{"document":{"slug":"rec-20261009-5158","title":"Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the Motion for Leave to Answer and Answer filed by American…","issued":"2026-10-09","accession":"20261009-5158","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"Midcontinent Independent System Operator Inc.","kind":"answer","file":"sources/filings/text/20261009-5158_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-5158","tier":"record","sha256":"028d6af855e5b390d42fea0928244243434bf1993b0e90d1537fc7f07e7d6401","pages":10,"tokens":2613,"emptyPages":[],"textThemes":["cost"]},"pages":[{"page":1,"startToken":0,"endToken":333,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nAmerican Transmission Company, LLC \n) \n) \n) \n \n \nDocket No. ER26-3531 \nMOTION FOR LEAVE TO ANSWER AND ANSWER OF THE  \nMIDCONTINENT INDEPENDENT SYSTEM OPERATOR, INC. \n \nThe Midcontinent Independent System Operator, Inc. (“MISO”) submits1 this Motion for \nLeave to Answer and Answer (“Answer”) to the Motion for Leave to Answer and Answer filed by \nAmerican Transmission Company LLC by its corporate manager, ATC Management Inc. \n(collectively, “ATC”).  MISO appreciates ATC’s efforts to reconcile the differing standards \napplicable under the MISO Open Access Transmission, Energy, and Operating Reserve Markets \nTariff (“Tariff”) and associated revisions, and ATC’s proposed requirements.  Yet, the core issues \nidentified in MISO’s limited protest and the identified directives are not resolved.  Accordingly, \nMISO reiterates the concerns noted in its limited protest and its requests that the Commission \ndirect ATC to revise Attachment FF-ATCLLC either to: (1) align with MISO’s pending \nInterconnection Reliability Requirements Proposal (“IRR”) and other large load filings related to \nFERC’s Large Load Show Cause Order2 once they are completed; or (2) explicitly provide that \nany requirements imposed by Attachment FF-ATCLLC on ATC Large Load are additional to those \napplicable to Large Load under the MISO Tariff.  As discussed below, MISO also would support \n \n1  \nSee Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission \n(“FERC” or “Commission”) (herein referred to the “Rules of Practice and Procedure”), 18 C.F.R. §§ 385.212 and \n213 (2026).  \n2  \nMidcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212 (2026) (“Show Cause Order”). These filings ore \nmore specifically identified in MISO’s abeyance motion filed in response to the Show Cause Order and generally \ninclude the large load related filings that MISO has made or intends to make prior to mid-November of this year. \nSee, Motion of the Midcontinent Independent System Operator and the MISO Transmission Owners to Hold \nProceedings in Abeyance and Request for Shortened Comment Period and Expedited Treatment, Docket No. \nEL26-70-000 (filed Aug. 3, 20226) at 9-13."},{"page":2,"startToken":333,"endToken":617,"text":"2 \na transitional framework that enables ATC’s revised Attachment FF-ATCLLC to be implemented \nuntil MISO’s implementation of large load requirements and processes are enacted, to allay ATC’s \nconcerns regarding potential delays.  \nI. \nINTRODUCTION \nMISO acknowledges both the challenges and opportunities presented by the growth of \nLarge Loads in the MISO region and within ATC’s footprint.  All parties should have clear and \nuniform base-level rules and frameworks in place to address large load growth in a reliable manner \nand without undue cost-shifting.  Any mismatch in expectations or requirements within the MISO \nregion would result in confusion and potential cost-shifts that could—and should—be avoided \nthrough a uniform regulatory standard that establishes minimum requirements.  Correspondingly, \nMISO requests that the Commission should (1) allow ATC’s requirements only where MISO has \nno corresponding requirement, as proposed in the transitional framework discussed below; or (2) \nin cases where MISO has an established framework, allow ATC to impose stricter requirements \nwhile maintaining compliance with MISO’s requirements (e.g. establish MISO’s requirements as \na minimum threshold that must be met).  Specifically, MISO’s process and operational \nrequirements as detailed in the IRR Proposal and other filings in response to the Show Cause Order \nshould apply to ensure a regional set of standards that, once accepted by the Commission, create \nthese minimums.  An appropriate transition period from ATC’s Attachment FF-ATC framework \nto any minimum requirements which vary in MISO’s filings would be acceptable to ensure that no \ndelays occur due to differences in timing of such filings.   \nII. \nMOTION FOR LEAVE TO FILE ANSWER \n \n \nMISO requests permission to submit this Answer to provide additional information related \nto the issues raised in ATC’s answer and assist the Commission in its decision-making.  