{"document":{"slug":"rec-20260923-5149-2","title":"NOVEC_Coscia Supplemental Affidavit","issued":"2026-09-23","accession":"20260923-5149","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"attachment","file":"sources/filings/text/20260923-5149_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5149","tier":"record","parent":"rec-20260923-5149","sha256":"86e5ba2159a70bc95a930cbcf6313949c960f15dacfa5c131c760d45f2d9c6b4","pages":12,"tokens":4456,"emptyPages":[],"textThemes":["credit","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":366,"text":"UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY \nCOMMISSION \nPJM Interconnection, L.L.C.\nDocket No. ER26-3380-000\nSUPPLEMENTAL REPLY AFFIDAVIT OF CARL F. COSCIA, Ph.D. \nOn Behalf of Northern Virginia Electric Cooperative, Inc. \n \nI. PURPOSE, POSTURE, AND PRINCIPAL CONCLUSIONS \n1. \nMy name is Carl F. Coscia. I am the Principal of Toller Energy. I submitted an \naffidavit in this docket on August 21, 2026 in support of the Protest of Northern \nVirginia Electric Cooperative, Inc. (“NOVEC”) (“NOVEC Coscia Aff.”).1 My \nqualifications, the basis for my opinions, and the materials I reviewed are set out \nthere and are not repeated here. The opinions expressed in this supplemental reply \nare my own. No part of my compensation is contingent on the outcome of this \nproceeding. \n1. \nSince submitting that affidavit, I have reviewed the Motion for Leave to Answer and \nAnswer of PJM Interconnection, L.L.C. filed September 10, 2026 (“PJM Answer”);2 \nEast Kentucky Power Cooperative, Inc.’s September 18, 2026 Second Limited \nAnswer and the Reply Affidavit I submitted with it (“EKPC Reply Aff.”);3 PJM’s \nReliability Backstop Procurement Execution presentation dated September 14, 2026 \n(“September 14 Presentation”);4 PJM’s Reliability Backstop Procurement Design \npresentation of April 16–17, 2026 (“April 17 Design Presentation”);5 and the CIFP-\n \n1 Affidavit of Carl F. Coscia, Ph.D. on Behalf of Northern Virginia Electric Cooperative, \nattached to Protest of Northern Virginia Electric Cooperative, Inc., Docket No. ER26-3380-\n000 (filed Aug. 21, 2026) (Accession No. 20260821-5307) (“NOVEC Protest”). \n2 Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C., Docket No. ER26-\n3380-000 (filed Sept. 10, 2026) (Accession No. 20260910-5296). \n3 Motion for Leave to File Limited Answer, and Limited Answer, of East Kentucky Power \nCooperative, Inc., Docket No. ER26-3380-000 (filed Sept. 18, 2026) (Accession \nNo. 20260918-5364), including the Reply Affidavit of Carl F. Coscia, Ph.D. attached thereto. \n4 PJM Interconnection, L.L.C., Reliability Backstop Procurement Execution (Sept. 14, 2026), \navailable at https://www.pjm.com/-/media/DotCom/committees-groups/cifp-\nrbp/2026/20260914/20260914-item-01---reliability-backstop-procurement-execution---\npresentation.pdf. \n5 PJM Interconnection, L.L.C., Reliability Backstop Procurement Design, Reliability Backstop \nCIFP (Apr. 16–17, 2026), available at https://www.pjm.com/-"},{"page":2,"startToken":366,"endToken":771,"text":"RBP Options and Packages Matrix updated June 30, 2026 (“Package Matrix”).6 I have \nalso reviewed NOVEC’s filed Protest and the supporting affidavit of Wilbur Rollins \n(“Rollins Aff.”).7 References to the “July 31 Filing” are to PJM’s filing in this \nproceeding of July 31, 2026, including the Affidavit of Gwen Kelly on Behalf of PJM \n(“Kelly Aff.”).8 Materials on which I rely are cited where used. \n2. \nThis affidavit is limited to the buyer-side Load Serving Entity (“LSE”) credit \nrequirement. I do not repeat the financial and exposure analysis in my original \nNOVEC affidavit except where PJM’s Answer supplies a new explanation or changes \nan implementation assumption on which that analysis depended. The original \naffidavit remains the basis for my opinions concerning NOVEC’s financial capacity, \nthe magnitude of the requirement, and the consequences of applying a uniform \nCredit Rate to NOVEC. \n3. \nPJM