{"document":{"slug":"rec-20260929-5169","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Answers filed by Pennsylvania Governor Josh Shapiro et al. re the…","issued":"2026-09-29","accession":"20260929-5169","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260929-5169_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5169","tier":"record","sha256":"123be9d8ce8a54701984ab6fcacc4a09441f05a9a5f51852b7c9e55c33f13f16","pages":23,"tokens":7201,"emptyPages":[],"textThemes":["flex","retail","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":271,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C.: \n205(d) Rate Filing: Proposal to Establish \nInterim Resource Adequacy Service & a \nLarge Load Registry to be effective \n10/12/2026 \n) \n) \n) \n) \n) \n) \n \nDocket No. ER26-3515-000 \n \nMOTION FOR LEAVE TO ANSWER AND ANSWER  \nOF CONSTELLATION ENERGY GENERATION, LLC  \nPursuant to Rules 212 and 213 of the Commission’s Rules of Practice and Procedure, \nConstellation Energy Generation, LLC (“Constellation”) respectfully moves for leave to answer and \nanswers comments filed in this proceeding by PJM (“PJM Answer”) and Pennsylvania Governor \nJosh Shapiro (“Shapiro Answer”).1  Constellation seeks to respond to issues raised by the Answers \nto provide information that will assist in the Commission’s decision-making process as it relates to \nPJM’s August 12, 2026 Proposal (“PJM Proposal,” “IRAS Proposal,” or “Proposal”). \nI. \nMOTION FOR LEAVE TO ANSWER \nConstellation respectfully moves for leave to answer.2  The Commission routinely grants \nmotions to answer for good cause.3  Good cause exists where an answer provides information that \nassists in the Commission’s decision-making process. 4   And good cause exists here, as \nConstellation’s Answer clarifies important issues raised in the Answers and thereby provides \ninformation that will assist the Commission in addressing the Proposal. \n \n1 Together, those two filings are referred to in this filing as “the Answers.” \n2 This motion is made under FERC Rule 212, 18 C.F.R. § 385.212. \n3 See 18 C.F.R. §§ 385.101(e), 385.213(a)(2). \n4 See, e.g., SunZia Transmission, 191 FERC ¶ 61053, at P 46 (Apr. 17, 2025); Columbia Gas Transmission, 182 \nFERC ¶ 61,171, at P 9 (Mar. 17, 2023)."},{"page":2,"startToken":271,"endToken":575,"text":"2 \n \nII. \nANSWER \nThe Proposal exceeds the Commission’s jurisdiction.  The Proposal also unlawfully \ndiscriminates based on load size, load date, and resource vintage, and its design is unjust and \nunreasonable in numerous respects.  In arguing otherwise, the Answers misunderstand the \napplicable law and conveniently ignore key features of the proposed tariff.  They also incorrectly \nsuggest that the Proposal is the only way to address issues raised by new large loads and that the \nRatepayer Protection Pledge somehow justifies violating limits set by the FPA—neither of which \nis true.  \nA. \nThe Proposal Is Outside The Scope Of The Commission’s Jurisdiction \n1. \nThe Answers Incorrectly Contend That Judicial Decisions Support The \nView That The Commission Has Jurisdiction Whenever An Action \nAffects The Wholesale Market \n \nThe Answers are wrong about what courts have held in defining the scope of the \nCommission’s jurisdiction.  The Answers’ overall import is that any effect on the wholesale market \nis enough to make the Proposal jurisdictionally acceptable—a proposition that the Supreme Court \nhas soundly rejected. \n \nFirst, addressing Constellation’s “targeting” argument and relying heavily on FERC v. EPSA, \n577 U.S. 260 (2016), PJM’s Answer contends that the question of whether an action crosses the \njurisdictional line is all about the intent behind that action, defined at a high level of generality.5  That \nis self-evidently incorrect.  As EPSA explains, the Commission could not “issue[] a regulation \ncompelling every consumer to buy a certain amount of electricity on the retail market,” even though \n“[s]uch a rule would necessarily determine the load purchased on the wholesale market too, and thus \nwould alter wholesale prices”6—regardless of whether (in PJM’s words) the “justification for” that \n \n5 E.g., PJM Answer 19-20 (stating that whether targeting is occurring “turns on the justification for the rule”). \n6 EPSA, 577 U.S. at 280."},{"page":3,"startToken":575,"endToken":912,"text":"3 \n \nregulation was to benefit the wholesale market in some way.7  Were the law otherwise, the statutorily \nmandated limits on the Commission’s jurisdiction would essentially cease to exist, because—given \nthe connection between the wholesale and retail markets—it would be easy to claim that almost any \nretail-market-targeted action was ultimately intended to have some wholesale-market effect. \n \nIn reality, the “targeting” question—which is just one of multiple relevant factors in assessing \njurisdiction, all of which point against asserting jurisdiction here8—is a more practical one.  It asks \nwhether “the things [the] regulation is directed at, the control of rates and facilities … , are precisely \nthe things over which FERC has comprehensive authority.”9  In EPSA, the answer was yes—not \nbecause it was possible to hypothesize some downstream wholesale-market related justification, but \nbecause the action in question addressed only transactions on the wholesale market and the \njustification for the action matched its target.10  Here, the answer is plainly no.  The Proposal is \ndirected at New Large Loads’ demand for power purchased at retail and seeks to control and regulate \nthe terms of retail sales to those loads, including through the cudgel of curtailment.  The fact that the \nProposal’s ultimate goal may be to affect the wholesale market is of no moment, as EPSA makes \nclear:  the Commission “cannot take an action transgressing th[e] limit” on intruding on the retail \nsphere “no matter how direct[] or dramatic” that action’s “impact on wholesale rates” may be.11  \n \nSecond, citing New Jersey Board of Public Utilities v. FERC, 744 F.3d 74 (3d Cir. 2014), \nPJM’s Answer contends that IRAS is jurisdictionally permissible because it prevents States’ choices \nabout “retail customers and retail rates” from “‘adversely affecting wholesale capacity rates.’”12  But \n \n7 PJM Answer 19-20. \n8 Constellation Protest 10-13. \n9 Schneidewind v. ANR Pipeline, 485 U.S. 293, 308 (1988). \n10 See EPSA, 577 U.S. at 282-83, 287. \n11 Id. at 280. \n12 New Jersey, 744 F.3d at 98, quoted in PJM Answer 28."