Under the"},{"page":3,"startToken":617,"endToken":971,"text":"3 \nCommission’s rules, answers to answers generally are not permitted.3  Nonetheless, the \nCommission waives this requirement where an otherwise prohibited answer would clarify the \nissues under consideration, ensure completeness of the record or assist the Commission in its \ndecision-making.4  MISO’s Answer will clarify the issues under consideration, ensure a complete \nrecord, and assist the Commission in its decision-making by detailing the importance of having \nuniform base-level rules and avoiding cost-shifts in the MISO region, and by addressing \noperational and other issues that will arise if ATC’s proposal is accepted as proposed.  \nAccordingly, MISO respectfully requests that Rule 213(a)(2) be waived and that the Commission \naccept this Answer for good cause shown.  \nIII. \nANSWER \nA. \nATC’s Proposed Tariff Changes Do Not Address the Concerns Raised in \nMISO’s Answer and Will Create Further Misalignments  \n \nIn its Answer, ATC proposes to modify its Large Load definition as follows; \n• ATC’s large load criteria will apply within the ATC footprint.  Large loads over 50MW \nconnecting to ATC’s system will be required to comply with MISO’s IRR requirements \nwhen they become effective if ATC does not have applicable criteria on a given topic. \n• ATC will modify Attachment FF-ATCLLC and any related business practices to ensure \nthat ATC’s large load planning and interconnection criteria will apply to all Large \nLoads over 50 MW. \n• For Large Loads over 50 MW, ATC will distinguish between computational loads and \nother large loads for power factor and other requirements as deemed necessary by ATC.5 \n \n \n3  \nSee Rule 213 of the Rules of Practice and Procedure, 18 C.F.R. § 385.213(a)(2) (2026). \n4  \nSee, e.g., Midcontinent Indep.  Sys.  Operator, Inc., 169 FERC ¶ 61,173, at P 24 (2019) (accepting MISO’s answer \nto protests because it assisted FERC in the decision-making process); Texas Eastern Transmission, LP, 122 FERC \n¶ 61,205, at P 8 (2008) (accepting answer that completed the record); California Indep.  Operator Corp., 105 \nFERC ¶ 61,284 at P 10 (2003) (accepting MISO’s answer that clarified the issues). \n5  \nMotion for Leave to Answer and Answer of American Transmission Company  LLC (“ATC Answer”) at 8-9. \n(emphasis added)."},{"page":4,"startToken":971,"endToken":1251,"text":"4 \nWhile MISO appreciates ATC’s willingness to revise its definition of Large Load to \ncoincide with MISO’s 50 MW Large Load threshold, ATC’s plan to implement its own study \nprocesses, agreements, and operational requirements for Large Loads without also requiring, at a \nminimum, compliance with MISO’s IRR requirements, ultimately could create a less stringent \nstandard for load within ATC’s footprint, resulting in operational risk.  ATC’s proposal to use \nMISO’s IRR criteria only “if ATC does not have applicable criteria on a given topic”6 would result \nin ATC’s criteria preempting – not supplementing - MISO’s IRR criteria.  Thus, even if there is \ninitial alignment because Transmission Customers connecting through ATC Transmission \nFacilities must follow MISO’s filed Tariff, ATC’s framework could be used to justify actions by \nlarge loads that deviate from MISO’s requirements, creating implementation challenges and \nreliability concerns, as described in MISO’s Protest.7  Further, ATC’s framework establishes a \nbroad, “topic” based approach that could result in ambiguity and uncertainty as to whether a \nproposed ATC rule encompasses a requirement also included in MISO’s Tariff requirements \nwithout specific identification.  This could result in MISO’s specific Tariff requirements being \npreempted rather than being supplemented in instances where ATC determines that applicable \nMISO criteria can be considered as part of the same “topic” proposed by ATC.  Ultimately, this \nwill drive process uncertainty for large loads, Transmission Customers, and other stakeholders, \nbecause it would be unclear which MISO requirements have been preempted and where that \npreemption ends.  This uncertainty is compounded by the fact that ATC does not propose to include \nmany of its requirements in filed tariff sheets or pro forma agreements.   \n \n6  \nATC Answer at p. 8.  \n7  \nMISO Protest at 6-11."},{"page":5,"startToken":1251,"endToken":1564,"text":"5 \nIn addition, ATC did not address MISO’s need for direct operational visibility into ATC \nlarge loads.  As MISO explained in its Comments and Protest, MISO needs the ability to require \ninformation directly from the Large Load in real time in order to anticipate demand swings, commit \ngeneration reliably, maintain reserve sufficiency, and manage real time system balance.8  ATC’s \ntransmission facilities are part of the larger MISO Transmission System and large loads connection \nthrough ATC Facilities will have impacts beyond their own facilities.  Allowing large loads \nconnected to the ATC system to deviate from the generally-applicable MISO visibility and \nmonitoring requirements would impair MISO’s operation of the Transmission System.  \nFinally, while ATC indicates its willingness to use MISO’s definition of “Computational \nLoad,” MISO’s associated rules would not universally apply under ATC’s framework.  