has now stated that the buyer-side LSE Credit Rate need not be effective for the \nReliability Backstop Procurement (“RBP”) to proceed and has consented to the \nCommission resolving that rate through additional procedures. PJM Answer at 92–\n93 & nn.282–86. The issue is therefore not simply whether $1.5 million per MW \nshould be replaced with another number. It is the methodology by which the \namount is derived. \n4. \nPJM’s Answer provides additional explanation. PJM now states that Peak Market \nActivity is not an adequate tool for prospectively securing the RBP obligation; that \nno collateral should be required for an RBP Resource that is not in service for a \nDelivery Year; that the Credit Rate can decline as remaining payment exposure \ndeclines; and that the initial Credit Rate could be keyed to the actual MW-weighted \naverage levelized procurement cost rather than the maximum $555/MW-day. PJM \nAnswer at 78 n.234, 86 n.259, 87 & n.261, 92–93. \n \n/media/DotCom/committees-groups/cifp-rbp/2026/20260417/20260417-item-05---\npjm-reliability-backstop-procurement-design---pjm-presentation.pdf. \n6 PJM Interconnection, L.L.C., CIFP-RBP Options and Packages Matrix (updated June 30, \n2026), available at https://www.pjm.com/-/media/DotCom/committees-groups/cifp-\nrbp/2026/20260630/20260630-cifp---reliability-backstop-procurement---options-and-\npackages-matrix---updated.xls. \n7 Affidavit of Wilbur Rollins on Behalf of Northern Virginia Electric Cooperative, Inc., \nattached to NOVEC Protest. \n8 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource \nAdequacy Concerns Stemming from Large Loads, Docket No. ER26-3380-000 (filed July 31, \n2026) (Accession No. 20260731-5214); Affidavit of Gwen Kelly on Behalf of PJM, \nAttachment D thereto."},{"page":3,"startToken":771,"endToken":1244,"text":"5. \nThose explanations do not identify the residual loss the buyer-side collateral is \nintended to secure. PJM instead explains the initial $1.5 million per MW as \napproximately fifty percent of the gross fifteen-year contractual value at $555/MW-\nday. PJM Answer at 87–88; Kelly Aff. ¶ 26. That arithmetic explains the source of the \nfigure. It does not establish that the figure corresponds to the loss that would \nremain after an LSE default, application of collateral, reallocation under Tariff \nsection 18.9(a), and any further default allocation under Operating Agreement \nsection 15.2.2. \n6. \nPJM’s illustrative allocation assigns the NOVEC zone 1,302.6 RBP UCAP MW, or \napproximately 19.07 percent of the Initial RBP Target, producing a collateral \nrequirement of approximately $1.954 billion at the filed Credit Rate. NOVEC Coscia \nAff. ¶¶ 17–18; Rollins Aff. at 2:15–17. As Mr. Rollins explains, that amount exceeds \nthe assets on NOVEC’s balance sheet. Rollins Aff. at 3:7–8. \n7. \nMy principal opinion is therefore methodological. Before a buyer-side Credit Rate is \nselected, the credit framework should identify the residual loss being secured, the \npopulation that bears it, the quantity of MW to which the requirement applies, how \nthe amount changes as RPM prices and remaining tenor change, and the standards \nfor recalculating and releasing collateral. The filed construct and PJM’s subsequent \nexplanations do not yet establish those relationships. \n \nII. PJM HAS IDENTIFIED A PAYMENT STREAM, NOT THE RESIDUAL LOSS TO BE \nSECURED \n9. \nCollateral is a credit-risk instrument. In my original NOVEC affidavit, I distinguished \ncounterparty credit risk from the separate economic risk that forecast large load \ndoes not materialize. Counterparty credit risk is the risk that an LSE fails to pay an \nRBP Charge; the parties exposed are PJM and, through the default provisions, other \nmarket participants. NOVEC Coscia Aff. ¶¶ 32–34. The amount of collateral should \nbe related to that loss. \n10. PJM now states that the buyer-side requirement is intended to cover the full \nforward RBP payment obligation, including the RPM component