{"document":{"slug":"rec-20261007-5190","title":"Motion for Leave to File Answer, and Answer, of East Kentucky Power Cooperative, Inc. to the 09/23/2026 Answer of PJM Interconnection, L.L.C","issued":"2026-10-07","accession":"20261007-5190","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"East Kentucky Power Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20261007-5190_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5190","tier":"record","sha256":"df0c17a00575f7dcbc52391f00a8d625136dc675b46db8dc4a47165a134d7547","pages":15,"tokens":4250,"emptyPages":[],"textThemes":["flex","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":295,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n) \nPJM Interconnection, L.L.C. \n \n) \n \nDocket No. ER26-3515-000 \n \n \n \n \n \n \n) \n \nMOTION FOR LEAVE TO FILE ANSWER, \nAND ANSWER, OF \nEAST KENTUCKY POWER COOPERATIVE, INC. \n \nPursuant to Rules 212 and 213 of the Commission’s Rules of Practice and Procedure,1 East \nKentucky Power Cooperative, Inc. (“EKPC”) moves for leave to file this answer and answers the \nSeptember 23, 2026 answer submitted by PJM Interconnection, L.L.C. (“PJM”) in the above-\ncaptioned proceeding.2 EKPC’s Protest in this proceeding opposed PJM’s proposed revisions to its \nOpen Access Transmission Tariff (“Tariff”) and the Reliability Assurance Agreement Among Load \nServing Entities in the PJM Region (“RAA”) to establish an Interim Resource Adequacy Service \n(“IRAS”). As explained in EKPC’s Protest, certain provisions of PJM’s IRAS Proposal are unjust \nand unreasonable, unduly discriminatory, and inconsistent with the Commission’s cost-causation \nprinciples.3 PJM’s Answer does not cure those defects. It largely responds to arguments EKPC did \nnot make or answers EKPC’s concerns only at a level of generality that avoids the implementation \nproblems identified in EKPC’s Protest and the Affidavit of Marc D. Montalvo (“Montalvo \nAffidavit”). For the reasons set forth herein and in EKPC’s Protest, the Commission should reject \nor require revisions to those elements of the IRAS Proposal that would impose IRAS exposure, \ncompensation costs, or curtailment risk on loads and Load Serving Entities (“LSEs”) that did not \n \n1 See 18 C.F.R. §§ 385.212, 385.213 (2026). \n2 PJM Interconnection, L.L.C., “Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.,” Docket \nNo. ER26-3515-000 (filed Sept. 23, 2026) (“PJM Answer”). \n3 PJM Interconnection, L.L.C., “Limited Protest of East Kentucky Power Cooperative, Inc.,” Docket No. ER26-3515-\n000 (filed Sept. 3, 2026) (“EKPC Protest”)."},{"page":2,"startToken":295,"endToken":630,"text":"2 \ncause the asserted resource adequacy deficiency or that have already supported their load through \na prudent resource portfolio. \nI. \nMOTION FOR LEAVE TO FILE ANSWER \nRule 213(a)(2) of the Commission’s Rules of Practice and Procedure generally prohibits \nanswers to answers or protests unless otherwise ordered by the decisional authority. Good cause \nexists to accept this Answer because PJM’s Answer misconstrues EKPC’s portfolio-sufficiency, \nresource-attribution, and transferability arguments and does not resolve the real-time curtailment \nand compensation issues identified in EKPC’s Protest and supporting affidavits. This Answer will \nassist the Commission in its decision-making process4 and clarify the record.5 For these reasons, \nthe Commission should accept this Answer. \nII. \nANSWER \nA. \nPJM Failed to Address or Misstates Significant Concerns Raised in \nEKPC’s Protest. \nIn its Protest, EKPC explained that a legitimate reliability objective does not justify the \nCommission’s acceptance of a proposal that has not been shown in its entirety to be just and \nreasonable, that is potentially unduly discriminatory, and that is inconsistent with the \nCommission’s cost-causation framework. EKPC’s Protest raised several concerns regarding \naspects of the IRAS Proposal, and PJM’s Answer misconstrues or does not address the central \nissues raised by EKPC. \n \n4 See, e.g., PJM Interconnection, L.L.C., 189 FERC ¶ 61,110, P 22 (2024) (accepting answers to protests and answers \nbecause they assisted the Commission in its decision-making process); PJM Interconnection, L.L.C., 181 FERC ¶ \n61,162, P 29 (2022) (same). \n5 See, e.g., Potomac-Appalachian Transmission Highline, LLC, 140 FERC ¶ 61,229, P 102 (2012) (accepting answer \nto an answer because it provided material evidence that corrected the record and informed the Commission’s decision-\nmaking process); High Island Offshore Sys., L.L.C., 113 FERC ¶ 61,202, P 8 (2005) (accepting an answer to a protest \nbecause it assisted the Commission with a more complete record); N.E. Utils. Servs. Co. v. NRG Energy, Inc., 101 \nFERC ¶ 61,327, P 17 (2002) (accepting answer to an answer because it helped clarify issues in the proceeding)."