{"document":{"slug":"rec-20260918-5386","title":"Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Interconnection Reliability Requirements for Large Loads Proposal","issued":"2026-09-18","accession":"20260918-5386","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"Google LLC","kind":"comments","file":"sources/filings/text/20260918-5386_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5386","tier":"record","sha256":"1b6d80166d1eb1068264c64888fd50b05a344c7286cca5c56c99878c21a94acf","pages":10,"tokens":2663,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":244,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nMidcontinent Independent System Operator \nInc. \n \n) \n) \n) \n) \n) \n \nDocket No. ER26-3650-000 \n \nCOMMENTS OF GOOGLE LLC \n \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission”),1 Google LLC (“Google”) submits these comments on \nMidcontinent Independent System Operator Inc.’s (“MISO”) Interconnection Reliability \nRequirements for Large Loads Proposal (“IRR Proposal”).  Google supports the proposal as a \nreasonable and responsible step to bolster the near-term reliability of the nation’s electric grid.   \n \nEnsuring electric reliability must continue to be job number one.  That responsibility has \nbecome increasingly complex, in large part due to the addition of large loads that may exhibit \ndifferent operating characteristics than other loads.  Google therefore commends MISO for \nprioritizing the reliability of the transmission system and working proactively to identify and \nmitigate the risks that certain Large Loads can pose to the power grid.  In addition, Google supports \nMISO’s pragmatic approach to these issues, including its reasonable grandfathering of existing \ncustomers in a manner that respects reliance interests and investments made under the rules in \neffect at the time.  An approach along the lines proposed in this proceeding is consistent with \nGoogle’s approach to responsible energy growth.2   \n \n1 18 C.F.R. § 385.211 (2026). \n2 See Amanda Peterson Corio, Supporting the White House Ratepayer Protection Pledge: Google's Approach for \nResponsible Energy Growth, Google: The Keyword (Mar. 4, 2026), https://blog.google/innovation-and-\nai/infrastructure-and-cloud/global-network/affordability-pledge-responsible-energy-growth."},{"page":2,"startToken":244,"endToken":550,"text":"-2- \nAt the same time, while Google supports this filing, additional work is needed to further \nrefine MISO’s approach to reliability issues associated with new Large Loads.  For example, the \nbest way to ensure the reliability of the system is to tie any regulations or requirements to the \nelectrical characteristics of the load rather than the specific type of end use they constitute.  In \nother words, regulators should focus on imposing obligations based on the reliability challenges \nassociated with a particular load (e.g., ramp rate, voltage sensitivity, etc.) rather than the nature of \nthe retail customer (e.g., data center, arc furnace, etc.).  In addition, several aspects of the IRR \nProposal have yet to come into focus, either because they will be specified in the MISO Business \nPractice Manuals (“BPM”) or because the proposed tariff language gives MISO significant \ndiscretion over how it will implement the IRR Proposal.  Those implementation questions will go \na long way in determining the effectiveness and administrability of the IRR Proposal. \nI. \nCOMMENTS \nAs noted, Google supports the IRR Proposal.  It offers the following observations and \nsuggestions as MISO and the Commission continue to refine their approach to addressing the \nreliability implications of load growth driven by new Large Loads.    \nA. Grandfathering Existing Loads Is Important and Consistent with Commission \nPolicy \nGoogle supports the grandfathering provisions in the IRR Proposal, which provide \nimportant commercial certainty to entities seeking to invest in the MISO region.  The \ngrandfathering paradigm is also consistent with Commission policy and analogous large load \nregulatory frameworks for other Independent System Operators (“ISOs”)/Regional Transmission \nOrganizations (“RTOs”).  Under the IRR Proposal, the extent to which MISO will regulate Large \nLoads varies depending on the date on which service to the Large Load begins, whether \ntransmission projects or upgrades associated with the Large Load have been approved by the"},{"page":3,"startToken":550,"endToken":854,"text":"-3- \nMISO Board in MTEP, and when transmission projects or upgrades associated with the Large \nLoad are submitted to the MISO EPR process.3  For example, Large Loads with a transmission \nservice commencement date on or prior to December 4, 2026—i.e., the proposed effective date of \nthe IRR Proposal—will not be subject to certain IRR regulations.4 \nData centers have operated safely and reliably within the MISO footprint for years (and in \nsome cases, decades).  