that Peak Market \nActivity does not prospectively collateralize over an up-to-fifteen-year term. PJM \nAnswer at 87. It also states that $1.5 million per MW is approximately fifty percent \nof the notional contractual value at the maximum $555/MW-day RBP price. Id. at \n87–88; Kelly Aff. ¶ 26. \n11. At $555/MW-day, fifteen years of gross payments equal $3,038,625 per MW. Fifty \npercent is $1,519,312.50 per MW. The filed $1.5 million figure is therefore \napproximately 49.4 percent of that gross amount. But the RBP does not settle as a \nsingle fifteen-year payment at inception. Load pays the RPM clearing price through \nordinary capacity settlement and pays or receives the difference between the RBP \ncommitment price and the RPM clearing price through the RBP settlement \nmechanism."},{"page":4,"startToken":1244,"endToken":1695,"text":"12. Gross contractual value therefore is not itself a measure of loss on default. The \nrelevant credit exposure depends on when a default occurs, what amounts remain \npayable, what RPM prices have been established, what collateral has already been \nposted and applied, what amounts are reallocated under section 18.9(a), and what \nresidual, if any, reaches the broader PJM membership. \n13. PJM’s Answer describes that default consequence in two ways. In responding to \nEKPC, PJM states that an unpaid RBP Charge is reallocated among other LSEs \nalready responsible for RBP Charges. PJM Answer at 67 n.205. In defending the \nmagnitude of the credit requirement, PJM states that the approach “balances the \nprotection of Members against the effects of LSE default,” citing Operating \nAgreement section 15.2.2. Id. at 84 & n.252. Those provisions may describe \nsuccessive levels of a default waterfall. Their relationship determines the residual \nloss. See EKPC Reply Aff. ¶¶ 18–24. \n14. PJM addressed the same question during the stakeholder process. Its April 2026 \ndesign presentation states, under the heading “Default Allocation,” that “[i]f a \ndefault occurs as a result of a nonpayment of a RBP charge, that amount would be \nhandled as a default allocation assessment under the existing OA Section 15.2.2,” \nand described that treatment as consistent with the existing RPM market. April 17 \nDesign Presentation at 47. That statement indicates that unpaid RBP Charges were \nexpected to reach the broader membership through the same mechanism that \napplies to other market defaults. \n15. NOVEC carries approximately nineteen percent of the Initial RBP Target. Its original \naffidavit explained that a failure to post collateral or a payment default at that scale \nwould not remain confined to the cooperative. NOVEC Coscia Aff. ¶¶ 14(h), 68–69. \nThe size of the residual loss, and who bears it, therefore should be identified before \nthe amount of collateral intended to absorb it is selected. \n16. In my opinion, a formula based on approximately one-half of gross contractual value \ndoes not establish that relationship. Additional procedures should first define what \nremains unpaid after the RBP settlement, collateral application, section 18.9(a) \nreallocation, and any Operating Agreement section 15.2.2 allocation. Only then can a \nbuyer-side Credit Rate be evaluated against the loss it is intended to secure. \n \nIII. PJM’S CREDIT-MIGRATION ANALYSIS DOES NOT SUPPORT A UNIFORM RATE \n17. PJM defends a Credit Rate that does not vary with an obligor’s credit condition in \npart by reference to credit migration. PJM extrapolates a ten-year S&P Global \ncorporate rating-transition study to fifteen years and reasons that an individualized \ncredit approach could require additional collateral as an LSE’s creditworthiness \ndeteriorates. PJM Answer at 81–83 & Table 2."