},{"page":4,"startToken":912,"endToken":1282,"text":"4 \n \nthat decision does not support PJM’s position.  It predates EPSA by two years, and so does not reflect \nthe Supreme Court’s holding that a mere effect on wholesale rates is not enough to trigger this \nCommission’s statutorily defined jurisdiction.13  And in any event, New Jersey is distinguishable \nbecause the Commission action at issue there directly regulated the terms of capacity auctions and \ndid not purport to reach into the retail sphere, although it permissibly had some effects there.14 \n2. \nThe Answers Conveniently Ignore The Requirement In the Proposed \nTariff To Curtail A Particular Category Of Retail Customers And \nOtherwise Mischaracterize The Proposal And Protestors’ Position \n \na.  The Answers mischaracterize the proposed tariff and the effect on a specific class of retail \ncustomer, identified by retail characteristics.  The Answers repeatedly contend that the Proposal does \nnot dictate which particular retail customers will be curtailed and claim that this demonstrates that \nthe proposed tariff does not intrude into States’ discretion to decide which customers should be \ncurtailed.15  That is incorrect.  The proposed tariff language requires that Eligible New Large Loads \nbe curtailed, which is a means of penalizing them for not bringing their own new generation.  Indeed, \nPJM’s Answer admits as much when it states that “only New Large Load may be eligible to provide \nIRAS.”16  As a result, the Proposal targets and seeks to dictate the terms of retail sales as to specific \ntypes of retail customers, identified by retail characteristics.  That is a fatal jurisdictional problem—\nand the Answers have no rejoinder to it. \n \nThe express terms of the proposed tariff, which would govern if the Commission accepted \nthe Proposal, make that problem clear.  The proposed tariff states that “Electric Distributors” \nshall “execute the [PJM] Office of the Interconnection’s directives to implement Interim Resource \n \n13 See EPSA, 577 U.S. at 282-83, 287. \n14 See New Jersey, 744 F.3d at 90-91, 98 (action preventing “uneconomic offers” from “clear[ing] the auction”). \n15 E.g., Shapiro Answer 10 (stating that the Proposal “neither targets nor directs specific retail customers to be \nsubject to curtailment”); PJM Answer 29 (“[S]tates/RERRAs may determine which retail customers will \nimplement the load reduction directives.”). \n16 PJM Answer 61."},{"page":5,"startToken":1282,"endToken":1728,"text":"5 \n \nAdequacy Service Actions among the Eligible New Large Loads in the Electric Distributor’s \nzone/area.”17  It states that a proposed registry that contains only information about large loads will \n“inform which New Large Loads are eligible to be called on to provide” IRAS—that is, to be \ncurtailed.18  And it states that compensation will be provided for those curtailed by “compensating \nall Eligible New Large Loads that provided [IRAS]”—i.e., the only retail customers that “provided” \nthat “service.”19  The proposed tariff language leaves no doubt that Electric Distributors would \nactually violate the PJM tariff if they bypassed curtailment of Eligible New Large Loads and chose \nto curtail other retail customers instead.20 \n \nIt is no surprise that the proposed tariff reads that way, because absent that specific direction \nabout curtailing Eligible New Large Loads the Proposal could not function as intended.  The whole \npoint of the Proposal is to push New Large Loads, as PJM defines that term, to bring their own new \ncapacity.21  If the curtailment consequence of a New Large Load’s failure to do so could fall on \nresidential customers or on New Large Loads that had complied with the BYONC requirement, then \nthere is no reason to believe that the Proposal would incentivize New Large Loads to bring their own \nnew capacity—and nothing about the Proposal would help to solve the problem of system reliability \nthat the Answers identify as the Proposal’s raison d’être.22 \n \n17 Proposed Tariff Attachment DD-4 §§ II(e), III(a) (emphasis added); see id. (stating that the PJM “shall … \nrequest Electric Distributors to direct that a quantity of Eligible New Large Load Amounts … be reduced in \naccordance with an [IRAS] Action”); id. § IV(a) (“All Eligible New Large Loads shall be available to be \nrequested to provide [IRAS] by the [PJM] Office of the Interconnection.”). \n18 Id. § I(a), I(c) (emphasis added). \n19 Proposed Tariff Attachment DD-4 § X(b)(i) (emphasis added); see id. § I(a), I(c) (IRAS “is a load reduction \nservice” and “Eligible New Large Loads may be compensated for providing load reductions”).   \n20 PJM’s transmittal letter says the same thing.  See Constellation Protest 22 (citing examples); see also PJM \nAnswer 61 (acknowledging that “PJM explain[ed] in the August 13 Filing” that “only New Large Load may be \neligible to provide IRAS”). \n21 E.g., PJM Answer 48-49 (“underlying purpose of BYONC, and the reason BYONC may reduce IRAS \nexposure [i.e., curtailment]—is to incentivize new and lasting capacity contributions to the capacity shortfall”); \nid. at 61. \n22 There could be situations in which an Electric Distributor is instructed to curtail a certain number of megawatts"},{"page":6,"startToken":1728,"endToken":2081,"text":"6 \n \n \nIn ignoring that central fact about the proposed tariff, the Answers engage in a sort of shell \ngame.  On one hand, they insist that Electric Distributors are totally free to decide which retail \ncustomers to curtail.  On the other hand, they insist that the Proposal is needed because it will work \nto ensure that new large loads like data centers shoulder the burden of bringing their own new \ncapacity and that the burden should not fall on existing loads that have (in the Answers’ view) already \nstaked a claim to existing capacity.23  But both things cannot be true at the same time.  