{"document":{"slug":"rec-20260925-5186","title":"Motion for Leave to Reply and Reply Comments of American Electric Power Service Corporation","issued":"2026-09-25","accession":"20260925-5186","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"American Electric Power Service Corporation","kind":"comments","file":"sources/filings/text/20260925-5186_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260925-5186","tier":"record","sha256":"a984892de73cea84a2f4abc9e33325f84c01a5238dab0227d6e2528632374b12","pages":11,"tokens":2787,"emptyPages":[],"textThemes":["flex","adequacy","retail"]},"pages":[{"page":1,"startToken":0,"endToken":243,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \n) \nDocket No. ER26-3515-000 \n \nMOTION FOR LEAVE TO REPLY AND REPLY COMMENTS OF  \nAMERICAN ELECTRIC POWER SERVICE CORPORATION \n \nAmerican Electric Power Service Corporation, on behalf of its affiliates \nAppalachian Power Company, Indiana Michigan Power Company, Kentucky Power \nCompany, Kingsport Power Company, Ohio Power Company, and Wheeling Power \nCompany (collectively, “AEP”), submits this motion for leave to reply and reply.  AEP \nseeks leave to reply to several comments submitted in response to PJM Interconnection, \nLLC’s (“PJM’s”) proposed tariff revisions to the PJM Open Access Transmission Tariff \n(“PJM Tariff”) and Reliability Assurance Agreement Among Load Serving Entities \n(“RAA”) proposed in the above-captioned docket to establish Interim Resource Adequacy \nService (“IRAS”) effective October 12, 2026.1  AEP also seeks leave to reply to PJM’s \nMotion for Leave to Answer and Answer filed on September 23, 2026.2  As AEP discusses \nbelow, PJM’s treatment of the Fixed Resource Requirement (“FRR”) Alternative under its \nIRAS proposal, as clarified by AEP’s comments in this proceeding, is necessary to ensure \n \n1 PJM Interconnection, L.L.C., Proposal of PJM Interconnection, L.L.C. to Establish Interim Res. Adequacy \nServ. and a Large Load Registry to Address Sys. Reliability, Docket No. ER26-3515 (filed Aug. 13, 2026) \n(“IRAS Proposal”).   \n2 PJM Interconnection, L.L.C., Morion For Leave to Answer and Answer of PJM Interconnection, L.L.C., \nDocket No. ER26-3515 (filed Sept. 23, 2026) (“PJM Reply”)."},{"page":2,"startToken":243,"endToken":500,"text":"2 \nthat the FRR Alternative remains viable and just and reasonable.3  Critically, the \nclarifications that AEP seeks from the Commission in its comments are also important to \nthe viability of the FRR Alternative and do not seek to avoid the requirement to serve new \nLarge Load with new capacity. \nI. \nMOTION FOR LEAVE TO REPLY \nWhile Rule 213(a)(2) of the Commission’s Rules of Practice and Procedure does \nnot generally permit answers to protests, the Commission has permitted answers where the \nanswer clarifies the issues or assists in creating a complete record.4  Accordingly, AEP \nrespectfully requests leave to reply to the relevant protests and, to the extent necessary, the \nrelevant comments in the above-captioned docket.  In several instances, the protests \nmisrepresent or ignore the plain language of the IRAS Proposal and how the FRR \nAlternative will be addressed in the IRAS Proposal.  Good cause exists to grant this motion \nfor leave to answer because the answer corrects those unsupported misstatements and \nmisrepresentations, leading to a full and complete record in this proceeding. \nII. \nREPLY \nA. \nFRR Entities and RPM Entities Are Not Similarly Situated, and the \nIRAS Proposal’s Differential Treatment Is Therefore Just and \nReasonable. \nCertain commenters argue that the IRAS Proposal is unduly preferential and \ndiscriminatory because FRR Entities are exempt from IRAS while load serving entities \n \n3 PJM Interconnection, L.L.C., Comments and Request for Clarification of Am. Elec. Power Serv. Corp., \nDocket No. ER26-3515 (filed Sept. 3, 2026) (“AEP Comments”). \n4 18 C.F.R. § 385.213(a)(2) (2026)."},{"page":3,"startToken":500,"endToken":879,"text":"3 \n(“LSEs”) participating in the Reliability Pricing Model (“RPM”) are subject to it.  