Instead, \nATC will “distinguish between computational loads and other large loads for power factor and \nother requirements as deemed necessary by ATC.”9  This could create different requirements for \nATC-located large loads as the “as deemed necessary” language appears to invite ad hoc \ndeterminations.  A common definition of “Computational Load” is a critical prerequisite to a \nuniform ruleset.  Treating a large load on ATC’s system differently from a technically similar large \nload elsewhere in the MISO footprint would risk shifting costs, as loads with more strict \nrequirements may bear costs of reliability impacts caused by loads with less strict requirements.   \nB. \nATC’S Proposals Exceed the Limits of Local Planning Criteria and Would \nResult in Inconsistent Terms of Transmission Service. \nMISO acknowledges that large loads present new challenges and that, addressing the \nconcerns noted by the Commission in the Show Cause Order will require MISO to impose \nrequirements where it previously did not.  Large load study, operational, and Transmission Service \n \n8  \nComments and Protest of the Midcontinent Independent System Operator, Inc. (“MISO Protest”) at 8-10. \n9  \nATC Answer at p. 8."},{"page":6,"startToken":1564,"endToken":1873,"text":"6 \nRequirements will overlap with established local planning criteria, and MISO seeks to work with \nits Transmission Owners to accommodate local planning criteria as part of its regional framework. \nHowever, several aspects of ATC’s proposed large load framework exceed the traditional \nbounds of local planning criteria in that they supersede MISO’s Tariff requirements with \nreliability, operational, and market consequences that accrue to the MISO region broadly, and not \nexclusively to ATC.  They also create uncertainty about the applicability of the requirements MISO \nwill shortly file related to any large load pro forma cost recovery agreements and/or transparency \nrelated to the costs associated with large loads.  More specifically, ATC’s framework addresses \ncost allocation for ATC large loads beginning at 100 MW whereas MISO’s Large Load cost \nallocation provisions will be applied to MISO defined Large Loads of 50 MW.  This raises \nimportant questions that would need to be addressed including: (1) how will ATC’s proposal \nprevent cost shifts associated with loads between 50 MW – 100 MW and will this gap result in \ndisparate treatment of wholesale loads within the ATC footprint; (2) will ATC’s proposed \nagreements address situations in which network upgrades for a specific ATC large load are needed \non another MISO Transmission Owner’s facilities outside of the ATC footprint; and (3) will \nATC’s agreements include necessary security provisions as contemplated by the Show Cause \nOrder?  MISO’s upcoming filings establishing a pro forma agreement and large load cost \ntransparency will address these questions and would set minimum requirements that ATC’s large \nload framework could expand upon. \nThe rules at issue here involve the processes for studying, pricing, granting, providing \ntransparency for, and maintaining system-wide operational reliability for Transmission Service.  \nThere is room to accommodate and integrate local planning criteria while still maintaining a \nuniform set of minimum requirements in such processes.  However, for this room to exist, local"},{"page":7,"startToken":1873,"endToken":2183,"text":"7 \nplanning criteria must be supplemental to the uniform process and cannot overrule MISO’s \nbaseline requirements.  While certain requirements that make sense for the MISO region may be \nmore than what any singular entity believes is needed, a uniform regional process for granting and \nproviding transparency for the same products—such as Transmission Service—does not create \nundue burdens, especially when specific baseline requirements can be augmented by local \nplanning criteria.  Any burdens that exist must be weighed against the benefits of such regional \nuniformity—specifically including fairness, transparency, consistency, the avoidance of cost \nshifts, maintaining regional reliability, and promoting commercial certainty in the Midwest region.   \nC. \nA Transition Framework May Be Useful to Balance Speed of Ruleset  \nImplementation with Uniformity. \nMISO recognizes ATC’s concern that it may take several months or longer for all of \nMISO’s large load 205 filing to be accepted by the Commission, whereas ATC’s process is \navailable now.  To the extent that ATC currently is processing large load additions using existing \nprocesses or expects to receive new additions before MISO’s processes are accepted, it would be \nreasonable to allow ATC to use those study processes and operational requirements that the \nCommission does accept to process large load interconnections on an interim basis until such time \nas MISO’s proposed processes are accepted by the Commission.  