{"document":{"slug":"rec-20261023-5183","title":"Motion to Intervene and Comments of Data Center Coalition on Midcontinent Independent System Operator, Inc.’s proposal to establish the Large Load…","issued":"2026-10-23","accession":"20261023-5183","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Data Center Coalition","kind":"comments","file":"sources/filings/text/20261023-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5183","tier":"record","sha256":"1207250253bc43cbe6e72d22a266793edbfce843d9ed09747af755720d4ac00e","pages":10,"tokens":2249,"emptyPages":[],"textThemes":["study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":291,"text":"1 \n \nUNITED STATES OF AMERICA  \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \n    ) \nMidcontinent Independent System   \n    )                               Docket No. ER27-25-000 \nOperator, Inc.  \n                                        )   \n \nMOTION TO INTERVENE   \nAND COMMENTS OF THE DATA CENTER COALITION \n \nPursuant to Rules 211, 212, and 214 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“FERC” or the “Commission”)1 and the Commission’s October \n2, 2026 Combined Notice of Filings #1,2 the Data Center Coalition (“DCC”) hereby moves to \nintervene and submits these comments on Midcontinent Independent System Operator, Inc.’s \n(“MISO”) proposal to establish the Large Load Additional Resource Study (LARS) framework3 \nI. \nINTRODUCTION  \nDCC is the membership organization for the U.S. data center industry, representing \nleading data center owners and operators that develop, operate, and maintain data center \ninfrastructure and teams across the country.4 DCC members operate data centers that constitute \nsignificant loads within the MISO region and DCC has been an active stakeholder in regional \nefforts to ensure reliability, enable new generation, and discipline load forecasts. DCC and its \nmembers have been at the forefront of efforts to advance reforms to accommodate the growth of \n \n1 118 C.F.R. §§ 385.212 and 385.214. \n2 Midcontinent Independent System Operator, Inc., et al., Docket No. ER27-25-000 et al., Combined \nNotice of Filings #1 (Oct, 2, 2026). \n3 Midcontinent Independent System Operator, Inc., Docket No. ER27-25-000, Proposal of Midcontinent \nIndependent System Operator, Inc. to Establish the Large Load Resource Addition Study (Oct. 2, 2026) (“Filing”).   \n4 The DCC is a membership organization of leading data center owners and operators. Public testimony and \nwritten comments submitted by DCC do not necessarily reflect the views of each individual DCC member. A list of \ncurrent DCC members is accessible at https://www.datacentercoalition.org/members."},{"page":2,"startToken":291,"endToken":562,"text":"2 \n \nlarge loads within the MISO region while maintaining reliability and protecting existing retail \ncustomers.  \nAs the industry unlocks unprecedented economic opportunities across the country and in \nthe MISO region, supporting affordability is a foundational priority for DCC members and the \ncommunities they serve. DCC advocates for grid reforms that minimize unnecessary cost \nburdens, align with cost causation principles, facilitate responsible load growth, support the \ndevelopment of new generation, and enhance grid resilience system-wide without imposing \nundue costs on existing ratepayers. DCC members are committed to supporting the generation \nand infrastructure additions required to serve their demand responsibly. \nDCC commends MISO’s proactive engagement with stakeholders and the data center \ncommunity to develop innovative study process reforms to facilitate the timely integration of \nlarge loads while maintaining system reliability and affordability. DCC member facilities depend \nupon reliable and cost-effective electricity service, and DCC shares MISO’s objective of \nensuring that the interconnection and operation of large load customers does not adversely affect \nreliability, system operations, or other transmission customers. Accordingly, DCC supports \nMISO’s proposed LARS framework for the expedited, coordinated study of certain generation-\nload pairs as a pragmatic new pathway to “facilitate the cost effective, timely and reliable \nintegration of new large loads into the system”5 by allowing large loads to support both the \ngeneration as well as infrastructure additions required to serve their demand while also \naddressing Commission directives in its June 18, 2026 Order to Show Cause.6 \n \n5 Filing, Transmittal Letter at 2. \n6 Midcontinent Independent System Operator, Inc., Order Instituting Proceeding Under Section 206 of the \nFederal Power Act, 195 FERC ¶ 61,212 (2026) (“Show Cause Order”)."