{"document":{"slug":"rec-20260921-5148","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.…","issued":"2026-09-21","accession":"20260921-5148","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260921-5148_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-5148","tier":"record","sha256":"8054375f937de2a0efccbfabf1f5eb9360dea15d54c10ee2e34f96387e974bdf","pages":11,"tokens":3181,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":371,"text":"1 \nUNITED STATES OF AMERICA \n \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n) \nPJM Interconnection, L.L.C. \n \n \n) \n \nDocket No. ER26-3380-000 \n \n \n \n \n \n \n \n) \n \nMOTION FOR LEAVE TO ANSWER  \nAND ANSWER OF CONSTELLATION ENERGY GENERATION, LLC \nPursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s (“FERC” \nor the “Commission”) Rules of Practice and Procedure,1 Constellation Energy Generation, LLC \n(“Constellation”) respectfully moves for leave to answer and answers the Motion for Leave to \nAnswer and Answer of PJM Interconnection, L.L.C. (“PJM”).2  Constellation seeks to provide \nadditional information and context that will assist the Commission in its decision-making process.3 \nI. \nBACKGROUND \nOn July 31, 2026, PJM Interconnection, L.L.C. (“PJM”) submitted revisions to the PJM \nOpen Access Transmission Tariff (“Tariff”) and the Reliability Assurance Agreement Among \nLoad Serving Entities (“RAA”) to establish the Reliability Backstop Procurement (“RBP”).4  \n \n1  18 C.F.R. §§ 385.212, 385.213. \n2 PJM Interconnection, L.L.C., Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C., Docket \nNo. ER26-3380-000 (filed Sept. 10, 2026) (“PJM Answer”). \n3 Although the Commission’s Rules of Practice and Procedure do not generally permit answers to answers unless \notherwise ordered by the decisional authority, the Commission has made exceptions where an answer provides useful \nand relevant information that will assist the Commission in its decision-making process, corrects factual inaccuracies \nand clarifies the issues, or assures a complete record in the proceeding. See, e.g., Pioneer Transmission, LLC v. N. \nInd. Pub. Serv. Co., 140 FERC ¶ 61,057, at P 94 (2012) (accepting answers that “provided information that assisted \nus in our decision-making process”); Entergy Servs., Inc., 126 FERC ¶ 61,227, at P 76, order on clarification & reh’g, \n127 FERC ¶ 61,225 (2009); New Power Co. v. PJM Interconnection LLC, 98 FERC ¶ 61,208, at p. 61,756 (2002) \n(answer accepted to provide new factual and legal material to assist the Commission in decision-making process). \n4 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming \nfrom Large Loads, Docket No. ER26-3380-000 (filed July 31, 2026) (“PJM Proposal”).  Capitalized terms used but \nnot otherwise defined herein have the meaning as defined in the Tariff, the RAA, or the PJM Proposal, as applicable."},{"page":2,"startToken":371,"endToken":688,"text":"2 \n \nNumerous parties filed comments and protests addressing the proposal, including Constellation.5  \nIn response, PJM filed the PJM Answer on September 10, 2026.  The PJM Answer addressed \ncertain issues raised by Constellation in its Limited Protest and Answer.  Constellation submits \nthis answer to briefly respond to the PJM Answer and provide clarification that will assist the \nCommission in its decision in this proceeding.  \nII. \nANSWER \nA. \nEddystone and Similarly Situated Energy Resources Should Qualify as RBP \nResources and Resources Eligible to Supply Qualifying RBP Offset UCAP \nMW \nOn September 11, 2026, the D.C. Circuit issued a unanimous ruling vacating the \nDepartment of Energy’s (“DOE”) order issued under section 202(c) Federal Power Act (“FPA”) \nrequiring Consumers Energy to continue operating the J.H. Campbell power plant (the “Campbell \nOrder”).6  The Campbell Order could have implications for other electric generators currently \noperating pursuant to the Secretary’s authority under section 202(c), including Constellation’s \nEddystone Units 3 & 4 (“Eddystone”).  The court rejected the DOE’s interpretation of section \n202(c), finding that no “emergency” existed to warrant a section 202(c) order.7  Legal challenges \nto other DOE orders under section 202(c), including with respect to Eddystone, remain pending.  \nIn light of this development and its implications, Constellation provides additional clarification \nregarding its earlier request to modify the criteria for resources eligible to provide Qualifying RBP \nOffset UCAP MW and RBP Sell Offers.8   \n \n5 See PJM Interconnection, L.L.C., Limited Protest of Constellation Energy Generation, LLC, Docket No. ER26-\n3380-000 (filed Aug. 21, 2026) (“Limited Protest”); PJM Interconnection, L.L.C., Motion for Leave to Answer and \nAnswer of Constellation Energy Generation, LLC, Docket No. ER26-3380-000 (filed Sept. 8, 2026) (“Answer”). \n6 People of the State of Michigan v. U.S. Department of Energy, No. 25-1159 (D.C. Cir. Sept. 11, 2026). \n7 Id.  \n8 Limited Protest at 13–14; Answer at 2–3."},{"page":3,"startToken":688,"endToken":1045,"text":"3 \n \nOn December 1, 2023, Constellation announced its plans to retire Eddystone.  The day \nprior to the scheduled deactivation, on May 30, 2025, the Secretary declared that the operational \navailability and economic dispatch of Eddystone was necessary to meet an emergency on the \nsystem and directed Constellation to keep the units online.  The Secretary has extended its 202(c) \norder for Eddystone continuously since, most recently on August 21, 2026.9  Notably, those DOE \norders direct that the Eddystone units “shall not be considered capacity resources.”10  As a result, \nConstellation requested, and the Commission granted, a request for waiver to remove Eddystone \nUnits 3 and 4 from Capacity Resource status and transferred the Capacity Interconnection Rights \n(“CIRs”) from Eddystone to Crane Clean Energy Center earlier this year.11  Eddystone is now an \nenergy-only resource with no capacity rights. \nOnce Eddystone is no longer subject to a DOE 202(c) order, it could proceed with \ndeactivation as planned.  Or, if commercially practicable, it could request to become a new capacity \nresource.  To be clear, from a PJM perspective the path to becoming a new capacity resource for \nEddystone would look no different from that of a new build resource or an uprate to an existing \ncapacity resource:  it would require entry into the interconnection queue and payment to upgrade \nthe transmission system as necessary.  Network upgrade costs are uncertain but could be \nsignificant—potentially in the tens of millions or even hundreds of millions of dollars. \n  While uncertainty remains, Eddystone’s ability to qualify as an RBP Resource and/or \nQualifying RBP Offset UCAP MW could provide a viable economic path forward for keeping its \n \n9 Dep’t of Energy, Order No. 202-26-40 (Aug. 21, 2026); Dep’t of Energy, Order No. 202-26-24 (May 21, 2026); \nDep’t of Energy, Order No. 202-26-17 (Feb. 23, 2026) (“Feb. 2026 Eddystone Order”); Dep’t of Energy, Order No. \n202-25-10 (Nov. 25, 2025); Dep’t of Energy, Order No. 202-25-8 (Aug. 28, 2025); Dep’t of Energy, Order No. 202-\n25-4 (May 30, 2025). \n10 Feb. 2026 Eddystone Order at 10, Ordering Para. G (emphasis added). \n11 See Constellation Energy Generation, LLC, 195 FERC ¶ 61,162 (2026)."},{"page":4,"startToken":1045,"endToken":1329,"text":"4 \n \nunits online rather than proceeding with deactivation as planned.  The RBP as currently proposed, \nhowever, does not appear to contemplate an admittedly unusual scenario like Eddystone’s:  an \nenergy-only resource that is considering adding new capacity to the grid by acquiring new \nCapacity Interconnection Rights and new Installed Capacity.12 \nIn the PJM Answer, PJM dismissed Constellation’s requests with little explanation.13  We \nrespectfully submit that PJM is overlooking one of the better opportunities to unlock new capacity \nquickly. The Eddystone units are already fully permitted and constructed, with fuel supply in place, \nand do not face the significant land acquisition, construction, permitting, supply chain and other \nissues that new generation inevitably face.  Eddystone would need to seek new CIRs through an \nInterconnection Request, and, accordingly, bear its share of any required Network Upgrades, but \nEddystone is otherwise uniquely positioned to provide new capacity to the grid.  \nAccordingly, Constellation maintains its prior requests for relief with the additional clarity \nand context provided herein.  As previously discussed,14 minor changes to the PJM Proposal would \nmake clear that an energy-only resource obtaining new capacity rights would qualify for RBP \n(whether as a RBP Seller or as Qualifying RBP Offset UCAP MW).  