{"document":{"slug":"rec-20261023-5143","title":"Motion to Intervene and Comments of MISO Transmission Owners in support of the 10/02/2026 filing by the Midcontinent Independent System Operator, Inc","issued":"2026-10-23","accession":"20261023-5143","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"MISO Transmission Owners","kind":"comments","file":"sources/filings/text/20261023-5143_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5143","tier":"record","sha256":"43db776f7f4454adf526be68d45ed71975f4d3aab3c80d78d3c1a8d412b3adb5","pages":11,"tokens":2542,"emptyPages":[],"textThemes":["study","adequacy","proximate"]},"pages":[{"page":1,"startToken":0,"endToken":320,"text":"UNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION  \n \n \nMidcontinent Independent System   \n) \n \nDocket No. ER27-25-000 \n \nOperator, Inc.  \n \n \n) \n  \n \n \n \nMOTION TO INTERVENE AND COMMENTS IN SUPPORT OF  \nTHE MISO TRANSMISSION OWNERS  \n \nPursuant to Rules 212 and 214 of the Federal Energy Regulatory Commission’s \n(“Commission”) Rules of Practice and Procedure,1 the MISO Transmission Owners2 \nsubmit this motion to intervene and comments in support of the October 2, 2026 Filing by \nthe Midcontinent Independent System Operator, Inc. (“MISO”) in which MISO proposes \n \n1  \n18 C.F.R. §§ 385.212, 385.214.   \n2  \nFor purposes of this filing, the MISO Transmission Owners for this filing consist \nof: Ameren Services Company, as agent for Union Electric Company d/b/a Ameren \nMissouri, Ameren Illinois Company d/b/a Ameren Illinois and Ameren \nTransmission Company of Illinois; Big Rivers Electric Corporation; Central \nMinnesota Municipal Power Agency; Citizens Electric Corporation; City Water, \nLight & Power (Springfield, IL); Cleco Power LLC; Cooperative Energy; \nDairyland Power Cooperative; Duke Energy Business Services, LLC for Duke \nEnergy Indiana, LLC; East Texas Electric Cooperative, Inc.; Entergy Arkansas, \nLLC; Entergy Louisiana, LLC; Entergy Mississippi, LLC; Entergy New Orleans, \nLLC; Entergy Texas, Inc.; Great River Energy; GridLiance Heartland LLC; \nHoosier Energy Rural Electric Cooperative, Inc.; Indiana Municipal Power \nAgency; Indianapolis Power & Light Company d/b/a AES Indiana; International \nTransmission Company d/b/a ITCTransmission; ITC Midwest LLC; Lafayette \nUtilities System; Michigan Electric Transmission Company, LLC; MidAmerican \nEnergy Company; Minnesota Power (and its subsidiary Superior Water, L&P); \nMissouri River Energy Services; Montana-Dakota Utilities Co.; Northern Indiana \nPublic Service Company LLC; Northern States Power Company, a Minnesota \ncorporation, and Northern States Power Company, a Wisconsin corporation, \nsubsidiaries of Xcel Energy Inc.; Northwestern Wisconsin Electric Company; Otter \nTail Power Company; Prairie Power, Inc.; Southern Illinois Power Cooperative; \nSouthern Indiana Gas & Electric Company (d/b/a CenterPoint Energy Indiana \nSouth); Southern Minnesota Municipal Power Agency; Wabash Valley Power \nAssociation, Inc.; and Wolverine Power Supply Cooperative, Inc."},{"page":2,"startToken":320,"endToken":612,"text":"2 \nrevisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff \n(“Tariff”) to establish a Large Load Addition Resource Study (“LARS”) process.3  As \ndetailed in the LARS Filing, the LARS process provides a streamlined and flexible process \nwhereby MISO is able to expedite the study of load interconnection requests of 200 \nmegawatts (“MW”) or greater that are paired with electrically proximate new generation \nresources.  LARS provides an accelerated framework that will “facilitate the cost effective, \ntimely and reliable integration of new large loads into the system.”4   \nAs MISO explains, MISO’s LARS proposal is built upon MISO’s existing \nExpedited Project Review (“EPR”) for load integration and the Expedited Resource \nAdditions Study (“ERAS”) for accelerated generation interconnection and positions the \nregion to meet the significant increase in electricity demand and support critically \nimportant industries.5  LARS is aligned with initiatives such as the Department of Energy’s \n(“DOE”) Speed to Power Initiative6 and is responsive to the Commission’s June 18, 2026 \nShow Cause Proceeding that called on MISO to address potential bottlenecks limiting the \nability of new generation and electrically proximate large loads to be studied for their \ncombined impacts on the transmissions system.7 \n \n3  \nMidcontinent Independent System Operator, Inc.’s Large Load Addition Resource \nStudy Process, Docket No. ER27-25-000 (October 2, 2026) (“LARS Filing”).  