},{"page":3,"startToken":630,"endToken":923,"text":"3 \nThe defects warrant different forms of relief. The Commission should reject the \ncompensation provision and any interpretation of an IRAS Action that would permit curtailment \nof non-IRAS load because those provisions lack an adequate record basis and exceed the stated \nscope of IRAS. Additionally, the Commission should condition acceptance on tariff revisions \nestablishing a portfolio-sufficiency pathway, interim recognition of operating resources pending \ntheir first available RPM commitment, reasonable reassignment of unused Bring Your Own New \nCapacity (“BYONC”) UCAP MW, and a Fixed Resource Requirement (“FRR”) exemption tied to \na sufficient FRR Capacity Plan. \nPJM Must Recognize the Value of an LSE’s Existing Portfolio. PJM’s Answer discusses \nflexibility within the BYONC construct, but it does not answer EKPC’s separate portfolio-\nsufficiency argument. PJM repeatedly states that the PJM Region needs new capacity, but that \nregional observation does not establish that every New Large Load served by every RPM-\nparticipating LSE lacks capacity support or contributes to the resource adequacy shortfall IRAS is \nintended to address. EKPC’s point is not that existing capacity should be “repackaged” as BYONC. \nRather, a self-supply LSE that demonstrates, using PJM-validated UCAP values and Large Load \nincluded in the Registry and verified to be online in the relevant Delivery Year, that its portfolio is \nsufficient to serve its aggregate obligations, including incremental load growth, should not be \ntreated as though its load is unsupported merely because PJM’s proposed eligibility rules recognize \nonly BYONC (including BYONC tied to specific loads that ultimately may not need all allocated \nBYONC) or Allocated RBP UCAP MW. Curtailing portfolio-supported load also breaks the causal \nlink on which PJM relies to justify IRAS because PJM has not shown that an LSE making that \ndemonstration causes the deficiency IRAS purports to remedy. The Commission therefore should"},{"page":4,"startToken":923,"endToken":1203,"text":"4 \nrequire PJM to establish a portfolio-sufficiency pathway with objective eligibility, verification, and \nanti-double-counting requirements. \nRPM Auction Timing Disconnect for BYONC Qualification. PJM does not explain why \na resource that is online, not committed outside PJM, capable of providing energy and ancillary \nservices, and expected to be offered into RPM at the first available opportunity should provide no \nIRAS offset during the period between commercial operation and its first available RPM \ncommitment. EKPC does not object to requiring a resource that offsets IRAS exposure to assume \nobligations comparable to those of an Reliability Pricing Model (“RPM”)-committed Capacity \nResource. But making prior RPM commitment an absolute prerequisite goes further than necessary \nand can leave load exposed to curtailment after the underlying reliability concern has been \naddressed by an operating resource. The Liberty RICE and Cooper CCGT examples demonstrate \nthat commercial-operation dates follow permitting, construction, testing, and interconnection \nschedules—not the June 1 Delivery Year boundary—and that an operating resource may support \nreliability for months before it clears an RPM auction.6 PJM’s filing therefore treats resources with \ncomparable present reliability capability differently based solely on administrative timing. The \nCommission should require PJM to recognize an operating resource pending its first available \nRPM commitment where the resource: (1) has achieved commercial operation; (2) has PJM-\nconfirmed deliverability and a PJM-determined accredited UCAP capability; (3) is not committed \noutside PJM or counted toward another obligation; (4) is subject to PJM dispatch, outage-\nreporting, testing, and performance requirements; and (5) is bound to offer into the first RPM \nAuction for which it is eligible. \n \n6 EKPC Protest at 19. See also Montalvo Affidavit at PP 26-27 and Tucker Affidavit at PP 13-16."