These \narguments fail because they rest on the flawed premise that FRR load is similarly situated \nto RPM load.  It is not.  The critical distinction is structural: RPM Entities may rely on the \nRPM auction as a backstop to meet their capacity obligations, whereas FRR Entities \ncannot.  Instead, FRR load can come online only if it is served by capacity that the FRR \nEntity has contracted for or owns.  This fundamental difference in capacity obligation \ndesign dooms the claims of undue discrimination or preferential treatment, because the \nCommission has long held that there is no undue discrimination when entities are \ndifferently situated.5  Moreover, even if FRR Entities and RPM Entities were similarly \nsituated—which they are not—PJM has articulated a sound basis for the differential \ntreatment, and the Commission has confirmed that “there is no undue discrimination or \npreference [when] we have identified appropriate reasons for it.”6  Thus, the Commission \nshould reject commenters’ discrimination arguments. \nEast Kentucky Power Cooperative, Inc.’s (“EKPC”) arguments exemplify this \nflawed reasoning.  EKPC argues that the IRAS Proposal is unduly discriminatory because \nFRR Entities are exempt from IRAS while RPM Entities that have prudently planned \n \n5 City of Anaheim, Opinion No. 483, 113 FERC ¶ 61,091, at P 130 (2005) (“Discrimination is undue when \nthere is a difference in rates or services among similarly situated customers that is not justified by some \nlegitimate factor.”) (citations omitted); PacifiCorp Elec. Operations, 54 FERC ¶ 61,296, at 61,855 \n(“[U]ndue discrimination can occur only when two similarly situated customers are treated differently, and \nthere is no justification for the differing treatment.”) (citations omitted), reh’g denied, 55 FERC ¶ 61,461 \n(1991); Puget Sound Energy, Inc. v. All Jurisdictional Sellers of Energy, Opinion No. 537, 151 FERC ¶ \n61,173, at P 43, n.105 (2015) (quoting Energy Transfer, 120 FERC ¶ 61,086, at P 169 (2007)), rev’d on \nother grounds, 157 FERC ¶ 61,026 (2016) (“It is well established that a finding of undue discrimination \nrequires a showing that ‘(1) two classes of customers are treated differently; and (2) the two classes of \ncustomers are similarly situated.’”).  \n6 Midwest Indep. Transmission Sys. Operator, Inc., 155 FERC ¶ 61,082 at P 31 (2016)."},{"page":4,"startToken":879,"endToken":1167,"text":"4 \ncapacity to serve their load remain subject to it.7  EKPC contends that, because both have \nplanned capacity, FRR Entities and such RPM Entities are similarly situated.8  This \ncontention is wrong.  The question is not whether an entity has prudently planned capacity.  \nRather, the question is whether an entity has a guaranteed safety net in the RPM auction if \nits capacity position proves inadequate.  FRR Entities do not have that safety net, while \nRPM Entities do.  Thus, they are not similarly situated.  The structural difference also \ndetermines whether the entity contributes to the RPM auction shortfall that IRAS is \ndesigned to address. \nThe FRR Alternative imposes stringent self-supply obligations that distinguish FRR \nEntities from RPM Entities.  An FRR Entity must identify the load it expects to serve and \nmust own, build, or contract for the capacity necessary to serve that load in each delivery \nyear.9  Critically, the FRR Entity must procure sufficient capacity to serve not only \nanticipated load but also any actual load that materializes during the Delivery Year.10  If \nthe FRR Entity’s forecast proves wrong, it has no safety net because it cannot turn to the \nRPM auction for additional capacity.11 \nRPM Entities face no comparable constraint.  They are not required to own or \ncontract for their own capacity.  Instead, they may rely entirely on the RPM auction to \n \n7 PJM Interconnection, L.L.C., Limited Protest of East Ky. Power Coop., Inc., Docket No. ER26-3515, at \n13 (filed Sept. 3, 2026) (“EKPC Comments”). \n8  EKPC Comments at Attach. 