All \ncapitalized terms in this pleading that are not otherwise defined herein have the \nsame meaning they are given in the current Tariff. \n4  \nLARS Filing at 2. \n5  \nId. at 2. \n6  \nSpeed to Power Initiative, U.S. Dep’t of Energy, https://www.energy.gov/oe/speed-\npower [https://perma.cc/X4CX-DFER] (last visited Oct. 23, 2026).  \n7  \nMidcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212, at P 113 (2026) \n(“Show Cause Order”)."},{"page":3,"startToken":612,"endToken":851,"text":"3 \nAs noted in the LARS Filing, the addition of new large loads to the system has the \npotential to strain the region’s resource adequacy needs, with new large load additions \ncoming online faster than the generation needed to support them.8  By studying the \ngeneration and load in a parallel, coordinated, and streamlined manner, MISO’s LARS \nproposal can reduce study times for both load and generation, and identify cost-effective \nsolutions for interconnection that are more efficient than if load and generation were \nstudied separately.9 \nThe MISO Transmission Owners support MISO’s LARS proposal.  As explained \nin the LARS Filing, the Commission should accept the proposed Tariff revisions, effective \nDecember 2, 2026, to ensure new large loads paired with generation can be studied in \nstreamlined, efficient, and expedited manner.   \nI. \nMOTION TO INTERVENE \nThis proceeding involves revisions to MISO’s Generator Interconnection \nProcedures and the Tariff that are necessary to implement LARS.  Under the Commission’s \nrules, intervention is appropriate where “[t]he movant has . . . an interest which may be \ndirectly affected by the outcome of the proceeding.”10  As Transmission Owners within \nMISO that are subject to the Tariff, each of the MISO Transmission Owners may be \naffected by the Commission’s action in this proceeding.  MISO’s LARS proposal \nspecifically identifies MISO Transmission Owners as one of the four primary types of \n \n8  \nLARS Filing at 2-3. \n9  \nId. at 4. \n10  \n18 C.F.R. § 385.214(b)(2)(ii)."},{"page":4,"startToken":851,"endToken":1079,"text":"4 \nentities involved in implementing LARS, aside from MISO.11  Consequently, each of the \nMISO Transmission Owners has a direct interest in this case that cannot be adequately \nrepresented by any other party.  Therefore, the Commission should allow the intervention \nof each MISO Transmission Owner.   \nThe MISO Transmission Owners also request that the Commission place the \nfollowing individuals on the official service list for this proceeding: \nWendy N. Reed \nAnna Fernandez \nStefan A. Koester \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n202-393-1200 \nreed@wrightlaw.com \nfernandez@wrightlaw.com \nkoester@wrightlaw.com \nII. \nCOMMENTS IN SUPPORT \nThe MISO Transmission Owners support MISO’s LARS Filing.  The LARS Filing \nwill provide the region with another efficient, effective, and appropriately tailored tool to \naddress the need to expedite the interconnection of new large loads and the necessary \ngeneration to serve them.  The proposed LARS process provides a framework to a parallel, \nstreamlined, and coordinated study process for pairing new load with much needed \ngeneration projects.  The pairing of new load with generation for large load customers is \npart of a broader suite of efforts on the part of MISO and MISO stakeholders to address \nresource adequacy and reliability needs across the MISO footprint while providing a \npathway to bring new large loads online as fast as possible.  The Commission should accept \n \n11  \nLARS Filing at 6."},{"page":5,"startToken":1079,"endToken":1373,"text":"5 \nthe LARS Filing, finding the LARS proposal to be a just and reasonable and not unduly \ndiscriminatory or preferential solution to addressing a specifically regional problem.12 \nA. \nThe LARS Proposal Is Just and Reasonable Given It Is Narrowly \nTailored in Scope, Avoids Negative Impacts on the Generator \nInterconnection Queue, and Facilitates Speed to Power  \nThe LARS proposal is a narrowly tailored but valuable tool that enables the \naccelerated evaluation and integration of electrically proximate large load and generation \npairs and the related identification of more efficient network upgrades.  As a new \npermanent study process, the LARS proposal will provide for a new Large Load Generator \nInterconnection Agreement in an estimated 120 days.13  The LARS proposal is a balanced \nand necessary addition to MISO’s tools for addressing exponential load growth across the \nregion.  \n1. \nUrgent Need to Interconnect New Large Loads and Associated \nGeneration \nMISO and MISO stakeholders, including the MISO Transmission Owners, fully \nagree on the need to meet the moment by facilitating the interconnection of new large loads, \nsuch as data centers, without jeopardizing resource adequacy and reliability needs.14  The \nurgent resource adequacy and reliability needs that led to the LARS proposal are in part \ndue to recent, rapid changes to the MISO footprint.  