},{"page":5,"startToken":1695,"endToken":2161,"text":"18. Credit migration over a fifteen-year horizon is a legitimate credit consideration. But \nthe fact that credit quality can change supports periodic measurement and \nadjustment; it does not explain why the obligor’s credit condition should be ignored. \n19. NOVEC illustrates the problem. Assuming an annual carrying cost of 100 basis \npoints, the requirement would cost approximately $19.5 million per year, \napproximately 94 percent of NOVEC’s 2025 patronage capital and operating \nmargins. At 150, 200, and 300 basis points, the carrying cost rises to approximately \n141, 188, and 281 percent of that margin, respectively. Mr. Rollins further explains \nthe consequences for NOVEC’s credit rating, its ability to transact bilaterally, and its \ncapacity to borrow for infrastructure. Rollins Aff. at 3:7-20. \n20. A generalized corporate transition matrix does not measure the effect of imposing \ncollateral comparable to or exceeding an obligor’s balance sheet. A requirement of \nthat magnitude can consume liquidity, encumber assets, absorb credit-facility \ncapacity, and impose recurring financing expense. The requirement can therefore \naffect the very credit quality the migration analysis is used to predict. EKPC Reply \nAff. ¶¶ 25–30. \n21. PJM already has current, participant-specific information concerning NOVEC. PJM \nbills NOVEC, observes its payment performance, measures exposure under \nAttachment Q, monitors internal and external credit ratings, and receives financial \ninformation through its existing credit processes. NOVEC Coscia Aff. ¶¶ 25–27. At \nDecember 31, 2025, NOVEC reported approximately $34.4 million of cash collateral \nposted to PJM against its existing market activity. Id. \n22. The proposed RBP requirement changes that result by a factor of approximately 57. \nThe original affidavit compared approximately $34.4 million of existing PJM \ncollateral with approximately $1.954 billion of incremental RBP collateral. Id. ¶¶ \n10(d), 27. \n23. PJM also uses a term-sensitive methodology on the seller side of the same RBP \nconstruct. The seller requirement is tied to a defined period of exposure, is \ndiscounted, declines as the commitment runs off, and permits reductions that take \naccount of participant credit quality. My EKPC reply affidavit compares that \nmethodology with the buyer requirement and explains that, at the same $555/MW-\nday price, the seller posts $121,545 per MW while the buyer posts $1.5 million per \nMW. EKPC Reply Aff. ¶¶ 28–30. \n24. I do not suggest that the buyer and seller risks are identical or that the same \nnumerical requirement should apply to both. The comparison shows that long-term \ncollateral need not be fixed or uniform. PJM’s seller methodology discounts the \nexposure, reflects remaining tenor, and permits reductions that take account of \ncredit quality. PJM’s migration analysis does not explain why those variables should \nbe omitted from the buyer-side methodology. \n25. In my opinion, any additional procedures should permit the buyer-side requirement \nto respond to changes in both the obligor and the exposure over time. A"},{"page":6,"startToken":2161,"endToken":2622,"text":"requirement intended to address possible future deterioration should not itself \ncreate a present liquidity stress by ignoring the obligor’s financial capacity. \n \nIV. THE OPT-OUT DISTINCTION DOES NOT TRACK THE RISK IT IS SAID TO \nADDRESS \n26. I addressed the opt-out at paragraphs 12(f), 35, 52 through 57 and 74 of my original \naffidavit and do not repeat that analysis here. PJM’s Answer now explains the \nprovision and applies it to another Virginia cooperative. Proposed Tariff, \nAttachment DD, section 18.1(d) permits certain Electric Distributors to elect out of \nthe RBP. In its Answer, PJM explains the provision as addressing “a limited \nregulatory gap faced by cooperatives and municipal utilities whose rates are not \nregulated by the states,” on the reasoning that where no state regulatory authority is \nresponsible for addressing the reallocation of RBP costs, those utilities’ customers \nare “at risk of absorbing the costs of an ‘overbuy’ if a particular large load fails to \nmaterialize.” PJM Answer at 30 (citing July 31 Filing, Transmittal Letter at 45). \n27. PJM concludes that the opt-out “should appropriately be limited only to those \nElectric Distributors that are not regulated by the state,” and applies that conclusion \nto Old Dominion Electric Cooperative: because ODEC “is not subject to rate \nregulation by state commissions,” ODEC “would qualify as an Electric Distributor \nthat is not subject to regulation by the state and may elect to opt out of the RBP.” \nPJM Answer at 30–31. \n28. NOVEC is a Virginia distribution cooperative whose rates the State Corporation \nCommission regulates. On PJM’s stated criterion, NOVEC is ineligible. Two Virginia \ncooperatives therefore reach opposite results under the same provision. \n29. The distinction does not track the risk. The risk PJM identifies is that utility \ncustomers may absorb the cost of an overbuy if the forecast large load does not \nmaterialize. Whether that occurs depends on whether the cost can actually be \nreassigned to the large-load customer and whether the utility can carry the \nobligation in the meantime. State rate regulation does not answer either question. It \nidentifies who reviews retail rates; it does not establish a mechanism for \ntransferring a fifteen-year wholesale obligation to the customer that caused it. \n30. NOVEC’s exposure to that risk is not reduced by the presence of state rate \nregulation. Its allocation of 1,302.6 RBP UCAP MW derives from a large-load forecast \nsubmitted for transmission planning purposes, and the filed Tariff provides no \nreconciliation of allocated megawatts against load actually realized. NOVEC Coscia \nAff. ¶¶ 9(c), 20–22. The overbuy risk PJM describes therefore applies to NOVEC in \nthe same form. \n31. In my opinion, the economic rationale for the opt-out would be stronger if eligibility \ntracked the overbuy risk PJM identifies rather than state rate-regulatory status \nstanding alone."},{"page":7,"startToken":2622,"endToken":3048,"text":"V. THE CONTROLLING MEGAWATT QUANTITY REMAINS UNDEFINED \n32. PJM states in footnote 234 of its Answer that no collateral would be required for \nRBP Resources that are not in service for a Delivery Year and that no RBP Charges \nwould be assessed for those resources. PJM Answer at 78 n.234. NOVEC’s answer \nappropriately asks that this interpretation be reflected in the Tariff. \n33. This is not only a drafting issue. Proposed Tariff, Attachment DD, section \n18.8(b)(i)(A) defines the quantity to which the Credit Rate applies by reference to \n“RBP UCAP MW committed”: commitments received through the RBP minus \ncommitments rescinded under section 18.6(e). The provision does not state an in-\nservice limitation. \n34. That distinction matters because rescission does not occur immediately when a \nresource fails to enter service. As explained in my EKPC reply affidavit, section \n18.6(e) permits a resource to remain committed for up to three Delivery Years \nbefore rescission, and PJM’s September 14 implementation example for a resource \nthat does not come online continues to show committed MW even while Daily \nOwned MW is zero. EKPC Reply Aff. ¶¶ 37–43. \n35. The filed provisions also use the Final RBP Target in determining individual LSE \npostings. Section 18.8(b)(i)(B)(1) scales reported RBP Obligation MW where the \nreported values do not sum to the fixed Final RBP Target. If the procurement clears \nshort of the Final RBP Target, committed MW and the Final RBP Target are different \nquantities. My EKPC reply affidavit explains that PJM has identified both as \ngoverning in different statements. Id. ¶¶ 44–46. \n36. At the filed Credit Rate, each 100 MW difference changes the aggregate collateral \namount by $150 million. For NOVEC, whose illustrative allocation already produces \na $1.954 billion requirement, the quantity definition is therefore economically \nmaterial. \n37. In my opinion, an LSE should be able to calculate its requirement directly from