},{"page":3,"startToken":562,"endToken":831,"text":"3 \n \nII. \nCOMMENTS IN SUPPORT \nA. LARS Modernizes Transmission Service and Generator Interconnection Study \nProcesses to Align with the Pace of Economic Growth \nDCC members are committed to supporting regional economic expansion as reliable grid \ncitizens, supporting reforms that facilitate responsible load growth and new generation \ndevelopment while protecting ratepayer affordability and system resilience. MISO projects \nannual load growth of 1% to 3% through 2044, driven by the expansion of energy-intensive \nindustries including data centers as well as advanced manufacturing.7 Meeting the unprecedented \ngrowth in MISO’s footprint responsibly and reliably requires a modernized approach to resource \nintegration and identification of grid upgrades and the LARS proposal embodies this necessary \nevolution. The LARS proposal provides a productive and targeted framework for studying \nqualifying large loads (200 MW or greater) alongside contractually paired new generation in the \nsame Local Resource Zone (“LRZ”) on an expedited 120-day cycle. By evaluating this group of \nload and generation pairs on a coordinated and concurrent basis, LARS offers a practical tool \nthat will bring essential supply online quickly to support MISO’s economic growth while \noptimizing network upgrades and protecting overall customer affordability. Such an approach is \ndirectly aligned with DCC’s objective of ensuring data centers and other large load customers \ntake appropriate responsibility for supporting the development of new generation and \ninfrastructure necessary to serve their demand.  \nFor generation and load that are contractually associated, the traditional approach of \ndisaggregated generation queue and transmission service study processes can result in inaccurate \nstudy results and unnecessary delays that fail to match the pace of economic growth and need for \n \n7 Filing, Transmittal Letter at 2."},{"page":4,"startToken":831,"endToken":1110,"text":"4 \n \nnew supply. Failing to reflect contractually associated generators when studying the provision of \ntransmission service for large loads can create an incomplete and inaccurate picture of grid \nconditions. This may lead to the identification of inefficient, unnecessary, or costly Network \nUpgrades that do not match actual grid impacts.  \nIn response to these challenges, MISO’s LARS framework provides a new pathway \noffering load customers new optionality to access a coordinated and expedited study pathway for \nthe discrete set of circumstances where eligible large loads have contractually associated \ngeneration located in the same LRZ. By studying this discrete set of load-generation pairs \nconcurrently under LARS, MISO will be able to produce a more realistic picture of the grid, \ncreating opportunities for MISO to potentially optimize Network Upgrades.  Additionally, the \nmore streamlined 120-day process proposed under the LARS framework can bring both needed \nsupply and demand online efficiently, aligning with the original federal objectives of the \nDepartment of Energy’s (DOE) Speed to Power Initiative to accelerate development timelines \nfor large-scale transmission and generation projects to meet rising electricity demand.8 \nB. LARS Supports Ratepayer Affordability By Facilitating New Generation, \nOptimizing Network Upgrades, and Isolating Network Upgrade Costs \n \nAs the industry unlocks unprecedented economic opportunities across the country and in \nthe MISO footprint, supporting affordability is a priority for DCC members and the communities \nthey serve. DCC acknowledges that bringing significant new large loads online without enabling \nsufficient new generation supply may exacerbate tight grid conditions and resource adequacy \nconcerns, putting upward pressure on prices or inappropriately shift costs to existing ratepayers. \n \n8 U.S. Department of Energy’s Speed to Power Initiative (Sept. 18, 2025). See also, Filing, Transmittal \nLetter at 2."},{"page":5,"startToken":1110,"endToken":1380,"text":"5 \n \nThe DCC will continue to champion reforms that enable data centers to bring their own \ngeneration capacity as a method to insulate existing ratepayers from the costs of serving demand \nfrom large load customers. The LARS framework is an example of such a reform. LARS can \nmitigate cost risks by creating the opportunity for MISO to explore optimized transmission \nsolutions, offering a pathway that encourages large loads to proactively identify and bring new \ngeneration supply to directly satisfy their new energy demands, and producing a more holistic \nview of Network Upgrades that can be appropriately allocated under future cost allocation \nreforms.  \nFirst, LARS supports affordability by allowing MISO to more accurately evaluate the \nimpact of both load and generation on the transmission system, allowing MISO to consider \noptimized configurations of Network Upgrades, potentially reducing unnecessary infrastructure \ninvestment and associated costs. Moreover, the LARS framework can help provide cost \ntransparency by isolating the Network Upgrades needed to support these discrete generation-load \npairs, which can better inform cost allocation methods. \nAdditionally, access to a coordinated and expedited 120-day study process creates an \nincentive for new large load customers to proactively contract with new generation supply, \nallowing large load customers to support the generation and infrastructure additions required to \nserve their demand responsibly. DCC welcomes MISO’s balanced approach of introducing new \npathways and optionality, without mandating that new large loads must bring their own \ngeneration. \nFinally, DCC also recognizes that the appropriate allocation of costs for transmission \nupgrades identified through LARS, and other transmission service study processes, remains an \nimportant issue to be addressed through MISO's ongoing stakeholder process. Any resulting cost"},{"page":6,"startToken":1380,"endToken":1643,"text":"6 \n \nallocation framework should reflect cost causation, recognize benefits to the broader \ntransmission system, and avoid inappropriate cost shifts to existing customers. In alignment with \nthese principles, DCC members proudly joined over 200 governors, utilities, electric \ncooperatives, and industry leaders in supporting the White House’s “Ratepayer Protection \nPledge.”9  \nIII. \nCONCERNS AND ROOM FOR IMPROVEMENT \nWhile DCC supports MISO’s LARS proposal as a productive framework that facilitates \nthe timely integration of large loads, DCC acknowledges outstanding concerns regarding access \nto the generator interconnection queue under this process. Under MISO’s proposed framework, \nall LARS applications must be submitted exclusively through the new “LARS Associated \nTransmission Customer,”10 typically the Load-Serving Entity (“LSE”). As a result, third-party \ngeneration owners cannot submit a LARS generator interconnection request directly to MISO \nand must instead route requests through the LSE, restricting their direct participation and ability \nto reap the benefits of the new expedited generator interconnection study under the LARS \nframework. \nWhile it is appropriate for LSEs with obligations to serve load to manage load-side \nrequests under LARS, requiring all supporting generation to route through an LSE for purposes \nof accessing a FERC-jurisdictional generator interconnection queue imposes unnecessary \nrestrictions. In MISO’s primarily vertically integrated footprint, establishing the LSE as the sole \nLARS application facilitator narrows the pool of supply that can gain access to expedited Large \n \n9 Ratepayer Protection Pledge, THE WHITE HOUSE, Proclamation No. 11014, 91 Fed. Reg. 11439 (Mar. \n4, 2026), https://www.whitehouse.gov/releases/2026/03/ratepayer-protection-pledge/. See also,  \n10 Filing, Transmittal Letter at P 7, see also id. at P 6 n. 23."},{"page":7,"startToken":1643,"endToken":1892,"text":"7 \n \nLoad Generation Interconnection Agreements (“LLGIAs”) to only those projects that are \neffectively approved by the LSE. In contrast, most FERC-jurisdictional queue processes, \nincluding MISO’s DPP and ERAS, allow all generators to directly submit interconnection \nrequests and execute interconnection agreements without LSE approval, aligned with FERC’s \nopen access principles. DCC clarifies that its concern strictly pertains to maximizing generator \naccess to expedited LLGIAs, while fully recognizing state jurisdictional authority over retail \nservice, including decisions regarding retail competition for generation.  \nIn response to these concerns, DCC supports approval of the proposed LARS framework, \nbut requests FERC encourage MISO to consider improvements for independent generator access, \nsuch as allowing third-party generators with demonstrated commercial pairings to submit LARS \ngenerator interconnect requests directly to MISO alongside the load application, or explore \nadditional transparency and evaluation metrics regarding LSE decisions on LARS application \nselection. Broad access will expand the pool of supply that has access to expedited LLGIAs, \nultimately supporting new demand.  \n \nFinally, following implementation experience with LARS, MISO could also consider \nadditional improvements to ensure program effectiveness, including whether greater flexibility in \nthe generation-to-load ratio and minimum generation project size would better support supply \ndiversification and resilience, as well as whether a more defined transition period could help \noperating LARS loads maintain transmission service while securing replacement generation if \nsuch instances arise. \nIV. \nMOTION TO INTERVENE   \nDCC respectfully moves to intervene in this proceeding. DCC is the membership \norganization for the U.S. data center industry, representing leading data center owners and"},{"page":8,"startToken":1892,"endToken":2136,"text":"8 \n \noperators that develop, operate, and maintain data center infrastructure and teams across the \ncountry. DCC members operate data centers that constitute significant loads within the MISO \nregion and have been at the forefront of efforts to advance reforms to accommodate the growth \nof large loads within the MISO region while maintaining reliability and protecting existing retail \ncustomers.  \nDCC’s member companies provide the essential digital infrastructure that underpins the \nmodern economy and supports critical public services, including cloud computing, artificial \nintelligence, emergency response systems, and public safety operations. From 2017 to 2023, the \ndata center industry contributed $3.5 trillion to U.S. GDP. DCC advocates for grid reforms that \nminimize unnecessary cost burdens, align with cost causation principles, facilitate responsible \nload growth, support the development of new generation, and enhance grid resilience system-\nwide without imposing undue costs on existing ratepayers.    \nFor the above reasons, DCC has a substantial interest in the outcome of this proceeding \nthat cannot be represented adequately by any other participant to this proceeding. DCC’s \nintervention is in the public interest and its motion for leave to intervene in this proceeding \nshould be granted.  \nV. \nCORRESPONDENCE AND COMMUNICATIONS  \nDCC requests that the following names be placed on the official service list for this \nproceeding by the Commission and that all correspondence and communications with respect to \nthis proceeding be addressed to the following: \nMorgan A. Sipple \nDirector, Energy Policy – FERC and RTOs \nDATA CENTER COALITION \n1250 H Street, NW"},{"page":9,"startToken":2136,"endToken":2196,"text":"9 \n \nWashington, DC  20005 \nmorgan@datacentercoalition.org  \n \nVI. \nCONCLUSION  \nFor the reasons set out above, DCC respectfully requests that the Commission issue an \norder consistent with these comments. \nRespectfully submitted, \n \n/s/ Morgan A. Sipple \nMorgan A. Sipple \nDirector, Energy Policy – FERC and RTOs \nDATA CENTER COALITION \n1250 H Street, NW \nWashington, DC  20005 \nmorgan@datacentercoalition.org  \n \nDated: October 23, 2026"},{"page":10,"startToken":2196,"endToken":2249,"text":"10 \n \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served a copy of the foregoing document on the persons \ndesignated on the official service list compiled by the Secretary in this proceeding. \n         Dated at Washington, D.C., this 23th day of October 2026. \n/s/ Morgan A. Sipple                         \nMorgan A. Sipple"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":771,"startToken":0,"endToken":98},{"p":1,"at":771,"title":"I. INTRODUCTION","method":"printed heading","endPage":3,"endAt":5,"startToken":98,"endToken":563},{"p":3,"at":5,"title":"II. COMMENTS IN SUPPORT","method":"printed heading","endPage":3,"endAt":31,"startToken":563,"endToken":567},{"p":3,"at":31,"title":"A. LARS Modernizes Transmission Service and Generator Interconnection Study","method":"printed heading","endPage":4,"endAt":1255,"startToken":567,"endToken":1009},{"p":4,"at":1255,"title":"B. LARS Supports Ratepayer Affordability By Facilitating New Generation,","method":"printed heading","endPage":6,"endAt":379,"startToken":1009,"endToken":1429},{"p":6,"at":379,"title":"III. CONCERNS AND ROOM FOR IMPROVEMENT","method":"printed heading","endPage":7,"endAt":1706,"startToken":1429,"endToken":1862},{"p":7,"at":1706,"title":"IV. MOTION TO INTERVENE","method":"printed heading","endPage":8,"endAt":1323,"startToken":1862,"endToken":2081},{"p":8,"at":1323,"title":"V. CORRESPONDENCE AND COMMUNICATIONS","method":"printed heading","endPage":9,"endAt":63,"startToken":2081,"endToken":2143},{"p":9,"at":63,"title":"VI. CONCLUSION","method":"printed heading","endPage":10,"endAt":6,"startToken":2143,"endToken":2197},{"p":10,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":341,"startToken":2197,"endToken":2249}]}