Google applauds MISO for crafting regulations that reflect its considerable \nexperience operating a grid that has long provided service to data center loads, rather than imposing \non those loads a new regulatory regime meant to mitigate risks that those loads have never \npresented.   \nThe grandfathering provisions do more than just reflect MISO’s experience to date; they \nalso provide commercial certainty for parties that have already invested in electrical and digital \ninfrastructure in MISO and send an important signal to prospective investors that they can rely on \nthe regulatory landscape to remain predictable.  This, in turn, creates the certainty necessary to \ndeploy capital needed to upgrade digital and electrical infrastructure, including through \ninvestments that help make data centers better grid citizens.  As Google has emphasized, during \nthis time of rapid transformation, regulations that create uncertainty or raise the risk that \ninvestments made in reliance on the rules in effect at the time will be rendered obsolete decrease \ncompanies’ appetite to make those investments voluntarily.5  As such, greater regulatory \nuncertainty can lead to impaired reliability if it prevents companies from making the investments \n \n3 Midcontinent Indep. Sys. Operator, Inc., Reliability Requirements for Large Loads, Docket No. ER26-3650-\n000, 13-14 (filed Aug. 28, 2026) (“Transmittal”). \n4 Id. at 14. \n5 See generally PJM Interconnection, L.L.C., Protest of Google LLC, Docket No. ER26-3515-000 (filed Sept. 3, \n2026)."},{"page":4,"startToken":854,"endToken":1146,"text":"-4- \nthat will go above and beyond to ensure that the grid remains safe and reliable.  Grandfathering \nprovisions, like the ones in the IRR Proposal, respect existing reliance interests and signal to \ninvestors and developers that the regulatory ground beneath them is less likely to shift \nunexpectedly.   \nMoreover, respecting reliance interests, including through existing contracts and \ncommercial arrangements, is consistent with the Commission’s guidance in the MISO Large Load \nShow Cause Order where the Commission encouraged MISO to “(a) propose a reasonable \nimplementation period to ensure minimal disruption to such existing commercial arrangements, \nand (b) allow a reasonable amount of time to finalize ongoing agreements that are nearing \ncompletion as of the date such Tariff provisions are filed with the Commission. Such proposed \nTariff revisions should include a reasonable effective date that accommodates such considerations \nregarding these existing commercial arrangements.”6  The IRR Proposal grandfathering provisions \ndo just that.  Projects that begin operating before the effective date of the IRR Proposal will be \nsubject to the regulations in effect when those projects were conceived, not the entirely new IRR \nregulatory regime, and projects that are verifiably in progress will only be subject to a subset of \nthe IRR regulations, thus ensuring minimal disruption.   \nThe grandfathering provisions in the IRR Proposal are also consistent with transition \nmechanisms that the Commission has approved for similar regulations in SPP.  SPP’s HILLS \nconstruct imposes reliability requirements on large loads, which include load forecasting \nprovisions, remote capability to disconnect load from the transmission system, installation of \nphasor measurement units for real-time load data, and ride-through requirements.7  SPP’s large \n \n6 Midcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212, at P 5 (2026).  \n7 Sw. Power Pool, Inc., 194 FERC ¶ 61,031, at PP 18-20, 63 (2026)."},{"page":5,"startToken":1146,"endToken":1492,"text":"-5- \nload reliability requirements similarly do not apply to existing loads.8  Google urges the \nCommission to note the importance of this approach and encourage any other regions considering \nsimilar measures to follow suit and adopt an approach that, as noted above, facilitates the \ninvestment in the reliability measures that the country badly needs. \nAt the same time, as noted above, ensuring electric reliability must remain job number \none.  To that end, MISO has included important “notwithstanding” language in the grandfathering \nprovisions of the IRR Proposal,9 which allows it to continue monitoring the operational risks \nintroduced by certain large loads and modify its approach where necessary to address reliability \nrisks.  In so doing, MISO has struck an important balance that preserves reliance interests while \nalso preserving its ability to adjust its approach as needed to ensure reliability.    \nB. Large Loads Should Be Classified and Regulated Based on Their Objective \nElectrical Characteristics Rather than the Function they Perform \nThe IRR Proposal regulates Large Loads based on the function they perform—e.g., \ncomputation—rather than their operational characteristics and their effects on the grid.  