{"document":{"slug":"rec-20260924-5183","title":"Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026","issued":"2026-09-24","accession":"20260924-5183","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"New Jersey Board of Public Utilities","kind":"answer","file":"sources/filings/text/20260924-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260924-5183","tier":"record","sha256":"d7f5d0f0ffbbed5dcfdb9861e3764fb4295dd767abfc18d4697ff71c4bbb5358","pages":8,"tokens":1881,"emptyPages":[],"textThemes":["cost","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":232,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C.  \n  \n) \n \n   \n                   \nDocket No. ER26-3380-000\n                                         \n \n \nMOTION FOR LEAVE TO ANSWER AND ANSWER OF  \nTHE NEW JERSEY BOARD OF PUBLIC UTILITIES \n \n \nOn July 31, 2026, PJM Interconnection, L.L.C. (“PJM”) proposed revisions to the \nReliability Assurance Agreement Among Load Serving Entities (“RAA”) and the Open Access \nTransmission Tariff (“Tariff”) to establish the Reliability Backstop Procurement (“RBP”).  On \nAugust 21, 2026, the New Jersey Board of Public Utilities (“Board”) submitted comments.1   \n \nOn September 10, 2026, PJM filed a Motion for Leave to Answer and Answer.2  Pursuant \nto Rules 212 and 213 of the Federal Energy Regulatory Commission’s (“Commission” or “FERC”) \nRules of Practice and Procedure, the Board respectfully moves for leave to answer and submits \nthis Answer to provide additional information and context that will assist the Commission in its \ndecision-making process.   \nI. \nMotion for Leave to Answer \n \nWhile Rule 213(a)(2) generally prohibits answers to protests and comments, good cause \njustifies the Commission’s granting this motion and accepting this Answer because it provides \n \n1 PJM Interconnection, L.L.C., Comments of the New Jersey Board of Public Utilities, Docket No. ER26-\n3380 (Aug. 21, 2026) (“NJ BPU Comments”). \n2 PJM Interconnection, L.L.C., Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C., \nDocket No. ER26-3380 (Sept. 10, 2026) (“PJM’s Answer”)."},{"page":2,"startToken":232,"endToken":596,"text":"2 \n \nuseful and relevant information that will assist the Commission in its decision-making process.3  \nThe information presented here came to the Board’s attention recently, during its efforts earlier \nthis month to review Load Adjustments in New Jersey and compare those Load Adjustments to \nthe proposed RBP cost obligations.4   \nII. \nAnswer \nPJM has proposed to use the 6.8 GW shortfall from the 2028/2029 Base Residual Auction \n(“BRA”) as the initial target amount for the RBP.5  As stated in its Comments to PJM’s RBP \nProposal, the Board ultimately supports PJM using this value for setting the procurement target; \nthe Board understands that aligning this target more directly with distinct large loads would require \nadditional time, and the Board understands the importance of running this backstop procurement \npromptly.6   \nThe Board submits this Answer to express concern over the inputs used to establish PJM’s \ncost allocation proportions set forth in its RBP Proposal.  As explained in PJM’s Answer, the \nproposed RBP cost allocations are based on the Load Adjustments between 2026 and 2028 that the \nelectric distribution companies (“EDCs”) submitted to PJM.7  Conceptually, the Board supports \n \n3 See, e.g., PJM Interconnection, L.L.C., 142 FERC ¶ 61,019, P 23 (2013); PJM Interconnection, L.L.C., \n145 FERC ¶ 61,035, at P 32 (2013); Wis. Pub. Serv. Corp., 144 FERC ¶ 61,093, at P 27 (2013); Iberdrola \nRenewables, Inc. v. Bonneville Power Admin., 137 FERC ¶ 61,185, at P 17 (2011); SW Power Pool, Inc., \n119 FERC ¶ 61,199 at P 18 (2007); and Allegheny Elec. Coop. v. PJM Interconnection, 119 FERC ¶ \n61,165 at P 10 (2007). \n4 A recent revision to PJM Manual 19, effective June 30, 2026, added a new step in the Load Forecast \nAdjustment process requiring submitters to provide their Relevant Electric Retail Regulatory Authority \n(“RERRA”) with an opportunity to review their adjustments. See Revision 39 to PJM Manual 19, \nAttachment B. \n5 See PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy \nConcerns Stemming from Large Loads, Docket No. ER26-3380 (July 31, 2026) (“PJM RBP Proposal”), \nTransmittal Letter at 31.  \n6 NJ BPU Comments at 4.  \n7 PJM’s Answer at 71."