the stand-\ntheir costs that they impose on the\nards for future technology. This bill\ngrid. This includes new and upgraded\nstrikes the right balance of providing a\nhigh-voltage\nsections (b) and (c) shall not apply to the stand-\nard established by paragraph (22) of section\nmodest but important level of account-\nmission lines, and local power lines.\n111(d) in the case of any electric utility in a\nability as we continue to support this\nState if, before the date of enactment of this\nvital industry.\nMr. Speaker, I thank my friend from\nWe can all agree that data centers\nmust pay their fair share and that the\n\"(1) the State has implemented for the electric\nutility the standard (or a comparable standard);\n\"(2) the State regulatory authority for the\nStute or the relevant nonreguloted electric util-\nity has conducted a proceeding to consider im-\nplementation of the standard (or a comparable\nstandard) for the electric utility; or\n\"(3) the State legislature has voted on the im-\nplementation of the standard (or a comparable\nstandard) for the electric utility.\".\n(2) PRIOR AND PENDING PROCEEDINGS.-Section\n124 of the Public Utility Regulatory Policies Act\nof 1978 (16 U.S.C. 2634) is amended by adding at\nthe end the following:ẠIn the case of the stand-\nard established by paragraph (22) of section\n111(d), the reference contained in this section to\nthe date of enactment of this\ndeemed to be a reference to the date of enact-\nment of that paragraph (22).\".\nThe SPEAKER pro tempore. Pursu-\nant to the rule, the gentleman from\nKentucky (Mr. GUTHRIE) and the gen-\ntleman from New Jersey (Mr. PALLONE)\neach will control 20 minutes.\nThe Chair recognizes the gentleman\nfrom Kentucky.\nColorado again for his tireless bipar-\ntisan leadership on this issue. He is\ntogether both sides of the\naisle on a critical issue. I would say, we\nwere home, working in our districts in\nAugust. We listened to our constitu-\nents, and we are here today based on\nwhat we heard, taking action here in\nWashington, D.C. That is how our sys-\nagree, but this bill, I do believe, is one\nsmall step in that direction.\nThe bill, as I said, isn't perfect. It\nalso only addresses one small part of\nthe puzzle. It does not change how\nwholesale generation or transmission\ncosts are allocated at the Federal level.\nIt doesn't push for the transparency\ntem is supposed to work\nMr. Speaker, I urge my colleagues to\nsupport this legislation, and I reserve\nState regulators need to ensure that\ndata centers actually are paying their\nthe balance of my time.\nMr. PALLONE. Mr. Speaker, I yield\nmyself such time as I may consume.\nI rise in support of H.R. 9340, the\nRatepayer Protection Act. Everyone\nknows that data centers are helping\ndrive electricity prices to record highs\nthis year. Just in the mid-Atlantic\nover the past few years, data centers\nhave increased electric bills by over $30\nData centers must bring their own\nclean electricity generation capacity\nonto the grid and be willing to get cur-\ntailed first when there are grid reli-\nability issues.\nNow, Representative LANDSMAN from\nOhio has a bill that would kick FERC\ninto gear to start studying some of\nthose issues. It passed the Energy and\nbillion. By and large, it has not been\nthe data centers that have been footing\nnearly 2 months ago, but unfortu-\nthe bill. It has been our constituents.\nMr. GUTHRIE. Mr. Speaker, I ask\nThis problem is happening across the\nnately, House Republican leadership\ndid not include that bill on the floor\nunanimous consent that all Members\nNation, from Texas to California, from\nmay have 5 legislative days to revise\nFlorida to Washington State. It doesn't\nRegardless of what happens with this\nand extend their remarks and include\nmatter if you are in a red State or a\nbill in the Senate, I will make a com-\nextraneous material on H.R. 9340.\nblue State. Your prices have gone up.\nThe SPEAKER pro tempore. Is there\nAmericans, Mr. Speaker,\nmitment to the American people, Mr.\nSpeaker. Americans across the country\nobjection to the request of the gen-\ncerned about what data centers and Big\nare furious about the unchecked devel-\ntleman from Kentucky?\nTech's push for more AI means for\nopment of data centers and artificial\nThere was no objection.\ntheir communities, jobs, property val-\nintelligence. They\nMr. GUTHRIE. Mr. Speaker, I yield\nues, and the future. Dlectricity prices\nwhat it means for their communities,\nmyself such time as I may consume.\nare skyrocketing. The electric grid is\nfor their jobs, or even for their lives. I\nMr. Speaker, I rise in support of H.R.\nstrained. Our clean air and water are\n9340, the Ratepayer Protection Act,\nbeing polluted. Noise is wearing on our\npromise that this bill is not the end of\nsponsored by my colleague and friend\ncommunities' health and patience.\nour focus on these issues. It is only the\nfrom Colorado, Congressman EVANS.\nPeople, frankly, are sick and tired of\nI have repeatedly said that we need\nThis bill encourages States to pro-\nstrong guardrails on data centers and\ntect our neighbors and small businesses\nbillionaires taking over their\nthe impact they have on our commu-\nfrom footing the bill for infrastructure\nneighborhoods and threatening their\nnities, our environment, and our bills.\ninvestments needed for the Al race,\nutility bills, air, water, and property.\nIf we can't establish\nthose strong\nwhile protecting existing\nUnfortunately, these very real con-\nguardrails, then it is my belief that we\nthorities. The evidence is clear: When\ncerns are repeatedly swept to the side-\nwill need to establish a moratorium on\nStates have the proper processes in\nlarge-load data\nhouseholds, centers\nlines, minimized, or ridiculed by Presi-\nTrump and Republican congres-\nconstructing new data centers.\nThis bill by itself, or even in com-\nsional leaders.\nbination with a number of other bills\nhave positive benefits for the commu-\nLast month, Trump posted on social\nwe are considering this week, is simply\nnities in which they reside.\nmedia that communities that opposed\nnot enough, but it is a start.