},{"page":5,"startToken":1203,"endToken":1493,"text":"5 \nCommitting Specific Capacity Resources to Specific Loads. PJM’s response answers a \ndifferent question than the question raised by EKPC. EKPC did not argue that BYONC must be \nelectrically deliverable to or physically serve a particular New Large Load.7 EKPC’s concern is \nthat IRAS exposure turns on whether PJM recognizes specific UCAP MW as assigned to a specific \nNew Large Load, rather than whether the serving LSE’s aggregate portfolio is sufficient to satisfy \nits aggregate load and reliability obligations. That remains resource-to-load attribution, even if \nPJM does not require the identified resource to physically serve the customer.8 Resource adequacy \nstudies, integrated resource plans, reserve-margin analyses, and RPM obligations ordinarily test \nportfolios against aggregate load; they do not require permanent assignments between individual \nresources and individual retail customers. PJM has not explained why that portfolio-based \nparadigm suffices for FRR entities but not for self-supply LSEs participating in RPM. Because the \nresulting curtailment exposure can attach to load supported by an adequate portfolio, the \nCommission should reject the resource-specific attribution requirement or require PJM to accept \na portfolio-sufficiency demonstration as an alternative. \nTransferability. PJM misstates EKPC’s concern regarding the lack of transferability of \nBYONC by characterizing EKPC’s concern as a request for a liquid secondary market in BYONC.9 \nEKPC’s concern is narrower. PJM has not justified a rule that permanently strands unused UCAP \nMW when load does not materialize as initially forecast or when an LSE’s portfolio needs change. \nPJM permits a New Large Load to oversize BYONC for anticipated future growth,10 but prohibits \n \n7 PJM Answer at 38–39. \n8 See Montalvo Affidavit at PP 28–35; Tucker Affidavit at PP 12, 17–18. \n9 PJM Answer at 39. \n10 Proposed Tariff, Attachment DD-4, section VII(h)."},{"page":6,"startToken":1493,"endToken":1846,"text":"6 \nunused UCAP MW from being reassigned if that growth does not occur.11 Given that PJM defines \nBYONC as UCAP MW and already permits a physical resource to support multiple BYONC \narrangements, this absolute restriction on transferability is not necessary to prevent double-\ncounting. Verified reporting through the Large Load Registry can preserve the one-MW/one-offset \nrule without penalizing prudent forward procurement. The Commission should therefore require \nPJM to permit reasonable reassignment of unused BYONC UCAP MW subject to validation and \nanti-double-counting safeguards. \nLarge Load Definition. PJM’s Answer does not satisfy its burden of proof to justify \napplying the extraordinary IRAS curtailment and compensation framework to every qualifying \nform of commercial and industrial load growth.12 A Kentucky manufacturing facility below 50 \nMW today may become subject to IRAS when incremental growth causes the site to exceed 50 \nMW, even though the LSE has long served the existing facility and planned for ordinary industrial \nexpansion through its integrated portfolio.13 PJM responds only that its 50 MW threshold follows \nCommission guidance and that EKPC showed no basis to distinguish computational load from \nother industrial load.14 PJM itself grounds IRAS principally in the speed, concentration, and scale \nof data-center growth.15 It has not shown that ordinary manufacturing or industrial expansion \npresents the same timing, concentration, or operational risks, or that subjecting such growth to the \n \n11 Proposed Tariff, Attachment DD-4, section VII(e). \n12 PJM attempts to shift the burden to the entities opposing its proposed Large Load and New Large Load definitions, \nand this attempt should be rejected. See PJM Answer at 16 (entities protesting the proposed definitions “have shown \nno basis for deviating from the Commission’s approach of treating data center or computational, manufacturing, \nindustrial, or other types of Large Load the same.”).  \n13 See EKPC Protest at 25–27; Montalvo Affidavit at P 32. \n14 PJM Answer at 14–16. \n15 PJM Interconnection, L.L.C., Docket No. ER26-3515-000, “Proposal of PJM Interconnection, L.L.C. to Establish \nInterim Resource Adequacy Service and a Large Load Registry to Address System Reliability,” at 13-14, 21-24 (filed \nAug. 13, 2026)."},{"page":7,"startToken":1846,"endToken":2165,"text":"7 \nsame curtailment regime is narrowly tailored to the asserted reliability need.16 The Commission \nshould require PJM either to narrow the definitions or to establish objective criteria demonstrating \nthat non-computational load presents the same IRAS-relevant risks. \nNon-IRAS Load May be Subject to Curtailment. Although PJM responds to EKPC’s \nBYONC and FRR arguments, it neither cites the Montalvo Affidavit nor answers his showing, \nfrom an operational perspective, that an IRAS instruction may exceed the IRAS-eligible load then \nonline and available for curtailment. PJM will calculate annual zonal IRAS availability from \nregistered peak-load quantities and then issue an IRAS Action as a NERC Operating Instruction \nto the Electric Distributor. PJM’s IRAS Proposal does not require PJM to limit a real-time directive \nto the amount of Eligible New Large Load then online and capable of being curtailed, nor does it \nspecify whether compliance will be measured by curtailment of IRAS-eligible load or by aggregate \nzonal load reduction. That ambiguity matters because a Reliability Coordinator’s Operating \nInstruction carries mandatory compliance consequences unless it cannot be physically \nimplemented or would violate safety, equipment, regulatory, or statutory requirements. An Electric \nDistributor should not be forced to choose between noncompliance and curtailing firm customers \noutside the IRAS class. The Commission should therefore condition acceptance on inclusion of \nthe tariff language set out below.17  \nCompensation. PJM’s Answer assumes the conclusion EKPC disputes: that IRAS \ncurtailment is a compensable wholesale service rather than a condition attached to taking service \nwithout recognized capacity support. If IRAS is justified because a New Large Load has not \nsecured qualifying capacity, PJM must explain why interruption of that load constitutes a service \n \n16 See Sw. Power Pool, Inc., 195 FERC ¶ 61,196, PP 84–87 (2026) (accepting differentiated treatment where narrowly \ntailored to the specific and unique characteristics of high-impact large loads). \n17 See NRG Power Mktg., LLC v. FERC, 862 F.3d 108, 114–16 (D.C. Cir. 2017)."},{"page":8,"startToken":2165,"endToken":2514,"text":"8 \nsold to the system rather than the consequence of conditional access. It does not. EKPC’s analogy \nto non-firm transmission service remains instructive because interruption is an inherent \ncharacteristic of service taken without the facilities or commitments necessary to support firm \ntreatment, not a separately compensable product. PJM’s reliance on compensation and \nnonperformance rates for committed Demand Resources is inapposite because those resources \nassume an RPM capacity obligation, whereas an IRAS-exposed load has not. Nor has PJM \nidentified the seller, buyer, measurable performance obligation, settlement quantity, or avoided \nwholesale cost associated with the asserted service. The proposed default rate may also weaken \nthe incentive to secure qualifying capacity and, by charging other load in the zone, shift costs to \ncustomers that did not cause the underlying resource adequacy concern. Nor does PJM’s retail-\nlevel waiver option cure the federal default rate or Kentucky’s retained authority over load-\nmanagement programs.18 PJM therefore has not shown that the proposed payment reflects a \ndistinct wholesale service or that allocating its cost to other zonal load follows cost causation. \nEKPC requests that the Commission reject Tariff, Attachment DD-4, section X or, at minimum, \nsever that provision for a separate section 205 filing supported by an evidentiary record. \nPJM’s September 3 planning-parameter report exposes a separate defect in the proposed \ncompensation formula. Attachment DD-4, section X(a), sets the default IRAS rate at 50 percent of \nthe Non-Performance Charge Rate in Attachment DD, section 10A(e). Section 10A(e), however, \ncalculates that rate using Net CONE for the applicable Locational Deliverability Area (“LDA”) \nand Delivery Year, while section X does not identify the LDA applicable to an Eligible New Large \nLoad. If PJM intends to use the LDA in which the curtailed load is located, the 2029/2030 \n \n18 See EKPC Protest at 31-32 (the Kentucky Public Service Commission retained jurisdiction over demand-side \nmanagement programs involving retail loads as a condition of integration of the Kentucky utilities that are members \nof PJM, which means PJM may not offer load interruption programs to retail consumers without the utilities’ consent \nand Public Service Commission approval)."