{"document":{"slug":"rec-20260928-5172","title":"Motion for Leave to Answer and Answer of Corporate Energy Buyers Association to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish…","issued":"2026-09-28","accession":"20260928-5172","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/filings/text/20260928-5172_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260928-5172","tier":"record","sha256":"c48aa82fbb975ba84b85c73e6be0139e865e7c0965344cc777364c70cc8c7553","pages":9,"tokens":2036,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":244,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \n) \nDocket No. ER26-3515-000\n \nMOTION FOR LEAVE TO ANSWER AND ANSWER OF \nCORPORATE ENERGY BUYERS ASSOCIATION \n \nPursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s (FERC \nor Commission) Rules of Practice and Procedure,1 Corporate Energy Buyers Association \n(CEBA) respectfully submits this motion for leave to answer and limited answer to the answer \nfiled by PJM Interconnection, L.L.C. (PJM) in this proceeding.2 CEBA submits this answer to \ncorrect PJM’s characterization of CEBA’s position regarding customer-sponsored Peak Shaving \nAdjustments and to explain why the PJM Answer does not resolve the undue preference \nidentified in CEBA’s protest.3 \nI. \nMOTION FOR LEAVE TO ANSWER \nAlthough Rule 213(a)(2) does not generally permit answers to protests, the Commission \npermits answers for good cause shown, such as when an answer contributes to a more accurate \nand complete record or provides useful information that aids the Commission’s decision-making \nprocess.4 CEBA respectfully moves for leave to file this answer because it responds to \n \n1 18 C.F.R. §§ 385.212, 385.213. \n2 PJM Sept. 23 Motion for Leave to Answer and Answer (PJM Answer). \n3 CEBA Sept. 3 Motion to Intervene and Protest (CEBA Protest).  \n4 See, e.g., PJM Interconnection, L.L.C., 189 FERC ¶ 61,110, at P 22 (2024) (accepting answers to protests and \nanswers because they assisted the Commission in its decision-making process)."},{"page":2,"startToken":244,"endToken":557,"text":"2 \n \narguments raised in the PJM Answer that mischaracterize CEBA’s position. As discussed below, \nPJM’s arguments do not address an issue that the Commission must help resolve in order to \nensure that large load customers can invest with confidence in a full range of solutions to the \nresource adequacy challenges confronting the PJM region. For this reason, good cause exists for \nthe Commission to grant this motion. \nII. \nANSWER \nThe PJM Answer does not resolve the disparate treatment identified in CEBA’s Protest. \nInstead, PJM responds to an argument CEBA did not make. PJM characterizes CEBA and other \nintervenors as challenging the “omission of Peak Shaving Adjustment MW from [Bring Your \nOwn New Capacity (BYONC)] arrangements” and ultimately concludes that Peak Shaving \nAdjustments (PSAs) “cannot and should not qualify as BYONC MW capable of reducing \n[Interim Resource Adequacy Service (IRAS)] exposure.”5  But CEBA did not ask PJM to treat \nPSA MW as BYONC, permit them to participate as Capacity Resources in capacity auctions \n(Reliability Pricing Model [RPM] Auctions), or make them dispatchable during an IRAS Action. \nCEBA asked for a tariff-based mechanism that recognizes incremental, customer-sponsored \nPSAs that reduce PJM’s capacity requirement, including qualifying investments elsewhere \nwithin the relevant utility service territory or zone.6 \n \n5 PJM Answer at 47–48, n.170 (characterizing CEBA and other intervenors as challenging the “omission of Peak \nShaving Adjustment MW from BYONC arrangements” and concluding that Peak Shaving Adjustments “cannot and \nshould not qualify as BYONC MW capable of reducing IRAS exposure”). \n6 CEBA Protest at 8–9 (requesting “a clear tariff-based mechanism” for recognition of “incremental, customer-\nsponsored Peak Shaving Adjustments that reduce PJM’s capacity requirement,” including qualifying investments \nelsewhere within the relevant utility service territory or zone, and explaining that the requested treatment would \npermit New Large Loads to address resource adequacy through “either incremental supply or an incremental \nreduction in the capacity requirement”)."