And, as the \nproposed tariff language demonstrates, the first of those things is not true.  Because PJM asks the \nCommission to put in place a regime that disfavors and curtails the service of a specific type of retail \ncustomer, thus affecting whether such customers receive the retail service for which they have paid \nretail rates, the Commission has no jurisdiction.24 \n \nIt is no answer to assert without explanation (as the Answers do) that, within the disfavored \ngroup of Eligible New Large Loads, Electric Distributors can decide which particular Eligible New \nLarge Loads will be forced to suffer curtailment.  There is no jurisdictional distinction between \nregulation of a particular retail customer and regulation of a category of retail customer identified by \nspecific retail characteristics.25  Any other jurisdictional rule would be irrational.  If Congress’s \njurisdictional limitation could be evaded with respect to a category of, say, three or four retail \ncustomers simply through identifying them by category rather than by name, then that limitation \nwould be easy to circumvent and would create precisely the overlap between state and federal \njurisdiction that Congress legislated to avoid.26 \n \nunder IRAS but no Eligible New Large Loads have yet come online.  In that specific situation, the curtailment \nwould presumably fall on (and harm) other retail customers.  See Part II.C.3, infra; N.J. BPU Answer 2-4. \n23 E.g., PJM Answer 48-49. \n24 Constellation Protest 13-15. \n25 Constellation Protest 23. \n26 Constellation Protest 23; see 16 U.S.C. § 824(a)."},{"page":7,"startToken":2081,"endToken":2408,"text":"7 \n \n \nPJM’s Answer claims that the Commission’s recent decision in Tri-State Generation & \nTransmission Association, 196 FERC ¶ 61,127 (2026), illustrates that “tariff provisions addressing \n‘concerns regarding the rapid growth of large loads[]’ do not constitute ‘an impermissible intrusion \nupon retail rate regulation’” so long as utilities have some discretion about exactly how those \nprovisions affect their retail customers.27  But Tri-State does not illustrate any such thing.  In an \nearlier 2025 decision, the Commission rejected a prior Tri-State proposal for addressing large loads \nthat would have required Tri-State’s wholesale customers to set minimum load and energy \nrequirements for retail customers with which they dealt.28  The Commission explained that the \nproposed tariff “require[d] specific terms and conditions of service by a Utility Member to an end-\nuse [High Impact Load] Customer (i.e., a retail service)” and that the “specification of terms of sale \nat retail ‘is a job for the States alone.’”29  Subsequently, Tri-State revised its proposal to eliminate \nany requirement that a utility take action with respect to any retail customer; the new proposal placed \nrequirements directly on utilities involving only “provision of transmission service and wholesale \npower,” without “dictat[ing] the terms or conditions of retail service.”30  The Commission’s 2026 \ndecision deems that new proposal jurisdictionally acceptable because it “does not include provisions \nthat establish” such terms or conditions, but instead “impos[es] obligations only on Tri-State’s Utility \nMembers and leav[es] those same Utility Members full discretion as to whether they will flow … \nthrough” the consequences to retail customers.31 \n \nThe Proposal here is like the first Tri-State proposal that the Commission rejected, not like \nthe second Tri-State proposal that the Commission accepted.  PJM’s Proposal unquestionably \n \n27 PJM Answer 24-25, 29. \n28 Tri-State Generation and Transmission Ass’n, 193 FERC ¶ 61,070, at PP 49-50 (2025).  \n29 Id. \n30 196 FERC ¶ 61,127, at PP 65-68. \n31 Id.; see PJM Answer 29-30 (quoting Tri-State, 196 FERC ¶ 61,127 at P 25)."},{"page":8,"startToken":2408,"endToken":2719,"text":"8 \n \n“dictate[s] the terms or conditions of retail service,”32 because it requires that electric distributors \ninterrupt retail customers’ service in certain specified circumstances—indeed, PJM’s proposed tariff \nrequires curtailment of a certain specified category of retail customers.33  Nothing about that 2026 \ndecision suggests that it is jurisdictionally permissible for a tariff to regulate retail sales, let alone \ncategories of retail sales, so long as the tariff does not specify an individual retail customer who is to \nbe affected.  Rather, the decision simply accepts a proposed tariff that does not establish “terms or \nconditions of retail service” of any kind and leaves it entirely up to the utility whether and how the \ntariff’s terms might ultimately have a trickle-down effect on retail customers.34  Electric distributors \nhave no such “full discretion”35 under PJM’s proposed tariff.   \n \nb.  The Answers essentially admit that the Proposal’s compensation provisions are \njurisdictionally improper.  As Constellation’s Protest explains, the proposed tariff’s compensation \nprovisions fall on the wrong side of the jurisdictional line because they effectively regulate a retail \nrate by fixing the default amount that retail customers are paid for the interruption of their retail \nservice under IRAS.36  The Answers respond only by asserting that the compensation provisions—\nalbeit “confusi[ng]” and in need of “clarifi[cation]” 37 —“target[] wholesale rates for wholesale \ncustomers.”38  It is difficult to see how that could be so, and the Answers do not provide any relevant \nexplanation.  Under the proposed tariff, Eligible Large Loads would have their retail service curtailed \nand would be provided compensation for that retail curtailment in their retail rates—that is, they \n \n32 Id. \n33 See pp. 4-5, supra (discussing the text of the proposed tariff). \n34 Id. \n35 196 FERC ¶ 61,127, at PP 65-68. \n36 Constellation Protest 14. \n37 Shapiro Answer 12. \n38 PJM Answer 54; see Shapiro Answer 12."},{"page":9,"startToken":2719,"endToken":3074,"text":"9 \n \nwould pay less because, as end-users, they received interrupted service.39 \n \nBut even assuming that it were true that the compensation prescribed in the proposed tariff \nis a “wholesale compensation level subject to change by the relevant retail authority,”40 a fatal \njurisdictional problem remains.  