},{"page":9,"startToken":2514,"endToken":2791,"text":"9 \nparameters imply a default rate of approximately $156/MWh in DOM and $3,109/MWh in \nCOMED—a twenty-fold difference. That spread is driven by LDA-specific Net CONE, including \nforward E&AS offsets, rather than by any stated difference in the IRAS obligation or measured \ncurtailment. If PJM intends another locational mapping, the tariff does not state it. Either way, PJM \nhas not explained how the imported capacity-performance benchmark produces a just and \nreasonable rate for IRAS. \nImplied IRAS Compensation Benchmark by LDA \nAssuming Attachment DD-4, section X(a), uses the Net CONE for the LDA in which the \ncurtailed load is located.19 \n \nLDA \n2027/2028 \n2028/2029 \n2029/2030 \nDOM \n$837/MWh \n$822/MWh \n$156/MWh \nBGE \n$682/MWh \n$1,344/MWh \n$764/MWh \nSWMAAC \n$1,028/MWh \n$1,636/MWh \n$1,016/MWh \nDAYTON \n$910/MWh \n$1,329/MWh \n$1,233/MWh \nDEOK \n$1,031/MWh \n$1,442/MWh \n$1,289/MWh \nPJM West \n— \n— \n$1,416/MWh \nATSI / Cleveland \n$1,073/MWh \n$1,486/MWh \n$1,421/MWh \nPEPCO \n$1,373/MWh \n$1,928/MWh \n$1,529/MWh \nRTO \n$1,139/MWh \n$1,565/MWh \n$1,593/MWh \nDPL South \n$1,233/MWh \n$2,027/MWh \n$2,141/MWh \nMAAC \n$1,416/MWh \n$2,244/MWh \n$2,158/MWh \n \n19 PJM’s 2027/2028 Planning Parameters are available here: https://www.pjm.com/-/media/DotCom/markets-\nops/rpm/rpm-auction-info/2027-2028/2027-2028-planning-period-parameters-for-base-residual-auction-pdf.pdf; \nPJM’s 2028/2029 Planning Parameters are available here: https://www.pjm.com/-/media/DotCom/markets-\nops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-report.pdf; PJM’s 2029/2030 Planning Parameters are available \nhere: \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2029-2030/2029-2030-planning-\nperiod-parameters-for-base-residual-auction-report.pdf."},{"page":10,"startToken":2791,"endToken":3100,"text":"10 \nPL \n$1,481/MWh \n$2,325/MWh \n$2,393/MWh \nEMAAC \n$1,685/MWh \n$2,608/MWh \n$2,687/MWh \nJCPL \n$1,877/MWh \n$2,846/MWh \n$2,961/MWh \nPS / PS North \n$1,904/MWh \n$2,871/MWh \n$2,975/MWh \nCOMED \n$1,781/MWh \n$2,772/MWh \n$3,109/MWh \n \nApplicability of IRAS to FRR Entities. PJM responds that FRR entities are not similarly \nsituated to RPM LSEs because an FRR entity must provide capacity for all load in its service area \nand may incur an insufficiency charge.20 Even if FRR and RPM are distinct administrative \nframeworks, that does not justify an unconditional IRAS exemption where PJM’s premise for the \nexemption is that the FRR entity has provided adequate capacity support. Proposed Tariff, \nAttachment DD-4, section V(a), excludes New Large Load in an FRR Service Area without \nconditioning the exclusion on the sufficiency of the applicable FRR Capacity Plan. PJM’s Answer \ntherefore does not explain why IRAS should never apply when the FRR Entity’s plan is \ninsufficient. The relevant distinction is not FRR versus RPM in the abstract; it is whether the load \nis supported by sufficient capacity.21 A portfolio-based demonstration cannot be sufficient for FRR \nload while an equivalently adequate self-supply portfolio receives no recognition under RPM. The \nCommission should require PJM to condition the FRR exclusion on a sufficient FRR Capacity \nPlan and to provide a comparable portfolio-sufficiency pathway for self-supply LSEs.   \n \n20 PJM Answer at 61–63.   \n21 See also Montalvo Affidavit at PP 36–41. For the first two Delivery Years in which IRAS is proposed to be in effect, \nthere is no applicable FRR Plan insufficiency charge. See PJM RAA, Schedule 8.1-D FRR Capacity Plans (“Delivery \nYears between the 2025/2026 Delivery Year through the 2028/2029 Delivery Year, no FRR Commitment Insufficiency \nCharge shall be assessed.”)."