{"document":{"slug":"rec-20261020-5159","title":"Motion to Intervene and Protest of Tesla, Inc. et al. re the Section 206 investigation re PJM Interconnection’s Reliability Backstop Procurement framework","issued":"2026-10-20","accession":"20261020-5159","docket":"EL26-108-000","group":"PJM Reliability Backstop Procurement","filer":"Tesla, Inc.Sunrun, Inc.Renew Home VPP, LLC ,","kind":"protest","file":"sources/filings/text/20261020-5159_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261020-5159","tier":"record","sha256":"4a0a86c51a7d2c75f4b57674f557699811c8c1dfe9499b2eb4fe1149dd7b50a7","pages":7,"tokens":1261,"emptyPages":[],"textThemes":["registry","colo","flex","retail"]},"pages":[{"page":1,"startToken":0,"endToken":145,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket No. EL26-108-000 \n \n(Consolidated with \nDocket No. ER26-3380-000) \n \nMOTION TO INTERVENE AND PROTEST OF TESLA, INC., SUNRUN, INC., \nAND RENEW HOME VPP, LLC D/B/A EVERYDAY ELECTRIC \n \nPursuant to Rules 211 and 214 of the Federal Energy Regulatory Commission's \n(\"Commission\" or \"FERC\") Rules of Practice and Procedure1, Tesla, Sunrun, and \nEveryday Electric  (collectively, \"Joint Intervenors\") hereby submit this Motion to \nIntervene and Protest in the parallel Section 206 investigation regarding PJM \nInterconnection, L.L.C.'s (\"PJM\") Reliability Backstop Procurement (\"RBP\") framework. \n \nI. COMMUNICATIONS \n \nAll communications, pleadings, and orders regarding this proceeding should be \ndirected to the following designated representative for the Joint Intervenors: \nJaden D. Crawford \nTesla, Inc. \n1 Tesla Road  \nAustin, Texas 75725 \njadcrawford@tesla.com \n617-872-6568 \n \n1 18 C.F.R. §§ 385.211, 385.214."},{"page":2,"startToken":145,"endToken":351,"text":"2 \n \nII. MOTION TO INTERVENE \n \nThe Joint Intervenors, namely Tesla, Sunrun, and Everyday Electric, are leading \ndevelopers, operators, and aggregators of advanced energy technologies, distributed \nenergy resources (DERs), behind-the-meter energy storage, and automated Virtual Power \nPlants (VPPs) operating across the PJM footprint. Collectively, the Joint Intervenors \nmaintain a coordinated technical framework delivering over 1.0 GW of fast, flexible \nresidential and small commercial capacity committed directly to the PJM footprint, \ncapable of alleviating regional grid congestion and support wholesale reliability: \n● Tesla, Inc. (\"Tesla\") is an original equipment manufacturer of residential and \nsmall commercial battery energy storage, and develops and deploys energy \nmanagement software, vehicle-to-grid systems, and behind-the-meter small \ncommercial and residential battery networks across PJM states. \n● Sunrun, Inc. (\"Sunrun\") develops residential solar-plus-storage systems in the \nregion, managing a growing footprint of behind-the-meter battery systems capable \nof injecting energy back to the grid during peak events. \n● Renew Home VPP, LLC d/b/a Everyday Electric (\"Everyday Electric\") \ncoordinates flexible residential capacity across millions of connected devices in \nPJM states, orchestrating mass-scale, automated household load-shifting and \nadvanced vehicle-grid integration. \nAs active market participants, technology providers, and creators of regional \nvirtual power infrastructure, the Joint Intervenors' commercial operations, asset \ndeployments, and multi-state investments are directly affected by PJM's wholesale"},{"page":3,"startToken":351,"endToken":561,"text":"3 \n \nmarket rules, reliability procurement targets, and forecasting structures. No other party \ncan adequately represent the distinct commercial and technical interests of the Joint \nIntervenors. Accordingly, the Joint Intervenors respectfully request that they be granted \nfull party status in this consolidated proceeding. \n \nIII. LEGAL PRECEDENT AND THE \"RULE OF REASON\" \n \nThe Commission has long established that a Regional Transmission Organization \n(\"RTO\") cannot shield practices that significantly affect wholesale rates or terms of \nservice by burying them inside internal business practice manuals. Under the judicial and \nCommission \"Rule of Reason\" doctrine, provisions that \"significantly affect rates, terms, \nand conditions of service\" must be filed in the RTO's tariff.2 \nThe Commission has consistently applied this doctrine to ensure that PJM's \nbusiness practice manuals maintain regulatory transparency and conform with filed tariff \nobligations: \n● The \"Significantly Affects Rates\" Standard: The Commission has explicitly held \nthat when PJM modifies accounting, math, or crediting methodologies within its \nbusiness practice manuals in a way that alters market clearing or procurement \ntargets, those rules must be moved to the tariff.3 \n \n2 See City of Cleveland v. FERC, 773 F.2d 1368, 1376 (D.C. Cir. 1985). \n3 See Energy Storage Ass'n v. PJM Interconnection, L.L.C., 162 FERC ¶ 61,296, at PP 111–13 (2018)."