States can no more invade the federal government’s jurisdictional \nsphere than the Commission can invade the States’ jurisdictional sphere.  Thus, a retail authority \ndoes not have the jurisdictional power to meddle in the wholesale-compensation arena by taking \nresponsibility for setting the level of that compensation (below a tariff-imposed cap),41 and the \nCommission cannot authorize such a jurisdictional intrusion. 42  \n \nThe Answers assert that there is precedent for giving States that kind of intrusive role:  Order \nNo. 719, in which “the Commission granted the relevant electric retail regulatory authority (RERRA) \na veto over that existence of the wholesale [demand-response] transaction entirely.”43  According to \nthe Answers, giving States the ability to reduce the amount of wholesale compensation is less \nintrusive than giving them a veto, so it must be permissible.  That is wrong.  For one thing, as noted \nabove, this is a retail rate—and to say that the Commission can restrict state authority to set retail \nrates is completely unprecedented. \nBut even assuming that the rate here is a wholesale rate, the Answers’ argument still fails.  It \nis one thing (as under Order No. 719) for a federal entity with jurisdiction over the wholesale sphere \nto show “solicitude”44 by honoring the States’ desire that wholesale demand-response not take \n \n39 Proposed Tariff Attachment DD-4 § X. \n40 Shapiro Answer 12. \n41 See Constellation Protest 14 (discussing the cap). \n42 PJM’s proposed tariff allows Eligible New Large Loads (not States) to “elect” to choose a compensation \nlevel below the level PJM proposed.  Proposed Tariff Attachment DD-4 § X.  But there is no valid reason for \na retail customer to ever elect a lower compensation rate of its own accord.  A customer would make such \nan election only if required to do so by a state regulator. \n43 Shapiro Answer 13; see PJM Answer 57. \n44 EPSA, 577 U.S. at 287-88."},{"page":10,"startToken":3074,"endToken":3411,"text":"10 \n \nplace—and it is another thing entirely to give States independent power to regulate within the \nwholesale sphere (as PJM’s Proposal does) by varying and setting the amount of wholesale \ncompensation.  That involves the States directly reaching into and regulating the wholesale market, \nwhich the statute does not allow.45  If that state conduct were jurisdictionally permissible, nothing \nwould stop the Commission from turning over all kinds of wholesale-regulatory responsibilities to \nthe States—which, once again, would effectively erase the jurisdictional division that Congress \ncreated. \n \nc.  The Answers wrongly suggest that protestors’ position is that PJM must blind itself to \nload-growth information.  The Answers also incorrectly suggest that protestors’ position is that “PJM \nmust blind itself” to relevant data because “it is legally barred from acting on information about the \ncharacteristics of load growth in a zone or area, even if that information is directly relevant to reliable \noperation of the bulk power system.”46  That suggestion bears no relationship to Constellation’s \nactual position (or the position of other protestors).  PJM is of course not barred from learning and \nacting on information about load-growth characteristics.  PJM can use that information to take \nnumerous permissible steps, including urging States to regulate retail markets differently and asking \nthis Commission to take actions that do not “transgress[] th[e] limit” on intruding on the retail \nsphere47—some of which Constellation identified in its Protest.48 \nBut neither PJM nor the Commission is entitled to act on such information by regulating the \nretail market based on the existence of certain retail characteristics, which “is a job for the States \nalone.”49  Yet that is exactly what PJM’s Proposal seeks to do.  The problem is not only that “PJM \n \n45 Constellation Protest 9-13; 16 U.S.C. § 824(a), (b)(1). \n46 Shapiro Answer 10. \n47 EPSA, 577 U.S. at 280. \n48 Constellation Protest 24; see pp. 12, 21, infra. \n49 EPSA, 577 U.S. at 280; see id. at 266; California v. FERC, 495 U.S. 490, 497 (1990)."},{"page":11,"startToken":3411,"endToken":3756,"text":"11 \n \nproposes to base” the number of megawatts that must be curtailed on “whether the load growth in \n[a] zone or area is comprised of new Large Loads … and whether such new Large Load additions \nhave been matched by addition of commensurate new supply.”50  The problem is also (among other \nthings) that PJM proposes to require curtailment at the retail level “among the Eligible New Large \nLoads in [an] Electric Distributor’s zone/area”51; to dictate the default (and maximum) compensation \nto be paid to curtailed retail customers in that category; and ultimately to try to strongarm New Large \nLoads into obtaining retail service in a particular manner.  Deeming those actions outside of the \nCommission’s jurisdiction does not amount to “blind[ing]” or unduly constraining PJM. \n3. \nThe Proposal Asks The Commission To Assert Authority That It Has \nNever Asserted Before, And The Answers’ Arguments To The Contrary \nAre Incorrect \n \nFinally, the Answers try to counter Constellation’s jurisdictional arguments by asserting that \nIRAS involves actions “no different” from curtailment authority PJM already possesses.52  But if \nPJM already could impose the IRAS curtailment regime under existing authority, PJM’s extensive \nProposal (with its many specifications and purported justifications) would be unnecessary.  Rather, \nas the discussion above makes clear, the Proposal seeks to do something that has never been done \nbefore, including choosing load to be curtailed based on specific retail characteristics of retail \ncustomers and regulating the retail rates for such curtailment. 53   PJM’s generic authority to \ncoordinate emergency load shed does not involve those jurisdictionally significant features.54 \n \nPJM’s Answer also asserts that the Commission and the States both have some authority with \n \n50 Shapiro Answer 10. \n51 Proposed Tariff Attachment DD-4 § III(a).  \n52 E.g., Shapiro Answer 7, 9. \n53 See pp. 4-8, supra. \n54 See Constellation Protest 13; Patterson Affidavit 6-7 ¶¶ 13-15.  The Answers also are wrong that the Proposal \n“align[s] IRAS” with zones experiencing “real-time capacity shortfalls.”  Shapiro Answer 9.  Under the Proposal, \nexposure to IRAS curtailment is calculated using New Large Load/BYONC status.  See Proposal 70-71, 82."},{"page":12,"startToken":3756,"endToken":4076,"text":"12 \n \nrespect to resource adequacy.55  But the fact that the Commission can address resource adequacy \ndoes not make the specific action set forth in the Proposal jurisdictionally permissible.  Instead, the \nCommission—and the States—must address the issue through jurisdictionally proper action.56 \n \nB. \nPJM’s Proposal Should Be Rejected Because It Would Violate The FPA By \nTreating Certain Load and Certain Resources Differently Without Relevant \nJustification \nConstellation’s Protest explains that PJM’s Proposal asks the Commission to unlawfully \ndiscriminate based on load size, load date, and resource vintage.57  The Answers concede that the \nProposal treats certain load and resources more favorably than others, yet fail to explain why that \ndifferential treatment does not amount to “undu[e] discriminat[ion]”58 under the FPA—including \nFPA Section 202(g), which specifically prohibits undue prejudice or disadvantage in the \naccommodation of anticipated capacity shortages but which the Answers never even mention.59 \n1. \nThe Proposal Violates The FPA By Disfavoring New Large Loads Even \nThough They Are Not Materially Different From Other Loads \nThere is no meaningful dispute that PJM’s Proposal treats New Large Loads differently—\nand worse—based on their size and date of entry.60  The Answers assert that the Proposal “neither \ntargets nor directs specific retail customers to be subject to curtailment.”61  To be sure, the Proposal \ndoes not name individual customers—but that misses the point for discrimination purposes (as for \njurisdictional ones).  Under the Proposal, as PJM’s Answer expressly reaffirms, “only New Large \n \n55 PJM Answer 23. \n56 Constellation Protest 24, 28-29; see p. 21, infra; PJM Answer 27 & n.105 (explaining steps taken by the \nPennsylvania PUC and citing https://www.puc.pa.gov/pcdocs/1949305.pdf [https://perma.cc/7UFL-ZX6D]).  \n57 Constellation Protest 29-40. \n58 16 U.S.C. § 824e(a); see id. § 824d(b). \n59 Constellation Protest 29-30 (discussing Section 202(g)). \n60 Constellation Protest 31. \n61 E.g., Shapiro Answer 10."},{"page":13,"startToken":4076,"endToken":4474,"text":"13 \n \nLoad may be eligible” for curtailment.62  That is so, the Answers explain, because the “objective” of \nIRAS “is to protect native loads from the costs and reliability issues posed by New Large Loads that \nfailed to bring new capacity.”63 \nThe Answers do not provide any reason why that disfavored treatment is justified by any \ndifference “material to the inquiry at hand.”64  As Constellation has explained, 50 MW of demand \ncould come from one new customer, one existing customer, or multiple smaller new and/or existing \ncustomers.  All three scenarios place the same resource-adequacy burden on PJM, but only the first \nscenario can give rise to IRAS curtailment.  Although PJM suggests that New Large Loads warrant \ndisfavored treatment because they “have failed to cover their capacity obligations,”65 that is exactly \nthe point:  discrimination against New Large Loads includes not only the risk of curtailment but also \nthe requirement to make arrangements with new capacity, which is a burden not placed on other \ncustomers that also impose capacity requirements. \nIndeed, PJM’s effort to justify its discrimination against New Large Loads actually confirms \nthat its approach is unlawful.  According to PJM, “[n]ew, not existing load, is the reason for the \nshortfall, which drives the need for IRAS.”66  But the D.C. Circuit has held that “imputing an \nexclusive or even primary causal role to the … demand” of the newest market entrants is not \nequitable.67  Rather, because “every shipper is economically marginal, the costs of increased demand \nmay equitably be attributed to every user.”68  By contrast, PJM proposes to impose all of the burdens \n \n62 PJM Answer 61; see Constellation Protest 16, 21; pp. 4-8, supra. \n63 PJM Answer 35; PJM Answer 31 (calling for IRAS load reductions before Demand Response “protects native \nloads from the cost and reliability impacts of such new large loads”); see also Shapiro Answer 19-20. \n64 Constellation Protest 30 (quoting Calpine, 171 FERC ¶ 61,035, P 318 (2020)) (emphasis added). \n65 PJM Answer 31, 34; see id. at 35 (“the objective is to protect native loads from the costs and reliability issues \nposed by New Large Loads that failed to bring new capacity”). \n66 PJM Answer 61. \n67 BNP Paribas Energy Trading v. FERC, 743 F.3d 264, 269 (D.C. Cir 2014).   \n68 Southeastern Michigan Gas v. FERC, 133 F.3d 34, 41 (D.C. Cir. 1998)."},{"page":14,"startToken":4474,"endToken":4795,"text":"14 \n \nof the system’s increased aggregate demand on a narrow group of customers.  Because those \ncustomers are similarly situated to relevant comparators that would not bear those burdens, the \nProposal is unlawfully discriminatory. \nGovernor Shapiro’s effort to justify discrimination against “new large computational loads” \nsimilarly underscores, rather than refutes, the Proposal’s unlawfulness.69  Although the Shapiro \nAnswer offers perfunctory statements that the loads are “new,” “distinct,” and “novel,” it does not—\nand presumably cannot—explain why such loads are different with respect to their capacity needs \nand resource-adequacy burdens.70  In any event, the Shapiro Answer seeks to justify differential \ntreatment of computational load, but the IRAS Proposal treats all New Large Loads (including \ntraditional commercial and industrial load) worse than other loads.  PJM has rejected the suggestion \nto distinguish “data center Large Loads/computational Large Loads” from “other types of Large \nLoads, such as manufacturing or industrial loads.”71 \nThe Answers try to suggest that the Commission has previously approved similar \narrangements as non-discriminatory, but those analogies fail.  