This would be consistent with \nthe Commission’s priority of not disrupting existing commercial arrangements and would allow \nATC to move forward now without precluding the benefits of a consistent region-wide process.  \nAs part of this transition, ATC could be allowed to utilize its rules for projects submitted prior to \nwhen MISO’s requirements are effective and continue to use its local planning criteria to \nsupplement, not supplant, MISO requirements thereafter.  Such an approach would avoid conflicts \nbetween MISO’s Tariff and ATC’s local planning criteria and facilitate both speed and a smooth \ntransition."},{"page":8,"startToken":2183,"endToken":2429,"text":"8 \nIV. \nCOMMUNICATIONS \nMISO requests waiver of Rule 203(b)(3)10 of the Commission’s Rules of Practice and \nProcedure to the extent necessary to permit the designation of more than two persons for service \non behalf of MISO in this proceeding and requests all communications related to this filing be \ndirected to: \nChristopher D. Supino \nManaging Senior Corporate Counsel \nMichael Kessler  \nManaging Assistant General Counsel \nMidcontinent Independent System  \nOperator, Inc. \n720 City Center Drive  \nCarmel, Indiana 46032  \nTelephone: (317) 249-5400 \ncsupino@misoenergy.org \nmkessler@misoenergy.org \nJames C. Holsclaw \nCalfee, Halter & Griswold LLP \n3900 Salesforce Tower \n111 Monument Circle \nIndianapolis, Indiana 46204 \nTelephone: (317) 308-4266 \njholsclaw@calfee.com  \n \n \nV. \nNOTICE AND SERVICE \nMISO has served a copy of this filing electronically, including attachments, upon each \nperson designated on the official service list compiled by the Secretary as well as on all Tariff \ncustomers, MISO Members, Member representatives of transmission owners and non-\ntransmission owners, as well as all state commissions within the MISO Region and the \nOrganization of MISO States.  The filing has been posted electronically on MISO’s website at \nhttps://www.misoenergy.org/legal/ferc-filings/ for other interested parties in this matter. \nVI. \nCONCLUSION \nWHEREFORE, MISO respectfully requests that the Commission (i) accept this Answer; \nand (ii) direct ATC to revise Attachment FF-ATCLLC as requested in MISO’s Limited Protest; \nand (iii) to the extent that the Commission determines that a transition would alleviate process \n \n10  18 C.F.R. § 385.203(b)(3) (2026)."},{"page":9,"startToken":2429,"endToken":2528,"text":"9 \navailability concerns, allow for a limited effective period for ATC’s proposed Tariff revisions with \nsuch period tied to acceptance of MISO’s large load rules. \nRespectfully submitted, \n/s/ Christopher D. Supino \n \nChristopher D. Supino \nManaging Senior Corporate Counsel \nMichael Kessler  \nManaging Assistant General Counsel \nMidcontinent Independent System  \nOperator, Inc. \n720 City Center Drive  \nCarmel, Indiana 46032  \nTelephone: (317) 249-5400 \nmkessler@misoenergy.org \ncsupino@misoenergy.org \n \nJames C. Holsclaw \nCalfee, Halter & Griswold LLP \n3900 Salesforce Tower \n111 Monument Circle \nIndianapolis, Indiana 46204 \nTelephone: (317) 308-4266 \njholsclaw@calfee.com   \n \nAttorneys for the Midcontinent Independent \nSystem Operator, Inc. \n \n \nDATED: October 9, 2026"},{"page":10,"startToken":2528,"endToken":2613,"text":"10 \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day e-served a copy of this document upon all parties listed \non the official service list compiled by the Secretary in the above-captioned proceeding, in \naccordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and \nProcedure (18 C.F.R. § 385.2010). \n \nDated this 9th day of October 2026, in Carmel, Indiana. \n/s/ Julie Bunn \nJulie Bunn  \nMidcontinent Independent  \nSystem Operator, Inc.  \n720 City Center Drive  \nCarmel, IN 46032  \n317-249-5400"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":232,"startToken":0,"endToken":364},{"p":2,"at":232,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":1721,"startToken":364,"endToken":582},{"p":2,"at":1721,"title":"II. MOTION FOR LEAVE TO FILE ANSWER","method":"printed heading","endPage":3,"endAt":787,"startToken":582,"endToken":732},{"p":3,"at":787,"title":"III. ANSWER","method":"printed heading","endPage":3,"endAt":801,"startToken":732,"endToken":734},{"p":3,"at":801,"title":"A. ATC’s Proposed Tariff Changes Do Not Address the Concerns Raised in","method":"printed heading","endPage":5,"endAt":1600,"startToken":734,"endToken":1484},{"p":5,"at":1600,"title":"B. ATC’S Proposals Exceed the Limits of Local Planning Criteria and Would","method":"printed heading","endPage":8,"endAt":3,"startToken":1484,"endToken":2184},{"p":8,"at":3,"title":"IV. COMMUNICATIONS","method":"printed heading","endPage":8,"endAt":779,"startToken":2184,"endToken":2292},{"p":8,"at":779,"title":"V. NOTICE AND SERVICE","method":"printed heading","endPage":8,"endAt":1343,"startToken":2292,"endToken":2377},{"p":8,"at":1343,"title":"VI. CONCLUSION","method":"printed heading","endPage":10,"endAt":4,"startToken":2377,"endToken":2529},{"p":10,"at":4,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":536,"startToken":2529,"endToken":2613}]}