This clarification to the \neligibility rules would be consistent with the overall framework of PJM’s RBP and PJM’s stated \nintent of procuring new capacity to address the region’s capacity shortfall. \nB. \nPJM Mischaracterizes the Commission’s Treatment of Price Taker \nRequirements in Prior Proceedings \nThe PJM Answer claimed that the Commission should disregard the concerns raised in \nConstellation’s Limited Protest regarding the RBP’s price taker requirement because the \n \n12 PJM Answer at 41. \n13 Id.  \n14 Limited Protest at 13–14; Answer at 2–3."},{"page":5,"startToken":1329,"endToken":1645,"text":"5 \n \nCommission has found in other proceedings, particularly in the context of Reliability Must Run \n(“RMR”) resources, that offering resources into the PJM Reliability Pricing Model (“RPM”) as \nprice takers is just and reasonable.15  This comparison is misguided.  The Commission should not \nrely on its limited RMR precedent to guide its decision here for the following reasons: \n• PJM Ignores the Commission’s Balancing Analysis in its RMR Proceeding.  In its \nRMR proceedings (and other proceedings considering the impact of price taker offers \nby resources with out-of-market support), the Commission engages in a balancing \nanalysis to determine whether it is just and reasonable to require out-of-market \nresources to offer as price takers, wherein it balances market and resource adequacy \nimpacts and cost impacts to determine whether a proposal is just and reasonable.16  This \nbalancing analysis is fact specific, and the RMR proceedings considered, among other \nthings, the unique nature of RMR units, the nature of the service provided, and the \nmagnitude and duration of such service.  Here, PJM has not engaged in any meaningful \nbalancing that considers the impact of RBP resources offering as price takers on \nmarkets, resource adequacy or costs, let alone provided evidence that the specific facts \napplicable to RBP resource (including, the uncertainty as to when or if the associated \nload will materialize, the duration and magnitude of the RBP service, etc.) justify \nPJM’s proposed result.  As described below, the Commission should find that the \nbalancing analysis here, unlike in the RMR proceedings, weighs against finding that \nPJM’s price taker requirement is just and reasonable.  \n \n15 PJM Answer at 47–51. \n16 See, e.g., PJM Interconnection, L.L.C., 192 FERC ¶ 61,135, at P 31 (2025) (acknowledging that “treating RMR \nresources as price takers in the capacity market may affect capacity prices,” but finding “on balance” that such \ntreatment is necessary to avoid customers paying for more capacity than needed)."},{"page":6,"startToken":1645,"endToken":1974,"text":"6 \n \n• Load Served by RMR Resources Already Exists.  Resources subject to RMR \nagreements are already serving existing load, with such generation operating past \nplanned deactivation dates in response to a well-studied transmission reliability \nproblem.  Such RMR resources continue to operate to ensure transmission reliability \nfor existing load until specific and necessary transmission system upgrades are \ncompleted.  On the other hand, the load expected to be served by RBP resources is not \nyet energized, and as explained in Constellation’s Limited Protest and Answer and Dr. \nShanker’s supporting testimony,17 there is risk this load may be delayed or never \nenergized at all.  Others agree this distinction between existing load and new large load \nis a meaningful concern.  For example, in PJM’s Interim Resource Adequacy Service \nproceeding,  Southern Maryland Electric Cooperative, Inc. explained that new large \nloads “are, as a structural matter, disproportionately likely to be projects still working \nthrough interconnection, construction, or commissioning, rather than loads already \ndrawing their full expected demand, if any demand at all based upon the state of project \ndevelopment.”18  Thus, the impact on markets, resource adequacy provided by existing \nresources, and costs overall could be far greater in the RBP context where there is no \nload certainty than in the RMR context where the load already exists. \n• The Magnitude of the Initial RBP Target Far Outweighs that Typical of RMR \nResources.  RMR resources in operation in PJM have historically been few in number, \n \n17 Limited Protest at 8–10, Shanker Aff. ¶¶ 13–17. \n18 PJM Interconnection, L.L.C., Comments and Limited Protest of Southern Maryland and Electric Cooperative, \nInc., Docket No. ER26-3515-000 (filed Sept. 3, 2026); see also PJM Interconnection, L.L.C., Motion for Leave to \nAnswer and Answer of the New Jersey Board of Public Utilities, Docket No. ER26-3515-000 (filed Sept. 18, 2026) \n(expressing concern that “New Large Loads may not be yet energized, or may have only just begun a ramp or testing \nperiod that is below its expected draw”)."