This means \nthat MISO may end up regulating some Large Loads that do not pose a reliability risk to the \ntransmission system while excluding non-data center loads that pose some of the same risks.  \nUnder the IRR Proposal, MISO would subject Computational Loads, which it defines as “Large \nLoad comprised of 25 MW or more of Demand from information technology equipment, such as \nservers, storage, and networking hardware,”10 to more onerous regulatory requirements than Large \nLoads, which MISO defines as loads over 50 MW at a single substation behind one or more \n \n8 Id. P 10 (“A load may be categorized as a HILL after the initial effective date of Attachment BA of the Tariff.”);  \nid. P 10 n.23 (“Existing loads will not be considered HILLs or be subject to the requirements of Attachment BA unless \nthey seek to increase load and otherwise meet the definitional requirements.”). \n9 Filing, Proposed MISO Tariff Revisions, § 37A(II)(3). \n10 Transmittal at 11."},{"page":6,"startToken":1492,"endToken":1760,"text":"-6- \nPoint(s) of Withdrawal from the Transmission System.11  Specifically, Large Loads would need to \ncomply with visibility requirements while Computational Loads would also need to comply with \nramp, PMU, and ride-through requirements.  As MISO explains, “[d]efining Computational Load \nsupports a more targeted and risk-informed approach, rather than applying the same requirements \nto all Large Loads regardless of facility type or operating behavior.”12 \nAs noted above, Google believes reliability requirements like those in this proposal are \nimportant and need to be implemented promptly.  Nevertheless, by proposing a scheme that turns \non the function that a facility performs rather than on its electrical behavior, MISO has, in fact, \ncreated an approach that “appl[ies] the same requirements . . . regardless of . . . operating behavior.”  \nTo see why this is the case, consider industrial loads beyond data centers (e.g., arc furnaces, \ncryogenic facilities, hydrogen electrolyzers, etc.), which can exhibit identical electrical behaviors \nas certain data centers but would escape the ramp, PMU, and ride-through requirements in the IRR \nProposal.  At the same time, data centers that do not exhibit high-risk behaviors—e.g., because \nthey have made investments or adopted operational protocols to reduce impact on the grid—would \nbe regulated as Computational Loads.  An approach that regulates loads based on their risks to and \neffects on the grid would not only be a more efficient system of regulation; it would also \nincentivize data center operators to make additional investments needed to mitigate or eliminate \nthose effects entirely—a win-win situation for both customers and grid operators more generally.   \n \n11 Id. at 10. \n12 Id. at 11 (emphasis added)."},{"page":7,"startToken":1760,"endToken":2060,"text":"-7- \nC. The Success of the IRR Proposal Will Depend on Details that Will Be Included in \nMISO’s Manuals \nMISO has deferred critical details of the IRR regulatory paradigm—e.g., the 30 \nMW/minute ramp calculation methodology, voltage ride-through curve specifications, and \ndeviation penalties—to its Business Practice Manuals.  As such, the IRR Proposal is best described \nas a high-level framework rather than a comprehensive regulatory regime, which makes it difficult \nto evaluate whether the IRR Proposal will achieve its stated goals and, relatedly, the extent to \nwhich Large Loads will be able to comply with its requirements.  Google recognizes that some of \nthe terms and requirements that MISO has left unspecified are technical implementation details \nthat should be set forth in the Business Practice Manuals.  We urge MISO to work closely with \nstakeholders in fleshing out those details.   \nAt the same time, the IRR Proposal gives MISO open-ended authority to impose what \namounts to penalties on Large Loads that fail to comply with various new requirements (e.g., \nmodeling, data, telemetry, etc.), which raises a particular risk of running afoul of the rule of reason.  \nUnder the rule of reason, practices that “affect rates and service significantly,” “are realistically \nsusceptible of specification,” and “are not so generally understood in any contractual arrangement \nas to render recitation superfluous” must be filed with the Commission, not housed in Business \nPractice Manuals and the like.13  The Commission has previously found that penalty provisions \nthat significantly affect the conditions of transmission service must be included in a transmission \nprovider’s tariff.14    \n \n13 City of Cleveland v. FERC, 773 F.2d 1368, 1376 (D.C. Cir. 1985) (emphasis removed). \n14 See California Indep. Sys. Operator Corp., 175 FERC ¶ 61,245, at P 166 (2021), order on reh’g, 178 FERC \n¶ 61,180 (2022)."},{"page":8,"startToken":2060,"endToken":2374,"text":"-8- \nThe penalty authority in the IRR Proposal could do just that.  