First, the cited decisions that \npurportedly differentiated large loads from other customers are distinguishable. 72   The \nCommission’s June 2026 Order to Show Cause recognized that large customers may create \nidentifiable transmission and interconnection impacts—not that they pose specialized capacity or \nresource-adequacy concerns.73  And the Commission’s approval of the CHILLS proposal authorized \n \n69 Shapiro Answer 3. \n70 See Shapiro Answer 3, 16. \n71 PJM Answer 16. \n72 See PJM Answer 59 n. 212 (citing June 2026 Order to Show Cause, 195 FERC ¶ 61,211 at P 58; Sw. Power \nPool, 195 FERC ¶ 61,196, at PP 84-85, 87 (2026)); see also Shapiro Answer 17 nn.38-40. \n73 June 2026 Order to Show Cause, 195 FERC ¶ 61,211, P 50 (2026); see also Reliability Standard(s) Pertaining \nto Computational Load Integration, 196 FERC ¶ 61,031, PP 1, 4 (2026) (addressing “integration of \ncomputational loads” and “timely and orderly interconnection of large loads”)."},{"page":15,"startToken":4795,"endToken":5180,"text":"15 \n \na “voluntary” new large load service product—not a mandatory curtailment.74  Those examples are \nnot remotely comparable to the present Proposal, which would force large new customers to face \nservice interruption while sparing other customers that impose equivalent capacity needs.   \nSecond, the cited decisions that “grandfather[] existing entities under prior rules” do not \njustify discrimination based on load date under the IRAS Proposal. 75  Those decisions protect \ncontractual reliance interests,76 distinguish identified resource types from speculative types with \nunknown attributes,77 or approve a transition process as a bridge to a new regime.78  The IRAS \nframework would not do any of those things.  Instead, it would strip certain new entrants of service \nthat has always been available to all comers, creating a permanent, stark, and unfavorable difference \nbetween otherwise identical customers. \n2. \nThe Proposal Violates The FPA By Discriminating Against Existing \nCapacity Resources Even Though They Are Not Materially Different \nFrom New Resources \nThe Answers also fail to meaningfully address the Proposal’s discrimination against existing \ncapacity resources.79  PJM says only that the requirement to contract with new capacity is justified \nbecause “[t]he PJM Region needs new capacity.”80  But that ignores that existing and new resources \ncan provide the very same benefit to the system, regardless of vintage.81  \n \n74 Southwest Power Pool, 195 FERC ¶ 61,196, P 84 (2026). \n75 Shapiro Answer 18 & n. 42; PJM Answer 61 & n. 218. \n76 PJM, 193 FERC ¶ 61,217 at P 224 (2025); MISO, 150 FERC ¶ 61,180 at P 21 (2015). \n77 ISO-NE, 162 FERC ¶ 61,205 at P 47 (2018) (distinguishing between identified eligible resources and “future \nresource types that are speculative” because details informing their classification were unknown). \n78  Order No. 2023, Improvements to Generator Interconnection Procedures and Agreements, 184 FERC \n¶ 61,054 at P 856 (2023) (adopting “transition process” to move to “new cluster study process”). \n79 See PJM Answer 44; compare Constellation Protest 37. \n80 PJM Answer 44. \n81 Constellation Protest 37-38; see also PJM Interconnection, 117 FERC ¶ 61,331, at P 141 (2006) (“In a \ncompetitive market, prices do not differ for new and old plants …”); id. P 77 (disagreeing that “proposal … \nwhich would provide additional payments to new generators but not to existing generators would support our \nobjective of achieving an efficient market overall”)."},{"page":16,"startToken":5180,"endToken":5460,"text":"16 \n \nGovernor Shapiro contends that differentiating between newly available capacity and \nexisting capacity is appropriate because existing capacity resources are “already committed” to the \nsystem. 82   That contention rests on the mistaken premise that existing capacity resources are \npermanently tied to the market because they previously cleared an auction.  To the contrary, “many \nexisting resources have the capability to exit the RPM,” 83  which underscores that contractual \narrangements with new or existing resources can provide the same capacity benefits. \nGovernor Shapiro further argues that the new-resource requirement is “needed to prevent \ncross-subsidization” by existing ratepayers of new large load—that is, to prevent “new large loads” \nfrom contracting with “cheaper” “available capacity resources,” which will be motivated to “lock-in \nlong-term contracts with new large loads.”84  That argument is economically incoherent, as there is \nno reason to expect that existing capacity is “cheaper” in a market that is set by competition among \nnew and existing capacity.  Moreover, existing ratepayers have no continuing entitlement to existing \ncapacity resources.  Prior payments those ratepayers made to pay for existing resources were only \nfor prior obligations in prior Delivery Years; they did not guarantee permanent dedication of specific \nresources to particular customers.  Governor Shapiro’s concern about cross-subsidization boils down \nto an attempt to enforce a policy that would preserve lower-cost capacity for incumbent load and \nrelegate new load to more expensive and scarcer alternatives.  That is not a legitimate justification \nfor discrimination among capacity resources by vintage, but rather a concession that the purpose of \nthe Proposal is to discriminatorily benefit existing customers at the expense of New Large Load. \n \n82 Shapiro Answer 19. \n83 Patterson Affidavit 23 ¶ 48. \n84 Shapiro Answer 16, 19."},{"page":17,"startToken":5460,"endToken":5790,"text":"17 \n \nC. \nPJM’s Proposal Should Be Rejected Because Its Design Is Unjust and \nUnreasonable \n1. \nPJM Unreasonably Proposes to Exclude New Large Load Without \nBYONC From the Demand Curve, Which Would Distort Market \nDynamics And Worsen Resource Constraints \nPJM’s proposal would unreasonably remove New Large Loads that are subject to IRAS from \nthe VRR Curve used to clear RPM Auctions.85  None of the purported justifications offered in the \nAnswers overcomes the unreasonableness of that aspect of the Proposal. \nFirst, according to PJM’s Answer, its demand curve approach is justified by the Pledge.  