the \nTariff. If PJM intends collateral to follow only in-service MW, that should be stated \nexpressly. The Tariff should also establish the relationship among committed MW, \nin-service MW, RBP Obligation MW allocated to an LSE, and the Final RBP Target. \n \nVI. PJM’S PEAK MARKET ACTIVITY CLARIFICATION DOES NOT RESOLVE THE \nCREDIT QUESTION \n38. My original NOVEC affidavit stated that once RBP Charges were billed, the same \neconomic activity would also enter Peak Market Activity under Attachment Q, \ncreating an overlap between the new RBP requirement and existing credit \ntreatment. NOVEC Coscia Aff. ¶¶ 10(d), 25–29. PJM has now responded directly to \nthat issue."},{"page":8,"startToken":3048,"endToken":3520,"text":"39. PJM consents to deleting the proposed sentence stating that settlement of RBP \npositions “may be included, as appropriate, in Peak Market Activity,” because that \nsentence could create confusion that RBP Charges may be captured in Peak Market \nActivity. PJM Answer at 86 n.259. In light of that consent, I do not rest my opinion on \nthe proposition that an invoiced RBP Charge would itself be collateralized again \nthrough Peak Market Activity. The remaining issue is PJM’s treatment of the forward \nRPM component, addressed below. \n40. PJM’s new explanation raises a different issue. PJM states that the separate RBP \nrequirement must secure the forward RPM component as well as the contract-for-\ndifferences component, because Peak Market Activity does not prospectively \ncollateralize the RPM component over the fifteen-year commitment. PJM Answer at \n87. \n41. The relevant comparison is not PJM’s stated rationale but the ordinary treatment of \nthe RPM component PJM invokes. Every LSE carries, as a matter of course, a forward \nRPM capacity obligation extending roughly three years. PJM applies its ordinary \nAttachment Q credit framework to that obligation; it does not require collateral \nequal to the full three-year forward RPM payment stream. \n42. Consider an RBP commitment with three Delivery Years remaining at an RBP \ncommitment price of $555/MW-day and an RPM clearing price of $554/MW-day. \nThe forward RPM exposure then has the same horizon as an ordinary capacity \nobligation. Per MW, the contract-for-differences amount over those three years is \n$1,095, while the remaining gross payment stream is $607,725. Applied to NOVEC’s \nillustrative 1,302.6 MW allocation, the three-year contract-for-differences amount is \napproximately $1.43 million, while the total remaining payment stream is \napproximately $791.6 million. \n43. PJM’s own roll-off illustration shows the collateral it would hold at that point. At \nthree Delivery Years remaining, PJM’s schedule sets collateral equal to the total \nremaining payment obligation: $60,772,500 per 100 MW, or $607,725 per MW. \nSeptember 14 Presentation at 69. Applied to NOVEC’s illustrative allocation, that is \napproximately $791.6 million. \n44. At three years remaining, therefore, an ordinary LSE and an RBP buyer carry \nforward RPM obligations of the same horizon at essentially the same price. The \nordinary obligation remains subject to PJM’s ordinary Attachment Q credit \ntreatment. Under PJM’s illustration, the RBP obligation carries collateral equal to \nevery remaining dollar of the payment stream. What distinguishes the two is a \ncontract for differences of $1/MW-day. \n45. In my opinion, the existence of an RBP commitment can justify considering risks not \npresent in an ordinary capacity obligation. But at three years remaining the horizon \nis the same, and the RPM exposure is the same. The methodology should explain \nwhy the credit treatment differs at that point, and how the separate requirement \nconverges with ordinary RPM credit treatment as the contract-for-differences"},{"page":9,"startToken":3520,"endToken":3886,"text":"amount and remaining tenor decline. The answer should not depend solely on \nwhether a MW carries the label “RBP.” \n \nVII. PJM’S REDUCTION MECHANISM REMAINS A GROSS-PAYMENT ROLL-OFF, \nNOT AN EXPOSURE METHODOLOGY \n46. PJM states that the Credit Rate can decline when previously required collateral \nexceeds remaining expected payment exposure. PJM Answer at 87 & n.261. The \nSeptember 14 Presentation then illustrates a 100 MW obligation at the $1.5 million \nrate. \n47. As described in my EKPC reply affidavit, that illustration holds $150 million of \ncollateral unchanged for the first eight Delivery Years. The first reduction occurs in \nthe ninth Delivery Year, when the remaining gross payment obligation falls below \nthe collateral held. Thereafter, the requirement follows the remaining gross \npayment stream. EKPC Reply Aff. ¶¶ 62–68. \n48. That illustration provides useful information about how PJM presently expects the \npermissive reduction language to operate. The reduction is therefore driven by \nremaining gross payments, not by the RPM clearing price, the contract-for-\ndifferences amount, participant credit condition, or modeled loss on default. \n49. For NOVEC, a discretionary reduction standard is particularly significant because \nthe starting amount is approximately $1.954 billion and the carrying cost is itself \nfinancially material. NOVEC Coscia Aff. ¶¶ 63–66. A reduction that occurs only after \nremaining gross payments fall below posted collateral can leave the requirement \nunchanged for years despite changes in market prices, remaining tenor, or credit \ncondition. \n50. In my opinion, additional procedures should establish objective, tariff-based \nstandards for recalculation and release. Those standards should state the frequency \nof review, the inputs used, the circumstances requiring a reduction, and the time \nwithin which excess collateral is returned. \n \nVIII. A CREDIT DESIGN OF THE KIND NOVEC SEEKS WAS BEFORE PJM IN THE \nSTAKEHOLDER PROCESS \n51. NOVEC’s answer points to the voluntary, subscription-based framework that \nreceived sector-weighted supermajority support. On the credit question, that \nframework was specific. \n52. At design component 22.0 of PJM’s package matrix, the package proposed by the \nJoint Electric Distribution Companies and the Data Center Coalition would have used \na registry to identify, before the procurement, the LSEs required to hold collateral \nand the megawatts for each. It provided that “[i]f an LSE-Large Load cannot post"},{"page":10,"startToken":3886,"endToken":4279,"text":"collateral, the load is not procured for through the backstop,” and that buyer default \nexposure would be recognized early and funded continuously over time. Package \nMatrix, tab “3. Package Matrix,” design component 22.0. \n53. Two features of that approach bear on the questions addressed above. The obligated \nentity and its megawatt quantity were identified before the procurement rather \nthan allocated afterward. And an inability to post operated on the procurement \nrather than on other parties: the megawatts were not bought, and no unsecured \nobligation arose. \n54. PJM states that the Board “adopted various concepts from the Coalition RBP \nProposal,” identifying the “credit requirement for Load Serving Entities” among \nthem. July 31 Filing at 22. The filed construct assigns the obligation to LSEs. It does \nnot incorporate the registry, the identification of the obligated entity before the \nprocurement, the requirement to post before the obligation attaches, or the \ncontinuous measurement of exposure as it emerges. \n55. I express no view on whether the Commission should direct adoption of that \nframework. I note only that a credit design addressing the matters identified in this \naffidavit was before PJM and received stakeholder support. \n \nIX. ADDITIONAL PROCEDURES SHOULD ADDRESS THE ENTIRE BUYER-SIDE \nCREDIT METHODOLOGY \n56. PJM has consented to Commission resolution of the buyer-side Credit Rate through \nadditional procedures and has also stated that the initial rate could be keyed to the \nactual