},{"page":11,"startToken":3100,"endToken":3422,"text":"11 \nPJM also fails to cure the ambiguity and overbreadth in proposed RAA, Schedule 8.1, \nsection D.1.1, which would prohibit an FRR Entity from including Existing Generation Capacity \nResources above the amount owned or contracted before June 1, 2027, to serve New Large Load.22 \nEKPC supports preventing an FRR Entity from withdrawing existing capacity from RPM to serve \nnew load while the region is short, but the filed language is not limited to Delivery Years in which \nIRAS applies or a regional shortfall exists. A permanent restriction untethered to the condition that \npurportedly justifies it can foreclose cost-effective capacity and disadvantage future FRR elections \nafter the asserted emergency has passed.23 The Commission must judge PJM’s filed rate as \nproposed and may not supply a narrowing construction that the tariff does not contain.24 The \nCommission should reject the restriction or require PJM to limit it to Delivery Years in which the \nrelevant IRAS shortfall condition exists. \nB. \nTargeted Tariff Revisions.  \nTo provide the Commission with administrable relief that preserves the basic structure of \nPJM’s filing, EKPC proposes the following limited revisions to address the immediate operational \nrisk without changing IRAS’s basic structure. The Commission should require PJM to address any \nnecessary implementation and compliance procedures in a compliance filing. \nLimitation on Interim Resource Adequacy Service Actions. Notwithstanding any other \nprovision of Attachment DD-4, an Interim Resource Adequacy Service Action directed to an \nElectric Distributor shall not exceed the quantity of Eligible25 New Large Load within the \n \n22 PJM Answer at 61–63. \n23 See EKPC Protest at 35–36. \n24 See NRG Power Mktg., 862 F.3d at 114–16 (explaining the Commission would violate its FPA section 205 authority \nif its proposed modifications accepted by the utility “involved the Commission’s own original notion of a new form \nof rate.”). \n25 EKPC’s use of “Eligible” assumes that the Commission has addressed EKPC’s portfolio-sufficiency and interim \nqualifying-UCAP concerns."},{"page":12,"startToken":3422,"endToken":3721,"text":"12 \napplicable Zone or other area specified in the directive that, at the time the directive is issued: (i) \nis consuming electric energy; (ii) remains subject to Interim Resource Adequacy Service; and (iii) \nmay be curtailed in a manner consistent with applicable state law and regulatory requirements and \nwithout requiring the Electric Distributor to interrupt or reduce service to load that is not receiving \nInterim Resource Adequacy Service. Only a verified reduction in Eligible New Large Load then \nsubject to Interim Resource Adequacy Service shall count toward compliance. A reduction in load \nnot then subject to Interim Resource Adequacy Service shall not be required or credited for that \npurpose.  \nInsufficient Available IRAS Load. If an Electric Distributor determines that the quantity \nof Eligible New Large Load available for curtailment is less than the quantity stated in an Interim \nResource Adequacy Service Action, the Electric Distributor shall promptly notify PJM and \nimplement the directive only to the extent consistent with applicable state law and regulatory \nrequirements. The Electric Distributor shall not be required to interrupt or reduce service to native \nload or other load that is not receiving Interim Resource Adequacy Service to satisfy the difference. \nAn Electric Distributor’s inability to provide the remaining reduction because Eligible New Large \nLoad is unavailable or because curtailment would conflict with applicable state law or regulatory \nrequirements shall not constitute noncompliance with the IRAS Action or any NERC Operating \nInstruction through which PJM communicates that Action.  \nC. \nPJM Has Not Carried Its Affirmative Burden Under FPA Section 205. \nEKPC’s Protest raised serious questions concerning the justness and reasonableness of the \nIRAS Proposal, and PJM’s Answer does not cure the identified defects. Section 205 places the \nburden on PJM to establish that the rates, terms, and conditions it filed are just and reasonable and"},{"page":13,"startToken":3721,"endToken":4070,"text":"13 \nnot unduly discriminatory or preferential.26 Although the Commission may accept one of multiple \njust and reasonable approaches, it may do so only on the basis of the proposal and evidentiary \nrecord before it.27 It may not presume answers PJM