\nData center growth can be a catalyst\ndata centers must want to end up being\nMr. Speaker, I urge my colleagues to\ninvestment in\nbackward and poor. The President, in\nsupport the bill, and I reserve the bal-\nstrengthening the tax base to fund es-\nmy opinion, is out of touch on this\nance of my time.\nsential public services and anchor ten-\nissue, and the American people are de-\nMr. GUTHRIE. Mr. Speaker, I yield 1\nants for utilities that lower rates for\nmanding action. That is the reality we\nminute to the gentleman from Lou-\neveryone else.\nare living in right now, where Presi-\nisiana (Mr. SCALISE), the distinguished\nElectricity demand is growing at a\ndent Trump wants to continue to give\nmajority leader and my good friend\npace not seen since World War II, and\nBig Tech free rein to build data cen-\nMr. SCALISE. Mr. Speaker, I thank\nare rightly concerned\nters, with no Federal guardrails.\nmy friend and the chairman of the\nabout what this might mean for their\nThis bill is a start in addressing the\nHouse Energy and Commerce\nimpact that data centers have on our\nmittee (Mr. GUTHRIE) for yielding.\nAs this industry continues to de-\npower bills, but this particular bill\nMr. Speaker, I rise in support of this\nvelop, I want to be absolutely clear\ndoes not go far enough to ensure that really important bill by my friend Mr."},{"page":15,"startToken":5958,"endToken":7373,"text":"CONGRESSIONAL RECORD - HOUSE\nSeptember 15, 2026\nEVANS from Colorado who led on this\nbut the data center is still being built.\nall one party, either Republican or ei-\nIt is up to about $50 billion in private\nther Democrat. The States that have\nMr. Speaker, we are talking about\nfunding that is being built in little\nall unified Democratic Party control in\nthe latest advancement in technology.\nthose States actually have higher elec-\nIf you think about the history of this\nAs they are building that data cen-\ntricity costs than States that have all\ngreat Nation as we celebrate 250 years\nter, because of all of the increased sales\nAmerica, one of the things\ncollections\nto Richland Parish,\nThe Institute for Energy Research\nAmerica has been so successful at has\nthey were able to give a bonus. I am\ndid the study. You can go find it on-\nbeen always being on the frontier of\nnot talking about the base salary of\nline. It shows you State by State the\nnew innovations. In fact, in the last 150\nschoolteachers. They\nkilowatt-per-hour cost. The reason it is\nyears, America has led the world in ad-\nbonus to every schoolteacher in Rich-\nrising is because a lot of those States\nvancements in technology.\nland Parish because of the building of\nthat have unifed Democratic govern-\nToday is no different. In fact, today,\nthat data center.\nment are also States that are losing\nAmerica is at the heart of the domina-\nMr. Speaker, do you know how much\npopulation. Some hundreds of thou-\ntion of technology all around\nevery schoolteacher in Richland Parish\nsands to nearly millions of people have\nworld. If you think about some of the\nreceived a few months ago because of\nfled those States. As those States lose\nsimplest things we are able to do in our\nthe data center? They received a bonus\npopulation because of bad policies, Mr\nlives, that give us the ability to have\nof $50,000 per teacher because of the\nSpeaker, their baseload capacity is the\nmore free time, or the things you can\ndata center.\nsame. The cost to run their grid is the\ndo on a cell phone that would have\nThose are the stories that you are\nsame. It is spread amongst fewer people\ntaken a supercomputer 30 years ago to\nseeing in communities that have em-\nbecause their bad policies are running\ndo, that is because of advancements in\nbraced it, where they worked with the\nhundreds of thousands or a million-plus\nlocal community. It is not a burden on\npeople out of the State.\nArtificial intelligence and data cen-\nthat community. It is actually a tre-\nThe States that are growing, that\nters are no different. It is another ad-\nmendous benefit.\nNot only teachers\nvancement in technology. As we are\nwill benefit, but small businesses are\nthat are attracting people and jobs,\nadvancing in technology, we have to do\nthose States have lower kilowatt-per-\nit the right way, Mr. Speaker, in a\nLoudoun County in Virginia,\nhour costs for their consumers because\nsmart and thoughtful way. If you look\nSpeaker, is another community\nthe same grid has the same fixed costs,\nat communities that have embraced\nmade the decision for themselves. It is\nbut there is more people to spread the\ndata centers, some communities said it\nnot a Washington choice. It is a local\ncost around so those people pay less.\nis not for me, and that is a choice com-\ncommunity choice, and I think every-\nThat is what actually is happening in\nmunities make.\nbody would agree with that. If there\nthis country. Look at all the States\nThe Federal Government is not the\nare local communities that don't want\nGo look at the Institute for Energy Re-\none making that decision.\nit, believe me there are other commu-\nsearch study, Mr. Speaker, because it\nhave always said, and what President\nnities that will take those benefits.\nshows you what is really happening out\nTrump took the leadership in doing, is\nLoudoun County in Virginia got the\nmeeting with all of the Big Tech com-\nbenefits of their data centers to the\nThere is a revolution\npanies building these massive data cen-\ntune of a 30 percent reduction in prop-\nChina is competing, and America is\nters and said just make sure as you are\ntaxes for every homeowner in\ncompeting. We surely do not want\nmaking these big investments in com-\nLoudoun County, Virginia. They are\nChina to win this war. America is stay-\nmunities, you won't aad to the cost of\nbenefiting from that still to this day,\ning at the forefront. I want us to stay\na local community's ratepayer elec-\nas well as the jobs that come along\nat the forefront. Let locals make the\nwith it. They are benefiting from the\nchoice and let consumers reap the ben-\nThe President got a commitment to\ninvestment, the buildings that come\nefits. That is what is happening right\ndo that. We are not fully codifying\nalong, and the small business growth\nnow, and this bill, by my friend Con-\nthat. It is, in essence, a step in that di-\nthat we are seeing.