},{"page":7,"startToken":1974,"endToken":2368,"text":"7 \n \naveraging a few hundred MWs at any given time over the past twenty plus years.19  \nEven the all-time high amount of RMRs on the system (i.e., the two RMR resources \nrelevant in the proceeding cited by PJM—Brandon Shores Generating Station Units 1 \nand 2 and Wagner Generating Station Units 3 and 4) together account for under 2,000 \nMW.20  On the other hand, the volume of RBP capacity (initially targeting 6,831 MWs) \nis expected to be significantly more than these typical RMR volumes,  including three \ntimes the peak RMR volume considered in the cited PJM RMR proceeding.  The impact \nof this volume of RBP capacity on market signals, resource adequacy and ultimately \ncosts in the RPM will be far greater than was ever considered in the RMR proceeding.  \n• RMR Resources Offer As Price Takers for a Relatively Short, Time-Limited \nPeriod.  The time period during which RMR resources act as price takers is generally \nmore limited to cover only the brief period of time necessary to address short-term \ntransmission reliability needs, typically under three years.21  Indeed, the RMR \nresources referenced in the RMR proceeding PJM cites are expected to serve as RMR \nresources for only a few delivery years.22  In fact, the Commission “has emphasized \nthat RMR agreements should be of a limited duration so as to not perpetuate out-of-\nmarket solutions that have the potential, if not undertaken in an open and transparent \nmanner, to undermine price formation.”23  In contrast, RBP resources will offer as \n \n19 Monitoring Analytics, LLC, 2026 Quarterly State of the Market Report for PJM: January through March, at 381 \n(May 14, 2026),  https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q1-som-\npjm.pdf (the “Market Monitor Q1 2026 Report”). \n20 PJM Interconnection, L.L.C., 193 FERC ¶ 61,234 (2025) (letter order accepting PJM Interconnection, L.L.C.’s \n10/24/2025 filing of proposed revisions to its Open Access Transmission Tariff).  \n21 The Market Monitor Q1 2026 Report at 381, Table 5-34. \n22 PJM Interconnection, L.L.C., 193 FERC ¶ 61,234 at P 10. \n23 N.Y. Indep. Sys. Operator, Inc., 150 FERC ¶ 61,116, at P 2 (2015), order on reh’g, 155 FERC ¶ 61,076 (2016), \nclarified by 161 FERC ¶ 61,189 (2017), order on reh’g, 163 FERC ¶ 61,047 (2018)); see also Indep. Power"},{"page":8,"startToken":2368,"endToken":2728,"text":"8 \n \nprice takers in each RPM for up to 15 years—again resulting in outsized impact on \nmarkets, resource adequacy and costs—a duration far greater than what was \ncontemplated in the RMR proceedings. \n• The Commission Must Consider the Cumulative Effect of PJM’s Out-of-Market \nInterventions.  Like the RBP, the RMR proposal cited by PJM was an “interim,” “stop-\ngap” solution “while PJM work[ed] with stakeholders to develop a more fulsome \nproposal.”24  Since then, PJM has also enacted other significant out-of-market, \n“interim” measures, including price caps and the RBP itself, that affect RPM price \nsignals.    But these cumulative impacts were not considered in the cases cited by PJM \nor any analysis it provided.  Rather, as discussed in Constellation’s Limited Protest, \nPJM itself recognizes what it calls the “credibility trap,” where “high scarcity prices \nthat are economically necessary to signal the need for investment become, in this \nenvironment, the trigger for governmental intervention that undermines the credibility \nof those same prices . . . . Investors, anticipating further intervention, discount the \ndurability of the price signal. Capital stays on the sidelines; the shortage persists.”25  In \nits balancing analysis, the Commission must consider the cumulative effect of PJM’s \nrepeated out-of-market interventions and the long-term impact and find that this aspect \nof PJM’s proposal is not just and reasonable. \n \nProducers of N.Y. v. N.Y. Indep. Sys. Operator, Inc., 150 FERC ¶ 61,214, at P 69 (2015), order on reh’g & \nclarification, 170 FERC ¶ 61,118 (2020) (“Unlike the RSSA contracts discussed in the original Complaint that \nprocure adequate capacity to address short-term reliability needs, the Dunkirk repowering agreement appears to \nprocure more capacity than is needed for short-term reliability, and for a much longer term.  