{"document":{"slug":"rec-20261008-5058-2","title":"PAG_ER26-3515_Supplemental_Cover_Letter_2026-10-08","issued":"2026-10-08","accession":"20261008-5058","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20261008-5058_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5058","tier":"record","parent":"rec-20261008-5058","sha256":"99971ffdec86682f7c1fd6861a44a93d08f8b4fa4ea20cbb1a8574131a75ec96","pages":1,"tokens":168,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":168,"text":"October 8, 2026\nThe Honorable Debbie-Anne A. Reese\nSecretary\nFederal Energy Regulatory Commission\n888 First Street, N.E.\nWashington, D.C. 20426\nRe: PJM Interconnection, L.L.C., Docket No. ER26-3515-000\nDear Secretary Reese:\nEnclosed for filing in the above-captioned proceeding are the Motion for Leave to File Supplemental \nComments and Supplemental Comments of Persistence Analytics Group LLC regarding PJM \nInterconnection, L.L.C.'s Large Load Registry and Bring Your Own New Capacity implementation \nmaterials.\nPAG's supplemental comments are limited to implementation issues raised by PJM's October 2026 materials, \nincluding the distinction between the proposition actually validated, the currency of supporting evidence, \nmaterial-change revalidation, and the evidentiary maturity appropriate to later consequential reliance.\nPAG does not seek to delay the Phase 1 Registry process or the 2029/30 Base Residual Auction and does not \npropose a new public scoring methodology or separate approval layer.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid™\n82 Spring Lake Blvd.\nWaretown, NJ 08758\nneil@persistenceanalyticsgroup.com\n609-464-9055"}],"sections":[{"p":1,"at":0,"title":"Page 1","method":"page range","endPage":1,"endAt":1190,"startToken":0,"endToken":168}]}