\ngressman EVANS, ensures that we con-\nrection what this bill is doing. But as\nThere has been this assertion, Mr.\ntinue to see that growth continue.\nthe President did that, you saw compa-\nSpeaker, some of it funded by China,\nMr. Speaker, I urge adoption.\nnies going and making massive multi-\nthat data centers are driving up utility\nbillion-dollar investments in some of\nprices. There was a study done. In fact,\ncommunities and helping those\nthe Institute for Energy Research did a\nMr. PALLONE. Mr. Speaker, I yield\ncommunities\nalong the\nState-by-State study in all 50 States of\nsuch time as she may consume to the\nthis country and they looked at energy\ngentlewoman from Florida (Ms. CAS-\nThat story does not get told. Frank-\nthe kilowatt-per-hour cost in\nTOR), who is the ranking member of our\nly, I think that story needs to get told\nSubcommittee on Energy.\nmore. I have seen massive data centers\nSome States have data centers. Some\nMs. CASTOR of Florida. Mr. Speaker,\nin my home State of Louisiana. In fact,\nStates don't. The study is titled: ẠạHave\nI thank the ranking member for yield-\nif you go to little Richland Parish, a\nData Centers Driven Up Electricity\nrural part of north Louisiana that not\na lot of people live in, not a lot of op-\nTheir conclusion was clearly no, they\nportunities for wealth in that parish,\ndo not. There was no disparity in kilo-\nMr. Speaker, but then Meta decided to\nwatt hours per customer in States that\nbuild a data center, and that data cen-\nhave data centers and States that\nter grew and grew as the community\nMr. Speaker, I rise in support of my\nbill, the Ratepayer Protection Act. I\nam proud to lead this bipartisan bill\nwith Congressman EVANS to protect\nmy neighbors from unfairly paying for\nthe energy needs of large AI data cen-\nembraced it.\nAgain, a lot of that is because Presi-\nThey worked with the community.\ndent Trump made all of the data cen-\nThey are building their own natural\nters, the companies that build them.\ngas facilities. It is actually going to\nthose pledges that they will not\nhelp the grid in that community be-\nhave a negative impact on the rate-\ncause they are going to be paying their\nown way and anything extra they have\nWhat they did find, Mr. Speaker, was\nis going to be off-loaded to the grid so\nquite interesting, and that was a dis-\nthe neighbors in that community will\nthat does exist in electricity\nMr. Speaker, all across America,\nfamilies, farmers, and small business\nowners fear the arrival of their electric\nbill every month. Too many are strug-\ngling under the weight of soul-crushing\nenergy bills, and it comes at a time es-\npecially where everything costs more\nyour groceries, gas, diesel, nealthcare,\nactually get lower utility rates.\nprices between States. It is not all\nDo you know what else happened, Mr.\nSpeaker? This is another part of the\nWhat they ultimately looked at is\nstory that is not getting told enough, States that have a unified government,\nMany of my neighbors back in the\nTampa Bay area show me their electric\nbills. They are exorbitant, and it is"},{"page":16,"startToken":7373,"endToken":8658,"text":"September 15, 2026\ngut-wrenching. They are not alone be-\ncause across the country, electricity\nprices are up on average 15 percent, but\nmuch higher in many places.\nBut now there is a new stressor: mas-\nsive hyperscale data centers are\nnecting to the grid. These are energy\ndescriptors know no end.\nWhen a data center or other large\nload comes online, it can trigger mas-\nupgrades new\ntransmission\nformers and typically those costs are\npassed along to ratepayers, and that is\nnot fair. Our neighbors should not be\nstuck paying for the energy infrastruc-\nture of the wealthiest countries in the\nworld. The Ratepayer Protection Act\nsays that the data center pays for its\nown upgrades, not the rest of us.\ncenters can span hundreds of thousands\nof square feet. They host thousands of\nservers, computer storage, networks,\nand then they have these giant cooling\nsystems that also\namounts of energy as well.\nMassive hyperscale data centers can\ncontinuously\nmegawatts, with the largest facilities\nconsuming over 650 megawatts. That is\ncomparable to the energy use of tens of\nthousands or hundreds of thousands of\nAccording to the U.S. Department of\nEnergy, right now data centers con-\nsume about 4.4 percent of all elec-\ntricity in America, but they predict\nthat that will go up to 12 percent of the\ntotal electricity consumption in Amer-\nMr. Speaker, hyperscale data centers\nare being constructed by the wealthiest\nBig Tech corporations on the planet.\nAs hardworking Americans are just\nmeet, they\nshouldn't carry Big Tech's data center\nload as well. That is why we hammered\nout the bipartisan Ratepayer Protec-\ntion Act, to ensure that data centers\npay the full cost of their energy de-\nmand and upgrades.\nIt says that if a company wants to\nbuild a data center, they should pay for\nthe power and grid upgrades they need,\nThis bill will require those data cen-\nters to cover all the costs. It is an im-\nportant first step. I know some people\nnot enough.\nenough. It is not enough, but it does\nprovide some first steps.\nCongress has to do more. We should\nset stricter requirements for States to\nreport their progress to Congress so we\ncan ensure the bill is enforced. We\nshould incentivize data centers to be\nempowered\nby\nclean\nenergy\nprioritize projects that can reduce de-\nmand during peak hours.\nBut notably,\nthis bill does allow\nStates to do some of those things. The\nStates now can set additional specific\nguardrails. For example, States can re-\nquire that data centers are powered by\nclean energy and don't damage local\nwater supplies. They can require in-\nCONGRESSIONAL RECORD - HOUSE\ngrid-enhancing\nnologies or virtual power plants. States\ncan even require that data centers fund\nweatherization initiatives\nment of energy-saving batteries, roof-\ntop solar, and heat pumps.\nFor example, Virginia is requiring\ndata centers to cover new transmission\nand distribution capacity costs. Min-\nnesota requires data centers to pay\ninto an energy conservation and weath-\nerization fund to benefit working-class\nneighbors. Kansas incentivized data\ncenters to participate in demand re-\nsponse programs to reduce peak de-\nThis bill also empowers local commu-\nnities to make decisions on the siting\nand building of data centers. It allows\nfor robust community input, not NDAs,\nnondisclosure agreements, where they\ntry to sneak in.