{"document":{"slug":"rec-20261023-5088","title":"Motion to Intervene and Comments of Base Electron, Corp. re Midcontinent Independent System Operator, Inc’s filing to establish the Large Load Addition…","issued":"2026-10-23","accession":"20261023-5088","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Base Electron, Corp.","kind":"comments","file":"sources/filings/text/20261023-5088_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5088","tier":"record","sha256":"536e8463ffb2d573b7db5259ca0abff91c17cba9c247ed1dc25478b78ebd74c0","pages":6,"tokens":1292,"emptyPages":[],"textThemes":["study"]},"pages":[{"page":1,"startToken":0,"endToken":224,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nMidcontinent Independent System  \nOperator, Inc. \n) \n) \n) \n \nDocket No. ER27-25-000 \n \n \nMOTION TO INTERVENE AND COMMENTS OF \nBASE ELECTRON, CORP. \n \n \nPursuant to Rules 212 and 214 of the Federal Energy Regulatory Commission’s (“FERC” \nor the “Commission”) Rules of Practice and Procedure,1 and the Commission’s October 2, 2026 \nNotice regarding the Midcontinent Independent System Operator, Inc.’s (“MISO”) proposed \nrevisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff (“Tariff”) \nto implement the Large Load Addition Resource Study (“LARS”), Base Electron, Corp. (“Base \nElectron”) respectfully submits this Motion to Intervene and Comments. \nI. \nMOTION TO INTERVENE \n \nBase Electron, an independent power producer, respectfully moves under Rules 212 and \n214 of the Commission’s Rules of Practice and Procedure2 to intervene in this proceeding. Base \nElectron and its subsidiaries are developing a portfolio of dedicated, dispatchable power projects \ndesigned to provide large-load customers, including hyperscale data center operators, and artificial \nintelligence and advanced computing companies, with access to firm, reliable, cost-efficient, grid-\nconnected power at scale. Base Electron supports the initiatives undertaken by MISO to develop \nLARS and implement it in its Tariff. Moreover, Base Electron participated in MISO’s stakeholder \nprocess that preceded MISO’s filing in this docket. As provided below, Base Electron seeks to \n \n1 18 C.F.R. §§ 385.212, 385.214. \n2 Id."},{"page":2,"startToken":224,"endToken":439,"text":"2 \n \nintervene in this proceeding to offer limited comments on items within MISO’s proposal where \nclarification and confirmation would be beneficial for entities seeking to interconnect under the \nLARS procedures.  \nGiven its planned development in MISO, Base Electron has a direct and substantial interest \nin proposed revisions to MISO’s Tariff, such as those related to LARS. Therefore, Base Electron’s \ninterests may be directly affected by the outcome of this proceeding and cannot adequately be \nrepresented by any other party. Accordingly, Base Electron respectfully requests that the \nCommission grant this timely motion to intervene with full rights associated with party status in \nthis proceeding. \nII. \nCORRESPONDENCE AND COMMUNICATIONS \n \nAll correspondence and communications regarding this matter and filing should be \naddressed to the following: \nColson R. Williams* \nCounsel, Commercial & Regulatory \nBase Electron, Corp. \n4324 Mapleshade Lane, Suite 137 \nPlano, Texas 75093 \n(214) 270-2140 \ncwilliams@baseelectron.com  \n \n*Admitted in Montana \nTim Woodland \nExecutive Vice President, Operations \nBase Electron, Corp. \n4324 Mapleshade Lane, Suite 137 \nPlano, Texas 75093 \n(214) 270-2140 \ntwoodland@baseelectron.com  \n \nIII. \nCOMMENTS \n \nAt the outset, Base Electron supports timely acceptance of MISO’s LARS Tariff proposal. \nBase Electron’s comments neither seek to delay the resolution of this proceeding nor request FERC \nto condition or delay effectiveness of MISO’s LARS proposal on the requested clarification and \nconfirmation herein."},{"page":3,"startToken":439,"endToken":788,"text":"3 \n \nBase Electron’s comments seek clarification and confirmation on a single item within \nMISO’s proposal: for the purpose of determining the allowable Interconnection Service amount \nrequested under the LARS Interconnection Request, whether the LARS Associated Load’s \n“expected peak Demand” means the load’s Demand at the time it first takes service or the expected \npeak Demand once any planned future phase build-outs of the load are in service.3 Put differently, \nhow will MISO measure the LARS Associated Load’s expected peak Demand? \nMISO’s proposed Tariff revisions implementing LARS provide that “[a]n Interconnection \nRequest seeking LARS processing shall request NRIS Interconnection Service in an amount that \nis both: (1) not less than 200 MW, and (2) not more than 150% of the peak Demand of the LARS \nAssociated Load.”4 Moreover, the proposed Tariff revisions later state that the Interconnection \nService requested “must not exceed 150 percent of the LARS Associated Load’s expected peak \nDemand.”5 In further support of the need for clarification, MISO states that a LARS Associated \nLoad can come online in phases and that “[t]he LARS Application should identify the total \nexpected large load amount that is aligned with the full Generator Interconnection Service request \nnot to exceed 150% of the peak demand of the LARS Associated Load.”6  \nBase Electron’s comments merely seek clarification and confirmation on how and based \non what parameters MISO will measure the 150% limit on Interconnection Service for the \ninterconnecting generator, when a LARS Associated Load might commence service in phases (i.e., \nhow MISO will measure expected peak Demand). As Base Electron understands it, the 150% cap \non Interconnection Service is not measured on any first or initial phase of the load, but on a total \n \n3 MISO, Proposed Tariff, Attachment X (193.0.0), § 3.12.2; id., § 1 (Definitions).   \n4 Id., Attachment X (193.0.0), § 3.12.2.vi. \n5 Id., Attachment X (193.0.0), § 3.12.2 (emphasis added). \n6 MISO, Filing, Docket No. ER27-25-000, Tab C, Prepared Direct Testimony of Christina Drake at 26:21-27:1 (filed \nOct. 2, 2026) (Drake Test.)."},{"page":4,"startToken":788,"endToken":1109,"text":"4 \n \nexpected load at the conclusion of any phases anticipated by the LARS Associated Load. \nClarification and confirmation from MISO on this issue is important because, according to the \nLARS Tariff proposal, a generator cannot change requested Interconnection Service after the \nsubmission of the LARS Application and prior to the execution or unexecuted filing of the final \nLarge Load Generator Interconnection Agreement.7 Likewise, MISO’s testimony states that for the \nLARS Associated Load, “[a]ny increase in the amount of load demanded is not allowed and the \ncustomer would need to submit a new LARS Application or apply for some other kind of \nInterconnection Service.”8 If the 150% limit on Interconnection Service is measured by a load’s \nfirst phase, and not the expected and anticipated future load size, the interconnecting generator \nwould be precluded from adequately sizing its facility to meet the full load at final phased build-\nout. In turn, any remaining generator Interconnection Service to serve a full build-out of the load \ncould then be required to go through MISO’s Definitive Planning Phase process, which includes a \nlonger study timeline. \nIn conclusion, Base Electron respectfully requests confirmation and clarification on (1) \nwhether “expected peak Demand” for purposes of deriving the 150% limit on Interconnection \nService requested by the generator means the LARS Associated Load’s expected peak once it \n“commence[s] service for the full amount of transmission service requested in the LARS \nApplication”;9 and (2) whether a LARS Interconnection Request that sizes its Interconnection \nService based on the load’s full expected peak measured by future anticipated phases satisfies \nAttachment X, § 3.12.2.vi, even if the LARS Associated Load initially takes service at a lower \nlevel during any preliminary phase build-out.  \n \n \n7 See MISO, Proposed Tariff, Attachment X (193.0.0), §§ 3.12.2, 3.12.9. \n8 Drake Test. at 38:9-11. \n9 MISO, Proposed Tariff, Attachment X (193.0.0), § 3.12.2.vii."},{"page":5,"startToken":1109,"endToken":1246,"text":"5 \n \nIV. \nCONCLUSION \n \nFor the foregoing reasons, Base Electron respectfully requests that its motion to intervene \nbe granted by the Commission, and the preceding comments be considered by the Commission in \nits review of MISO’s filing in this proceeding. Base Electron reiterates that its comments merely \nseek clarification and confirmation, which could be provided either in any MISO answer it may \nfile or in FERC’s order in this proceeding, and it neither seeks to delay the resolution of this \nproceeding nor requests FERC to condition or delay effectiveness of MISO’s LARS proposal on \nthe requested clarification and confirmation herein. \n \nDated: October 23, 2026 \n/s/ Colson R. Williams \n \nColson R. Williams* \nCounsel, Commercial & Regulatory \nBase Electron, Corp. \n4324 Mapleshade Lane, Suite 137 \nPlano, Texas 75093 \n(214) 270-2140 \ncwilliams@baseelectron.com \n \n*Admitted in Montana \n \n \nCounsel for Base Electron, Corp."},{"page":6,"startToken":1246,"endToken":1292,"text":"6 \n \nCERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \n \nDated this 23rd day of October 2026. \n \n \n \n \n \n \n \n \n \n/s/ Colson R. Williams  \n \n \n \n \n \n \n \n \n \nColson R. Williams"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":769,"startToken":0,"endToken":102},{"p":1,"at":769,"title":"I. MOTION TO INTERVENE","method":"printed heading","endPage":2,"endAt":711,"startToken":102,"endToken":327},{"p":2,"at":711,"title":"II. CORRESPONDENCE AND COMMUNICATIONS","method":"printed heading","endPage":2,"endAt":1237,"startToken":327,"endToken":393},{"p":2,"at":1237,"title":"III. COMMENTS","method":"printed heading","endPage":5,"endAt":5,"startToken":393,"endToken":1110},{"p":5,"at":5,"title":"IV. CONCLUSION","method":"printed heading","endPage":6,"endAt":5,"startToken":1110,"endToken":1247},{"p":6,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":325,"startToken":1247,"endToken":1292}]}