{"document":{"slug":"rec-20261023-5164","title":"Protest of Anna Farrar re Midcontinent Independent System Operator, Inc’s filing to establish the Large Load Addition Resource Study","issued":"2026-10-23","accession":"20261023-5164","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Individual No Affiliation","kind":"protest","file":"sources/filings/text/20261023-5164_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5164","tier":"record","sha256":"19ec541c44ce6dc008ff7af9eab110631c5947e339d1676bb21fd981824e4c69","pages":9,"tokens":2089,"emptyPages":[],"textThemes":["study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":242,"text":"Docket No. ER27-25-000\n1\nUNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nMidcontinent Independent System Operator, Inc.         Docket No. ER27-25-000\nPROTEST OF ANNA FARRAR\nPursuant to Rule 211 of the Federal Energy Regulatory Commission's Rules of Practice\nand Procedure, 18 C.F.R. § 385.211, I, Anna Farrar, submit this protest of specified\nprovisions of the Large Load Addition Resource Study (LARS) tariff revisions filed by\nMidcontinent Independent System Operator, Inc. (MISO) on October 2, 2026, Docket\nNo. ER27-25-000 (Accession No. 20261002-5074). [1] This protest concerns the\nproposed federal tariff process, not authorization of any particular Missouri development.\nI reside in Warren County, Missouri, and receive residential electric service from\nAmeren Missouri (Union Electric Company). I support reliable and efficient review of\nlarge loads and associated generation. My objection is to accepting a new accelerated\nprocess without sufficient explanation of the financial consequences of transmission\nconstraints attributable to overlapping study assumptions and the treatment of upgrades\nidentified later.\nI. THE PROPOSAL INCLUDES MEANINGFUL SAFEGUARDS\nThe October 2 proposed clean tariff, Attachment X § 3.12.4, distinguishes mitigation\nidentified only through generation-interconnection studies from mitigation identified\nthrough transmission or common study results. The former is assigned as a Generator\nInterconnection Project (GIP); the latter is classified as a Baseline Reliability Project\n(BRP) or Other project under applicable tariff rules. Attachment X § 3.12.7.4 addresses\nspecified continuing obligations for assigned upgrades if the generator or associated large\nload withdraws. [1]"},{"page":2,"startToken":242,"endToken":525,"text":"Docket No. ER27-25-000\n2\nMISO also proposes load-study scenarios incorporating other planned load additions, and\nevaluates the loss of associated generation. [1] I do not allege that the proposal lacks\ncumulative modeling, outage analysis, or all financial protections. The narrower question\nis whether these provisions adequately address additional transmission upgrades that are\nfirst identified through a subsequent planning cycle because two separate studies relied\non overlapping available capacity.\nII. MISO IDENTIFIES A DISTINCT RISK FROM OVERLAPPING STUDIES\nMISO's transmittal letter discusses a potential overallocation of available transmission\ncapacity between the LARS process and the existing Definitive Planning Phase (DPP)\ngenerator-interconnection process. It contemplates addressing resulting constraints\nthrough a subsequent MISO Transmission Expansion Plan (MTEP) project, with the cost\nassigned under existing tariff mechanisms, likely to load in the affected Transmission\nPricing Zone. Drake characterizes the risk of overallocation as minimal. Transmittal\nLetter at 13; Drake Testimony at 33. [1]\nIn the supporting prepared testimony, Christina Drake explains that the overlapping\nLARS and DPP projects could proceed without additional charges arising from that\noverallocation, while the constraint is addressed through later transmission planning.\nDrake Testimony at 33 (combined filing PDF at 1511). [1]\nThis is a concrete concern about cost causation and the reasonableness of the proposed\nprocedure. I do not claim any current unlawful charge, nor do I assume that all future\nMTEP expenditures must be borne exclusively by an individual large load. A later\nupgrade may provide identifiable benefits to the wider network. But MISO should\nexplain why the costs associated with reconciling overlapping study assumptions would\nappropriately fall on the affected pricing zone instead of being attributed, in whole or in\npart, to the projects whose concurrent studies created the conflict."