\nFor example, in Florida, at least 20\ncounties and municipalities passed or\ndiscussed very strict guardrails on data\nHillsborough County, many say that is\nnot the appropriate place for a data\ncenter because we don't have the water\nresources and we don't have the elec-\ntricity yet to do that. There are places\nin America that don't want them.\nWe need to keep working on this, but\nthis is a very important first step.\nThese are the wealthiest corporations\nin America. There is no reason why the\nshould be sub-\nsidizing their electricity upgrades and\nI am eager to keep advancing bipar-\ntisan, real solutions to invest in our\nU.S. power grid, which is reaching the\nend of its useful life, which is also rals-\ning costs on Americans. We have just\ngot to remain clear-eyed that right\nnow our neighbors are suffering an af-\nfordability squeeze. They deserve so\nmuch better than what they are get-\nting right now.\nThis Ratepayer Protection Act is a\ngood first start, but it is a modest first\nstart. It is about fairness on this one.\nMr. Speaker,\nI urge passage of the\nMr. PALLONE. Mr. Speaker, I re-\nserve the balance of my time.\nMr. GUTHRIE. Mr. Speaker, I yield 2\nminutes to the gentleman from Ohio\n(Mr. LATTA), the chair of the Sub-\ncommittee on Energy\nMr. LATTA. Mr. Speaker, I thank\nthe gentleman, the chairman of the full\nCommittee on Energy and Commerce,\nMr. Speaker, I rise in support of H.R.\n9340, the Ratepayer Protection Act, led\nfrom Colorado's\nEighth Congressional District.\nThis legislation passed out of our En-\nergy and Commerce Committee with a\nMr. Speaker, the goal here is very\nsimple: Data centers should pay their\nown way. That is why this legislation\nis so important. We must ensure that\nnesses are protected from electricity\nprice increases caused by large loads\nlike data centers.\nThe increase in data center develop-\nment raises important questions about\nhow these facilities will affect local\nelectric grids in nearby communities.\nH.R. 9340 encourages States to estab-\nlish a standard that requires large data\ncenters to cover the full costs nec-\nessary to service their loads.\nOver the last 5 years, electricity\nrates have steadily\nincreased across\nthe country.\nWhile data center demand growth is\nexploding, at the same time, record\namounts of baseload generation are\nprematurely leaving our grids. This is\na problem that must be addressed.\nH.R. 9340 ensures that States can\nhold AI companies responsible for their\nown costs and that hardworking Amer-\nican families aren't on the hook for the\nMr. Speaker, I urge the House to pass\nthe Ratepayer Protection Act.\nMr. GUTHRIE. Mr. Speaker, I reserve\nthe balance of my time.\nMr. PALLONE. Mr. Speaker, I re-\nserve the balance of my time. I have no\nMr. GUTHRIE. Mr. Speaker, I yield 2\nminutes to the gentleman from Ohio\nBALDERSON), a member of the\nCommittee on Energy and Commerce.\nMr. BALDERSON. Mr. Speaker, I rise\ntoday in support of H.R. 9340, the Rate-\npayer Protection Act.\nThis bill codifies the principles of the\nPledge, ensuring that Ohio families and\nsmall businesses aren't left on the\nhook to pay the costs associated with\ngeneration and energy infrastructure\nneeded to power large data centers.\nAs demand for electricity continues\nto rise across Ohio and the Nation, it is\ncritical that Congress takes action to\nconstituents from in-\ncreased electric bills.\nOhio has already taken strong steps\nto make sure large electricity users\ncontribute appropriately to the costs\nthey impose on the grid\nThe Ratepayer Protection Act builds\non that commonsense approach by di-\nrecting States to adopt standards that\nensure these facilities pay their fair\nImportantly, this bill does not in-\nfringe on local control over the siting\nand permitting of these projects.\nMr. Speaker, I thank Congressman\nEVANS for leading this bipartisan legis-\nlation and urge my colleagues to sup-\nport the bill.\nMr. PALLONE. Mr. Speaker, I re-\nserve the balance of my time.\nMr. GUTHRIE. Mr. Speaker, I yield 2\nminutes to the gentleman from Colo-\nrado (Mr. EVANS), a member of the En-\nergy and Commerce Committee and\nsponsor of the legislation.\nMr. EVANS of Colorado. Mr. Speak-\ner, I thank the chairman for yielding\nMr. Speaker, I rise today in support\nof my bipartisan bill with Representa-\ntive CASTOR, the Ratepayer Protection"},{"page":17,"startToken":8658,"endToken":9941,"text":"CONGRESSIONAL RECORD - HOUSE\nAmerica is in a period of incredible\nnologies like streaming services. At\ngrowth. Manufacturing jobs are return-\nthe same time, they consume massive\ning to our shores. We are investing in\namounts of power and place increasing\nAmerican energy again. We are leading\nstrain on our electric grid while threat-\nthe charge for technological innova-\nening to increase costs for families.\ntion. With that growth, our demand for\nenergy is also skyrocketing, and some\nchoose to have data centers in their\npeople have very understandable res-\nervations and questions about data\nThe future, however, is binary: Ei-\nther we build out our power systems to\nmeet that demand, or we become de-\npendent on other countries, like Com-\nmunist China, for our daily needs, to\ninfrastructure\nstores Americans' consumer data, fi-\nnancial data, nealthcare data, and per-\nhigher electric bills as a result. In-\nstead, these costs should be borne di-\nrectly by the data center developers,\nthe primary catalysts of this increased\ndemand for energy.\nWe have a responsibility to ensure\nthat our constituents are not picking\nup the tab for data centers, and this\nlegislation will do exactly that.\nI am proud to be a cosponsor of the\nRatepayer Protection Act, and I urge\nall of my colleagues to support its pas-\nHardworking Coloradans in my dis-\ntrict do want economic growth, and\nthey do not want the Chinese Com-\nmunist Party handling their sensitive\ninformation. They want responsible de-\nvelopment practices, but they see the\nneed for massive investments in our\nsystems and wonder who\ngoing to pay for it. This bill answers\nthat question very clearly.