Specifically, for transmission \ncustomers that do not comply with the regulatory requirements in the IRR Proposal, MISO will \nhave unbounded discretion to delay the commencement date for transmission service to the new \nLarge Loads, impose operational limitations, or impose other remediation actions necessary to \nmaintain the reliability of the transmission system.15  In other words, MISO is reserving to itself \nthe power to penalize customers by imposing conditions on transmission service.  While MISO \nitself acknowledges, “clarity is required as to potential consequences in the event a party fails to \ncomply with applicable requirements,”16 it has yet to provide such clarity, and Google urges MISO \nto do so promptly and with the predictability necessary to avoid rule of reason concerns.   \nD. The Breadth of Certain Provisions Could Make it Difficult for Entities to Comply \nwith the IRR Proposal \nFinally, Google is concerned that some provisions in the IRR Proposal are framed so \nbroadly that it will be difficult, if not impossible, for regulated entities to comply.  Most notably, \nthe IRR Proposal gives MISO the right to audit information “including, but not limited to, \ninformation related to the registration, claimed capacity, operations, modeling, inverter settings, \nmetering, settlements, Large Load Equipment, and/or any other information related to the \nparticipation of the Large Load under this Tariff.”17  While Google believes that MISO should \nhave the audit rights necessary to ensure that entities are complying with its tariff—after all, the \nreliability of the grid depends on it—giving MISO such unbounded and undefined powers could \ncomplicate compliance for Large Loads in the region.  In the absence of limits on the information \nthat MISO can request, Large Loads will be required to retain a nearly limitless amount of \n \n15 Transmittal at 23. \n16 Id. \n17 Filing, Proposed MISO Tariff Revisions, § 37A.8 (emphasis added)."},{"page":9,"startToken":2374,"endToken":2604,"text":"-9- \ninformation.  MISO should be able to access any information it needs to ensure that Large Loads \n(and the transmission customers taking service on their behalf) are complying with reliability \nrequirements.  That said, a regime under which entities need to retain everything because MISO \ncan ask for anything will become unduly burdensome, unworkable in practice, and actually \ncomplicate the process of complying with these critical regulations.   \nII. \nConclusion \nGoogle supports the IRR Proposal, which will help MISO ensure reliability in this era of \nrapid load growth.  But the work cannot end here.  Eventually, the Commission should ensure that, \nwhere appropriate, the reliability requirements imposed by ISOs/RTOs align with the large load \nreliability standards that it has directed the North American Electric Reliability Corporation to \ndevelop.18  This will help to avoid a patchwork of reliability requirements across ISOs/RTOs, \nimproving reliability and reducing compliance costs.   \n \n \nRespectfully submitted, \n \n/s/ Brian George \nBrian George \nSr. Lead, US Energy Markets \nStephen Lindeman \nLead, Energy Market Development \nGoogle LLC \n655 New York Ave., NW \nWashington, DC 20001 \n(202) 999-0990 \nbriangeorge@google.com \nlindemans@google.com  \n \nMatt Christiansen \nBryan Shpall \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006 \n(617) 598-7871 \nmchristiansen@wsgr.com  \nbshpall@wsgr.com \n \nCounsel for Google LLC \n \nDated:  September 18, 2026 \n \n18 See Reliability Standard(s) Pertaining to Computational Load Integration, 196 FERC ¶ 61,031 (2026)."},{"page":10,"startToken":2604,"endToken":2663,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary of the Commission in these \nproceedings. \n \nDated:  September 18, 2026 \nWashington, D.C. \n \n \n/s/ Bryan Shpall \nBryan Shpall \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1071,"startToken":0,"endToken":411},{"p":2,"at":1071,"title":"I. COMMENTS","method":"printed heading","endPage":2,"endAt":1335,"startToken":411,"endToken":450},{"p":2,"at":1335,"title":"A. Grandfathering Existing Loads Is Important and Consistent with Commission","method":"printed heading","endPage":5,"endAt":921,"startToken":450,"endToken":1284},{"p":5,"at":921,"title":"B. Large Loads Should Be Classified and Regulated Based on Their Objective","method":"printed heading","endPage":7,"endAt":5,"startToken":1284,"endToken":1761},{"p":7,"at":5,"title":"C. The Success of the IRR Proposal Will Depend on Details that Will Be Included in","method":"printed heading","endPage":8,"endAt":871,"startToken":1761,"endToken":2192},{"p":8,"at":871,"title":"D. The Breadth of Certain Provisions Could Make it Difficult for Entities to Comply","method":"printed heading","endPage":9,"endAt":456,"startToken":2192,"endToken":2440},{"p":9,"at":456,"title":"II. Conclusion","method":"printed heading","endPage":10,"endAt":0,"startToken":2440,"endToken":2604},{"p":10,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":390,"startToken":2604,"endToken":2663}]}