},{"page":3,"startToken":525,"endToken":735,"text":"Docket No. ER27-25-000\n3\nFERC has separately identified the lack of public transparency regarding large-load\nnetwork upgrades and the risk that costs of unbuilt or undersubscribed large loads may\nshift to other transmission customers. The Commission's findings in its June 18, 2026\nSection 206 show-cause order are preliminary; this protest does not present them as a\nfinal adjudication of any LARS cost allocation. EL26-70-000, 195 FERC ¶ 61,212, at\nparagraphs 71-83. [2]\nIII. PROJECT CLASSIFICATION IS NOT THE SAME AS VERIFIED COST\nCAUSATION\nWhere the same constraint appears in both studies, the proposed tariff's BRP or Other\nclassification may be justified by shared reliability benefits. It does not, by itself, answer\nwhich portion of an upgrade is attributable to the new load, the associated generation, or\nan independently existing reliability need. Attachment X § 3.12.4. [1]\nThe Commission should require MISO to identify what records and comparison studies\nwill be available to substantiate causation: the relevant with-load and without-load\nassumptions, the effects of associated generation, the scope and estimated costs of\nincremental upgrades, the affected pricing zones, the governing allocation rules, and any\ncontributions or credits that prevent double recovery. Such information would allow\nregulators and transmission customers to examine both legitimate shared benefits and\npotential unjustified cost shifting."},{"page":4,"startToken":735,"endToken":1022,"text":"Docket No. ER27-25-000\n4\nIV. MISSOURI RECORDS SHOW MULTIPLE LARGE-LOAD STUDIES AND\nNETWORK CHANGES\nMISO's April 7, 2025 Expedited Project Review (EPR) for Project P50616 documents a\nproposed 200-MW data-center load at Ameren's Rootbeer 345-kV substation, possible\nfuture expansion, and an estimated $5 million project cost. MISO reported no new\nreliability violations in the studied scenarios. [3] MISO's February 5, 2024 EPR for\nP50086 documents a separate proposed 250-MW data-center load at Montgomery's\n161-kV facilities and names Navier, Inc. as the customer. That study likewise reported no\nnew violations in its reviewed scenarios. [4] These are proposed loads reviewed under\nEPR, not demonstrated applications under LARS.\nThe facilities are electrically connected, rather than simply nearby on a map. Ameren\nwitness Justin D. Wenk identifies the existing Montgomery-Rootbeer 345-kV line and\ndescribes relocating its terminal as part of the proposed Montgomery-Callaway\nConnector work in Missouri PSC File No. EA-2026-0058. Wenk Direct Testimony at 4.\n[5] Ameren witness Steven M. Wills separately explains that Rootbeer was originally\ndeveloped for the Split Rail solar interconnection, before the large-load proposals, and\nstates Ameren's expectation that large-load retail revenues would contribute toward\nshared network transmission expenses. The Split Rail interconnection agreement\nallocated the cost of a reserved future Rootbeer terminal to the entity creating the need\nfor it. Wills Surrebuttal at 15-16; Schedule SMW-S1, original Sheet 88. [6] The\nMontgomery-Callaway Connector's stated generation-related purpose should not be\nconflated with proven data-center cost causation.\nThe scale of the evolving network is also documented by MISO. Its November 4, 2025\nEPR results identify a 1,000-MW load at the planned Elkhorn substation (P50737) and a\n400-MW load at Yoshi (P50738), with proposed 345-kV connections involving\nLumberjack, the Odyssey-Montgomery corridor, and Scarlet. MISO's Elkhorn study"},{"page":5,"startToken":1022,"endToken":1291,"text":"Docket No. ER27-25-000\n5\nidentified two corrective-action projects, including P51113, a $5 million Baseline\nReliability Project proposal to upgrade Montgomery 345-kV terminal equipment to 4,000\namperes following identified thermal observations. MISO recommended advancement\ninto MTEP26 Appendix A. This is evidence of studied mitigation needs, not proof that\nthese facilities are built or that the proposed projects have been granted final approval.