},{"page":3,"startToken":557,"endToken":773,"text":"3 \n \n \nFundamentally, CEBA seeks recognition of incremental, customer-sponsored PSAs for \nwhat they are: reductions in forecast peak demand that reduce the underlying capacity need \nassociated with new load growth. The IRAS proposal is patently unjust, unreasonable, and \nunduly preferential insofar as it fails to recognize that core resource adequacy benefit of \ncustomer-sponsored PSAs. \nA. \nPJM conflates reducing the capacity need with providing a Capacity \nResource while failing to reconcile its position with its treatment of PSAs \nunder the RBP proposal \nPJM conflates two distinct ways of addressing a resource adequacy need: adding capacity \nto meet incremental demand and reducing the incremental demand for which capacity must be \nprocured. PJM emphasizes that PSA MW are “adjustments to PJM’s load forecasts, not \nresources that may participate in RPM Auctions.”7 That distinction does not rebut CEBA’s \nargument; it is the premise of it. As CEBA has previously argued, PJM’s own rules recognize \nqualifying PSAs as reductions to forecast peak demand and, therefore, to the capacity \nrequirement that PJM must satisfy when procuring capacity, whether through the RBP or RPM \nAuctions.8 The fact that the reduction occurs on the demand side rather than through the addition \n \n7 PJM Answer at 47. \n8 CEBA Protest at 8, n.13 (citing PJM Manual 19, Load Forecasting and Analysis, § 3.2)."},{"page":4,"startToken":773,"endToken":1076,"text":"4 \n \nof a Capacity Resource does not eliminate that resource adequacy benefit, nor does PJM offer \nevidence to the contrary.9 \nPJM’s discussion of the RBP reinforces this point. PJM notes that qualifying PSA MW \nmay reduce the identified capacity shortfall for which the RBP will procure while PSA MW \ncannot serve as Qualifying RBP Offset UCAP MW or eligible RBP Resources. CEBA does not \ncontend otherwise. The relevant feature of the RBP is that PJM recognizes qualifying PSAs on \nthe demand side of the equation by reducing the capacity shortfall—quantified in the RBP Initial \nProcurement Target—that must be addressed through new supply. CEBA seeks comparable \nrecognition here: not treatment of PSA MW as supply, but recognition that incremental, \ncustomer-sponsored peak shaving reduces the capacity need attributable to the sponsoring New \nLarge Load. \nB. \nPJM’s reliance on real-time dispatchability misses the point \nPJM’s observation that PSA MW are not “real-time dispatchable” is irrelevant.10 As PJM \nitself explains, “[t]he impetus for IRAS is to incent New Large Loads to bring new capacity to \nmeet their resource adequacy needs.”11  If an incremental, qualifying PSA reduces PJM’s \nforecast peak in the first instance and therefore reduces the amount of capacity that must be \nprocured to meet a New Large Load’s resource adequacy needs, that capacity need has been \nreduced before any real-time IRAS Action ever occurs. PJM does not explain why real-time \n \n9 Moreover, in the IRAS proposal, PJM itself recognizes that a Peak Shaving Adjustment may “reduce the amount of \ncapacity needed to meet the PJM Region Reliability Requirement.” PJM Filing, Transmittal at 54. \n10 PJM Answer at 48 (explaining that Peak Shaving Adjustments are not a “real-time dispatchable product” and \ntherefore, in PJM’s view, should not qualify as BYONC MW capable of reducing IRAS exposure). \n11 Id. at 45."