\nLarge-load data centers must cover\nthe full costs of any system upgrades\nthey require, not families or\nbusinesses. We cannot accelerate this\ngrowth on the backs of Americans who\nare working hard to pay their electric\nbills at the end of the month.\nThe Ratepayer Protection Act also\ngives States and local communities a\nvoice to implement these principles\nand protect community members from\nMr. PALLONE. Madam Speaker, I re-\nserve the balance of my time.\nGUTHRIE. Madam Speaker, I\nyield 2 minutes to the gentlewoman\nfrom Colorado (Ms. BOEBERT).\nAmerica is in a race for the future, and\nthat future is artificial intelligence.\nWe need to build data centers that\nwill power American AI. We need to\ncreate jobs, grow our economy, and\nmake sure that the next generation of\ntechnology is built right here in the\nUnited States.\nBut there is one principle that we\nfamilies should not be forced to pay for\nsomeone else's data center. That is ex-\nactly what the Ratepayer Protection\nSeptember 15, 2026\napplaud my colleague from Colorado\n(Mr. EVANS) for leading on this issue\nMr. PALLONE. Madam Speaker, I re-\nserve the balance of my time.\nGUTHRIE.\nMadam Speaker, I\nyield 2 minutes to the gentleman from\nNew York (Mr. LAWLER), my good\nMr. LAWLER. Madam Speaker, I\nthank the chairman for yielding me\nMadam Speaker, I rise today in sup-\nport of H.R. 9340, the Ratepayer Protec-\nNew York families and businesses\nface some of the highest electricity\ncosts in the country. In February, the\naverage residential electricity price in\nNew York reached about 70 percent\nhigher than the national average, and\nit is up 58 percent in the last 6 years.\nAt the same time, data centers seek-\ning to connect to New York's electric\ngrid are reportedly\nof additional\nelectricity. Years of failed energy poli-\ncies out of Albany, including shutting\ndown nuclear, banning natural gas,\nblocking pipelines, and other crazy\nideas, have already driven up costs for\nNew Yorkers. We\ncannot afford to\nmake the problem worse\nAs we work to bring new investments\nand jobs to New York and, indeed,\nAmerica, we need to make sure that\nthe costs of growth do not fall on the\nfamilies and small businesses already\nstruggling to pay their utility bills.\nThat is why I support the Ratepayer\nThis legislation simply establishes a\nThis bill passed unanimously in the\nIf a massive data center wants to\nEnergy and Commerce Committee. It is\ncome in and consume\nhundreds of\ncommon sense. It keeps costs low for\nmegawatts of electricity, it should pay\nAmericans and helps us build the en-\nthe full incremental costs of providing\nergy backbone required to compete and\nthat power, not the families struggling\nwin in the AI race and to keep Ameri-\nto pay their electric bills and not the\ncans' digital information here in the\nsmall businesses trying to keep their\nUnited States, not in China.\ndoors open. The companies creating the\nMadam Speaker, I am grateful it is\ndemand should pay for the demand.\nbeing considered today. I urge my col-\nThis is not antibusiness. It is not\nleagues to support this bill.\nanti-AI. It is certainly not antigrowth.\nMr. PALLONE. Madam Speaker, I re-\nIt is common sense.\nserve the balance of my time.\nIn fact, when we get this right, the\nGUTHRIE. Madam Speaker,\nI data centers can actually strengthen\nvield 2 minutes to the gentleman from\ncommunities. Georgia Power was able\nVirginia (Mr. WITTMAN).\nto freeze residential rates for 3 years as\nMr. WITTMAN. Madam Speaker,\nlarge-load growth expanded.\nrise today in strong support of H.R.\nIn Virginia, data centers took on a\n9310, the Ratepayer Protection Act.\ndramatically larger share of trans-\nThis legislation will require State\nmission costs while residential cus-\nutility regulators to examine standards\ntomers saw their share decline.\nto ensure that data centers pay all the\nLoudoun County alone, data centers\ncosts associated with their power gen-\nhave generated $1.1 billion in tax rev-\neration, transmission lines,\nupgrades needed to serve their facili-\nbasic principle of fairness. It is about\nmaking sure that the companies driv-\ning new demand for electricity are re-\nsponsible for the costs associated with\nthat demand.\nWe are already seeing communities\nand policymakers grappling with how\nto manage the rapid growth of large-\nscale data centers and the demands\nthat they place on our energy infra-\nstructure. This is something that the\nFederal Government needs to work to-\ngether on to create regulations and\nprotect the people because we need a\nbetter approach.\nWe need one that respects the role of\nlocal communities while ensuring that\ncompanies driving new demand are re-\nsponsible for the costs that they cre-\nate. We need a policy that looks ahead.\nbuilds the infrastructure we need, and\nprotects ratepayers at the same time.\nI will continue working to ensure\nthat New Yorkers have access to reli-\nThe Commonwealth of Virginia is\nhome to approximately 13 percent of\nall data centers in the world. Some of\nthese data centers are located in the\ndistrict that I represent.\nWhile data centers create economic\nMadam Speaker, let's build. Let's\ncompete. Let's win the AI race. Let's\nalso protect the people who keep this\ncountry running.\nThe Ratepayer Pro-\ntection Act gives States a practical\ntool to make sure that massive new\nelectricity users pay their fair share\nwhile preserving State authority over\nable and affordable energy while mak-\ning sure that large energy users pay\ntheir fair share.\nMadam Speaker, I urge all of my col-\nleagues to support this legislation.\nMr. PALLONE. Madam Speaker, I re-\nserve the balance of my time.\nMadam Speaker, I\nyield 2 minutes to the gentleman from\nthey also come with enormous chal-\nAmerica can lead the world in AI\nPennsylvania (Mr. MACKENZIE).\nMr. MACKENZIE. Madam Speaker,\nhealth, mobile banking for American\nfoot the bill. That is not a radical idea.