But \nthe Pledge is a policy statement that does not suggest that PJM’s IRAS Proposal is the only possible \napproach that can be taken here, let alone that the Proposal is legally sound or is consistent with other \npolicies supporting new load development and infrastructure to serve that new load.86   \nSecond, the Answers contend that New Large Loads that do not bring their own new capacity \nshould be excluded from the VRR Curve because they are “effectively electing not to receive \ncapacity service.”87  But that justification makes no sense, because under the Proposal New Large \nLoads without BYONC would be excluded even in delivery years when IRAS curtailment is not \ntriggered.88  Similarly, in any period in which no such curtailment is taking place, the excluded load \nwill be physically present and served, yet the VRR Curve will pretend that it does not exist.  The \ncategorical exclusion of certain New Large Loads from the VRR Curve thus is inconsistent with the \nrealities of the market, which explains why it will undermine RPM’s structural integrity and \nunjustifiably mute market signals, ultimately worsening resource constraints.89 \n \n85 PJM Answer 50. \n86  Ratepayer Protection Pledge, available at https://www.whitehouse.gov/releases/2026/03/ratepayer-\nprotection-pledge/ (committing to “pay[] the full cost” of new generation resources and “add more capacity” \n“where possible”). \n87 PJM Answer 53; see Shapiro Answer 4. \n88 Constellation Protest 48. \n89 Constellation Protest 46."},{"page":18,"startToken":5790,"endToken":6097,"text":"18 \n \nThird, Governor Shapiro states that “sufficient new capacity is not [coming] and perhaps \ncannot come online as fast as new large load demand,” so excluding the need for that supply from \nthe market makes sense.90  But the purpose of the capacity market is not only to encourage new and \nimmediately accessible generation.  Capacity prices also encourage existing resources to remain in \nservice in PJM, support uprates and demand response, affect long-term investment timing and \nincentives, and promote entry in future Delivery Years.91  If anything, limitations on speed and \navailability of new resources make an accurate demand signal more important, not less. \n2. \nPJM Unreasonably Proposes To Sequence IRAS Before Demand \nResponse, Which Is Economically Irrational And Will Undermine Price \nFormation in the Energy Market \nPJM’s Proposal also is unreasonable because it would curtail New Large Load before calling \non emergency resources. 92   Constellation’s Protest explains the economic irrationality of that \nsequencing, which prioritizes involuntary curtailment of customers with high interruption costs over \ncurtailment of a self-selected and compensated population.93  PJM misunderstands this system-wide \ncritique as an argument about the relative costs to individual customers.94  Its Answer reiterates that \nIRAS is intended to “burden … New Large Loads,” but it does not explain how the proposed \nemergency-response sequence advances the collective interests of the system as a whole.95 \nThe Answers also argue that calling on Demand Resources first could risk “fatigue” of those \nresources.96  But that argument does not justify an economically irrational emergency response \n \n90 Shapiro Answer 23. \n91 See, e.g., Hughes v. Talen, 578 U.S. 150, 155-56 (2016); see also FERC, Energy Primer: A Handbook of \nEnergy Market Basics 85-86 (2024) (discussing RPM market). \n92 Constellation Protest 42.   \n93 Constellation Protest 43-44. \n94 PJM Answer 34-35. \n95 PJM Answer 35. \n96 PJM Answer 36; see Shapiro Answer 24."},{"page":19,"startToken":6097,"endToken":6464,"text":"19 \n \nprocess.  Instead, PJM could explore other ways to incentivize alternative capacity resources, \nincluding by developing more limited Demand Response products that would not threaten to fatigue \nproviders.97 \n3. \nPJM Risks Curtailing The Very Customers It Claims To Protect, Which \nIs Irrational And Unjust \nPJM’s Proposal may threaten the service of the very residential customers it purports to \nprotect.  PJM proposes to calculate each zone/area’s IRAS obligation before the start of each \nDelivery Year using the peak load of Eligible New Large Loads.98  But the Proposal is not designed \nto ensure that the Eligible New Large Loads used to calculate the prospective amount of possible \nIRAS are actually online and available to provide that service when an IRAS Action occurs, which \nmeans that “this pre-determined amount may not match the actual New Large Load demand” in \nreal time.99  In that circumstance, if PJM directs an amount of IRAS that is higher than the real-\ntime demand of Eligible New Large Loads in that zone, the result could actually be that Electric \nDistributors are required to either (1) violate PJM’s tariff by failing to curtail enough load, given \nthe limited pool of “eligible” load to curtail, or (2) violate PJM’s tariff by curtailing some \ncustomers that are not New Large Loads.100  Although PJM’s Proposal clearly targets and intends \nto curtail only New Large Loads, 101 the specified mechanics leave a hole that risks instead \ncurtailing other customers, including residential loads that happen to be in zones where significant \nlarge load growth is forecasted.102  That would run directly contrary to the stated purpose of IRAS \n \n97 Patterson Affidavit 11 ¶ 22; Constellation Protest 24. \n98 PJM Proposal 70 (“The amount of [IRAS] PJM may need to be available will be determined each \nDelivery Year for the PJM Region and each Electric Distributor zone/area”); Proposed Tariff, Attachment \nDD-4, § V(b); see also id., Attachment DD-4 §§ II(c), (e), IV(c)(ii); Pilong Aff. ¶¶ 28, 42-43.  \n99 NJ BPU Answer 3 (citing other comments making the same point). \n100 E.g., NJ BPU Answer 3; Pilong Aff. ¶¶ 42-43. \n101 See Parts II.A & II.B, supra. \n102 See PJM Answer 29; cf. Shapiro Answer 9-10."