},{"page":5,"startToken":1076,"endToken":1341,"text":"5 \n \ndispatchability is necessary to recognize that reduction when determining the amount of a New \nLarge Load’s demand that gives rise to IRAS exposure in the first place.12 \nC. \nPJM’s disparate treatment of customer-sponsored PSAs is unjustified and \ncounterproductive to state-led efforts to support resource adequacy \nUnder the IRAS proposal, the disparate treatment is straightforward. Consider two \notherwise identical New Large Loads. One customer supports new Capacity Resources that PJM \ndetermines provide 25 MW of capacity toward addressing the incremental resource adequacy \nneed associated with its load. The other finances qualifying incremental peak-shaving capability \nthat reduces PJM’s forecast peak demand and, after application of the Forecast Pool \nRequirement, reduces PJM’s capacity requirement by the same 25 MW. PJM’s proposal \nrecognizes the first customer’s contribution in determining its IRAS exposure but provides no \ncomparable mechanism to recognize the second. PJM identifies differences between Capacity \nResources and PSAs, but it does not explain why those differences justify treating differently \ntwo investments that reduce PJM’s otherwise-unmet capacity need by the same amount. \nIn addressing other parties’ tangential arguments about BYONC gating criteria for \nDemand Resources and DER Capacity Aggregation Resources—both supply-side Capacity \nResources—PJM implies that its skepticism toward customer-sponsored PSAs may similarly \nstem from concern that such investments will not produce “new and lasting” solutions to the \ncapacity shortfall.13 Customer-sponsored PSAs can rely on the same types of distributed energy \n \n12 Id. at 48. \n13 Id. at 49 (“IRAS is an operational tool designed to address the shortfall created by the absence of new Capacity \nResources that offer lasting solutions to the capacity shortfall.”)."},{"page":6,"startToken":1341,"endToken":1658,"text":"6 \n \ninfrastructure, including distributed battery storage, that support aggregations participating as \nsupply-side Capacity Resources. Yet PJM has established BYONC gating criteria to ensure that \nDemand Resources and DER Capacity Aggregation Resources provide “new and lasting capacity \ncontributions to the capacity shortfall.”14 Although the criteria may differ, CEBA asks only that \ncustomer-sponsored PSAs have a similar opportunity to demonstrate that their underlying \ninfrastructure investments can provide lasting resource adequacy benefits. \nLastly, PJM’s disparate treatment between customer-sponsored PSAs and Capacity \nResources could foreclose a valuable source of investment in precisely the types of near-term, \ndistributed-scale solutions that states are actively seeking to develop, particularly in the face of \npersistent barriers to interconnecting new, utility-scale generation. Virginia and New Jersey, for \nexample, are pursuing programs to deploy distributed battery storage and other distributed \nresources to reduce peak demand and associated capacity needs.15 A framework that recognizes \ncustomer investment in new Capacity Resources but provides no means to recognize customer \ninvestment in qualifying Peak Shaving Adjustments would eliminate an important incentive for \nNew Large Loads to help finance these emerging pathways and frustrate legitimate state policy \ngoals aiming to unlock these innovative approaches. \n \n14 Id. at 48–49 (explaining the purpose of PJM’s requirement for BYONC that is backed by Demand Resources and \nDER Capacity Aggregation Resources to demonstrate Accredited UCAP each year of the 10-year BYONC \ncommitment period). \n15 Chief Energy Officer for the Governor of Virginia Sept. 3 Comments at 2–3 (“Virginia has already acted to \nestablish pathways for voluntary demand-flexibility programs that enable large loads to secure measurable and \nverifiable load reductions…. PJM’s rules should provide a clear, timely, and administrable process through which \nthese state-supported arrangements can be recognized in IRAS…, with such reductions accounted for in a \ncustomer’s curtailment exposure and related obligations.”); see also New Jersey Board of Public Utilities Sept. 18 \nMotion for Leave to Answer and Answer at 4–5."