},{"page":4,"startToken":561,"endToken":776,"text":"4 \n \n● Manuals Cannot Alter Substantive Rights: The Commission has firmly declared \nthat \"manual provisions cannot change or revise tariff obligations\" or frustrate a \nmarket participant's ability to offer compliant capacity.4  \nBecause the internal, structurally deficient forecasting metrics within PJM Manual \n19 directly dictate the total Procurement Target for the multi-billion dollar Reliability \nBackstop Procurement framework, they directly and significantly affect wholesale rates \nunder Docket No. EL26-108-000. Under the Rule of Reason, these practices are squarely \nwithin the Commission's Section 206 jurisdiction. \n \nIV. PROTEST \n \nThe Joint Intervenors respectfully urge the Commission to direct PJM to \nincorporate technical modifications to its load forecasting methodologies as part of its \nupcoming RBP compliance framework. The Joint Intervenors offer these parameters to \nensure an accurate and cost-effective resource target: \nRequirement for Technical Revisions to Account for Injection-Capable and Demand-\nShifting Resources: The operational target for any RBP auction relies directly on the peak \nload forecasting methodology governed by PJM Manual 19. As demonstrated in previous \nsubmissions in the related IRAS proceeding (Docket No. ER26-3515-000), including \nTesla’s formal comments filed on September 23, 2026, Manual 19 relies on static \nbaseline assumptions that treat large new loads as entirely flat, invariable demands. The \n \n4 See Radford's Run Wind Farm, LLC v. PJM Interconnection, L.L.C., 165 FERC ¶ 61,121 (2018)."},{"page":5,"startToken":776,"endToken":1009,"text":"5 \n \ncurrent framework does not fully incorporate advanced forecasting methodologies that \naccount for the over 1.0 GW capability of the Joint Intervenors' PJM-localized co-located \nenergy storage networks that are capable both of serving on-site load and grid injections, \nand automated demand response and peak-shaving dispatch regardless of whether those \nbehind-the-meter resources possess grid-injection capabilities5. Accounting for how these \nactive assets are operating to reduce system peaks through state or utility programs within \nthe PJM Manual 19 Attachment D demand-offset calculations is necessary to ensure the \nregional capacity target reflects actual grid conditions. \n1. Need for Predictable Demand Offsets Across Resource Categories: By omitting \nthese advanced, multi-technology metrics from the formal forecasting text, the \ncurrent framework prevents injection-capable behind-the-meter battery networks \nand automated residential demand-response assets from being fully credited as \noffsets to peak wholesale demand. Updating these definitions will ensure PJM \nestablishes its reliability procurement targets on an optimized baseline that \naccurately reflects the modern grid flexibility resources actively deployed by the \nJoint Intervenors within the PJM footprint. \n2. Alignment with Advanced Technology Investment Signals: Incorporating clear \nVirtual Power Plant and storage capabilities within peak load forecasts supports \nefficient wholesale market signals. Establishing a transparent methodology \nprevents the unintended penalization of commercial investments in flexible, cost-\neffective technologies, helping to avoid unnecessary, ratepayer-funded capital \nexpenditures for traditional backstop infrastructure. \n \n5 See Energy Storage Ass'n, 162 FERC ¶ 61,296, at PP 111–13."},{"page":6,"startToken":1009,"endToken":1221,"text":"6 \n \n3. Supporting the Regulatory Role of State Commissions: In its recent orders, the \nCommission affirmed that state utility commissions hold jurisdictional authority \nover retail energy delivery and large-load grid integration, noting that states play a \ncentral role in managing localized reliability dynamics.6 To effectively fulfill \nthese responsibilities, state regulators require clear visibility into regional \nforecasting data and underlying methodologies. Utilizing the Joint Intervenors' \nproposed technology-specific adjustments to reduce baseline peak load \nprojections provides state commissions with the necessary operational \ninformation to accurately evaluate and support local resource adequacy alongside \nPJM. \nV. CONCLUSION AND REQUESTED RELIEF \n \nWHEREFORE, the Joint Intervenors respectfully request that the Commission: \n● Grant full party status to the Joint Intervenors in Docket No. EL26-108-000; \n● Direct PJM to incorporate into its upcoming RBP compliance filing a \nmodification to Manual 19 that transparently subtracts verified, technology-\nspecific VPP asset pools, behind-the-meter storage grid injections, and automated \ndemand response capacities from its baseline peak load projections regardless of \nwhether those behind-the-meter resources possess grid-injection capabilities7; and \n \n6 See PJM Interconnection, L.L.C., Docket No. ER26-3515-000 (Oct. 9, 2026) (rejecting IRAS and \nrelated provisions as intruding on state jurisdiction over retail customer obligations, retail \ncurtailment, and retail rates). \n7 See Energy Storage Ass'n, 162 FERC ¶ 61,296, at PP 111–13."},{"page":7,"startToken":1221,"endToken":1261,"text":"7 \n \n● Accept PJM's subsequent compliance elements subject to the inclusion of these \nconstructive forecasting adjustments. \n \nRespectfully submitted, \nBy: /s/ Jaden D. Crawford \nJaden D. Crawford \nHead of VPP Policy, North America \nTesla, Inc. \njadcrawford@tesla.com \nDated: October 20, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":709,"startToken":0,"endToken":99},{"p":1,"at":709,"title":"I. COMMUNICATIONS","method":"printed heading","endPage":2,"endAt":5,"startToken":99,"endToken":146},{"p":2,"at":5,"title":"II. MOTION TO INTERVENE","method":"printed heading","endPage":3,"endAt":328,"startToken":146,"endToken":393},{"p":3,"at":328,"title":"III. LEGAL PRECEDENT AND THE \"RULE OF REASON\"","method":"printed heading","endPage":4,"endAt":632,"startToken":393,"endToken":643},{"p":4,"at":632,"title":"IV. PROTEST","method":"printed heading","endPage":6,"endAt":732,"startToken":643,"endToken":1101},{"p":6,"at":732,"title":"V. CONCLUSION AND REQUESTED RELIEF","method":"printed heading","endPage":7,"endAt":292,"startToken":1101,"endToken":1261}]}