1, Affidavit of Marc Montalvo at ¶¶ 40-41. \n9 See PJM Open Access Transmission Tariff, Attach. DD, section 1. \n10 Id. \n11 PJM Reliability Assurance Agreement, Schedule 8.1, section D.1.1."},{"page":5,"startToken":1167,"endToken":1424,"text":"5 \nsatisfy their capacity obligations.12  And even if an RPM Entity chooses to self-supply, the \nRPM auction remains available as a backstop if its capacity needs change.13  This access \nto the RPM auction is material to the IRAS Proposal because the RPM auction has \nexperienced capacity shortfalls for upcoming delivery years.  These shortfalls prompted \nPJM to propose IRAS.  Because FRR Entities do not participate in the RPM auction and \ncannot draw on it as a backstop, it is logical to exclude them from the IRAS Proposal.  The \nCommission should therefore reject claims that the IRAS Proposal’s differential treatment \nof FRR Entities and RPM Entities is unduly discriminatory or preferential. \nCommenters also contend that it is unduly preferential and discriminatory to permit \nFRR Entities to serve New Large Load using Existing Generation Capacity Resources \nwhile RPM Entities cannot.14  This argument, too, ignores the structural differences \nbetween the FRR Alternative and RPM.  As noted above, unlike RPM Entities, which can \nsatisfy capacity obligations through the auction, FRR Entities must own or contract for all \nthe capacity needed to serve their loads.  Allowing FRR Entities limited flexibility to \ndeploy Existing Generation Capacity Resources for New Large Load recognizes that \ninflexibility in FRR Plan structuring could undermine the viability of the FRR Alternative \naltogether because it has no backstop or safety net. \n \n12 PJM Open Access Transmission Tariff, Attach. DD, section 6. \n13 Id. \n14 PJM Interconnection, L.L.C., Protest of the Elec. Power Supply Assn., Docket No. ER26-3515, at 12 \n(filed Sept. 3, 2026) (“EPSA Comments”)."},{"page":6,"startToken":1424,"endToken":1706,"text":"6 \nAt the same time, the IRAS Proposal does not give FRR Entities unlimited \nflexibility.  Recognizing that FRR Entities could otherwise draw Existing Generation \nCapacity Resources away from the RPM auction and exacerbate the capacity shortfall that \nIRAS seeks to remedy, the IRAS Proposal imposes limitations on FRR Entities.  An FRR \nEntity may use Existing Generation Capacity Resources to serve New Large Load only if \nthe FRR Entity owned or contracted for those resources before June 1, 2027.15  The June \n1, 2027 cutoff serves dual purposes.  First, it preserves the operational flexibility that FRR \nEntities need to structure their FRR Plans.  Second, it protects the RPM auction by \npreventing FRR Entities from acquiring additional Existing Generation Capacity \nResources after the cutoff date to serve New Large Load and ensures that the IRAS \nProposal’s goal of addressing RPM auction shortfalls is not undermined by capacity \nmigration to FRR service.16  Again, these arguments that IRAS is unduly discriminatory or \nresults in preferential treatment fail and should be rejected. \nB. \nThe Commission Should Reject PJM’s Claims That AEP’s Proposed \nClarifications Will Allow It to Avoid The Requirement to Serve New \nLarge Load With New Capacity.   \nIn its comments, AEP requests that the Commission clarify that, when the IRAS \nrules are lifted in times where capacity is not short, the FRR restrictions are similarly \nlifted.17  AEP also requests that the Commission clarify that when IRAS reactivates after \n \n15 IRAS Proposal, Attach. B, Revisions to the PJM Open Access Transmission Tariff and Resource \nAdequacy Agreement, Schedule 8.1, section D.1.1, Docket No. ER26-3515 (filed Aug. 13, 2026) \n(“Proposed RAA”). \n16 PJM Transmittal Letter at 73-74. \n17 AEP Comments at section IV.A."},{"page":7,"startToken":1706,"endToken":1982,"text":"7 \nbeing dormant, FRR Entities be provided flexibility to serve any Large Loads that came \nonline prior to that reactivation with Existing Generation Capacity Resources.18  As \ndiscussed above, this flexibility is critical to ensuring that FRR Entities can economically \nand reliably serve all FRR loads and recognizes the structural differences between FRR \nEntities and RPM Entities.  \nIn response, PJM contends that these clarifications would “undermine the \noverarching policy driving IRAS and the Ratepayer Protection Pledge” because the \nclarifications would not result in FRR Entities serving new Large Load with new \ncapacity.19  PJM’s response mischaracterizes how FRR works.  As PJM itself admits later \nin its answer, “[b]y definition, FRR Entities must bring new capacity for all new loads \nwithin their territory.”20  This obligation is embedded in an FRR entity’s overall obligation \nto include sufficient capacity in its FRR Capacity Plan for all of its load.21  Thus, by \ndefinition any new Large Load served by an FRR Entity must be served by new capacity \nconsistent with the policy driving IRAS and the Ratepayer Protection Pledge.  The \nclarification AEP seeks is necessary to ensure that it has the flexibility to acquire and use \nthat capacity, once brought online to serve all load when the IRAS takes effect on June 1, \n2027, in the most efficient manner to address overall FRR needs in future years.  This is \ncritical to ensure that AEP can reliably and cost-effectively serve its customers.  \n \n18 Id. at section III.B. \n19 PJM Reply at 62.   \n20 Id. at 63 (citing RAA, Article 1) (emphasis in the original). \n21 Id. at 63 & n.227 (citing RAA, Schedule 8.1D, section 7)."},{"page":8,"startToken":1982,"endToken":2254,"text":"8 \nAccordingly, the Commission should reject PJM’s claim and grant the clarifications sought \nby AEP in its comments. \nC. \nThe IRAS Proposal Should Incentivize Alignment with Its Stated Goals \nand Avoid Jurisdictional Vulnerability. \nAEP supports commenters who argue the Commission should ensure IRAS \nincentivizes actions that align with the service’s goals and that the tariff changes are legally \ndurable.  For example, IRAS aims to address capacity shortfall in the RPM auction by \nrequiring RPM Entities to Bring Your Own New Capacity (“BYONC”) for Eligible New \nLarge Load, but commenters argue that the proposal leaves it uncertain whether BYONC \nwill allow Eligible New Large Load to avoid being curtailed under IRAS.22  Commenters \nargue that the IRAS Proposal is structured in a way that leaves open the possibility that \nEligible New Large Load could be curtailed under IRAS even if such load has BYONC.23  \nThus, AEP encourages the Commission to address any incentive misalignment present in \nthe IRAS Proposal. \nCommenters also highlight aspects of the IRAS Proposal that risk succumbing to \nlegal challenge.  They note that PJM’s proposal attempts to thread the needle between state \nand federal jurisdiction, but this narrow path to “cooperative federalism” is vulnerable to \nchallenge.24  Unlike recent large load tariff reforms that PJM claims are analogous to IRAS, \n \n22 PJM Interconnection, L.L.C., Protest of Google LLC, Docket No. ER26-3515, at 1-2, 3-7 (filed Sept. 3, \n2026) (“Google Comments”).  \n23 Id. \n24 See Google Comments at 5-6, 8-11; PJM Interconnection, L.L.C., Mot. to Intervene, Protest & Req. for \nClarification of PPL Elec. Utils. Corp., Docket No. ER26-3515, at 15-16 (filed Sept. 3, 2026) (“PPL \nComments”)."},{"page":9,"startToken":2254,"endToken":2576,"text":"9 \nsuch as SPP’s HILLGA proposal and MISO’s ERAS proposal, these commenters argue \nthat the IRAS Proposal attempts to reach retail customers, beyond the bounds of federal \njurisdiction.25  AEP urges the Commission to require PJM to address this jurisdictional \nrisk.  The Commission should not approve a version of the IRAS Proposal that could lead \nto lengthy litigation and may very well be successfully challenged—this would contravene \nthe goals of IRAS to expeditiously address an urgent capacity shortfall. \nD. \nAny Suggestion That AEP’s Ohio Large Load Tariff Is Not Protecting \nRetail Customers Is Unfounded. \nFinally, the Office of the Ohio Consumers’ Counsel (“OCC”) contends that AEP’s \nstate large load tariff in Ohio26 “does not adequately protect consumers from the federal \ncurtailments PJM is proposing for large load customers” under IRAS.27  To the extent OCC \nsuggests that AEP’s Ohio large load tariff fails to protect Ohio retail customers, its assertion \nis unfounded.  