},{"page":20,"startToken":6464,"endToken":6791,"text":"20 \n \nto protect existing customers, particularly residential loads103—and is yet another reason why the \nProposal is unjust and unreasonable and must be rejected. \nD. \nThe Answers’ Suggestion That The Proposal Is the Only Solution To The \nChallenges Presented Is Wrong, And The Commission Should Not Be Swayed \nBy It \n \nThreaded through the Answers is a repeated insistence that, whatever flaws the Proposal \nmight have, the Commission should accept it because it is the only possible solution to an \noverwhelming problem that needs to be solved this very instant.104  That is a false construct.   \nAlthough the Answers point to the Ratepayer Protection Pledge and the Statement of \nPrinciples (issued by the White House and Governors) as support for the IRAS imperative, those \ndocuments contemplate solutions and responsive options for data-center demand.105  They do not \nestablish that PJM’s version of IRAS is a necessary, reasonable, or lawful implementation of public \npolicy.  Nor do they override other policy statements that emphasize the need to support “vast AI \ninfrastructure and the energy to power it.”106 \n \nEven more fundamentally, PJM’s Proposal violates the statutory limits on the Commission’s \njurisdiction—regardless of PJM’s policy motivations.  Congress is empowered to decide how to \ndivide up responsibility for such problem-solving between the federal government and the States, \nand the Commission cannot step in just because industry participants—or even States themselves—\nbelieve that Commission action would be a more convenient or superior way of addressing a \nparticular issue.  Jurisdictionally improper action by this Commission is, in fact, deeply \n \n103 PJM Proposal 9; see id. at 5-6, 15, 23-24, 90-91. \n104 E.g., PJM Answer 3 (juxtaposing IRAS with “the myriad risks that doing nothing presents”); Shapiro Answer \n5 (“IRAS is necessary … in response to the severe challenges facing the region”). \n105 PJM Answer 2; Shapiro Answer 2. \n106 E.g., White House, America’s AI Action Plan (July 2025); Executive Order 14318, Accelerating Federal \nPermitting of Data Center Infrastructure (July 23, 2025)."},{"page":21,"startToken":6791,"endToken":6972,"text":"21 \n \ncounterproductive in the end.  It will not only encourage further violations of Section 201(b) but also \nis very likely to be undone on judicial review, thus creating regulatory uncertainty, disruption, and \ndelay that need never have existed. \nThe Answers are also wrong in asserting that the Proposal is the only possible form of \n“coordinated” action that can be taken here.107  The States are free—perhaps with PJM’s help and \nconsultation—to coordinate with each other, and even less-than-complete state coordination would \nstill advance the ball.  Moreover, there are steps that the Commission can take that do not have the \nsame jurisdictional flaws as the Proposal, including (as supply-side companies have previously \nproposed) adding voluntary demand response projects with limited call options.108  At the very least, \nthe Commission should try those other steps and see what effect they have before accepting PJM’s \nsiren call to venture into jurisdictionally hazardous territory. \nIII. \nCONCLUSION \nThe Commission should reject PJM’s Proposal (other than the proposal to create the Large \nLoad Registry). \n \n \n \n \n \n \n \n \n \n \n \n \n \n107 Shapiro Answer 6. \n108 Constellation Protest 24 & n.100."},{"page":22,"startToken":6972,"endToken":7120,"text":"22 \n \n \n \n \n \n \nRespectfully submitted, \nBy:  /s/ Elaine J. Goldenberg \nCarrie Hill Allen \nSr. Vice President & Deputy General \n  Counsel \nJohn M. White \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \njohn.white@constellation.com \nChristopher A. Wilson \nVice President, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \nElaine J. Goldenberg \nMUNGER, TOLLES & OLSON LLP \n601 Massachusetts Avenue NW \n  Suite 500 E \nWashington, DC 20001 \n(202) 220-1100 \nElaine.Goldenberg@mto.com \n \nHenry Weissmann \nMUNGER, TOLLES & OLSON LLP \n350 South Grand Avenue, 50th Floor \nLos Angeles, CA 90071-3426 \n(213) 683-9100 \nHenry.Weissmann@mto.com \n \nTeresa Reed Dippo \nMUNGER, TOLLES & OLSON LLP \n560 Mission Street, 27th Floor \nSan Francisco, CA 94105 \n(415) 512-4000 \nTeresa.ReedDippo@mto.com \nCounsel for Constellation Energy Generation, LLC \n \nDated:  September 29, 2026"},{"page":23,"startToken":7120,"endToken":7201,"text":"23 \n \nCERTIFICATE OF SERVICE  \nI hereby certify that I have on this 29th day of September 2026 served a copy of the \nforegoing upon all parties on the service list in this proceeding in accordance with the Rule 2010 \nof the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.2010.  \n \n \n \n \n \n \n \nBy: /s/ Elaine J. Goldenberg     \n \n \n \n \n \n \n \nElaine J,. Goldenberg \n \n \n \n \n \n \n \nMUNGER, TOLLES & OLSON LLP \n \n \n \n \n \n \n \n601 Massachusetts Avenue NW \n   \n \n \n \n \n \n   Suite 500 E \n \n \n \n \n \n \n \nWashington, DC 20001 \n \n \n \n \n \n \n \n(202) 220-1100 \n \n \n \n \n \n \n \nElaine.Goldenberg@mto.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":931,"startToken":0,"endToken":132},{"p":1,"at":931,"title":"I. MOTION FOR LEAVE TO ANSWER","method":"printed heading","endPage":2,"endAt":5,"startToken":132,"endToken":272},{"p":2,"at":5,"title":"II. ANSWER","method":"printed heading","endPage":2,"endAt":594,"startToken":272,"endToken":360},{"p":2,"at":594,"title":"A. The Proposal Is Outside The Scope Of The Commission’s Jurisdiction","method":"printed heading","endPage":12,"endAt":302,"startToken":360,"endToken":3800},{"p":12,"at":302,"title":"B. PJM’s Proposal Should Be Rejected Because It Would Violate The FPA By","method":"printed heading","endPage":17,"endAt":6,"startToken":3800,"endToken":5461},{"p":17,"at":6,"title":"C. PJM’s Proposal Should Be Rejected Because Its Design Is Unjust and","method":"printed heading","endPage":20,"endAt":165,"startToken":5461,"endToken":6488},{"p":20,"at":165,"title":"D. The Answers’ Suggestion That The Proposal Is the Only Solution To The","method":"printed heading","endPage":21,"endAt":1000,"startToken":6488,"endToken":6944},{"p":21,"at":1000,"title":"III. CONCLUSION","method":"printed heading","endPage":23,"endAt":6,"startToken":6944,"endToken":7121},{"p":23,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":23,"endAt":599,"startToken":7121,"endToken":7201}]}