},{"page":7,"startToken":1658,"endToken":1897,"text":"7 \n \nD. \nCustomer-sponsored PSAs and new Capacity Resources are complementary \npieces to the resource adequacy puzzle \nTo reiterate, CEBA is not asking the Commission to transform PSAs into Capacity \nResources or to require PJM to count PSA MW as BYONC. Rather, PJM should revise proposed \nTariff, Attachment DD-4, section V(b), to recognize the reduction in PJM’s capacity requirement \nattributable to a verified, incremental, customer-sponsored PSA when determining the \nsponsoring New Large Load’s Eligible New Large Load Amount.16 PJM should apply the \nForecast Pool Requirement as needed to express that benefit in the units used by section V(b), \nand establish appropriate rules for verification and safeguard against double counting. This \nwould recognize the PSA’s effect on resource adequacy without treating it as BYONC or as a \nresource PJM can dispatch during an IRAS Action. \nThis approach preserves the distinction on which PJM relies. BYONC supplies \nincremental capacity; PSAs reduce forecast demand. But both can support resource adequacy by \nreducing the incremental capacity need associated with a New Large Load. PJM has not \nexplained why IRAS should recognize only one side of that equation. \nIII. \nCONCLUSION \nFor the foregoing reasons, CEBA respectfully asks that the Commission accept this \nanswer in the record and find that PJM’s IRAS proposal is unjust, unreasonable, and unduly \npreferential insofar as it provides no mechanism to recognize the reduction in PJM’s capacity \n \n16 PJM Filing, Attach. A, Proposed Tariff, Attach. DD-4, § V(b)."},{"page":8,"startToken":1897,"endToken":1966,"text":"8 \n \nrequirement attributable to a verified, incremental, customer-sponsored PSA when determining \nthe sponsoring New Large Load’s IRAS exposure. CEBA asks the Commission to require PJM \nto provide such a mechanism, with appropriate verification, attribution, and safeguards against \ndouble counting. \n \nRespectfully submitted, \n \n/s/ John Miller___________________ \nJohn Miller \nDirector, Transmission Policy \nCEBA \n1501 M Street, N.W., Suite 900 \nWashington, D.C. 20005 \n(240) 630-2201 \njmiller@ceba.org \n \nSeptember 28, 2026"},{"page":9,"startToken":1966,"endToken":2036,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Commission in this \nproceeding. \nDated at Washington, D.C., this 28th day of September 2026. \n/s/ John Miller___________________ \nJohn Miller \nDirector, Transmission Policy \nCEBA \n1501 M Street, N.W., Suite 900 \nWashington, D.C. 20005 \n(240) 630-2201 \njmiller@ceba.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":784,"startToken":0,"endToken":116},{"p":1,"at":784,"title":"I. MOTION FOR LEAVE TO ANSWER","method":"printed heading","endPage":2,"endAt":422,"startToken":116,"endToken":311},{"p":2,"at":422,"title":"II. ANSWER","method":"printed heading","endPage":3,"endAt":391,"startToken":311,"endToken":610},{"p":3,"at":391,"title":"A. PJM conflates reducing the capacity need with providing a Capacity","method":"printed heading","endPage":4,"endAt":862,"startToken":610,"endToken":908},{"p":4,"at":862,"title":"B. PJM’s reliance on real-time dispatchability misses the point","method":"printed heading","endPage":5,"endAt":176,"startToken":908,"endToken":1105},{"p":5,"at":176,"title":"C. PJM’s disparate treatment of customer-sponsored PSAs is unjustified and","method":"printed heading","endPage":7,"endAt":5,"startToken":1105,"endToken":1659},{"p":7,"at":5,"title":"D. Customer-sponsored PSAs and new Capacity Resources are complementary","method":"printed heading","endPage":7,"endAt":1215,"startToken":1659,"endToken":1843},{"p":7,"at":1215,"title":"III. CONCLUSION","method":"printed heading","endPage":9,"endAt":0,"startToken":1843,"endToken":1966},{"p":9,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":451,"startToken":1966,"endToken":2036}]}