MW-weighted average of selected RBP Sell Offers rather than the maximum \n$555/MW-day. PJM Answer at 92–93. \n57. Using the actual RBP procurement price would reduce the requirement if the \nprocurement clears below $555/MW-day. It would not resolve the underlying \nmethodology. If the same approximately fifty-percent-of-gross-contractual-value \napproach is applied to a lower price, the number changes but its relationship to \nresidual credit exposure remains undefined. \n58. In my opinion, the scope of additional procedures should therefore encompass the \nbuyer-side credit framework, not merely the numerical Credit Rate. At a minimum, \nthe procedures should determine the residual loss the requirement secures, the \nparties that bear it, and the order in which collateral, section 18.9(a) reallocation, \nand any Operating Agreement section 15.2.2 allocation apply. They should also \ndetermine the controlling MW quantity, the relationship between RPM payments \nand the contract-for-differences amount, the period of exposure, participant credit \ncondition and permissible forms of support, and objective recalculation and release \nstandards."},{"page":11,"startToken":4279,"endToken":4421,"text":"59. The methodology should then produce the Credit Rate. The reverse approach — \nselecting a collateral amount first and then describing it as a fraction of gross \ncontractual value — does not demonstrate that the amount is calibrated to the \ncredit loss that can result from default. \n60. PJM’s Answer and subsequent implementation materials provide explanations that \nwere not available when NOVEC filed its Protest. Those explanations narrow certain \nissues, including the Peak Market Activity issue, but they leave unresolved the \nexposure, quantity, and release mechanics that determine the buyer-side credit \nrequirement. \n61. For NOVEC, those choices have immediate financial consequences because the filed \nmethodology produces an initial requirement of approximately $1.954 billion. In my \nopinion, a requirement of that scale should rest on a defined relationship between \nthe amount posted and the loss secured. The present record does not establish that \nrelationship."},{"page":12,"startToken":4421,"endToken":4456,"text":"VERIFICATION OF AFFIDAVIT \n \nPursuant to 18 C.F.R. § 385.2005(b)(3), I verify under penalty of perjury that the \nforegoing Affidavit is true and correct. \n \nExecuted September 22, 2026. \n \nBy: _____________________________ \n       Carl F. Coscia"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":244,"startToken":0,"endToken":35},{"p":1,"at":244,"title":"I. PURPOSE, POSTURE, AND PRINCIPAL CONCLUSIONS","method":"printed heading","endPage":3,"endAt":1471,"startToken":35,"endToken":1005},{"p":3,"at":1471,"title":"II. PJM HAS IDENTIFIED A PAYMENT STREAM, NOT THE RESIDUAL LOSS TO BE","method":"printed heading","endPage":4,"endAt":2422,"startToken":1005,"endToken":1627},{"p":4,"at":2422,"title":"III. PJM’S CREDIT-MIGRATION ANALYSIS DOES NOT SUPPORT A UNIFORM RATE","method":"printed heading","endPage":6,"endAt":164,"startToken":1627,"endToken":2182},{"p":6,"at":164,"title":"IV. THE OPT-OUT DISTINCTION DOES NOT TRACK THE RISK IT IS SAID TO","method":"printed heading","endPage":7,"endAt":0,"startToken":2182,"endToken":2622},{"p":7,"at":0,"title":"V. THE CONTROLLING MEGAWATT QUANTITY REMAINS UNDEFINED","method":"printed heading","endPage":7,"endAt":2226,"startToken":2622,"endToken":2984},{"p":7,"at":2226,"title":"VI. PJM’S PEAK MARKET ACTIVITY CLARIFICATION DOES NOT RESOLVE THE","method":"printed heading","endPage":9,"endAt":117,"startToken":2984,"endToken":3539},{"p":9,"at":117,"title":"VII. PJM’S REDUCTION MECHANISM REMAINS A GROSS-PAYMENT ROLL-OFF,","method":"printed heading","endPage":10,"endAt":1262,"startToken":3539,"endToken":4077},{"p":10,"at":1262,"title":"IX. ADDITIONAL PROCEDURES SHOULD ADDRESS THE ENTIRE BUYER-SIDE","method":"printed heading","endPage":12,"endAt":245,"startToken":4077,"endToken":4456}]}