\ncommunities throughout the Nation\nsmall businesses, and everyday tech-\nThat is responsible leadership, and I are seeing unprecedented growth ir"},{"page":18,"startToken":9941,"endToken":11247,"text":"September 15, 2026\nelectricity demand, driven in large\npart by data centers and other energy-\nThat growing demand is already hav-\ning a direct impact on communities\nlike those that I represent in the Le-\nhigh Valley and the Poconos, where,\nafter 4 years of severe inflation under\nPresident Biden, residents are being\nput in a position where they could end\nup footing the energy bill for new data\ncenters. The rapid growth of these fa-\ncilities requires unprecedented new in-\nvestments in our electric grid.\nWhile the grid capacity will catch up\nthe short-term costs\nthose investments must not be passed\non to families, seniors, and small busi-\nnesses, many of whom don't want data\ncenters in their communities in the\nThat is why I am proud to cosponsor\nthe bipartisan Ratepayer Protection\nAct, because large energy consumers\nwho create the demand for new energy\ninirastructure should pay\nWe can maintain local control of de-\nvelopment activities while also pro-\ntecting existing ratepayers, and that is\nexactly what this legislation does.\nI thank Representative EVANS for his\npartnership on this legislation, and I\nurge all of my colleagues to support\nPALLONE. Madam\nyield myself the balance of my time to\nclose. I do believe that this legislation\nis a first step, and therefore, I support\nit and would ask my colleagues to vote\nfor it. I yield back the balance of my\nMr. GUTHRIE. Madam Speaker, I\nyield myself the balance of my time to\nI agree, this is important. We\nhave to beat China. We have to win the\nwar on AI. If we don't, they are going\nto set the standards for technology\naround the world. It needs to be with\nTo do that, we have to have the data\ncenters. It needs to be locally decided\nwhere they go, and ratepayers need to\nbe protected from it. That is what I\nheard all of August. I think most of us\nhome working heard about it.\nThis is an example where people are\ngoing home, both sides of the aisle, lis-\nand coming back here and\ndoing something about the concerns for\nthe people they represent.\nI encourage support of this bill. I en-\ncourage for its passage, and I yield\nback the balance of my time.\nThe SPEAKER pro\ntempore (Mrs.\nMILLER of Illinois). The question is on\nthe motion offered by the gentleman\nfrom Kentucky (Mr. GUTHRIE) that the\nHouse suspend the rules and pass the\nbill, H.R. 9340, as amended.\nThe question was taken\nThe SPEAKER pro tempore. In the\nopinion of the Chair, two-thirds being\nin the affirmative, the ayes have it.\nGUTHRIE. Madam Speaker, on\nthat I demand the yeas and nays.\nCONGRESSIONAL RECORD - HOUSE\nThe yeas and nays were ordered.\nMadam Speaker, I encourage my col-\nThe SPEAKER pro tempore. Pursu- leagues to support this bill, and I re-\nant to clause 8 of rule XX, further pro-\nserve the balance of my time\nceedings on this motion will be post-\nAPPLICATION\nMEMBERS\nARMED FORCES TO MEMBERS OF\nTHE PUBLIC HEALTH SERVICE\nMr. GUTHRIE. Madam Speaker,\nmove to suspend the rules and pass the\nbill (H.R. 2846) to amend title II of the\nPublic Health Service Act to include as\nan additional right or privilege of com-\nmissioned officers of the Public Health\nService (and their beneficiaries)\nleave provided under title 10,\nUnited States Code to commissioned\nofficers of the Army (or their bene-\nThe Clerk read the title of the bill.\nThe text of the bill is as follows:\nBe it enacted by the Senate and House of Rep-\nresentatives of the United States of America in\nCongress assembled,\nSECTION 1. APPLICATION OF LEAVE PROVISIONS\nFORCES TO MEMBERS OF THE PUB-\nlic Health Service Act (42 U.S.C. 213a(a)) is\namended by adding at the end the following:\n-Section 219 of\nthe Public Health Service Act (42 U.S.C. 210-\n1) is repealed.\nThe SPEAKER pro tempore. Pursu-\nant to the rule, the gentleman from\nKentucky (Mr. GUTHRIE) and the gen-\ntleman from New Jersey (Mr. PALLONE)\neach will control 20 minutes.\nThe Chair recognizes the gentleman\nfrom Kentucky.\nGENERAL LEAVE\nMr. GUTHRIE. Madam Speaker, I ask\nunanimous consent that all Members\nmay have 5 legislative days to revise\nand extend their remarks and include\nextraneous material on H.R. 2846.\nThe SPEAKER pro tempore. Is there\nobjection to the request of the gen-\nThere was no objection.\nyield myself such time as I may con-\nMadam Speaker,\nstrong support of H.R. 2846 led by the\ngentlewoman from Pennsylvania (Ms.\nyield myself such time as I may con-\nI rise in support of H.R. 2846, legisla-\ntion that would extend expanded leave\nbenefits to members of the U.S. Public\nHealth Service Corps.\nThe U.S. Public Health Service Corps\nis one of eight uniformed services in\nthe United States. There are more than\n6,000 officers who serve as physicians,\nnurses, and scientists across agencies\nto advance public health. Right now,\nthese officers are not guaranteed the\nsame 12-week leave benefit as members\nof the military are entitled to under\nFederal law nor are they eligible for\nthe 12 weeks of leave that all Federal\nGovernment employees are entitled to\nLeave Act. This bill fixes this by ex-\ntending leave benefits to Public Health\nService officers, and this leave includes\nexpanded parental leave, emergency\nleave of absence, and leave for rest and\nrecuperation.\nI thank Representative HOULAHAN for\nher leadership on this legislation and\nmy colleagues on the Energy and Com-\nmerce Committee for working with us\nto bring this bill to the floor. I encour-\nage all my colleagues to vote \"yes.\"\nBefore I reserve the balance of my\ntime, I do want to take an opportunity\nto thank Una Lee, who is right here,\nfor her more than 11 years here at the\nCommittee,\nmost of those years serving as chief\ncounsel for the Health Subcommittee.\nUna has played a critical role in\nevery major healthcare bill that has\nbeen signed into law during that time.\nUna has been a trusted adviser, and she\nwill be missed. I don't want her to\nleave, but what can I do.\nI wish her nothing but the best in her\nfuture endeavors and congratulate her\nfor her tremendous work, truly tre-\nmendous work of making healthcare\naffordable and accessible for\nMadam Speaker, I reserve the bal-\nance of my time.