did not provide or rely on post hoc reasoning \nto fill material gaps.28 Nor may PJM’s consent to modification supply a substitute design where \nthe filed proposal lacks support for foundational elements.29 PJM has not supplied a reasoned \nrecord basis for the disputed provisions identified above. EKPC requests that the Commission \nreject those provisions or condition acceptance on the specific, limited relief requested above. \nIII. \nCONCLUSION \nFor the foregoing reasons and those set out in EKPC’s Protest and supporting affidavits, \nEKPC respectfully requests that the Commission accept this Answer and take such actions as set \nforth therein and herein. Specifically, the Commission should reject the proposed compensation \nprovision and any interpretation that would permit curtailment of non-IRAS load. If the \nCommission otherwise accepts IRAS, it should condition acceptance on tariff revisions that \nrecognize an adequate self-supply portfolio; provide interim recognition to operating resources \npending their first available RPM commitment; permit reasonable reassignment of unused \nBYONC UCAP MW subject to verification and anti-double-counting safeguards; limit resource-\nto-load attribution where an LSE demonstrates aggregate portfolio adequacy; require objective \ncriteria before applying IRAS to non-computational load; condition the FRR exemption on a \nsufficient FRR Capacity Plan; and limit the FRR resource restriction to the period in which the \n \n26 16 U.S.C. § 824d(a), (b), (e); 18 C.F.R. § 35.13. \n27 See Cities of Bethany v. FERC, 727 F.2d 1131, 1136 (D.C. Cir. 1984); PSEG Energy Res. & Trade LLC v. FERC, \n665 F.3d 203, 208 (D.C. Cir. 2011). \n28 See Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983); PSEG Energy Res. & \nTrade LLC v. FERC, 665 F.3d 203, 208 (D.C. Cir. 2011). \n29 See NRG Power Mktg., LLC v. FERC, 862 F.3d 108, 114–16 (D.C. Cir. 2017)."},{"page":14,"startToken":4070,"endToken":4202,"text":"14 \nasserted shortfall exists. Without these revisions, IRAS could impose curtailment and \ncompensation costs on customers and LSEs that did not cause the resource-adequacy shortfall, all \ncontrary to the Commission’s cost-causation principles. \n \nRespectfully submitted, \n \n \nDenise R. Foster Cronin \nChief Compliance Officer and Senior Vice \nPresident \nEast Kentucky Power Cooperative, Inc. \n4775 Lexington Road, P.O. Box 707 \nWinchester, KY 40392-0707 \nTel.: 859-745-9615 \nEmail: denise.cronin@ekpc.coop \n \nOn Behalf of East Kentucky Power \nCooperative, Inc. \n \n/s/ Daniel E. Frank \n \n \nDaniel E. Frank \nAllison E. S. Salvia \nKelly A. Cuthbertson \nAdriana J. Santana \nEversheds Sutherland (US) LLP \n700 Sixth St., N.W., Suite 700 \nWashington, DC 20001-3980 \nTel.: 202-383-0100 \nEmail: danielfrank@eversheds-sutherland.com \nallisonsalvia@eversheds-sutherland.com \nkellycuthbertson@eversheds-sutherland.com \nanasantana@eversheds-sutherland.com \n \nCounsel for \nEast Kentucky Power Cooperative, Inc. \n \n \n \n \nDated: October 7, 2026"},{"page":15,"startToken":4202,"endToken":4250,"text":"Certificate of Service \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Washington, DC this 7th day of October, 2026. \n \n/s/ Kelly A. Cuthbertson \n \nKelly A. Cuthbertson"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":133,"startToken":0,"endToken":314},{"p":2,"at":133,"title":"I. MOTION FOR LEAVE TO FILE ANSWER","method":"printed heading","endPage":2,"endAt":789,"startToken":314,"endToken":405},{"p":2,"at":789,"title":"II. ANSWER","method":"printed heading","endPage":2,"endAt":802,"startToken":405,"endToken":407},{"p":2,"at":802,"title":"A. PJM Failed to Address or Misstates Significant Concerns Raised in","method":"printed heading","endPage":11,"endAt":1007,"startToken":407,"endToken":3261},{"p":11,"at":1007,"title":"B. Targeted Tariff Revisions.","method":"printed heading","endPage":12,"endAt":1645,"startToken":3261,"endToken":3664},{"p":12,"at":1645,"title":"C. PJM Has Not Carried Its Affirmative Burden Under FPA Section 205.","method":"printed heading","endPage":13,"endAt":679,"startToken":3664,"endToken":3829},{"p":13,"at":679,"title":"III. CONCLUSION","method":"printed heading","endPage":15,"endAt":0,"startToken":3829,"endToken":4202},{"p":15,"at":0,"title":"Certificate of Service","method":"printed heading","endPage":15,"endAt":303,"startToken":4202,"endToken":4250}]}