\n[8]\nAmeren Missouri's October 19, 2026 Crossroads Connector announcement identifies a\nfurther approximately 22 miles of proposed double-circuit 345-kV transmission in\nWarren and Montgomery counties. Phase 1 would link Lumberjack to the\nMontgomery-Callaway corridor; Phase 2 would link a new Float substation west of\nWarrenton with the Nightingale and Lumberjack substations. Ameren expressly\ndescribes the project as intended to meet anticipated nearby data-center demand. Ameren\nsays those customers pay direct interconnection costs up front and that it will seek future\nMissouri PSC approval for rates covering the remaining Crossroads costs. Those are\nAmeren's representations and proposed future rate treatment, not a final determination\nthat all project costs have been recovered or assigned. [9]\nTogether, these official records establish an expanding set of major load additions,\nplanned transmission paths, and at least one specifically identified load-study corrective\naction. Their relevance here is methodological: MISO should explain how LARS\npreserves consistent cumulative assumptions across EPR, DPP, and MTEP, distinguishes\nexisting or generation-driven facilities from incremental large-load-driven costs, and\nretains the evidence needed to attribute later upgrades appropriately. I do not claim that\nthe named Missouri projects are LARS applicants, that all planned lines form a\ncompleted operational loop, or that every shared transmission improvement was caused\nby data centers."},{"page":6,"startToken":1291,"endToken":1489,"text":"Docket No. ER27-25-000\n6\nV. THE SEPARATE COST-RECOVERY FRAMEWORK SHOULD NOT LEAVE\nA GAP\nMISO's transmittal letter anticipates a further Section 205 filing concerning pro forma\nlarge-load cost-recovery protections by November 16, 2026. MISO states that LARS can\nbe implemented under the present proposal without awaiting those later tariff protections.\nThe proposal also addresses the availability of later Affected System study results.\nTransmittal Letter at 14 n.66; Attachment X § 3.12.4. [1] An anticipated future filing\ncannot itself establish enforceable obligations in this docket.\nMISO should explain whether the proposed withdrawal and assigned-project obligations\nextend to constraints and upgrades caused by study overallocation but identified only\nthrough a later MTEP cycle; which transmission customer or generator bears such\nobligations; when financial security becomes binding; and how state retail charges and\nfederal transmission recovery will be reconciled to avoid duplicate collections and\nfinancial gaps.\nMissouri PSC File No. ET-2025-0184 contains an approved Ameren Missouri large-load\nrate plan. [7] That retail tariff does not by its existence prove that every shared, federally\njurisdictional MISO transmission obligation is secured from the ultimate large-load\ncustomer. This concern parallels FERC's preliminary findings on transparency and\nlarge-load cost-recovery agreements in EL26-70-000. [2]"},{"page":7,"startToken":1489,"endToken":1690,"text":"Docket No. ER27-25-000\n7\nVI. REQUESTED COMMISSION ACTION\nI respectfully request that the Commission: (1) require MISO to substantiate its\nassessment that the risk of LARS/DPP transmission-capacity overallocation is minimal\nand explain who would bear resulting MTEP costs; (2) require an explanation of how\nLARS models previously reviewed EPR loads and planned network changes affecting\nshared facilities, and a transparent basis for identifying and allocating later-discovered\nupgrades, including projects classified as BRP or Other; (3) explain the binding effect\nand timing of any cost-recovery security, the treatment of later Affected System\nobligations, and credits needed to avoid double recovery; and (4) require an adequate\nexplanation or appropriate tariff changes before accepting the proposal without\nconditions, or take such other action as permitted under Section 205 of the Federal Power\nAct.\nThis protest does not ask FERC to reassign the entire cost of any named Missouri\ntransmission facility to a data-center developer or to determine Missouri retail rates. It\nasks for an adequately supported, reviewable federal study and cost-responsibility\nprocess.