\nMr. GUTHRIE. Madam Speaker, I\nyield myself such time as I may con-\nI just want to speak briefly. I have no\nfurther speakers, so I will be prepared\nUna Lee, but I didn't get to speak ear-\nThe U.S. Public Health Service Com-\nlier in the subcommittee today. We get\nmissioned Corps is one of eight uni-\nto work with fantastic people here, and\nformed services in the U.S. It is first in\nI know Una is one of them. We get to\nto defend\nour Nation's public\nsee, on the opposite sides of the table\nhealth against any threat. This bill\nsometimes, but I know we are always\ncloses the gap in benefits between Pub-\nworking to try to improve our country\nlic Health Service officers and other ci-\nI thank her for her service. We will\nuniformed public servants by\nmiss seeing her around the Energy and\naligning their leave policies with those\nroom. I am prepared to\nof other uniformed services.\nclose, and I reserve the balance of my\nThe dedicated men and women of the\nPublic Health Service Corps have my\nrespect and gratitude, and they deserve\nthe same benefits and protections af-\nforded to their fellow uniformed serv-\nPALLONE. Madam Speaker, I\nyield such time as she may consume to\nthe gentlewoman from Pennsylvania\n(MS. HOULAHAN), the sponsor of the leg-"},{"page":19,"startToken":11247,"endToken":11249,"text":"Exhibit B"},{"page":20,"startToken":11249,"endToken":11566,"text":"Comments of the\nAssociation of Businesses Advocating Tariff Equity (ABATE*),\nIllinois Industrial Energy Consumers (\"IIEC\"),\nLouisiana Energy Users Group (\"LEUG\"),\nTexas Industrial Energy Consumers ('TIEC'),\nCoalition of MISO Transmission Customers (\"CMTC\"),\nMidwest Large Energy Consumers (IMLECI),\nlowa Business Energy Coalition (*'IBEC\")\nand\nNIPSCO Large Customer Group (\"NLCG\").\nRegarding\nLLWG: Large Load Operational Forecast Requirements (LLWG-2026-4A)\nSeptember 10, 2026\nABATE, IIEC, LEUG, TIEC, CMTC, and MLEC as representatives of the End-Use Customer Sector, and IBEC\nand NLCG as representatives of organizations advocating for large end-users, appreciate this\nopportunity to provide these comments to MISO.\nDuring the June 29, 2026 and August 27, 2026 meetings of the Large Load Working Group ('LLWG'),\nMISO proposed details of the requirements for the Large Load forecast submissions in hourly and five-\nminute cadences and notice that it plans to monitor forecast accuracy including the potential for\npenalties? Specifically, due to concerns that large load additions could add substantial volatile demand\nthat MISO's current weather and calendar driven forecasting cannot capture and that FERC raised within\nits recent Show Cause order, MISO proposes to require the following of all Large Loads, regardless of\nwhether they are Non-Computational or Computational:\n• A forecast of five-minute integrated demand for the next five-minute period and the proceeding\n71 five-minute periods, updated every five-minutes; and\n• A potential monitoring period to measure Large Load forecast to actual error rates with\ntolerance bands that could be applied to different types of Large Loads, and the potential to\nassign torecast-related penalty costs to the Large Load errors that create them.\nWhile we understand and agree with the need to address the possibility of large load additions\nintroducing substantial volatile demand that MISO's weather and calendar driven forecasting cannot\ncurrently capture, MISO has not demonstrated: (i) a reasonable need for the five-minute integrated\ndemand portion of its proposal for Non-Computational Loads, or (ii) a need to design penalty charges at\nthis time."},{"page":21,"startToken":11566,"endToken":12042,"text":"Regarding five-minute interval load forecasts, the following are important considerations:\n• MISO has not provided any evidence showing the lack of individual load five-minute demand\nforecasts for existing 50 MW and larger Non-Computational Loads has resulted in either\nsignificant reliability or cost subsidy issues within MISO over the last decades which have\nincluded a very large number of 50 MW and larger Non-Computational Loads.\n• It is the possibility of additional, very large amounts of new Computational Load not operated at\na very high, steady load factor that can be quickly dispatched up or down based on market\nconditions which introduces a potential significant challenge to MISO's current weather and\ncalendar driven forecasting, not Non-Computational Loads.\n• Putting aside demand response participation, that has its own Tariff and Business Practice\nManual requirements, MISO currently settles all load in the real-time market on an hourly\nintegrated demand basis, and not on a five-minute integrated demand basis. As a result, there\nare no market signals that would cause loads that can quickly change their demand, specifically,\nComputational Loads, to make abrupt five-minute changes in their demand.\n• Requiring five-minute forecasts for a six-hour basis, updated every five-minutes, would impose a\nsubstantial continuous operational, analytical, and costly burden for Large Loads to provide\nwithout clear evidence that it will improve the risks of inaccuracies within MISO's Reliability\nAssessment Commitment, Look Ahead Commitment, or real time Security Constrained\nEconomic Dispatch processes.\nGiven the above we urge that hourly forecast data provided day-ahead for Non-Computational Loads,\nwhen combined with the newly required real-time telemetry for Large Loads, is sufficient for not only\nday-ahead needs but also for real-time needs, until proven otherwise with actual data-driven\nexperience. There is no FERC requirement for real-time five-minute forecasts from Large Loads nor has\nthere been a showing of MISO reliability problems given existing Non-Computational Loads that\nnecessitates a new burden for customers. The FERC only noted a concern that \"MISO's Tariff does not\nrequire transmission customers to provide MISO hourly forecasts, telemetry data, and other data to\nensure sufficient visibility...'