We are concerned that \nif the additional capacity created by the repowering agreement above the amount needed for short-term reliability is \nallowed to offer into the NYISO capacity market at prices below the cost of repowering, such capacity might deter \nnew entry or displace less-costly existing capacity in NYCA.  As a result, capacity market prices could be artificially \nsuppressed.”).  \n24 PJM Interconnection, L.L.C., 190 FERC ¶ 61,088, PP 28, 46 (2025). \n25 Limited Protest, Shanker Aff. ¶ 4."},{"page":9,"startToken":2728,"endToken":2874,"text":"9 \n \nC. \nConstellation Supports PJM’s Suggestion to Sever Credit and Collateral \nIssues \nConstellation and others raised concerns about the load serving entity (“LSE”) collateral \nand credit requirements in the PJM Proposal.26  In the PJM Answer, PJM acknowledged that \n“reasonable minds may differ on the credit approach,” and “consent[ed] to the Commission \nresolving the applicable buyer-side LSE RBP Credit Rate through additional procedures.”27  Given \nthe complexity and enormity of the potential LSE credit requirements, and given that “the LSE \ncredit rules do not need to be effective for the RBP to be conducted,”28 Constellation appreciates \nPJM’s openness on these issues and supports, as described in its Answer, severing these credit \nissues and establishing an expedited paper hearing limited to proposed Tariff section 18.8(b).29  \n \n \n \n26 See Answer § II.B. \n27 PJM Answer at 93. \n28 Id.  \n29 Answer at 9–10."},{"page":10,"startToken":2874,"endToken":3124,"text":"10 \n \nIII. \nCONCLUSION \nIn accordance with PJM’s willingness to accept changes under NRG Power Marketing,30 \nthe Commission should (i) accept the RBP subject to the modifications Constellation discussed in \nits Limited Protest and Answer, as clarified herein, and (ii) sever the LSE credit issue discussed in \nits Answer for further proceedings and refer that issue to an expedited paper hearing. \n \nRespectfully submitted, \n \nDated: September 21, 2026 \n \n30 See PJM Proposal at 3 (“PJM provides notice that it consents to the Commission’s exercise of authority to modify \nand/or sever any element of the proposed Tariff and RAA language to the extent necessary and permitted under section \n205 of the FPA and NRG Power Marketing, LLC v. FERC, where such modification and/or severance is consistent \nwith PJM’s overarching objectives in this filing”).   \n \n/s/ \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nJohn M. White \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \njohn.white@constellation.com \n \nChristopher A. Wilson \nVice President, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \nKenneth W. Irvin \nAlexandra K. Calabro \nSidley Austin LLP \n1501 K Street, N.W. \nWashington, DC 20005 \nPhone: (202) 736-8256 \nkirvin@sidley.com \nalexandra.calabro@sidley.com \n \nTerence T. Healey \nSidley Austin LLP \n60 State Street, 37th Floor \nBoston, MA 02109 \nPhone: (617) 223-0306 \nthealey@sidley.com \n \nCounsel for Constellation Energy Generation, \nLLC"},{"page":11,"startToken":3124,"endToken":3181,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Washington, D.C. this 21st day of September 2026. \n/s/ \nAlexandra K. Calabro  \nSidley Austin LLP \n1501 K Street, N.W. \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":727,"startToken":0,"endToken":100},{"p":1,"at":727,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":435,"startToken":100,"endToken":435},{"p":2,"at":435,"title":"II. ANSWER","method":"printed heading","endPage":2,"endAt":448,"startToken":435,"endToken":437},{"p":2,"at":448,"title":"A. Eddystone and Similarly Situated Energy Resources Should Qualify as RBP","method":"printed heading","endPage":4,"endAt":1570,"startToken":437,"endToken":1275},{"p":4,"at":1570,"title":"B. PJM Mischaracterizes the Commission’s Treatment of Price Taker","method":"printed heading","endPage":9,"endAt":5,"startToken":1275,"endToken":2729},{"p":9,"at":5,"title":"C. Constellation Supports PJM’s Suggestion to Sever Credit and Collateral","method":"printed heading","endPage":10,"endAt":6,"startToken":2729,"endToken":2875},{"p":10,"at":6,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":0,"startToken":2875,"endToken":3124},{"p":11,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":345,"startToken":3124,"endToken":3181}]}