\nRespectfully submitted,\n/s/ Anna Farrar\nAnna Farrar\nIndividual Protestant, appearing pro se\nP.O. Box 161\nWarrenton, MO 63383\nEmail for service: anna.farrar@wccrd.com\nTelephone: 636-235-6889\nOctober 23, 2026"},{"page":8,"startToken":1690,"endToken":1965,"text":"Docket No. ER27-25-000\n8\nAUTHORITIES AND PRIMARY RECORDS\n[1] MISO, Large Load Addition Resource Study (LARS) Section 205 Tariff Filing, Docket\nER27-25-000, Oct. 2, 2026, Accession No. 20261002-5074, Transmittal Letter at 12-14, proposed\nclean Attachment X §§ 3.12.4, 3.12.6, 3.12.7.4 and Prepared Direct Testimony of Christina Drake at\n33. FERC official filing record; MISO filing PDF.\n[2] FERC, Order Instituting Proceeding Under Section 206 of the Federal Power Act, Docket\nEL26-70-000, 195 FERC ¶ 61,212 (June 18, 2026), especially ¶¶ 71-83 (preliminary findings on\ntransparency and cost shifting). Official order PDF.\n[3] MISO, New Rootbeer 345 kV Load Addition, Project P50616, CTSTF presentation, Apr. 7, 2025,\nslides 2-4. Primary MISO presentation.\n[4] MISO, AmerenMO Montgomery 161 kV Substation Load Addition, Project P50086, CSPM\npresentation, Feb. 5, 2024, slides 2-5. Primary MISO presentation.\n[5] Missouri PSC, File EA-2026-0058, Justin D. Wenk, Direct Testimony (Nov. 10, 2025), printed pp.\n2, 4 (PDF pp. 4, 6). Official PSC testimony.\n[6] Missouri PSC, File EA-2025-0238, Steven M. Wills, Surrebuttal Testimony (Jan. 16, 2026),\nprinted pp. 15-16, and Schedule SMW-S1, original Sheet 88. Official PSC testimony and agreement\nexcerpt.\n[7] Missouri PSC, File ET-2025-0184, Order Regarding Ameren Missouri's Request for Approval of a\nLarge Load Rate Plan and Associated Variance (Nov. 24, 2025; effective Dec. 4, 2025). Official\ndocket.\n[8] MISO, Expedited Project Review Results and MISO Recommendation (Nov. 4, 2025), slides\n20-23 and 25-26 (P50737, P51113, P50738). MISO EPR results, official PDF.\n[9] Ameren Missouri, Ameren Missouri to Host Open Houses for Transmission Project in\nMontgomery and Warren Counties (Oct. 19, 2026), Crossroads Connector description, phases, and\nstated proposed cost-recovery treatment. Ameren official release."},{"page":9,"startToken":1965,"endToken":2089,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nMidcontinent Independent System Operator, Inc.\nDocket No. ER27-25-000\nCERTIFICATE OF SERVICE\nI hereby certify that on October 23, 2026, I served a copy of the foregoing Protest\nof Anna Farrar in Docket No. ER27-25-000 upon each person designated on the\nofficial email service list compiled by the Secretary of the Federal Energy\nRegulatory Commission for this proceeding. Service was made by electronic mail,\nin three separate batches, to all 120 unique email addresses included in the service\nlist downloaded for this proceeding.\nDated October 23, 2026.\n/s/ Anna Farrar\nAnna Farrar\nIndividual Protestant, appearing pro se\nP.O. Box 161\nWarrenton, MO 63383\nEmail: anna.farrar@wccrd.com\nTelephone: 636-235-6889\nDocket No. ER27-25-000\n9"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1149,"startToken":0,"endToken":160},{"p":1,"at":1149,"title":"I. THE PROPOSAL INCLUDES MEANINGFUL SAFEGUARDS","method":"printed heading","endPage":2,"endAt":505,"startToken":160,"endToken":310},{"p":2,"at":505,"title":"II. MISO IDENTIFIES A DISTINCT RISK FROM OVERLAPPING STUDIES","method":"printed heading","endPage":3,"endAt":473,"startToken":310,"endToken":597},{"p":3,"at":473,"title":"III. PROJECT CLASSIFICATION IS NOT THE SAME AS VERIFIED COST","method":"printed heading","endPage":4,"endAt":25,"startToken":597,"endToken":739},{"p":4,"at":25,"title":"IV. MISSOURI RECORDS SHOW MULTIPLE LARGE-LOAD STUDIES AND","method":"printed heading","endPage":6,"endAt":25,"startToken":739,"endToken":1295},{"p":6,"at":25,"title":"V. THE SEPARATE COST-RECOVERY FRAMEWORK SHOULD NOT LEAVE","method":"printed heading","endPage":7,"endAt":25,"startToken":1295,"endToken":1493},{"p":7,"at":25,"title":"VI. REQUESTED COMMISSION ACTION","method":"printed heading","endPage":9,"endAt":143,"startToken":1493,"endToken":1983},{"p":9,"at":143,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":806,"startToken":1983,"endToken":2089}]}