The AEP Ohio large load tariff was approved by the Public Utilities \nCommission of Ohio and is designed to recognize the importance of large loads and to \nensure they can connect and be served while protecting retail customers from unnecessary \ncost increases.  OCC provides no evidence that the AEP Ohio large load tariff is not \nworking as intended.  Any suggestion otherwise is misleading. \n \n25 See Google Comments at 6-7; PPL Comments at 14-16.  \n26 In the Matter of the Application of Ohio Power Co. for New Tariffs Related to Data Centers and Mobile \nData Centers, Opinion and Order,  Case No. 24-508-EL-ATA (Ohio PUCO Jul. 9, 2025); see also In the \nMatter of the Application of Ohio Power Co. for New Tariffs Related to The Standard Service Offer Service \nfor Data Center Load, Finding and Order, Case No. 26-113-EL-ATA (Ohio PUCO Aug. 5, 2026).   \n27 PJM Interconnection, L.L.C., Protest by Office of the Ohio Consumers’ Counsel, Docket No. ER26-\n3515, at 26-28 (filed Sept. 3, 2026) (“OCC Comments”)."},{"page":10,"startToken":2576,"endToken":2716,"text":"10 \nIII. \nCONCLUSION \nFor the foregoing reasons, AEP respectfully requests that the Commission:  (1) \nreject commenters’ claims that the IRAS Proposal’s treatment of FRR Entities is unduly \ndiscriminatory or preferential because FRR Entities are not similarly situated to RPM \nEntities (2) reject PJM’s claims that the clarification sought by AEP will allow it to avoid \nthe proposed requirement to serve new Large Load with new capacity; and (3) ensure the \nIRAS Proposal is legally durable and incentivizes actions that align with its stated goals. \n \n \n \nJohn C. Crespo \nSenior Legal Advisor \nAmerican Electric Power Service \nCorporation \n1 Riverside Plaza \nColumbus, OH  43215 \n(614) 716-3727 \njccrespo@aep.com  \n \nRespectfully submitted, \n \n/s/ William M. Keyser \nWilliam M. Keyser \nMegan McDowell \nSteptoe LLP \n1330 Connecticut Avenue, NW \nWashington, DC  20036 \n202-429-8186 \nwkeyser@steptoe.com \nmmcdowell@steptoe.com  \n \nCounsel for AEP \n \n \nDated:  September 25, 2026"},{"page":11,"startToken":2716,"endToken":2787,"text":"11 \nCERTIFICATE OF SERVICE \n \nPursuant to Rule 2010, 18 C.F.R. § 385.2010, I hereby certify that I have this day \ncaused the foregoing document to be served upon each person designated on the official \nservice list compiled by the Secretary in this proceeding. \n \nDated at Washington, D.C. on this 25th day of September, 2026. \n \n \n \n \n \n \n/s/ Jeannette Crooks \nJeannette Crooks \nSteptoe LLP \n1330 Connecticut Avenue, NW \nWashington, DC 20036"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":299,"startToken":0,"endToken":293},{"p":2,"at":299,"title":"I. MOTION FOR LEAVE TO REPLY","method":"printed heading","endPage":2,"endAt":1109,"startToken":293,"endToken":418},{"p":2,"at":1109,"title":"II. REPLY","method":"printed heading","endPage":2,"endAt":1121,"startToken":418,"endToken":420},{"p":2,"at":1121,"title":"A. FRR Entities and RPM Entities Are Not Similarly Situated, and the","method":"printed heading","endPage":6,"endAt":1097,"startToken":420,"endToken":1592},{"p":6,"at":1097,"title":"B. The Commission Should Reject PJM’s Claims That AEP’s Proposed","method":"printed heading","endPage":8,"endAt":119,"startToken":1592,"endToken":2000},{"p":8,"at":119,"title":"C. The IRAS Proposal Should Incentivize Alignment with Its Stated Goals","method":"printed heading","endPage":9,"endAt":514,"startToken":2000,"endToken":2333},{"p":9,"at":514,"title":"D. Any Suggestion That AEP’s Ohio Large Load Tariff Is Not Protecting","method":"printed heading","endPage":10,"endAt":4,"startToken":2333,"endToken":2577},{"p":10,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":4,"startToken":2577,"endToken":2717},{"p":11,"at":4,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":442,"startToken":2717,"endToken":2787}]}