},{"page":3,"startToken":596,"endToken":890,"text":"3 \n \nthis approach because “[e]ach [EDC] zone/area’s proportional share of the total Load Adjustment \nMW is a means of capturing the zone/area’s proportional share of the influx of new large load that \nis projected to come online in the near future.”8  However, the Board is concerned that substantial \ndiscrepancies exist in the inputs each EDC zone/area used to develop the Load Adjustment, and \nthat these discrepancies will result in a discriminatory cost allocation outcome.  Undue \ndiscrimination occurs when entities are “similarly situated,” and there is “no legitimate reason for \nthe difference in treatment.”9  Here, different EDC zones/areas may obtain different cost \nallocations due to differences in the assumptions and inputs used in forming their 2026 Load \nAdjustments, rather than differences in actual load growth alone.  This inconsistent set of \nassumptions does not provide a legitimate reason for different treatment when establishing cost \nallocations.  \nTo this end, the Board recommends that PJM run the backstop as proposed starting in \nSeptember 2026,10 and requests that FERC require PJM to submit a compliance filing to reform \nits cost-allocation methodology using updated Load Adjustments.  Specifically, the Board requests \nthat this reformed methodology establish a consistent MW threshold (50 MW) for large loads \nreported across each zone/area so the Load Adjustments used for cost allocation in the RBP can \nappropriately capture each zone/area’s proportional share of large load growth. \ni. \nInconsistencies in Large Load MW Thresholds Across Zones/Areas Result in a Cost \nAllocation Result that is Discriminatory  \n \n8 Id. at 72. \n9 PJM Interconnection, L.L.C., 184 FERC ¶ 61,087, P 46 (2023) (citing Mo. River Energy Servs. v. FERC, \n918 F.3d 954, 958 (D.C. Cir. 2019)). \n10 PJM RBP Proposal at 3 n. 5."},{"page":4,"startToken":890,"endToken":1223,"text":"4 \n \nBoard Staff recently met with the EDCs under its retail jurisdiction to discuss the 2027 \nLoad Adjustments.  This is a new process established under recent revisions to PJM Manual 19.11 \nThe Board used this process to better understand the Load Adjustment process.  It is now clear that \nthe 2026 Load Adjustments used to determine PJM’s proposed cost allocation methodology12 \nrelied on data from EDCs with substantially different characteristics across the PJM footprint.13  \nFor example, the Board understands that, in New Jersey, while some EDCs reported load growth \nonly for new large loads of 50 MW and above, other EDCs reported all Load Adjustments with no \nspecific MW threshold.  Importantly, PJM used these inputs in its Load Adjustment, which \ndetermines RBP cost allocation.   \nPresentations from PJM’s September 2025 Load Analysis Subcommittee suggest these \ninconsistencies could be regional, with the result being that EDCs receive different RBP cost \nallocations based not on load growth alone but on the characteristics they chose to include as Load \nAdjustments at the time.  For example, FirstEnergy’s presentation states it uses loads 50 MW or \ngreater as inputs to the Large Load Adjustment,14 while Duke Energy states that it reported \nexpansions of 20 MW or greater15 – note, PJM later removed Duke Energy’s Load Adjustment \n \n11 Revision 39 to PJM Manual 19, Attachment B (adding the RERRA Review requirement, effective June \n30, 2026). \n12 See PJM’s Answer at 71 (identifying the final RBP zonal allocation amounts).  \n13 Manual 19 has been updated to specifically require load shifts using a 50 MW threshold for future Load \nAdjustments. PJM Manual 19, Attachment B (adding, under a June 30, 2026, revision, the 50 MW or \ngreater threshold). \n14 FirstEnergy, PJM LAS Large Load Adjustment Presentation 4 (Sept. 16, 2025), https://www.pjm.com/-\n/media/DotCom/committees-groups/subcommittees/las/2025/20250916/20250916-item-04h---first-\nenergy-large-load-request.pdf.  \n15 Duke Energy, Approach to Large Load Adjustments 3 (Sept. 2025), https://www.pjm.com/-\n/media/DotCom/committees-groups/subcommittees/las/2025/20250916/20250916-item-04l--duke-large-\nload-request.pdf."},{"page":5,"startToken":1223,"endToken":1549,"text":"5 \n \nbecause PJM determined its economic models would capture the load growth.16  It is unclear how \npervasive these different treatments were because the EDC zones/areas providing Load \nAdjustments generally did not specify whether they used a MW threshold.  Therefore, the Board \nthinks allocating costs using these inputs is unduly discriminatory because some loads that are less \nthan 50 MW in one zone may need to take on RBP obligations, whereas loads of the same size in \na different zone will not, solely because its EDC zone/area decided to include it or not in its Large \nLoad Adjustment.   \nImportantly, PJM’s original goals for the Large Load Adjustment process were to enhance \ntransparency, improve accuracy, and mitigate double counting,17 and, for this reason, it may not \nhave been necessary for each EDC to use consistent methods during this initial reporting period.  \nHowever, if PJM’s RBP Proposal is approved, these inputs will result in substantial RBP cost \nobligations for zones/areas and therefore, the Board thinks it is crucial to revisit these inputs to \nestablish a consistent threshold and treatment.   \nUltimately, the Board supports PJM’s use of Large Load Adjustments to determine RBP \ncost allocation because it is roughly commensurate with large load growth in zones/areas and these \ncustomers have contributed most to PJM’s resource adequacy shortfall.  However, the Board thinks \nthis element of the RBP must be revised so that zones/areas receive consistent treatment in the \nRBP.  The Board thinks this issue can be resolved after the RBP is held but before the RBP cost \n \n16 PJM Interconnection, L.L.C., Load Adjustment Request Summary for 2026 Load Forecast – \nPreliminary 9 (Nov. 24, 2025), https://www.pjm.com/-/media/DotCom/committees-\ngroups/subcommittees/las/2025/20251124/20251124-item-03---large-load-adjustment-requests-\nsummary.pdf. \n17 PJM Interconnection, L.L.C., Large Load Adjustment Process Improvement Discussion 3 (June 10, \n2025), https://www.pjm.com/-/media/DotCom/committees-\ngroups/subcommittees/las/2025/20250613/20250613-item-03---large-load-adjustment-process-\nimprovement-discussion.pdf."},{"page":6,"startToken":1549,"endToken":1679,"text":"6 \n \napportionment and thinks that PJM should file a compliance filing that uses a consistent threshold \nacross zones/areas in the Load Adjustment.18   \nIII. \nConclusion \nThe Board recently became aware of these significant reporting inconsistencies and \nappreciates FERC’s consideration of the Board’s Answer.  The Board thinks these changes can be \nmade without necessitating substantial reform of PJM’s underlying RBP Proposal.   \n \nRespectfully,  \n \n \n \n18 See PJM’s Answer at 8-9 (explaining that “PJM is amenable to discrete adjustments to incorporate \nintervenors’ suggestions into the RBP proposal in a compliance filing if so ordered by the Commission” \nand citing to Cal. Indep. Sys. Operator Corp., 134 FERC ¶ 61,140, at P 1 (2011) as support for \nCommission’s discretion to order a compliance filing revising tariff provisions meant to rectify \ninconsistencies with proposal’s intent.)."},{"page":7,"startToken":1679,"endToken":1804,"text":"7 \n \nNEW JERSEY BOARD OF PUBLIC \nUTILITIES \n \nBy: /s/ Paul Youchak \n \nIan Oxenham \nAlex Cary \nAmanda Lescano \nTimothy Randazzo \nMahala Lahvis \nAiri Kogishi \nNew Jersey Board of Public Utilities  \n44 South Clinton Ave. \nTrenton NJ 08609 \nPaul.youchak@bpu.nj.gov \nIan.oxenham@bpu.nj.gov \nAlexander.cary@bpu.nj.gov \nAmanda.lescano@bpu.nj.gov \nTimothy.randazzo@bpu.nj.gov \nMahala.lahvis@bpu.nj.gov \nAiri.kogishi@bpu.nj.gov \nMICHAEL L. ZUCKERMAN \nACTING ATTORNEY GENERAL  \nOF NEW JERSEY \n \nBy: /s/ Jordan K. Mitchell \n \nDeputy Attorney General \nDepartment of Law and Public Safety \nDivision of Law \nP.O. Box 112 \nTrenton, NJ 08625 \nJordan.mitchell@law.njoag.gov \n \nAttorneys for the New Jersey Board of \nPublic Utilities \n \n \n \nDated: September 24, 2026  \n \n \nTrenton, New Jersey"},{"page":8,"startToken":1804,"endToken":1881,"text":"8 \n \nCERTIFICATE OF SERVICE \nI hereby certify that, on this 24th day of September, 2026, I have caused the foregoing \ndocument to be served upon each party designated on the official service list compiled by the \nSecretary in this proceeding, by email. \nBy: /s/ Jordan K. Mitchell \nJordan Mitchell \n \n \n \n \n \n \nDeputy Attorney General \n \n   \n \n \n \n \nNew Jersey Office of the Attorney General \nDepartment of Law & Public Safety  \nP.O. Box 112  \nTrenton, New Jersey 08625  \nJordan.mitchell@law.njoag.gov"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1064,"startToken":0,"endToken":147},{"p":1,"at":1064,"title":"I. Motion for Leave to Answer","method":"printed heading","endPage":2,"endAt":333,"startToken":147,"endToken":282},{"p":2,"at":333,"title":"II. Answer","method":"printed heading","endPage":6,"endAt":153,"startToken":282,"endToken":1573},{"p":6,"at":153,"title":"III. Conclusion","method":"printed heading","endPage":8,"endAt":5,"startToken":1573,"endToken":1805},{"p":8,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":8,"endAt":501,"startToken":1805,"endToken":1881}]}