Specifically, recent assessments by \nMISO demonstrate that a combination of factors, including, among other things, the rapid \n \n12  \nSee ISO New England Inc., 170 FERC ¶ 61,218, at P 26 (2020) (“[A]n \nRTO/ISO . . . has greater flexibility to customize its interconnection procedures \nand agreements to fit regional needs.”). \n13  \nLARS Filing at 11.  \n14  \nSee id. at 49-52 (detailing the robust stakeholder process used in developing the \nLARS proposal as well as changes made to the LARS proposal as a result of \nstakeholder feedback)."},{"page":6,"startToken":1373,"endToken":1693,"text":"6 \ngrowth of large energy-consuming industries (i.e., data centers and manufacturing), and \nearly retirements of large generating units, are significantly impacting resource adequacy \nand reliability needs in the region just when more generation is needed to serve new large \nloads.15  For example, the 2025 Organization of MISO States-MISO Survey found that \n“[a]t least 3.1 GW of additional capacity beyond the committed capacity will be needed to \nmeet the projected planning reserve margin forecast.”16  As noted by MISO, the LARS \nproposal, along with MISO’s recent generator interconnection reforms accepted by the \nCommission, such as ERAS, will speed up the study process for both new large loads and \ngeneration, bringing new large loads and necessary generation online faster than the status \nquo of studying these requests separately and in a non-coordinated manner.17 \nThe LARS proposal builds off of the successful EPR and ERAS processes. The \nLARS load study process requires similar information to that required in the EPR process, \nwhile the LARS generation study process builds off of ERAS.18  LARS improves upon \nthese two processes, however, by integrating the study and planning of new large load with \ngeneration, thereby enabling the identification of more efficient transmission Network \n \n15  \nSee id. at 2, n. 6 (MISO, 2026 Reliability Imperative Report at 4 (Feb. 2026) \n(projecting annual load growth of approximately 1% to 2% through 2044 and \nidentifying data centers, manufacturing expansion, and electrification as drivers of \nsustained, concentrated load growth); see also, MISO, 2026 Planning Resource \nAuction Results at 2 (May 22, 2026) (stating that faster resource additions are \nneeded to support large-load growth and ensure resource adequacy)). \n16  \n2025 OMS-MISO Resource Adequacy Survey Results Workshop, Midcontinent \nIndep. Sys. Operator, Inc. & \nOrg. of MISO States, 2 (June 6, \n2025), https://cdn.misoenergy.org/20250606%20OMS%20MISO%20Survey%20\nResults%20Workshop%20Presentation702311.pdf \n[https://perma.cc/J8AB-\nTUQX]. \n17  \nLARS Filing at 5.  \n18  \nId. at 13-15."},{"page":7,"startToken":1693,"endToken":1991,"text":"7 \nUpgrade solutions.  Additionally, LARS is a permanent, rather than temporary, proposal \nthat will provide a long-term market signal and certainty to new large loads and generation \nfor at minimum 15 years by pairing new electrically proximate generation appropriately \nsized to serve new large loads.19  \nAs shown above, the proposed LARS Filing is narrowly tailored to address speed \nto power and the resource adequacy and reliability needs of the region, while addressing \nthe concerns outlined in the Show Cause Order, specifically, the need to pair new \ngeneration with new large loads.  \n2. \nLARS Is an Appropriate, Focused, and Needed Solution to Bringing \non New Large Loads and Generation in a Timely Manner \nAs MISO explained, the region faces the twin imperatives of bringing critically \nimportant new large loads online fast enough while not exacerbating the region’s resource \nadequacy concerns by failing to bring new generation to support these new large loads.20  \nThe current separate, non-coordinated study processes of studying load interconnection \nrequests and generator interconnection requests separately was identified by MISO as a \nkey hurdle to speeding up the integration of large loads without compromising reliability.21 \nMeeting resource adequacy and reliability needs is a paramount concern for the \nMISO Transmission Owners and in MISO, it is the Load Serving Entities’ (“LSE”) \nobligation to meet the load needs for most of the region’s states.22  LSEs are also typically \n \n19  \nId. at 16. \n20  \nId. at 4-5. \n21  \nId. at 4-5.  \n22  \nSee id. at 4-5; see also Midcontinent Indep. Sys. Operator, Inc., 162 FERC \n¶ 61,176, at P 67 (2018) (“The vast majority (approximately 90 percent) of MISO’s \nload is served by vertically integrated utilities over which state and local authorities \nplay an active role in ensuring resource adequacy.  In fact, even states with retail"},{"page":8,"startToken":1991,"endToken":2239,"text":"8 \nthe entity responsible for interconnecting new large loads that seek to take service in their \nservice territory.23  The LARS proposal respects the division of responsibility by \nestablishing a single application process that is initiated by the LARS Associated \nTransmission Customer, typically the LSE.24  However, the Transmission Owners, \nInterconnection Customer, and Associated Load all have critical roles to play in the LARS \nApplication process.25   \nThe LARS process is also designed to avoid disrupting MISO’s existing load and \ngenerator interconnection study processes.  First, the LARS proposal includes a robust pre-\nsubmission coordination process aimed at streamlining the LARS Application process \nprior to submittal with specific consultation requirements and timelines baked into the \nprocess.  Transmission Owners have a distinct role to play in the LARS pre-submission \ncoordination process by meeting with an Interconnection Customer that proposes to \ninterconnect for participation in LARS and working jointly with that Interconnection \nCustomer to identify a feasible Point of Interconnection (“POI”).  MISO Transmission \nOwners must also provide necessary attestation with regard to an agreed upon POI with \nthe Interconnection Customer as a part of the LARS Application.26  Second, LARS is \nlimited to three study cycles per year with ten LARS Applications per cycle.  This limited \nwindow will allow for MISO to meet its stated goal of studying and completing the ten \n \ncompetition (i.e., Illinois and Michigan) have played an active role in ensuring \nresource adequacy.”). \n23  \nLARS Filing at 6. \n24  \nId. 7.  \n25  \nId. 7.  \n26  \nId. 8."},{"page":9,"startToken":2239,"endToken":2391,"text":"9 \ngeneration/load pairs in one model.27  Third, LARS projects will not impact existing \ncustomers in MISO’s generator interconnection queue (the Definitive Planning Phase \nprocess or “DPP”), with LARS requests not included in DPP studies, thereby avoiding \nutilizing available transmission capacity.28  Fourth, and finally, LARS includes various \nsafeguards to deter customers from gaming the LARS process and speculative \napplications.29  Together, these requirements ensure “commercially viable and shovel \nready projects enter LARS.”30  \nThe LARS proposal advances key elements of the DOE’s Speed to Power Initiative \nand is responsive, in part, to the Commission’s Show Cause Order.  MISO Transmission \nOwners support the goals of the LARS proposal, with it building off of recent successful \nMISO efforts to expedite the study and addition of new loads and generation in a timely \nmanner, while identifying more efficient transmission solutions.   \n \n27  \nId. 13.  \n28  \nId. 13.  \n29  \nId. at 9-10.  \n30  \nId. 11."},{"page":10,"startToken":2391,"endToken":2470,"text":"10 \nIII. \nCONCLUSION \n \nFor these reasons, the MISO Transmission Owners request that the Commission \ngrant this motion to intervene and accept the LARS Filing as just and reasonable, effective \nDecember 2, 2026.   \nRespectfully submitted, \n /s/ Wendy N. Reed \n \nWendy N. Reed \nAnna Fernandez \nStefan A. Koester \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005 \n(202) 393-1200 \nreed@wrightlaw.com \nfernandez@wrightlaw.com \nkoester@wrightlaw.com \n \nAttorneys for the \nMISO Transmission Owners \nOctober 23, 2026"},{"page":11,"startToken":2470,"endToken":2542,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \n \nDated at Washington, DC, this 23rd day of October 2026. \n \n/s/ Stefan A. Koester  \nStefan A. Koester \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005 \n(202) 393-1200 \nkoester@wrightlaw.com \n \nAttorney for the \nMISO Transmission Owners"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":846,"startToken":0,"endToken":741},{"p":3,"at":846,"title":"I. MOTION TO INTERVENE","method":"printed heading","endPage":4,"endAt":664,"startToken":741,"endToken":948},{"p":4,"at":664,"title":"II. COMMENTS IN SUPPORT","method":"printed heading","endPage":5,"endAt":180,"startToken":948,"endToken":1107},{"p":5,"at":180,"title":"A. The LARS Proposal Is Just and Reasonable Given It Is Narrowly","method":"printed heading","endPage":10,"endAt":4,"startToken":1107,"endToken":2392},{"p":10,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":0,"startToken":2392,"endToken":2470},{"p":11,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":466,"startToken":2470,"endToken":2542}]}