\nAs for MISO's proposed creation of incentives/penalties for Large Load forecast errors:\n• MISO has not provided any evidence showing that participant submitted load forecast errors\nhave been significant and have resulted in reliability or cost subsidy concerns over the last\ndecades which have included a very large number of 50 MW and larger Non-Computational\n• For many Non-Computational Loads, due to the nature of their processes, it is not possible for\nthem to forecast demand within a narrow band of accuracy on an hourly integrated demand\nbasis, never mind a five-minute integrated demand. As such, applying penalties to them for\nfalling outside a narrow band accuracy would not be just and reasonable as any lack of accuracy\nforecast would not be a behavioral issue but rather related to the nature of the processes\nassociated with these loads.\n2"},{"page":22,"startToken":12042,"endToken":12437,"text":"• Without evidence of actual significant forecast errors in aggregate, as individual errors could\nbalance each other out due to their diversity, causing significant dispatch cost impacts there is\nno basis for a new allocation of existing commitment, reserve, congestion, and/or shortage\npricing to loads based on the theoretical concept of uninstructed deviation or failure to follow\ndispatch instructions for load as MISO suggests within its August 27, 2026 presentation.\n• If penalties were applied to a Transmission Customer for forecast deviations without a\nmechanism to separate errors from updated forecast deviations, and without mechanisms to\nallocate charges appropriately between the Transmission Customer(s), Load Balancing Areas,\nand retail Large Loads, then the resulting charges have the propensity to become a zero sum\nincentive if they end up blindly being assigned to all load within a Load Balancing Area.\nGiven this, if it were demonstrated forecast inaccuracy for Non-Computational Loads introduced\nsignificant reliability or cost subsidy issues that need to be addressed, which MISO has not shown to be\nthe case, the appropriate action would be to first, monitor such deviations and study their reasons, and\nthen secondly explore potential changes to the cost allocation for ancillary services, not the immediate\napplication of penalties to these loads without a full examination of actual occurrences and conditions.\nCollected data can be monitored for potential impacts and accuracy incentives or penalties considered\nlater, if needed, around tolerance bands that are within the Load's control and based on actual\nexperience. 5\nFor the foregoing reasons, MISO should limit the application of its proposed real-time five-minute\nforecast requirement to Computational Loads.\nAlso for the above reasons, MISO should not pursue forecast deviation incentives or penalties at this\ntime. An actual data-driven and risk-informed framework applied proportionally to demonstrated\nreliability needs, system conditions, and facility characteristics makes the most sense at this time.\nThank you for providing us with an opportunity to submit our comments. The End-Use Customer Sector\nappreciates the continued constructive dialogue on this issue and looks forward to continuing to work\nwith MISO and other stakeholders to deliver on MISO's commitment to reliability and MISO's Value\nProposition.\nIf it would be of help, we would be glad to discuss the above comments further with MISO and other\nstakeholders. If you have any questions regarding these comments, please do not hesitate to contact\nany of the following representatives:\n3"},{"page":23,"startToken":12437,"endToken":12774,"text":"Jim Dauphinais\nBrubaker & Associates, Inc.\n(Consultants to ABATE, IBEC, IIEC, LEUG, NLCG and TIEC)\n(636) 898-6725\njdauphinais@consultbai.com\nScott S. Mallory\nBrubaker & Associates, Inc.\n(Consultants to ABATE, IBEC, IIEC, LEUG, NLCG and TIEC)\nsmallory@consultbai.com\nKen Stark\nMcNees Wallace & Nurick LLC (for CMTC)\n(717) 237-5378\nkstark@mcneeslaw.com\nKavita Maini\nKM Energy Consulting, LLC (Consultant to MLEC)\n(262) 646-3981\nkmaini@wi.rr.com\n1 ABATE, IIEC, LEUG, TIEC, CMTC, and MLEC are all MISO Members in the End-Use Customer Sector. IBEC is a non-\nMISO Member stakeholder whose members are large end-use customers of Alliant and MidAmerican and among\nlowa's largest and most energy-intensive employers. NLCG is a non-MISO Member stakeholder whose members\ninclude large end-use customers within Indiana that are interruptible and/or have cogeneration facilities and that\ntake service under NIPSCO Rate Schedule 531, which allows limited market purchases through Northern Indiana\nPublic Service Company (NIPSCO).\nhttps://cdn.misoenergy.org/20260629%20LLWG%20ltem%2008b%20Large%20Load%200perational%20Forecast%\n20Requirements%20(LLWG-2026-4A)765707.pdf\nhttps://cdn.misoenergy.org/20260827%2OLLWG%20ltem%2011%200perational%20Forecasting%20Requirements\n%20(LLWG-2026-4a)%20Presentation777222.pdf\n3 MISO is also requiring a day ahead forecast of hourly integrated demand for the next hour and the 168 hours\nbeyond the next hour, updated on an hourly basis.\n4 EL26-70 6/18/26 Order at page 42, para. 64. Emphasis added on hourly as the FERC concern did not require\nconsideration of more granular five-minute forecasts nor the consideration of benefits versus the costs of\nproviding such.\n5 Note that currently proposed Tariff Section 37A.4 does not contain language necessary for MISO to assess a\npenalty or settlement charge for forecast inaccuracies, thus affording time for an experience backed rate proposal\nat a later date if proven necessary to address potential inaccuracies. Also, setting tolerance bands and incentives\non a theoretical basis without empirical data on forecast deviations and their reasons is not likely to lead to\nreasonable incentive/penalty rates.\n6 ER26-3650 MISO 8/28/26 filing at pp.11-12.\n4"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":128,"startToken":0,"endToken":532},{"p":3,"at":128,"title":"EXECUTIVE SUMMARY","method":"printed heading","endPage":4,"endAt":209,"startToken":532,"endToken":887},{"p":4,"at":209,"title":"A. The Commission Should Require MISO to Clarify Exemption Scenarios in","method":"printed heading","endPage":5,"endAt":2000,"startToken":887,"endToken":1557},{"p":5,"at":2000,"title":"B. The Commission Must Not Impose Unreasonably Onerous Real Time","method":"printed heading","endPage":11,"endAt":0,"startToken":1557,"endToken":3118},{"p":11,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":23,"endAt":2220,"startToken":3118,"endToken":12774}]}